Embracing Competition
Stakeholder Engagement Workshop no. 29
12 September 2019
2
Housekeeping
Please take
time to give
feedback
Toilets Fire exitsPlease put
phones on
silent
Votes & Asking Questions
Step 1 Step 2 Step 3 Step 4
Connect to
WiFiGo to
slido.com
Join with our
event
Code: #7883
Vote on
test
poll
questions
Votes & Asking Questions – Test
13/09/2019 5513/09/2019 5
Mark AdolphusDirector of Connections
6
Agenda
09:30 – 10:00 Coffee and registration
10:00 – 10:05 Housekeeping and agenda
10:05 – 10:10 Welcome and opening remarks
10:10 – 10:15 Recap from last workshop
10:15 – 10:35 Service Development Plan (ICE) - Initiatives completed and underway
10:35 –11:00 Presentation on Electric Vehicles / Q&A
11:00 – 11:30 Consents Overview
11:30 – 11:40 Coffee and comfort break
11:40 – 12:00 Transitioning from DNO to DSO
12:00 – 12:15 Access to Records
12:15 – 12:40 Operational Activity Volumes
12:40 – 12:55 Breakout session
12:55 – 13:00 Closing Remarks and Feedback
13.00 – 13:30 Lunch and networking
Recap: 12 Feb 2019 Workshop
You said / asked We did
You asked us to open up the Small Service
Self Service tool to enable IDNO
connections
We have included this in our 2019/20
Service Development plan
Improve the turnaround and validation of
quotes
We have committed to review the process
for extending the quote validity in our
2019/20 Service Development plan
Run a workshop to cover using Netmap We held this workshop on 01 August
A further session on Electric Vehicles We’ve included a session on this today
7
Customer Satisfaction Engagement Score 91%
Welcoming Shaun DeSena and Chris Wonfor
8
Chris Wonfor has replaced Martyn Crocker as CiC Operations Manager. “Having worked as a designer for xx years, I now manage the team
who work with the ICPs and a number of internal departments to book
in the final connections and complete projects by making sure
everything is in check before closing them down. I am looking forward
to working with the team, supporting ICPs on a day to day basis with
their activities and leading the resolution of operational issues or
requirement for remedial works.”
Shaun DeSena has replaced James Cooper as CIC Design Manager
“Beginning my career a decade ago with an ICP, I have worked as a
Designer / Senior Designer and more recently a Project Manager in the
UK Power Networks Major Connections Team. I now manage the team of
Designers who look after all CiC Enquiries; Application and Designs, in
South LPN and SPN. I’m excited to also have the opportunity to develop
existing initiatives and create new ideas that the UK Power Networks
CiC Team and ICPs will both benefit from”
Antony WhiteStakeholder Engagement &
Account Manager
Service Development Plan 2018 / 19
Looking Back / Looking forward report 2018/19
• The Looking Back/Forward report was submitted to Ofgem at the end of May
and is available on our website to view here
• In it, we detail how we developed and delivered our plans for 2018/19 (‘Looking Back’) and how we developed our plan for 2019/20 (‘Looking Forward’).
