e!l:y If}: t! '11r KA Macy's - The Mall of America - disk? I. KA Macy's The Mall of America II. Project Location - The Mall of America Bloomington, Minnesota III. 7:10:29 AM Wednesday, May 1, 1991 A. Meeting In KA downtown office - Wednesday, May 1, 1991 B. Those attending 1. Bill JaNis • project manager 2. Donnie Wlllam - project superintendent 3. Ralph J. Stephenson - consultant C. Those Involved 1. Kraus-Anderson 2. Siomanson Smith & Barresi - Architects 3. Giudice, Valerio & Associates - Structural Engineer 4. Highland Associates • Mechanical-Electrical Engineers 5. NODA, Norwood Oliver Design Assoc., Inc. - Interior Consultants 6. Macy·s· Owner 7. Phoenix Steel - steel supplier & erector (subbed to Amerect) - earlier package 8. Kamlsh - excavators 9. Jessco· concrete & masonry 10. Gage Brothers - precast architectural panels 11. Anderson Iron • miscellaneous metals supplier 12. High Five • miscellaneous metals erector 13. Division 7 - metallic waterproofing & traffic topping 14. Classic Drywall. elfs, spray on fp, load bearing studs 15. Valley Building Products • cooling tower screen 16. All Weather Roofing· roofing 17. Carcloflnl - Joint sealers 18. Glewwe· hollow metal 19. Twin City Garage Door· overhead doors & grills 20. Thompson Lock & Key· finish hardware & cashier's vault equipment 21. Harmon Glass· glass & glazing, entrance doors 22. Crystal Manufacturing - louvers 23. Nordquist Sign· exterior slgnage 24. Pugleasa - loading dock equipment 25. Lln-EI· skylight 26. Montgomery Elevator • hydraulic elevators & escalators 27. Olson Fire Protection - standpipe system 28. Horowitz· HVAC & plumbing 29. ERC· Electrical D. Agenda 1. Review project scope with dwl and wja 2. Prepare network model for entire current contract work • GC1 3. Copy disks to hard drive and to floppy 4. Print networks If time permits E. Bid packages 1. GC1 - Exterior shell package F. racterlstlcs 1. Pro' t construction components Construct composite concrete decks Install vault door Wed, Mav 1. 1991 PaQe 1

Upload: others

Post on 28-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

e!l:y ~ If}: t! '11r

KA Macy's - The Mall of America - disk?

I. KA Macy's • The Mall of America II. Project Location - The Mall of America • Bloomington, Minnesota

III. 7:10:29 AM • Wednesday, May 1, 1991 A. Meeting In KA downtown office - Wednesday, May 1, 1991 B. Those attending

1. Bill JaNis • project manager 2. Donnie Wlllam - project superintendent 3. Ralph J. Stephenson - consultant

C. Those Involved 1. Kraus-Anderson 2. Siomanson Smith & Barresi - Architects 3. Giudice, Valerio & Associates - Structural Engineer 4. Highland Associates • Mechanical-Electrical Engineers 5. NODA, Norwood Oliver Design Assoc., Inc. - Interior Consultants 6. Macy·s· Owner 7. Phoenix Steel - steel supplier & erector (subbed to Amerect) - earlier

package 8. Kamlsh - excavators 9. Jessco· concrete & masonry

10. Gage Brothers - precast architectural panels 11. Anderson Iron • miscellaneous metals supplier 12. High Five • miscellaneous metals erector 13. Division 7 - metallic waterproofing & traffic topping 14. Classic Drywall. elfs, spray on fp, load bearing studs 15. Valley Building Products • cooling tower screen 16. All Weather Roofing· roofing 17. Carcloflnl - Joint sealers 18. Glewwe· hollow metal 19. Twin City Garage Door· overhead doors & grills 20. Thompson Lock & Key· finish hardware & cashier's vault equipment 21. Harmon Glass· glass & glazing, entrance doors 22. Crystal Manufacturing - louvers 23. Nordquist Sign· exterior slgnage 24. Pugleasa - loading dock equipment 25. Lln-EI· skylight 26. Montgomery Elevator • hydraulic elevators & escalators 27. Olson Fire Protection - standpipe system 28. Horowitz· HVAC & plumbing 29. ERC· Electrical

D. Agenda 1. Review project scope with dwl and wja 2. Prepare network model for entire current contract work • GC1 3. Copy disks to hard drive and to floppy 4. Print networks If time permits

E. Bid packages 1. GC1 - Exterior shell package

F. pro/ec~ch racterlstlcs 1. Pro' t construction components

Construct composite concrete decks Install vault door

Wed, Mav 1. 1991 PaQe 1

Wed, May 1, 1991

KA Macy's - The Mall of America - disk?

