BART … and you’re there. Project Purpose Study Objectives Develop a phased implementation plan for improvements to modernize and accommodate the increasing number of riders at Embarcadero and Montgomery Stations. EMBARCADERO - MONTGOMERY CAPACITY PLAN & STATION MODERNIZATION 1 Understand the setting, concerns of stakeholders and BART riders, and the relationship of project elements and setting. Explore the viability of project elements: • New Side Platforms • Platform Screen Doors • Additional Elevator • Pedestrian Connection to Transbay Terminal • Direct BART-MUNI Transfer Identify implementation and phasing issues. 2 3 Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans. October 2015

Upload: others

Post on 11-Jul-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EMBARCADERO - MONTGOMERY CAPACITY PLAN & STATION …

BART … and you’re there.

Project Purpose

Study Objectives

Develop a phased implementation plan for improvements to modernize and accommodate the increasing number of riders at Embarcadero and Montgomery Stations.

EMBARCADERO - MONTGOMERY CAPACIT Y PLAN & STATION MODERNIZATION

1 Understand the setting, concerns of stakeholders and BART riders, and the relationship of project elements and setting.

Explore the viability of project elements:• New Side Platforms

• Platform Screen Doors

• Additional Elevator

• Pedestrian Connection to Transbay Terminal

• Direct BART-MUNI Transfer

Identify implementation and phasing issues.

2

3

Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.

October 2015

Page 2: EMBARCADERO - MONTGOMERY CAPACITY PLAN & STATION …

UNDERSTANDING THE EXISTING CONDITIONS & C APACIT Y CHALLENGES

Platforms get crowded during peak evening commute times.

BART’s two busiest stations are Embarcadero and Montgomery.

The number of BART riders has been steadily increasing and ridership growth is expected to continue.

Planning Context

The demand for BART during peak morning hours is forecast to continually increase. Above is a preview of the year 2025.

Long lines develop at stairs and escalators

during peak morning commute times.