10
11
Ofgem Consultation 2018/19
• Ofgem issued a consultation seeking stakeholder feedback in late June
• At the end of July - Ofgem shared non-confidential responses with network companies
• In August, DNOs submitted their responses to Ofgem
• Ofgem now have to decide if we have involved you enough in our planning and delivered on our commitments and then decide if a financial penalty will be applied to DNOs
• We received 10 responses to the consultation - 1 Nil score, 1 not satisfied, 2 satisfied, 6 very satisfied. – See next slide
11
Ofgem Consultation responses - 2018/19
12
Antony WhiteStakeholder Engagement &
Account Manager
Service Development Plan 2019 / 20
14
Service Development Workplan 2019/20
• Through 6 months of collaboration with stakeholders, we published our
2019/20 Service Development Workplan at the end of April. The plan can
be viewed here
• We included 4 initiatives that are specific to CIC and 10 more that apply to
the wider stakeholder group inclusive of CIC
See next slide
15
2019/20 CIC Initiatives Apr-Jun Jul - Aug Sept - Dec Jan - Mar
2019 2020
20.19 - Widen the Small Services Self Service tool/scope to enable IDNO Connections
21.19 - Assess the feasibility to extend the scope of ECS 02 0067 to permit
service transfers on LV Steel Wire Armoured (SWA) Cables
22.19 - Enable IDNOs to undertake the bi-lateral technical statement themselves
23.19 - Review the procurement process for Operational Locks
COMPLETE
COMPLETE
COMPLETE
IN
PROGRESS
09.19 - Deliver Targeted EV Workshops
11.19 - Develop and publish an LV heat map for EV’s
10.19 - Introduce an ‘Ask the expert’ service for EV customers
13.19 - Hold subject specific workshops
14.19 - Review the process for extending quote validity
16.19 - Develop a guide on the process for undertaking EHV cable diversions
17.19 - Develop a guide of how to enhance security of supply
18.19 - Develop a process for the refund/reuse of plant used for Temporary Builders
Supplies
28.19 - Develop Factsheets to support new customers looking to use the UK Power
Networks heat maps, DG Mapping Tool and Piclo Flex platform
29.19 - Develop Factsheets to support new customers looking to use the UK Power
Networks heat maps, DG Mapping Tool and Piclo Flex platform
IN
PROGRESS
IN
PROGRESS
IN
PROGRESS
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
IN
PROGRESS
IN
PROGRESS
16
Service Development Workplan 2019/20 – Quarter 1
• Quarter 1 Update April – June 2019 was published at the end of July and can be viewed here
• 8 of those initiatives are already complete, inclusive of those that apply to the wider stakeholder group.
• See the following slides which give detail for each initiative
16
1717
Initiatives Complete (CIC)
Complete
Complete
Assess the feasibility to extend the scope of ECS
02 0067 to permit service transfers on LV Steel
Wire Armoured (SWA) Cables – July 2019
21.19
17
22.19
Complete
Complete
Enable IDNOs to undertake the bi-lateral
technical statement
themselves - June 2019
18
Complete
Complete
Complete
23.19
Review the procurement process for
Operational Locks – June 2019
Through a series of internal
meetings, discussion with ICPs and
our suppliers, we have reviewed the
current process in place for an ICP
to obtain operational locks, and can
confirm that we are now in further
dialogue with our suppliers to
evaluate if direct access to the
supplier, by an ICP, can be achieved.
Initiatives Complete (CIC)
1919
Introduce an ‘Ask the expert’ service for EV
customers – April 2019
Did you know that UK Power Networks offer
an EV Ask the Expert Service for all pre-
application enquiries. If you would like to
ask us a question,
Email us,
Book a face-to-face meeting,
10.19
Initiatives Complete
Complete
Develop and publish an LV heat map for Ev’s –
June 2019
To find further information on the visibility of
available electricity network capacity for the
connection of Electric Vehicle charge points,
please click on the following link, which will
open the LV electric vehicle heat map Here