Drill & install elevator plunger casing Insta" floor drains at toilet. mechanical & restaurant areas Apply spandrel spray on fireproofing Apply interior spray on fireproofing Construct loading dock walls Install underground utilities at first floor slab on grade Install underground utilities at loading dock slab on grade Construct loading dock slab on grade Construct cellar slab on grade Install loading dock equipment Construct first floor slab on grade Erect interior masonry partitions

Stairwells & elevator shafts Party wall at mall Loading dock area

Install standpipe Lay insulation & roofing Install skylight framing and glass (150' long by 30' wide - center section 42' x 42') Erect exterior architectural precast panels Install eifs exterior skin Form, reinforce, pour & strip vault at 2nd floor Install ext man doors, frames & hardware Install standing seam roof substrate Install standing seam metal roof Install and glaze ext storefronts Install equipment at mechanical equipment rooms· on 3rd floor Install escalators Install elevators Install 3 coil partitions at mall entrance

PaQe 2

Don Willam's schedule Wednesday, May 1, 91

May '91 ---~------,-------

Activities w T F S S M T W T F S S M T W T

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIR TO MAY 1, 1991 .. • f----- ---- -

CHECK STRUCT STEEL & OFFICIALLY NOTIFY OWNER OF II • PREPARE & SUBMIT EXT INSULATED FINISH SYSTEM SHOP

OWNER OFFICIALLY RELEASE KA TO BEGIN CONSTRUCTION - 2 --

SET ELECT & PLUMBING SLEEVES IN POUR #1 - 2ND FL - 1 -REVIEW & APPROVE EIFS SHOP DRAWINGS - 5 --~ '------1

SET EDGE FORMS, MESH & RESTEEL AT POUR #1 - 2ND FL-1 -SET ELECT & PLUMBING SLEEVES IN POUR #2 - 2ND FL - 1 -PLACE CONCRETE FOR DECK POUR #1 - 2ND FL - 1 ------ -- '----l

SET EDGE FORMS. MESH & RESTEELAT POUR #2 - 2ND FL-1 -SET ELECT & PLUMBING SLEEVES IN POUR #3 - 2ND FL - 1 - -PLACE CONCRETE FOR DECK POUR #2 - 2ND FL - 1 - ---SET EDGE FORMS, MESH & RESTEEL AT POUR #3 - 2ND FL - 1 -SET ELECT & PLUMBING SLEEVES IN POUR #4 - 2ND FL - 2

PLACE CONCRETE FOR DECK POUR #3 - 2ND FL - 1 -SET EDGE FORMS. MESH & RESTEEL AT POUR #4 - 2ND FL - 1 -SET ELECT & PLUMBING SLEEVES IN POUR #5 - 2ND FL - 2 --

PLACE CONCRETE FOR DECK POUR #4 - 2ND FL - 1 -SET EDGE FORMS, MESH & RESTEEL AT POUR #5 - 2ND FL - 1 -SET ELECT & PLUMBING SLEEVES IN POUR #6 - 2ND FL - 1 • SET ELECT & PLUMBING SLEEVES IN POUR #7 - 3RD FL - 1 .. PLACE CONCRETE FOR DECK POUR #5 - 2ND FL - 1 .. SET EDGE FORMS, MESH & RESTEEL AT POUR #6 - 2ND FL - 1 ..

-

KA Macy's - The Mall of America - disk?