UNIONSQUARE

UCSF - MISSIONBAY CAMPUS

CHINA BASIN

MISSIO

N CREEK

PIER 23

PIER 19

PIER 17

PIER 15

PIER 9

PIER 3

PIER 1

FERRY

BLDG

PIER 24

PIER 26

PIER 28

PIER 30

PIER 32

PIER 34

PIER 36

PIER 38

PIER 40

PIER 48

PIER 50

PIER 54

BAYBRID

GE

LOMBARD ST

STOC

KTON

ST

NUT ST

GREEN ST

COLUMBUS AVE

VALLEJO ST

UNION ST

GR

ANT AVE

PACIFIC AVE

ST

7TH ST

POST ST

6TH ST

MISSION ST

8TH ST

9TH ST

POW

ELL ST

TAYLOR

ST

MASO

N ST

ELLIS ST

POW

ELL ST

HOWARD ST

FOLSOM ST

TAYLOR

ST

HARRISON ST

BUSH ST

JON

ES ST

SACRAMENTO ST

MASO

N ST

10TH ST

9TH

15TH ST

ALAMEDA ST

DIVISION STDIVISION ST

FRO

NT ST

SANSO

ME ST

DAV

ISST

BATTERY ST

WASHINGTON ST

THEEM

BARCADERO

UNION ST

VALLEJO ST

BROADWAY

KE

AR

NY

ST

JACKSON ST

MO

NTG

OM

ERY ST

TELEGR

APH

H

IL L BLVD

MO

NTG

OM

ERY ST

FILBERT ST

GREENWICH ST

GR

ANT AVE

KING ST

MAIN ST

CLAY ST

POST ST

SPEAR STBEALE ST

DR

UM

M ST

STEUART ST

FREMONT ST

MISSION ST

MISSION ST

PINE ST

BATTERY ST

3RD ST

3RD ST

4TH ST

4TH ST

TOWNSEND ST

THE

EM

BAR

CAD

ERO

2ND ST

2ND ST

HOWARD ST

HOWARD ST

5TH ST

5TH ST

FOLSOM ST

FOLSOM ST

MARKET ST

MARKET ST

CALIFORNIA ST

HARRISON ST

SACRAMENTO ST

BEALE ST

BUSH ST

HARRISON ST

HARRISON ST

1ST ST

BRANNAN S

BRANNAN ST

BRYANT ST

BRYANT ST

UTHPARK

CLAY ST

GR

ANT AVE

MO

NTG

OM

ERY ST

BLUXOME ST

DAVIS

ST

NEW MONTGOMERY ST

6TH ST

FRO

NT ST

GEARY ST

OFARRELL ST

SUTTER ST

CALIFORNIA ST

KEARN

Y ST

SANSO

ME ST

BERRY ST

MISSION ROCK ST

TOWNSEND ST

TERRY

AFR

AN

BRANNAN ST

CHANNEL ST

KING ST

3RD

ST

KAN

RH

OD

E IS

LA

SA

N B

R

UCSF LN

VE

RM

ON

T ST

SOUTH ST

CAMPUS WAY

BRID

GE V

I EW

WA Y

7TH ST

8TH ST

8TH ST

DE

HA

RO

ST

CO

ISBLVD

OWENS ST

DIVISION ST

HOOPER ST

IRWIN

ST

HUBBELL ST

ST

7TH ST

3RD

STBRYANT ST

MAIN S

MAIN STT

FREMONT S

FREMONT STT

MISSIO

MISSIO

HOWARD SARD S

WARDS

AR

HOWARTT

FOLSOM S

FOLSOM S

FOFOFO

TTTT

BEALE ST

BEALE ST

1ST S1STT SS1ST ST STT

SPEAR S

SPEAR STT

HARRISON S

SISON S

ISO

HARRISO

TT

RD SRRD STT

MISSION S

MISSION STT

4TH ST4T4THTH S

4THTT

5THSS

5TH S

2ND S2N2N2N2ND STTTTT

NEW MONTGOMERY S

NEWNEWWW

MOTG

RYRY

MONTG

RY S

WNEW

TGTGOMERYTT

KING S

KING S

KING S

KING STTTT

BEALE S

BBEALE S

B

TT

SSTT

THE

EM

BAR

CAD

ERO

BRANNAN S

BRANNAN S

BBBRRRYYYAAAYYYYNNNTTT SSSTTTT

7TH S7TH STT

6TH SSS6TH SSTT

3RD S3R3R3R3RD STT

3RD S3RD STT

TOWNSEND S

TOWNSENDNDND STT

2ND S2ND STT

HOWARD S

OWARD S

HOW

TT

5TH SS5TH SSTT

FOLSOM S

FOLSOM STT

HARRISON SON S

HARHA

ON

HARRISONTT

SSTT

UUTTHHPPPAAAARRKK

7TH S7TH STT

8TH SS8TH SSTT

9TH SH

S9TH

SH

STT

HOWARD S

HOWARD STT

FOLSOM S

FOLSOM STT

HARRISON S

SON S

ARRISOSO

HARR

TT

10TH S

10TH STT

DDIV

7TH S7TH STT

BRYANT S

BRYANT STTT

HARRISON S

HARRISON STT

BRYANT S

BRYANT STT

SSTT

FOLSOM S

FOLSOM STT

99TTHH

15TH SS15TH STTTT

ONNN SSTTTTTTTTSSOOVIS NN SOSIOOVISION ST

TOWNSEND S

TOWNSEND STT

BRANNAN S

BRANNAN STT

CHANNEL S

CHANNEL STT

KING SG

S

KING STT

KKAAKKKNN

OD

E IS

LAO

DE

ISLA

RH

OR

HO

DE

ISLA

OR

HOO

SA

N B

RSS

AN

BR

SS T ST

SV

ER

MO

NV

ER

MO

NT S

NT

VE

RM

ONN

TTTT

8TH S8TH STT

8TH S8TH S8

TT

DE

HA

RO

SD

EH

AR

O S

DTT

DIVISION STSTON STDIVISSIOISION

HOOPER STR ST

HOOPER ST

HOOPER ST

IRWIN

ST

IRWIN

ST

HUBBELL ST

L ST

HUBBELL ST

HUBBELL ST

SSTT

7TH S7TH STT

BRYANT S

BRYANT STTTT

ALAMEDA SALAMEDA SSTTTT

DIVISI IOIOS ODIVISIO

ON

T SN

TS

FRO

FROO

NFR

OON

T SO

NTTT

DDAAVVAAAA

IISSSSTT

TTTHHHEEEEEEMMM

BBBAAARRRCCCAAADDDEEERRROOO

BROADWAYWAWAYBROADWWA

4THS

4THS

BEBBERRY SRRY S

BBERBERRY S

ERRRRY STTT

7TH SH

S7TH

TT

OWEN

OWEN

OWOOWE

5TH S5TH STT

BRANNAN S

BRANNAN STT

BLUXOME S

BLUXOME S

BLUXOME STTT6TH ST

6TH ST

TT

H SS7THH STH

7THTT

Transit Center District PlanRecent / Current Area Plans

Recent / Current Planning Studies

Active Redevelopment and Major DevelopmentTransbay Redevelopment Plan: Zone 1 (Transbay Downtown Residential)Transbay Redevelopment Plan: Zone 2 (Transbay C-3)Mission Bay North Redevelopment Plan