Complete
11.19
Hold subject specific workshops
- From June 2019
Initiatives Complete
20
• Attended: 20
• Customer
satisfaction
• Score:91%
13.19 16.19Develop a guide on the process for
undertaking EHV cable diversions
- July 2019
CompleteUsing NetMAP 01
August (AM/PM)
2121
17.19
Initiatives Complete
Complete
Develop a guide of how to enhance security
of supply – July 2019
9.19
Deliver targeted EV workshops -
From September 2019
• 5 July – Delivered jointly
with SSE
• 23 July – Delivered to Local
Authorities
• Further workshops TBC
Complete
2222
Initiatives Underway
Complete
Complete
Review the process for extending quote
validity – September 2019
So far:
• We met with subject matter
experts across our business to
identify improvement areas
• A draft approach process / approach
is under review
Next Steps:
• Finalise &
publish outcome
14.19 18.19Develop a process for the refund/reuse of
plant used for temporary builders
supplies – December 2019
So far we have:
Identified circumstances where
the refund/reuse of plant used for
temporary builders supplies may be
applicable (incl review feedback
received in 2018)
Next Steps:
Discuss potential solutions with UK
Power Networks’ representatives
(Operations, Supply Chain, Standards,
Connections & Regulation)
Draft proposal/ process
2323
Initiatives Underway
Complete
Complete
20.19
Widen the Small Services Self
Service tool/scope to enable
IDNO connections - December 2019
So far we have:
Held internal meetings to develop the
process
Next Steps:
Consult with IDNOs to capture
feedback and agree actions
to improve process
28.19
Develop Factsheets to support customers looking to use
the UK Power Networks heat maps, DG Mapping Tool and
Piclo Flex platform - From September 2019
So far we have:
Revisited customer feedback referencing requirement for
this initiative and the factsheet is in development
Next Steps:
Seek further customer feedback if required and develop a
fact sheet
24
Provide customers with more choice and flexibility over the services they receive
24 24
Carry out a review of ICP part funded reinforcement activity
including previous UKPN and other DNO pilots, to identify
learning points and optimum way forward
25.18
9 expressions
of interest to
date
25
Enhanced Service Provision
25 25
For 11kV/33kV schemes, Assess opportunities to extend the
current scope of contestability. Scenarios may include:
1: Upgrade and Relocation of existing 11kV sub-stations,
where the transformer is cost apportioned 2: Disconnection of
11kV IDNO sub-stations
38.18
Electric Vehicles – Neil Madgwick
DRIVING CHANGE
Facilitating the Uptake of EVs
28
Agenda
• New developments in the EV market
• Insights from our analysis of the market
• Using data to support our UKPN EV strategy & adapt our policies
• Using data to support our customer EV strategy
29
Industry consultations – New developments
Stage Time
Consultation Period Until 7 October 2019
Consultation Analysis and Policy Development Autumn 2019
Building Regulations laid in Parliament Winter 2019
Transposition By March 2020
Every new dwelling or building undergoing material change
of use to create a new dwelling to have a chargepoint.
Minimum rated output of 7kW power
Universal socket (Untethered)
Mode 3 or equivalent
Compliance with forthcoming smart
functionality regulations
30
Industry consultations – Smart charging
Government's overall aim for smart charging is to maximise the
use of smart charging technologies to benefit both consumers
and the electricity system, whilst supporting the transition to EVs.
Aim:
• encourage consumer uptake and innovation
• Use coordination and regulation to ensure market
does not evolve to have negative consequences for
grid protection and consumer protection
The consultation: 15 July 2019 until 7 October 2019
https://www.gov.uk/dft#consultations
31
Insights from our analysis of the market
Once every
3 weeks
Users with access to home
charging use rapid public
charge points
32
Who is charging where?