I. KA Macys - The Mall of America II. Project Location - The Mall of America - Bloomington, Minnesota

m. General notes - to be updated as project proceeds A. Project laundry list - added to general notes on June 12, 1991 (115)

1. Superstructure - Gel Construct composite concrete decks Apply spandrel spray on fireproofing

2. Building skin work - Gel Lay insulation & roofing Install skylight framing and glass [150' long by 30' wide -center section 42' x 42') Erect exterior architectural precast panels Install eifs exterior skin Install ext man doors. frames & hardware Install standing seam roof substrate Install standing seam metal roof Install and glaze ext storefronts

3. Interior rough work - Ge2 Install underground utilities at first floor slab on grade Construct loading dock walls DrUl & install elevator plunger casing Install floor drains at toilet. mechanical & restaurant areas Apply interior spray on fireproofing Install underground utilities at loading dock slab on grade Construct loading dock slab on grade Construct cellar slab on grade Install loading dock equipment Construct first floor slab on grade Erect interior masonry partitions

Stairwells & elevator shafts party wall at mall

/ Loading dock area V'lnstall standpipe

Form. reinforce. pour & strip vault at 2nd floor ,/fnstall above floor sheet metal ductwork ~nstall above floor mechanical piping ...AD.stall above sprinkler piping ~stall above floor rough electrical conduit & feeders Astall above floor rough security and safety rough in :"Erect interior metal studs ~stall stud wall in wall work /illstall hard ceiling suspension & framing

4. Int~or finish work - Ge2 /~g gyp board at stud walls ,,;:rape & sand gyp board at stud walls

Wed, Jun 12. 1991 Page 1

KA Macy's - The Mall of America - disk ?

/Hang hard ceiling gyp board /Tape & sand hard ceiling gyp board ~nstall ceramic tile at toilet rooms ,/1nstall quarry tile at food service areas

Install acoustic ceiling suspension & grid Install millwork and trim

Escalator well Skylight

Install doors and hardware Install light fixtures at ceilings Install grills & diffusers Install sprinkler heads and related ceiling tile Install toilet room vanities and plumbing fixtures Install toilet room partitions and accessories Install mechanical trim items Install electrical trim items Install architectural trim items Install fiberglas cove panels (gfrd - glass reinforced gypsum) install suspension & framing for fiberglas cove panels Install security and life safety devices and trim Paint required interior surfaces Apply vinyl wall covering Install vault door Install 3 coil partitions at mall entrance Clean up & move out

5. Systems work· GC2 Install equipment at mechanical eqUipment rooms - on 3rd floor Install escalators

Install trusses Install escalator machinery Install escalator finish items Test and approve escalators

Install elevators Install elevator rails Install elevator eqUipment at machine room Install elevator cab & finishes Test and approve elevator

IV. 7:10:29 AM· Wednesday, May 1, 1991 A. Meeting in KA downtown office· Wednesday, May 1, 1991 B. Those attending

1. Bill Jarvis - project manager 2. Donnie Willam . project superintendent 3. Ralph J. Stephenson· consultant

c. Those involved

Wed, Jun 12. 1991 Page 2

, "

KA Macy's - The Mall of America - disk ?

1. Kraus-Anderson 2. Slomanson Smith & Barresi • Architects 3. Giudice, Valerio & Associates· Structural Engineer 4. Highland Associates· Mechanical·Electrical Engineers 5. NODA, Norwood Oliver Design Assoc., Inc • . Interior Consultants 6. Macy's· OWner 7. Phoenix Steel· steel supplier & erector (subbed to Amerect) .

earlier package 8. Kamish· acavators 9. Jessco· concrete & masonry

10. Gage Brothers -precast architectural panels 11. Anderson Iron· miscellaneous metals supplier 12. High Five . miscellaneous metals erector 13. Division 7 - metallic waterproofing & trqfJi.c topping 14. Classic Drywall· eifs, spray oniP, load bearing studs 15. Valley Building Products· cooling tower screen 16. All Weather Roq/ing· roofing 17. Carciqfini -joint sealers 18. Glewwe - hollow metal 19. Twin City Garage Door - overhead doors & grills 20. Thompson Lock & Key • finish hardware & cashier's vault

equipment 21. Hannon Glass - glass & glazing, entrance doors 22. Crystal Manrifacturing . louvers 23. Nordquist Sign - aterior signage 24. Pugleasa - loading dock equipment 25. Lin-El - skylight 26. Montgomery Elevator - hydraulic elevators & escalators 27. Olson Fire Protection - standpipe system 28. Horowitz - HVAC & plumbing 29. ERC· Electrical