Mission Bay South Redevelopment Plan

Rincon Point / South Beach Redevelopment Plan

Treasure Island / Yerba Buena Island (not shown)

Rincon Hill Area Plan

East SoMa Area Plan

Central SoMa Area Plan

Western SoMa Community Plan

Showplace Square / Potrero Hill Area Plan

Mission Area Plan

Northeast Embarcadero Study

Railyard Alternatives and I-280 Boulevard Feasibility Study

Major planned development projects in the South of Market area are projected to bring additional ridership.

The Transbay Transit Center Project.

Land Use Context - San Francisco Planning Department - City and County of San Francisco

BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.

October 2015

Page 3: EMBARCADERO - MONTGOMERY CAPACITY PLAN & STATION …

YOU SPOKE, WE LISTENED!

BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.

AM AND PM IN-STATION EVENTS ON 10/28/2014

2,858 survey respondents

AM AND PM IN-STATION EVENTS ON 10/28/2014

2,042survey respondents

Word cloud created from words most mentioned in the 2,746 individually written comments received for both stations combined. (The bigger the word, more often it was mentioned).

GREAT IMPROVEMENT SUGGESTIONS!

THANK YOU for providing survey feedback!

All your comments and priorities were reviewed and considered in

the planning process.

Survey Results: Your Top Priorities for both stations Station Environment Station Access Capacity Improvements

Real-time train arrival displays at street and concourse levels (81%)Canopies to protect entrances(54%)Clearer public announcements (50%)

More cleaning (70%)More safety patrols/enforcement (47%)Additional or improved lighting (36%)

Additional platforms to relieve crowding (73%)Faster escalators (65%)Reducing clutter on platforms (56%)

How your feedback was considered in the Recommended Capacity + Modernization Plans:

Embarcadero Montgomery

• Improve station environment: > Cleanliness and brightening

• Better Information: > Better signage, more Real-time infor-mation on concourse and at street level

More frequent service, longer trains Will be implemented incrementally as new railcars are delivered to increase BART’s fleet size, and as a new train control system is in-stalled.

• Improve passenger flow during rush hours: > Additional street entrances, new stairs, escalators, elevators

• Improve elevator redundancy and reliability: > Larger, BART-dedicated elevator for existing platform and 2 elevators per side platform

• Reduce platform crowding: > Reorganization of platform elements to reduce clutter and create more space, new side platform

• Better space planning: > Expanded paid areas, free circulation between all entrances at concourse level, new retail/amenity space

BART• held 4 in-station public information events

during AM and PM commute times • handed out 15,000+ ‘postcards’ • received 4900 survey responses Cleanliness

RushhourRestrooms

FrequencyBroken

ReliabilityHomeless

Platform

ElevatorsLonger trainsDisplay

Flow Better signageAir conditioningBike parking

Better ventilation

Trash cans

Transbay Tube

October 2015

Page 4: EMBARCADERO - MONTGOMERY CAPACITY PLAN & STATION …

Embarcadero: elevator upgrades and more stairs

BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.

0-10 years

5-15 years

CAPACITY PHASING AND IMPLEMENTATION (as funding becomes available)Analysis and review of ways to improve capacity has resulted in a list of specific projects and a general timeframe for implementation pending funding. Next steps are integration with the station modernization effort and seeking funds.

Timeframe

10-20 years

BART General Engineering Services BART General Engineering Services Appendix A.1 2

Embarcadero StationNew Platform/Tunnel Longitudinal Section

(N) BART Platform

(N) Emergency Stair Shaft

(N) BART Platform Portals

(N) Stair/Escalator to BART Platform

(N) Elevator to BART Platform

New side platformsNew stairs, escalators, and elevators would also be added to access the new side platforms.

Platform screen doorsPlatform doors increase capacity and safety on very crowded station platforms.

Embarcadero east- and westbound

Montgomery eastbound only

Montgomery: new stairs and elevatorsA new elevator to the MUNI platform, additional stairs and escalators, replaced platform seating, to reduce platform crowding.

Early wins Real-time information, different seating and relocating the janitorial closet creates more platform space.