62%
19%
6%
8%
4%
At Work
At Home
Off-street
Destination
En-Route
Today
At Home
On-street
72k
38%
22%
22%
8%
9%
At Work
At Home
Off-street
Destination
En-Route
At Home
On-street
2025
3.6m
33
Informing UKPN strategy – charging hotspots
London EV energy demand in
2025 in the BAU scenarioSecondary substation transformer
reinforcement projections by 2025
34
Informing Local Authority EV Planning Strategy
0
100,000
200,000
300,000
400,000
2020 2025 2030 2035 2040 2045 2050
Plug-in Hybrids
East Sussex EV Scenarios
0
100,000
200,000
300,000
400,000
2020 2025 2030 2035 2040 2045 2050
Low
East Sussex EV Uptake
35
Informing Local Authority EV Planning Strategy
Public charger penetration
< 1,000
1,000 – 2,000
2,000 – 3,000
> 4,000
3,000 – 4,000
Number of EVs
East Sussex EV Uptake in 2030
36
Availability of electrical infrastructure
Substation EV heat map Capacity in the capital
Industrial Park, Lewes, East Sussex Signposting positions for rapids
serving 200 town centres
https://dgmap.ukpowernetworks.co.uk/site/?q=ev_ext
37
Using data to adapt our policies –
Diversity for new developments
Number of EVCPs
connecting to the asset
Slow
(<6.6kW)
Fast (>6.6kW,
<22kW)
1 to 14 0.5 0.5
15-19 0.5 0.47
20-29 0.5 0.41
30-39 0.5 0.33
40-49 0.48 0.33
50-69 0.46 0.30
70-99 0.42 0.28
100-139 0.4 0.25
140-274 0.35 0.22
>274 0.31 0.22
38
Educating new stakeholder groups
Level 2
Level1
Charger
Pillar
SWA
UKPN do
not install
supplies
to upper
levels
39
In summary
• Robust and up to date data is key to ensuring that we can
successfully deliver our EV strategy
• We have a detailed EV forecast which is constantly being refined
with new data sets
• We are using our forecasts to determine how and where we invest
in new infrastructure & to refine our policies
• We are helping educate customers about where and how to
connect EV infrastructure
CIC Consents Overview -
Noel Jemma
4141 19
Consent Overview – YTD 2019
0
20
40
60
80
100
120
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
ICP Avg. Working Day Tracker 2019
ICP Actual ICP 2018 ICP Average Target 60 w/days Stretch 55 w/days
4242 19
Consent Overview – Key Points for ICP
• Ensure full agreement of Heads of Terms – Do not cut corners
• Prepare legal plans in accordance with ICP Consents Policy
requirements
• UKPN Solicitors will issue standard documentation to landowner’s
lawyers, which mirror the HoT’s
4343 19
Consent Overview – Key Points for ICP
4444 19
Consent Overview - Visibility
ICP Consents Process (Legal)
UKPN
Des
ign/D
elive
ry
Team
ICP
UKPN
P&C
Refer to Consent Matrix
Is a freehold/leasehold acquisition
or easement required?
Refer to ICP Consents Process
(Wayleave)
Agree UKPN Heads of Terms with
landowner and prepare Legal Plan
Submit Legal Instruction Form, Heads of Terms and Legal and Design Plan to
UKPN P&C Team using mailbox [email protected] (to include job number and any Land
Registry searches/documentation and Highway searches)
Approve application?
Instruct UKPN Solicitor
(advise ICP)
UKPN Solicitor negotiates draft
documentation with landowner solicitor.Feedback any issues
to the ICP
Documentation agreed?
Proceed to completion
Refer to P&C for instruction
UKPN agree to amendment?
P&C confirm completion to UKPN Designer, Delivery
and ICP
Y
N
Y
N
Y
N
Following Design Acceptance, Designer
issues UKPN Instruction Form to
P&C
Add to Job Database
Check for payment on database?
STARTPayment/Acceptance
of job
Check that legal plan matches as-laid
drawings
ENDRelease for
Energisation
Deed of Variation required
YN
Y
N
Y
N
ICP and P&C review outstanding points
with landowner
Is documentation
now agreed?Y
N
4545 19
Consent Overview - Visibility
• Check HoT’s and Legal Plan are in acceptable form
• Instruct Solicitors to progress legal formalities
• Solicitors will check landowner’s title, carry out Land Registry searches
and prepare draft documentation
• Draft documentation may be passed back and forth between lawyers
several times, proposing amendments and counter-amendments
46
Consent Overview - Visibility
46 19
• P&C Team will agree acceptable amendments to the documentation.
