Eliminating Data Center Hot Spots: An Approach for Identifying and Correcting Lost Air Data center cooling is a hot topic. But, when you consider the challenges associated with cooling the latest generation servers, the growing cost of infrastructure equipment, and the risks associated with data center hot spots brought on by high-density clusters and premature hardware failure, it's easy to understand the focus. To view the recorded webinar event, please visit http://www.42u.com/data-center-hot-spots-webinar.htm

TRANSCRIPT

Page 1: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Eliminating Data Center Hot Spots: An Approach for Identifying and Correcting Lost Air

December 5, 2007

Presented By:

Page 2: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Speakers and Sponsor

• Lars Strong, P.E. for Upsite Technologies – Lead Engineer and Services Product Manager – Consulted numerous Data Centers internationally on

infrastructure design and management structure– Robust experience with fluid dynamics and

thermodynamics of data center cooling infrastructure

• Patrick Cameron, Director of Business Development, DirectNET

– Product manager for DirectNET’s suite of data center infrastructure products.

– Afcom information session presenter and SME for remote management solutions.

– Ten years of consulting experience designing and implementing custom hardware and software solutions.

Page 3: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Agenda

• Energy Trends• Measuring Data Center Performance• Leading Causes of Inefficiency • Methods for Improvement• Recommendations in Action: Case Study

Review • Q&A

Page 4: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

√ Server density has increased significantly over the past decade

√ The average server’s power consumption has quadrupled

√ Higher density and the resultant higher operating temperatures spawn increased administration costs

√ Executives are starting to look more closely at the energy budgets associated with IT infrastructure

√ Customers are running out of power and cooling capacity well before they reach the spatial limits of their facilities

A Snapshot: Energy Trends

Page 5: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Source: “Data center cooling strategies”, HP, August 2007

Energy Trends: Specific to Cooling

• According to HP, in 85 percent of data centers, most of the non-IT power is used by the cooling resources

Page 6: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Data Center Power Flow

Page 7: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Data Center Coefficient of Efficiency (CoE)

• CoE = total power / critical power

– Critical power is computer communication equipment consumption

• Sum of PDU loads

– Total Power is that required to support both UPS and Mechanical systems

• CoE = Building service entrance usage / sum of PDU loads (works best for standalone data centers)

Ideal CoE 1.6

Target CoE 2.0

Typical CoE 2.4 to 2.8 and higher

Many >3.0

Page 8: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Tier Performance Standards

• Tier I: Basic Site Infrastructure– Room dedicated to support IT equipment

• Tier II: Redundant Capacity Components Site Infrastructure– Redundant components for increased reliability

• Tier III: Concurrently Maintainable Site Infrastructure– Alternate distribution paths, one active

• Tier IV: Fault Tolerant Site Infrastructure– Dual active distribution paths

• Tiers I & II: Tactical solutions• Tiers III & IV: Strategic Investments

Page 9: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Coefficient of Efficiency (CoE)

• Interesting revelations– At a Coe of 2.0 it takes twice the “critical power” to

operate even an efficient data center– When CoE gets above 2.4 most of the additional

power is going into inefficient mechanical systems– As the CoE increases the environment in the

computer room can deteriorate– Adding more cooling units increases CoE and may

not reduce Hotspots

Page 10: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

What Leads to Inefficient CoE Sources of Mechanical Inefficiencies

Mismatched Expectations

Mismatched Architectures

No Master Plan

Failure to Measure and Monitor

Failure to Use Best Practices

Thermal Incapacity and Excessive

Bypass Airflow

Page 11: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Thermal Incapacity Defined

• Thermal incapacity is the portion of the mechanical system that is running, but not contributing to a dry bulb temperature change because of return air temperatures, system configuration problems, or other factors

• Most thermal incapacity can be inexpensively recovered by a mechanical system “tune-up”

Page 12: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Bypass Airflow: Defined

• Conditioned air is not getting to the air intakes of computer equipment– Escaping through cable cutouts and holes

under cabinets– Escaping through misplaced perforated tiles– Escaping through holes in computer room

perimeter walls, ceiling, or floor

Page 13: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

White Paper

• A comprehensive survey of actual cooling conditions in 19 computer rooms comprising 204,400 ft2 of raised floor.– Size from 2,500 square feet

(2,500 ft2 or 230 m2) to 26,000 ft2 (2,400 m2)

• More than 15,000 individual pieces of data were collected.

Page 14: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Consequences of Thermal Incapacity

• Inefficient cooling system– Operating cooling capacity is 2.6 times the

critical load (UPS output) – At Coefficients of Efficiency of 2.0 – 2.4– 10% of the racks had “hotspots” at the intake

air exceeding 77°F (25 °C)

Page 15: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Consequences of Thermal Incapacity

• Inefficient cooling system (cont.)– Rooms with the greatest excess of cooling

capacity had the worst environment– At Coefficients of Efficiency > 3.0– Up to 25% of the racks had “hotspots”

– More cooling capacity • Poorer environment• Wasting capital and operating expenses

Page 16: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Not Limited to High-Density Clusters • Study done by Uptime Institute

found that the highest % of hot spots were found in computer rooms with very light loads.