D. Agenda 1. Review project scope with dwi and wja 2. Prepare network model for entire current contract work - Gel 3. Copy disks to hard drive and tojloppy 4. Print networks if time pennits

E. Bid packages 1. Gel - Exterior shell package

F. Project characteristics 1. Zones as determined by tenant· shown injinish sequence as

specffied Second floor

Zone A2

Wed. Jun 12, 1991

Rough mechanical & electrical work 07/15/91 (137) am - start of work

Page 3

KA Macy's - The Mall of America - disk ?

10/14/91 (202) pm - complete work Finish work

01/20/92 (269) pm - complete work Zone B2 Zone C2

First floor Zone Al Zone Bl Zone Cl

Third floor Zone A3 Zone B3 Zone C3 Zone D3

2. Project construction components (continued in general notes) Construct composite concrete decks Install vault door Drill & install elevator plunger casing Install floor drains at toilet. mechanical & restaurant areas Apply spandrel spray on fireproofing Apply interior spray on fireproofing Construct loading dock walls Install underground utilities at first floor slab on grade Install underground utilities at loading dock slab on grade Construct loading dock slab on grade Construct cellar slab on grade Install loading dock equipment Construct first floor slab on grade Erect interior masonry partitions

Stairwells & elevator shafts party wall at mall Loading dock area

Install standpipe Lay insulation & roofing Install skylight framing and glass (I 50' long by 30' wide -center section 42' x 42') Erect exterior architectural precast panels Install eifs exterior skIn Form. reinforce. pour & strtp vault at 2nd floor Install ext man doors, frames & hardware Install standing seam roof substrate Install standing seam metal roof Install and glaze ext storefronts Install equipment at mechanical equipment rooms - on 3rd floor

Wed. Jun 12, 1991 Page 4

,-

KA Macy's - The Mall of America - disk ?

Install escalators Install elevators Install 3 coil partitions at mall entrance

V. 8:46:31 AM - Wednesday, June 12, 1991 A. Meeting in KA. downtown office - June 12, 1991 (115) B. Those attending

1. Bill Jarvis - project manager 2. Ralph J. Stephenson - consultant

C. Agenda 1. Monitor current project status 2. Prepare 002 laundry list 3. Prepare interior network models for

Levels 1, 2 & 3

Wed. Jun 12, 1991 Page 5

---d

I.aue 'I • not Issued I .... e '2 • .lune 12, 1l1li1 i2ahlll2 In\ wk macy disk? Shut format data: LaHr, 112146% red, horiz

Leyel 2 Interior Work

NETWORK MODEL FOR MACY'S THE MALL OF AMERICA Bloomington, Minnesota

Kraus-Anderson Construction Company - Minneapolis, Minnesota

Ralph I. Stephenson PH PC Consulting &gin_ 323 ffiawllha Drive Mt. PI_I, Michi&" 48SS8 phS17mZS37

~\ ..

S~et ,

flQlE;.

All ftoa1 time in this plan ofwori< is 1he f'I'OP'NIY of ~ and i. for IIMIir .... only. AIry ..... of ftoa16me IIf 01",,", is to be only will! the writhm penni""'n of K ..... IJ-Andenlon

Early SIBil OurUon Early irish

o

D laMIlIIBrI L_inish

Actiyity Key

20 B 20 MTL ABV fL ELECT, LIFE

SAfETY a. SECURITY

CONDUIT a. fDRS AT ZONE B· 20

ReBate! Activity Numbtl's

041 048 042 047 043 048 044 0411 045 050

LAN· 001 HAN·?