Otherwise, the ICP may be drawn back into the conversation to settle
any issues with the landowner
• Complete documentation and deal with registration formalities
• Confirm completion to ICP and UKPN Delivery Team
4747 19
Consent Overview - Visibility
Updates are available throughout the transaction by contacting:
• [email protected] mailbox
• UKPN’s lawyers direct
• or should we consider the re-introduction of self-serve updates through
UKPN’s Solicitors on-line portals
48
4913/09/2019 4949
A Smarter Energy Future
“DNO to DSO”
50
The UK Energy mix is changing
50
1% 12%
20%
3%
4%
6%
6%
16%
24%
10%
10%
4%
29%
14%
36%31%
24%
14% 14%21%
0%
20%
40%
60%
80%
100%
2011 2016 2025Solar Storage Wind Nuclear
GB installed generation capacity by type
86%
14%
2011 - % of generation connected
Transmission Distribution
60%
40%
2025 - % of generation connected
Transmission Distribution
Source: 2017 National Grid Future Energy Scenarios
51
May 2019 - 1 week
without coal generation
The impact of these changes are being felt now
Carbon emissions
in electricity down
50% on 2012
The Capacity of Renewable Energy
(41.9GW) overtakes that of fossil
fuels (41.2GW) for the first time
Twilight for coal: Rugeley power station in Staffordshire, which is now being demolished. Photograph:
Northern Nights Photography / Alamy Stock Photo
Britain has gone a week without using coal to generate
electricity for the first time since Queen Victoria was on the
throne, in a landmark moment in the transition away from the
heavily polluting fuel
The Guardian 8 May 2019
UK sets new wind power
record as turbines
deliver 14 gigawatts for
first time – 37 per cent
of nation's electricity
52
Centralised- few large Generators
Predominantly fossil fuel based
One way power flows
Predictable - Planned
Customers consume only
Flexibility from large generators
Decentralised (Thousands of distributed generators)
Hybrid – Vast volumes of renewables
Bi-directional power and information flows
Intermittent – Actively Managed
Customers self-produce, consume and trade
Flexibility from Demand, Storage and generation
The changing energy landscape
“Traditional”
“Emerging”
53
What is driving the change?
53
Transition to a low
carbon economy
• Mandated carbon
budgets
• Air quality regulations
• Vehicle emission
standards
Technology revolution
• Rapid cost reduction in
renewable tech
• Digitisation
• Connected homes
• Electric Vehicles
• Block chain technology
• Machine learning
• Population
growth/urbanisation
• ‘Local is best’
• Affordability
• Increasing expectations -
choice, transparency, value
Societal changesChanging regulatory
environment
• Outputs focused
• Promoting innovation and
competition
• Reducing Energy costs
7
Electrification of Heat
300 non-domestic installations
under the RHI &
~6000 residential RHI domestic
installs on our ntwk
Electric Vehicles
65,000 plug-in EV in UKPN, 22%
YoY growth
c3.6m EVs forecasted by end of
ED2
Distributed
Generation
9.1GW of
Distributed
generation
Over 160,000
distribution
connected
generators
Doubling of
capacity by end of
ED2
2.1GW accepted offers
215MW connected
storage
15 Grid scale batteries
connected to our
networks
2GW – 4GW of
installed capacity by
2028
The Future Is Now!
Electricity
Storage
We are currently updating our forecasts (Distribution Energy Scenarios). These will be available at the end of the year to
be used as an input to FES 2020.
55
What could this look like in the next 10-15 years? Enabled by:
• Smart meters
• Distributed
Generation
• Storage
• Micro Grids
• Community
Energy and
peer-to-peer
• Electric
Vehicles
• Smart
appliances
• Market and
regulatory
reform
• Demand
flexibility
The UKPN world in 2030: Up to 4m EVs, 4GW of battery storage and 13GW of DG
56
Keeping
the lights
on
Providing
great
customer
service
Lowering
our costs
Support
whole
system
optimisation
Enabling
markets
Secure and reliable
supplies taking into
account two way
flows and greater
intermittency
Facilitating cheaper
and quicker
connections using
proven innovation
Optimising network
investment decisions
using alternative
flexible solutions
Collaborating with
the GB SO to deliver
‘whole system’
outcomes that are
best for customers
Enabling market
solutions for DER
to provide
flexibility to local
and wider system
Emergent DSO Full DSO
The changing role of distribution networks
57
Customers are shaping our DSO transition
Visit: FutureSmart.ukpowernetworks.co.uk
Customers said
58
Our DSO Strategy – 5 key areas 2017-2019
Our plans are underpinned by strong stakeholder support
59
• An intelligent centralised software platform that will support those services and products
that require real-time monitoring and control of DER.
