electronic environments control centers

63
Electronic Environments Control Centers A Brief History…. he Focal Point Of Every Mission Critical Facility

Upload: tommy

Post on 05-Jan-2016

24 views

Category:

Documents


1 download

DESCRIPTION

Electronic Environments Control Centers. The Focal Point Of Every Mission Critical Facility. A Brief History…. Shearson Lehman American Express - 1985 Mainframe Operations Network Control - Monitoring 2 Front End Processors Open Style Space Savings. Citibank - Manhattan, NY - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Electronic Environments Control Centers

Electronic Environments

Control Centers

A Brief History….

The Focal Point Of Every Mission Critical Facility

Page 2: Electronic Environments Control Centers

Shearson Lehman American Express - 1985Mainframe Operations Network Control - Monitoring 2 Front End Processors• Open Style Space Savings

Page 3: Electronic Environments Control Centers

Citibank - Manhattan, NY• Network Operations Control Console• Exhaust Fans in the Base, First Tier & Second Tier Sections

Page 4: Electronic Environments Control Centers

American Express - Phoenix, AZ• Mainframe Ops / Network Ops / Print Area / Customer Support• Consolidation of Areas for increased communications• Introduction of Large Screen Technology

Page 5: Electronic Environments Control Centers

American Express - Phoenix, AZ• Mainframe Operations• Increased “Line of Sight” to all monitors with less movement• Reduced Staff

Page 6: Electronic Environments Control Centers

IBM (ISSC) / Kodak - Rochester, NY• Mainframe Operations• 80 Monitors / 40 Linear Feet• Rear Access

Page 7: Electronic Environments Control Centers

Federal Reserve Bank - Richmond, Virginia• Mainframe Operations• Network Operations• Customization• Glare Caused by Outside Light

Page 8: Electronic Environments Control Centers

Corestates - Philadelphia, PA• Mainframe Operations / Network Operations• Supervisors Look Over Operations

Page 9: Electronic Environments Control Centers

Fidelity Investments - Texas• Work Surface Lighting• Increased Keyboard Placement and Flexibility

Page 10: Electronic Environments Control Centers

Reuters - Hauppauge, NY• Overlooking the Enterprise• Reduced Height Consoles for “Line of Sight” While Seated

Page 11: Electronic Environments Control Centers

Space Planning

Control Room Design in Relation to Corporate Objectives & Goals

Console Layout

•Central Grouping of Main Operations Staff•Interdepartmental Adjacencies for Increased Communications•Key Positioning of Supervisory Staff For Line of Sight•A/V Wall Forward or Segregated per Functional Requirement•Library•Meeting Table•Shift Overlap•Shared Workstations•Lockers•Access, Egress, Entries & Exits

Page 12: Electronic Environments Control Centers

Baxter Travenol - Illinois

Page 13: Electronic Environments Control Centers

Prudential Securities - Manhattan, NY

Page 14: Electronic Environments Control Centers

Workstation Design & Ergonomics (A Compromise)

Operations Control

•Typically a Multi-Tiered Environment•Shared Workstation Per Shift

Command Center Workstation Design

•Number of Monitors to be Monitored•Number of Operators Prime Shift•Single, Double, Triple Tier Determinations•Monitor Layout by Application and Ease of Movement•Writing Surface Needs•Storage Needs•Keyboard Placement & KVM Switching Options•Workstation Lighting

Page 15: Electronic Environments Control Centers

Computer Associates - Islandia, NY

Page 16: Electronic Environments Control Centers

IBM - Melville, NY

Page 17: Electronic Environments Control Centers

Barnett Bank

Page 18: Electronic Environments Control Centers

Work Station Design & Ergonomics (A Compromise)

Network Operations Center (NOC)

•Typically a Single Tier Environment•Possibly a Common Multi-Tier Area to Walk-Up & Access

Individual Workstation Design

•Open or Enclosed Style•Number of Monitors per Operator Workstation•CRT’s or Flat Screens (Future Plans and Accommodations)•Number of CPU Accommodations Needed in Base•Number of Operators (Prime Shift) •Shift Overlap•Writing Surface Needs - Return Worksurfaces•File & Binder Storage Needs •Workstation Lighting•Base Section Cable Management - Voice / Data / Power / Misc

Page 19: Electronic Environments Control Centers

IBM - Boulder, Colorado• Line of Sight

Page 20: Electronic Environments Control Centers

The Depository Trust & Clearing Corporation - Manhattan, NY

Page 21: Electronic Environments Control Centers

Atlanta DOT - Atlanta, Georgia

Page 22: Electronic Environments Control Centers

Large Screen Technology

Today’s Choices

Direct View Monitors• Standard Television DesignFlat Panel Technology•Plasma •LCD Projection Technology•Front Projection Systems•Rear Projection Systems

•Cube Wall Systems

Page 23: Electronic Environments Control Centers

Lehman Brothers - Jersey City, NJ• Front Projection

Page 24: Electronic Environments Control Centers

Teligent• Rear Projection

Page 25: Electronic Environments Control Centers

Teligent• Direct View Monitors

Page 26: Electronic Environments Control Centers

The Associates - Texas• Rear Projection• Direct View Monitors

Page 27: Electronic Environments Control Centers

Large Screen Technology

•Resolution (Clarity)

•Screen Manipulation & Switching

•Master Control Systems

•Hard RGB Switching

•Video Wall Processing

•KVM Integration

•Audio

•Cable & Satellite Feeds

Page 28: Electronic Environments Control Centers

Facility Planning

•Adjacency Analysis - Air Handling Units & PDU’s

•Established Elements - Columns, Ceiling Height, Non Raised Floor, Etc..