Creating better access and more flow: Construct more stairs next to existing escalators and add another platform elevator

• Relocate existing zigzag stairs to end of platform

• Construct new elevator for primary BART use

• Modify existing elevator for primary MUNI use

October 2015

Reduces platform crowding and

improves passenger flow

Page 5: EMBARCADERO - MONTGOMERY CAPACITY PLAN & STATION …

EMBARC ADERORECOMMENDED C APACIT Y IMPROVEMENTS

BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.

CO

NC

OU

RS

E

PLA

TFO

RM

COLOR LEGEND

0-10 YEARS

10-20 YEARS

Potential pedestrian tunnel toTransbay Transit Center

(underneath Beale Street)

Fremont Street

East Bay

Front Street Spear Street

See station cross-section below

Paid area

New or relocatedvertical circulation

Paid area

BART Muni Metro

Existing

New or relocated

Street access

Construct new stairs next to

existing escalators

Circulation

Early Wins

Platform Doors

Replace platform seatingand janitorial closet to

create more platform space

Install platform doors on existing platform

s

Embarcadero westbound

Embarcadero eastbound

Move stairway Construct new elevator and decking

Modify current elevatorfor primary Muni use

Move Stairs and Add New BART-only Elevator

October 2015

New Side Platforms with Platform Doors

Page 6: EMBARCADERO - MONTGOMERY CAPACITY PLAN & STATION …

MONTGOMERY RECOMMENDED C APACIT Y IMPROVEMENTS

BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.

CO

NC

OU

RS

E

Platform Screen Doors

PLA

TFO

RM

See station cross-section below

COLOR LEGEND

5-15 YEARS

10-20 YEARS

Construct new stairs and escalators

New elevator to Muni platform at west end

Circulation Improvements

Install platform doors on existing platforms

Platform CapacityImprovements

Modify platform seating to create more platform space

New Side Platformwith Platform Doors

Montgomery eastbound only

October 2015

Street access

Existing

Free area

New or relocated

BART

Paid areaNew northside corridor New or relocated

stairs or escalators to platform

MUNI Metro

Paid area

New MUNI elevator to platform

Page 7: EMBARCADERO - MONTGOMERY CAPACITY PLAN & STATION …

MONTGOMERY MODERNIZ ATION PROGRAM UPDATE

BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.

CO

NC

OU

RS

EP

LAT

FOR

M

Major Renovations Being Studied

Opening up lobby spaces• Improve visibility & circulation • New ceiling design• Larger real-time information displays • Better incorporation of public art projects

Renovation of ticketing areas• Differentiate vending areas in station • New flooring & finishes • New ceiling & lighting • Integrated real-time information

Deep Station Cleaning

Improvements to Platform

• Brighten the entire passenger area • New lighter colored flooring• New ceiling design • Better integrated lighting

Repair flooring, improve displays, and increase overall lighting

Deep Station CleaningNew street level canopies at entries

Deep Station CleaningImprove ventilation and dead areas

Deep Station CleaningReplace outdated signage and maps

Deep Station Cleaning Deep Station CleaningDifferentiate appearance from Powell

October 2015

Replace seating to create more platform space

Opportunities for ImprovementsStation improvements provide modernization possibilities. Program objectives include:• Creating and implementing a new visual

and functional concept for the station, and also:• Returning facilities and systems to a state of good repair• Replacing components and features at the end of their useful life

Page 8: EMBARCADERO - MONTGOMERY CAPACITY PLAN & STATION …

EMBARC ADEROMODERNIZ ATION PROGRAM UPDATE

BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.

CO

NC

OU

RS

E

Major Renovations Being Studied

New Ceiling• Improve appearance and reinvigorate• New lighting and ceiling • Possible new bridges between sides of concourse

Improved Entries• Better signage to surface transit and integrated

real-time information• New flooring, lighting & finishes

Renovated Ticketing Areas• New vending wall design• Replace dirty ceilings and lighting• Clean and polish existing walls/floors• More real-time information

Deep Station CleaningNew street level canopies at entries

Deep Station CleaningReinvigorate empty “dead” spaces

Deep Station CleaningMore storage/reduced clutter

Deep Station CleaningConsolidate free-standing items

Deep Station CleaningUpgrade elevator

PLA

TFO

RM Before Before

October 2015

Opportunities for ImprovementStation improvements provide modernization possibilities. Program objectives include:• Creating and implementing a new visual

and functional concept for the station, and also:• Returning facilities and systems to a state of good repair• Replacing components and features at the end of their useful life

Deep Station CleaningReplace lighting and fixtures