Cover all voltage levels
Cover all three UKPN licenced regions
Integrating innovative technologies and commercial arrangements
Solution characteristics
Distributed Energy Resource Management
Constraint Management
Network asset monitoring and network optimisation
Operational forecasting and offline simulation
Commercial and market capabilities
Key capabilities
WHAT: Strategy to Action: ‘Rollout ANM’
60
WHAT: Strategy to Action: ‘LV Visibility & Control’
5,384 distribution substations
strategically targeted for LV
Monitoring based, where key
indicators point to high EV adoption
Live LV Network Diagram developed
that will visualise the collected data
and allow control of the networkToday ED1
Supporting our Transition to DSO ( ) and EV Readiness Strategy ( )
61
Distributed energy resources (DSR, generation, storage) that can increase generation
or reduce consumption in return for payment to support the local electricity network
New network capacityInvestment
trigger
WHAT: Strategy to Action: ‘Flexibility’
Visit:
PicloFlex.com
62
Our new approach provide tools that remove constraints to DER connections on the South East Coast in the short- to medium-term
Continued access to network capacity in the South East at lowest overall cost
Single stage connections process – no undue delays in application or connection
Investable proposition – no current financial exposure to transmission constraints.
Opportunity for additional revenues – participation in new markets
Secured Event
e.g.
Fault on
overhead line
WHAT: Regional Development Programmes
Coming Soon: DNO - DNO
63
Transforming the way that both local
Distribution Networks and national
Transmission Networks will operate
and work for customers.
Reducing cost for consumers through
more cost effective planning
Delivering Government policy set out in
the Ofgem and BEIS Smart Systems and
Flexibility Plan, the Government’s
Industrial Strategy and the Clean Growth
Plan
We are taking a ‘learn-by-doing’ approach; using innovation funding to trial and test
http://www.energynetworks.org/electricity/futures/open-networks-project/open-networks-project-overview/
WHAT: ENA Open Networks Project
Open Networks: 2018 Outputs
WS2:
Customer
Experience
WS1:
T-D
Processes
WS3:
DSO
Transition
WS4:
Charging
65
Open Networks – Collaboration is key
Advis
ory
Gro
up
Steering Group
Workstream
1a: Flexibility
Services
Workstream 1b:
Whole Electricity
System Planning
& T-D Data
Exchange
Workstream 2:
Customer
Information
Provision &
Connections
Workstream 3:
DSO Transition
Workstream 4:
Whole Energy
Systems
Workstream 5:
Comms &
Stakeholder
Engagement
ENFG
ENA BoardOfg
em
BEI
S
• More opportunities for
engagement: dissemination events,
workshops, forums and webinars,
along with ongoing engagement with
the Advisory Group
• Time to respond: Increased
standard consultation window to
eight weeks and restricted the
number of consultations to 4 per
year to focus on key priorities
• Improved transparency: Increased
social media activity, public events
and the frequency of the Open
Networks Project newsletter
• More access to Project materials:
Uploaded newly published project
materials on to the ENA website and
ensure regular contact
ENA Open Networks 2019 Workplan
6613/09/2019 66
Q&A
Antony WhiteStakeholder Engagement &
Account Manager
Available Resources [and how to access them]
68
UK Power Networks Engineering Standards, Technical Drawings and Specifications (& other useful information)
• Access the G81 website from
any browser / link from the
UK Power Networks website:
• https://g81.ukpowernetworks.
co.uk/
• Browse using search or by
category
• To download register
(verification step required)
• Subscribe to documents for
updates / bulletins
69
UK Power Networks Network Plans – Linesearch (option 1)
• Access network plans via the
linesearch website from any
browser / link from the UK
Power Networks website:
• https://www.linesearchbefore
udig.co.uk/
• Self registration & request
• Plans provided by email (or
email link) within minutes
70
UK Power Networks Network Plans – Remote Desktop Services (RDS) (option 2 [for ICP’s/IDNO’s)
• Access network plans via RDS
• Request access by contacting
• We need:
• Name
• Job Role
• Location
• Tele / email
• Instructions for access supplied with log in
details
• UK Power Networks Service desk for access issues: 020 3660 2010 (Option 1,
then Option3)
• Contact [email protected] for any subsequent
questions / support
71
Virtual Desktop Interface (VDI/PowerOn) • PowerOn - The Integrated Network Management and Control System used to manage
and control the distribution networks across EPN, SPN and LPN.