•Electrical Requirements

•Heat Load Assessment

•Access, Egress, Entries & Exits - ADA Requirements

Page 29: Electronic Environments Control Centers

Computer Associates - Islandia, NY• Lighting

Page 30: Electronic Environments Control Centers

Corecom - PA• Rear Projection• Digital Clocks

Page 31: Electronic Environments Control Centers

Globix - Manhattan, NY• Cube Wall System• Video Wall Processing

Page 32: Electronic Environments Control Centers

INTERIOR DESIGN

•Lighting

•Carpet

•Acoustics

•Seating

•Matching Finishes (Room Motif)

Page 33: Electronic Environments Control Centers

Concept NOC / Computer Rendering

Page 34: Electronic Environments Control Centers

ISO - Jersey City, NJ - Call Center• 50” Plasma Screens - Yoke Mounted

Page 35: Electronic Environments Control Centers

Metro Transit - Minnesota• Open Design Console for Flat Screen or CRT

Page 36: Electronic Environments Control Centers

Verizon - Dallas, Texas• Rear Projection• Video Wall Processor• Open Design Console

Page 37: Electronic Environments Control Centers

Verizon - Dallas, TX• Privacy Panels for Accoustics• White Board• CNN / Weather (NTSC Signal)

Page 38: Electronic Environments Control Centers

EMC - Hopkinton, MA• 42” Plasma Screens• Open Design Console - Trading Desk Design• Flat Screen Desktop Monitor Attachment Arms ( Fixed / Articulating)

Page 39: Electronic Environments Control Centers

Network Solutions• Flat Screen Desktop Monitor Attachment Arms (Articulating)• Centered Monitor sits on its own “Tilt & Swivel”

Page 40: Electronic Environments Control Centers

Prudential Securities - Manhattan, NY• Trading Floor

Page 41: Electronic Environments Control Centers

The New York Mercantile Exchange - Manhattan, NY• Project Management

Page 42: Electronic Environments Control Centers

The New York Mercantile Exchange - Manhattan, NY• Commissioning

Page 43: Electronic Environments Control Centers

Cairo & Alexandria Stock Exchange - Cairo, Egypt

Page 44: Electronic Environments Control Centers

The New York Stock Exchange - Manhattan, NY• Cable Management• Viewing Angles

Page 45: Electronic Environments Control Centers

The New York Stock Exchange - Manhattan, NY

Page 46: Electronic Environments Control Centers

The New York Stock Exchange - Manhattan, NYInternet Operations Center (IOC)• Non Raised Floor Environments

Page 47: Electronic Environments Control Centers

Super Booth - Morgan Stanley Dean WitterOn The Floor of The New York Stock Exchange - NY

Page 48: Electronic Environments Control Centers

Super Booth - JP MorganOn The Floor of The New York Stock Exchange - NY

Page 49: Electronic Environments Control Centers

Presentation RoomIBM - Boulder, Colorado

Page 50: Electronic Environments Control Centers

Crisis Management CenterComputer Associates - Islandia, NY

Page 51: Electronic Environments Control Centers

Board RoomOM Technology - Manhattan, NY

Page 52: Electronic Environments Control Centers

War RoomAT&T - Dayton, NJ• LCD Privacy Glass

Page 53: Electronic Environments Control Centers

War RoomAT&T - Dayton, NJ• LCD Privacy Glass

Page 54: Electronic Environments Control Centers

Video Teleconferencing FacilityPKS - Phoenix, AZ• LCD Privacy Glass

Page 55: Electronic Environments Control Centers

Y2K Help DeskSIAC - Brooklyn, NY

Page 56: Electronic Environments Control Centers

Decision Support Center - “Team Room”IBM / Kodak - Rochester, NY

Page 57: Electronic Environments Control Centers

Air Traffic Control CenterAmerican Airlines

Page 58: Electronic Environments Control Centers

Flight Information Display System (FIDS)Pittsburgh International Airport

Page 59: Electronic Environments Control Centers

Customs Clearing CountersPittsburgh International Airport

Page 60: Electronic Environments Control Centers

Distance Learning CenterUS Army

Page 61: Electronic Environments Control Centers

Industrial / Factory Control RoomBurton IndustriesLong Island, NY

Page 62: Electronic Environments Control Centers

Financial Branch Facility CSFB - Manhattan, NY

Page 63: Electronic Environments Control Centers

Thank You For Your Time