• Between 3.2 and 14.7 times more cooling capacity was running in those rooms than was required.

• 60% of the cold air cools the room but not the critical load except by recirculation

Page 17: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

How Can So Much Excess Capacity be Installed? • Historically data center managers have

relied on vendors and contractors– Vendors are motivated to sell more equipment– Contractors are motivated to perform

installations

• Ignorance of science behind cooling and capacity management

Page 18: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

The Culprit: Airflow Management

Three categories of air movement challenges

• Below floor obstruction

•Cables, pipes, etc.

• Raised floor performance

•Cable openings, perforated tile placement, etc.

• Above floor circulation

•Cabinet layout, cooling unit orientation, ceiling height, etc.

Page 19: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Deciphering Hot Spots: Zone vs. Vertical

• Two Varieties of hotspots– Zone hotspots typically exist over large areas of raised floor– Vertical hotspots are more discrete and may exist just at the top

few U of an isolated cabinet

In either case , exceeding 77 F with a relative humidity of less than 40% are serious threats to maximum

information availability and hardware reliability.

Page 20: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Raised-Floor Utilization: Legacy Layout

• All aisles have elevated “mixed” temperature (starved supply airflow compounds problem)

• Fails to deliver predictable air intake temperatures• Reduces return air temperature which reduces cooling unit capacity

and removes moisture• Removed moisture must be reinserted into the computer room

Page 21: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

• Cold air escapes through cable cutouts• Escaping cold air reduces static pressure resulting in insufficient

cold aisle airflow• Result is vertical and zone hotspots in high heat load areas

Computer Room Layout Options: The Effect of Bypass Airflow

Page 22: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Cold/Hot Aisle–Ideal Implementation: No Bypass Airflow

• Average power per rack (assuming one perforated tile per rack and 15°F temperature drop across the cooling unit coil)

– 3.3 kW per perforated tile (700 CFM)

– 6.6 kW per grate (1,400 CFM)

Page 23: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Sealing Options Need to be Evaluated for:

• Sealing effectiveness• Self sealing (is labor required)• Ease of recabling (is labor required)• Dresses raw edges (NFPA 75 requirement)• Static dissipative• Install it and forget it (is policing required)• Does not contribute to contamination

Page 24: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

A Case Study #1: Success

• Business: Major carmaker with 10,000 ft2 data center.

• Computing needs: Support of all North American operations, sales and corporate functions.

Page 25: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Case Study #1: Success

Problem Statement: • IT equipment reliability problems due to high intake

temperatures• Failure rates were so high that IT equipment

manufacturers were threatening to void warranties and charge for all service calls, a potentially very costly situation

• No redundant cooling capacity

Thermal Incapacity and Bypass Airflow Issues:• Unsealed cable openings wasting 43% of conditioned air

volume

Page 26: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

A Case Study #1: Success

Solution Approach: Comprehensive remediation• Comprehensive evaluation of the computer room’s cooling health• Adjustment of cooling infrastructure

– Sealing bypass openings– Perforated tile location and number– Cooling unit set points and calibration

• No downtime or exposure to downtime from: construction activities, adjustment of computer room layout, or the purchase of additional cooling units or perforated tiles

Results:• All IT equipment air-intake temperatures brought within

recommended range• Maximum 16°F drop occurred at critical enterprise servers. • Bypass airflow reduced from 43% to less than 10%

Page 27: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Case Study #1: Success

Business Benefit:• Increase in the cooling capacity of the existing CRAC

units • Cooling capacity to support growth• There was also the side benefit of the noise level

dropping significantly• “Decreasing the operating temperatures in hotspot areas

improves our equipment reliability, decreases outages, and helps us meet our business continuity goals”, quote from customer.

Page 28: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

A Case Study #2: Failure

• After rearrangement of 30 perforated tiles, 250 servers automatically thermaled off

• Internal safety controls in hardware turn off to prevent overheating

• Result: Internet service for critical application service provider halted during prime time

Page 29: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

How to get started…

KoldWorks Cooling Services– KoldProfile—Cooling Assessment

– KoldSeminar—Education & Profile

– KoldCheck—Cooling Audit

– KoldTune—Cooling Remediation

KoldLok Raised-Floor Grommets

KoldLokIntegral

KoldLokSurface

Page 30: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.

Cooling Tools

• Temperature Strip

• TroubleShooter – Test to see if there’s poor or

good airflow of conditioned air over holes in your perforated raised floor tiles

Receive a Complimentary Strip or Troubleshooter:

[email protected]

Page 31: Eliminating Data Center Hot Spots

DirectNET Confidential © 2007 DirectNET, Inc. All rights reserved.