• Last year, we upgraded the portal that enables ICPs to remotely access our
PowerOn system to improve stability & speed.
• This was rolled out to all ICPs who requested it.
• Request access by contacting Chris Wonfor ([email protected]) We
will need:
• Name
• Job Role
• Location
• Tele / email
• See following slide to view a Field Diagram Example
72
Virtual Desktop Interface (VDI/PowerOn) - Field Diagram
73
Steve Rogers, Head of Competition in Connections
CIC Operational Activity
7474
Current CiC Initiatives
• Self Determination of POC
• Design Self Approval
• Self Certification of contestable works
• Self Connect
• Small Service Self Service offering
7575
Current PositionSelf Determination of POC for standard HV and LV jobs
Self Determination of POCLV
(Target 5 w/d)HV
(Target 10 w/d)
Same day 0 0
1-5 w/d taken 4 0
6-10 w/d taken 8 5
11-15 w/d taken 3 5
16-20 w/d taken 0 0
21+ w/d taken 0 0
Total 15 10
CoP Self Determination of POC’s Sep 18 – Aug 19
7676
Current PositionSelf Determination of POC using small service self service option
Count of SSSS & EV Chargers
Month Templates Accepted Connections
Sep-18 4 12
Oct-18 32 11
Nov-18 15 9
Dec-18 9 5
Jan-19 10 7
Feb-19 85 9
Mar-19 86 5
Apr-19 37 6
May-19 35 15
Jun-19 29 13
Jul-19 20 27
Aug-19 33 9
Total 647 216
7777
Current PositionSelf Design Approval
171
15020
38
186
17 6
Self Approval of Designs by ICPSep 18 - Aug 19
ICP 1
ICP 2
ICP 3
ICP 4
ICP 5
ICP 6
ICP 7
Applicant LV HV Total
ICP 1 69 102 171
ICP 2 60 90 150
ICP 3 18 2 20
ICP 4 11 27 38
ICP 5 83 103 186
ICP 6 3 14 17
ICP 6 5 1 16
Total 249 339 588
Self Design Approvals Sep 18 - Aug 19
7878
Current PositionSelf Inspection of contestable works
• LV trial completed during 2018 with one ICP (20 jobs self inspected by the ICP)
• HV trial started this year but only one job completed
• Roll out to more ICP’s during 2020 if there is interest
7979
Current PositionSelf Connect Activity
Jul 18 – Jun 19
LV 305
HV 195
Total 500
0
10
20
30
40
50
60
70
Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Self Connects - LV & HV Split
HV LV
Please note - data is updated to the end of previous month due to timing of updates
80
Other issues…….
• A couple of instances recently of work being undertaken on the network without a SORN in place
• An instance of the use of a contractor not onboardingcorrectly and not in possession of NERS passports
• An LV operational incident where the incorrect isolation of an LV circuit resulted in loss of supplies to customers
• Two instances of small power and lighting installation defects on IDNO substations
81
BREAKOUT SESSION
• From the 2019 / 20 CIC Initiatives list which has
been of greatest value to your business and
Why?
• Service Development Plan 2020 / 21 Looking
Ahead - What should we focus our efforts on?
• What Subject Specific Workshops would you like
us to cover next year?
Votes & Asking Questions
Step 1 Step 2 Step 3 Step 4
Connect to
WiFiGo to
slido.co
m
Join with our
event
Code: #7883
Vote on
test
poll
questions
83
Closing remarks
Thank you…