B INSTL ABVFL elECT, LIFE

SAFETY a. SECURITY

CONDUIT a. FDRS AT ZONE B·20

A 10 I INSTALL MECH. i

ELECT AND ARCH TRIM rrEMS IN

ZONE A· 10

A 25 MAiM .lI"'

CO ... PAINT .. APPLY VINYL

_ 10

I INSTALL MECH. i ELECT AND ARCH

TRIM rrEMS IN ZONE B ·10

WALkTC~i'::NG ... , -----I SURFACES IN ZONE B· 15

B 10' INSTALC INSTL CEILING

ACOUSTIC CLG LIGHT FIXTURES SUSP It GRID IN IN ZONE B • 10

ZONE B· 15

15 C i COMP PAINT It

APPLY VINYL

C 10 I INSTALL MECH. ELECT AND ARCH

TRIM rrEMS IN ZONE C· 10

r WALL COVERING I r---------~ ATREQO ~------4

SURFACES IN ZONE C· 15

INSTL CEILING LIGHT FIXTURES

IN ZONE C· 10

10'

5 Iq EiU 1M • i

MOVE OUT OF FLOOR·5

A 5 'INSTALL QUARRY

TILE AT JUICE

A 10 r INSTL PLUMBING

FIXTURES. BAR IN ~ONE A • II------i RelATED

MILLWORK AT JUICE BAR IN ZONE A - 10

A 10 A 10

o

A

STD WlLS. HGYP BOARD FOR HCERAMIC TILE ATH VANITIES. HARD CLGS • STUD WALLS. TOILET ROOMS PLUMBING INSTL GLASS HARD CEILINGS IN ZONE A - 10 AXTURES AT

REINF GYP PNLS IN ZONE A - 15 TOILET ROOMS

ROOM I r APPlY VINYL I PARTITIONS. WALL COVERING

t------iACCESSORIES IN AT REQD ZONE A - 10 SURFACES IN

IN ZONE A - 15 IN ZONE A • 10

5 A INSTALL

ACOUSTIC CLG

ZONE A - 15

15 A 10/ PRIME PAINT

REQUIRED SURFACES IN

ZONEA·5

"'-:I""NST=L-""C':=EI""L""IN""G"-" LIGHT FIXTURES

IN ZONE A. 10 , ________________ -11 SUSP • GRID IN r- ZONE A _ 15 fo---------l

20 INSTL MTl STDS, SUSP, FRMG • IN WALL WORK FOR 1-------1

WALLS. HARD CLGS AT ZONE B

-20

15

HANG GYP DD ATH TAPE. SAND STD WlLS • GYP BOARD FOR

HARD ClGS • STUD WAllS. INSTl GLASS HARD CEILINGS

REINF GYP PNlS IN ZONE D· 15 IN ZONE B. 15

5

20 D '\ 15 ""INS:=::T!:-L-=MTl=--=ST=D""S"', HANG GYP BD AT .- fA-PI! Ii SAND SUSP, FRMG • IN STD WLLS • GYP BOARD FOR WALL WORK FOR HARD CLGS • STUD WALLS &

1-------1 WALLS. HARD INSTL GlASS HARD CEILINGS 1-------1 CLGS AT ZONE C REINF GYP PNLS IN ZONE C - 15

- 20 IN ZONE C - 15

PRIME PAINT REQUIRED

SURFACES IN ZONE C· 5

5

o Cl

FROM POINT WHERE FlOOR IS

o

A

AVAILABLE FOR 1------1 START OF r-

ROUGH INT WORK

INSTALL ABOVE FLOOR SHEET

METAL DUCTWORK AT

ZONE A - 15

CLOSE IN POINT - ASSUME

06/12191 FOR SIMULATION

ONLY

o

A 20

o 'INSTl MTL STDS, i

SUSP, FRUG lit IN , WALL WORK FOR f----------------f WALLS lit HARD CLGS IN ZONE A -

20

o

B 15 I INSTALL ABOVE r'

FLOOR SHEET METAL

DUCTWORK AT ZONE B -15

1_ 20

I INSTALL ABOVE i

FlOOR SHEET METAL

>' I l I DUCTWORK AT ZONE C - 15

B 15 15 INSTALL ABOVE INSTALL ABOVE FLOOR ROUGH FLOOR ROUGH

(I I MECH PIPING AT MECH PIPING AT • • ZONE B - 15 ZONE C - 15

B 15 C 15 INSTALL ABOVE INSTALL ABOVE

FLOOR FIRE FlOOR FIRE

~

I I I PROTECTION PROTECTION I • y PIPING AT ZONE PIPING AT ZONE

B - 15 C - 15