Kendall Pinder Work Profile Overview: An active leader, learner, and mentor in the field of Electrical Engineering, Substation Operation & Maintenance, Commissioning , and Non Destructive Testing (NDT) of Substation Apparatus. Career High Lights/Committees: Attended Numerous IEEE Meetings at Hardly Rd Facility NJ promoted by Mr. Ron Quade Attended Numerous Doble Conferences and Classes Sat on numerous Substation Committees: Strategic Maintenance 69kV and above Substation NERC Maintenance and adherence Critical Equipment /asset and ID and planning 5&10 Year Load impact transformer ID and Change out Substation Testing Procedures and Protocols Major Projects: Storm Sandy with PSEG in NJ 138 to 230KV Upgrades from PA to NY (22 plus Substations) Critical load plan via transformer re-allocation LTC- Maintenance and change out Program Manage the largest NDT Testing group in USA 20 plus employees Safety First-Safety Always 1

Upload: kendall-pinder

Post on 23-Jan-2018

203 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Electrical Power Experience1

Kendall Pinder Work Profile

Overview:

An active leader, learner, and mentor in the field of Electrical

Engineering, Substation Operation & Maintenance, Commissioning ,

and Non Destructive Testing (NDT) of Substation Apparatus.

Career High Lights/Committees:

Attended Numerous IEEE Meetings at Hardly Rd Facility NJ

promoted by Mr. Ron Quade

Attended Numerous Doble Conferences and Classes

Sat on numerous Substation Committees:

Strategic Maintenance 69kV and above

Substation NERC Maintenance and adherence

Critical Equipment /asset and ID and planning

5&10 Year Load impact transformer ID and Change out

Substation Testing Procedures and Protocols

Major Projects:

Storm Sandy with PSEG in NJ

138 to 230KV Upgrades from PA to NY (22 plus Substations)

Critical load plan via transformer re-allocation

LTC- Maintenance and change out Program

Manage the largest NDT Testing group in USA 20 plus employees

Safety First-Safety Always 1

Page 2: Electrical Power Experience1

Power Transformer Testing Acceptance test 230-34.5kV Transformer

Pre-Acceptance test:• Dew Point < 0.5%

• Insulation resistance

• Physical Inspection

• Impact Recorder

• Bushings C1 &C2

Safety First-Safety Always 2

Page 3: Electrical Power Experience1

Power Transformer Testing Hands on

Experience using various test sets

Doble, Leakage Reactance, SFRA, Winding Resistance, Meggar

Safety First-Safety Always 3

Page 4: Electrical Power Experience1

YY∆ 3Ø 230kV SMITH Power

Transformer Test and Commissioned Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage,

Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals

Safety First-Safety Always

4

Page 5: Electrical Power Experience1

Single Ø 500kV SIEMENS Auto Power

Transformer Test and Commissioned

Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage, Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals

Safety First-Safety Always

5

Page 6: Electrical Power Experience1

3Ø Single Tank 230kV HYUNDI Auto Power

Transformer Test and Commissioned

Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage, Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals

6

Safety First-Safety Always

Page 7: Electrical Power Experience1

Testing of an water Cooled Arc

Furnace TransformerWater cooled arc furnace transformer; coolant water used must be

pure and ionized or CL will be high

7

Safety First-Safety Always

Page 8: Electrical Power Experience1

Testing of an water Cooled Arc

Furnace TransformerCommissioning Test: TTR, Double PF, SFRA, Leakage, Winding

Resistance, Insulation Resistance, Excitation, Alarms

8

Safety First-Safety Always

Page 9: Electrical Power Experience1

Worked on many different types of LTCs

Rebuilt/Maintenance/Changing of

reversing and contact finger on the

TLH-21 Allis Chalmers LTC….Planed

Outage, ID parts, scheduled crews,

Maintained, Commissioned and test

9

Safety First-Safety Always

Page 10: Electrical Power Experience1

Profile

Maintenance/Changing reversing and

contact finger on the UZD LTC

10

Safety First-Safety Always

Page 11: Electrical Power Experience1

Profile

Emergency Corrective

Maintenance on a Waukesha

UZD load tap changer,

replacing reversing switch and

contacts very common with

this type of LTC….Fault was

identified by loss of one phase

on the distribution line…I ID

the problem and made

corrective action to the

installation process of the

reversing switch.

11

Safety First-Safety Always

Page 12: Electrical Power Experience1

Worked on many Transformer LTC

Problems

Investigating and correcting

problems on a GE LR65 LTC

Broken Support Rod on a GE LR65

LTC as a result bad mechanism

timing and coordination12

Safety First-Safety Always

Page 13: Electrical Power Experience1

Transformer Commissioning and Processing

Always check CT wells/

cabinet to ensure that correct

torque and to address and

correcting oil leaks (230-

34.5kV 150MVA TX)

Safety First-Safety Always 13

Page 14: Electrical Power Experience1

Transformer Lock Out Relay TestCritical Testing of the lock-out (68) relay on a Vacuum Type LTC…..Before

filling of the LTC

Safety First-Safety Always 14

Page 15: Electrical Power Experience1

Emergency Transformer Change out

Emergency Removal, replacement, and commissioning of

10 MVA bank

15

Safety First-Safety Always

Page 16: Electrical Power Experience1

Profile

Emergency Removal, replacement, and commissioning of

10 MVA bank

Safety First-Safety Always 16

Page 17: Electrical Power Experience1

Bushing Change out U-Type and degrading

program

U-Type Bushing replacement project

Safety First-Safety Always 17

Page 18: Electrical Power Experience1

Transformer High side bushing

Bottom connected

Prep for 24hrs standing in rack to ensure paper is immersed in oil before testing

18

Safety First-Safety Always

Page 19: Electrical Power Experience1

Profile

Draw Lead Bushing replacement project

Safety First-Safety Always 19

Page 20: Electrical Power Experience1

Breaker Projects: Maintenance, Commissioning,

Emergency: GCB/VCB/OCB/ACB

Maintenance/Repair 230kV S&C

circuit switcher combo with a gang

operated disconnect.

20Safety First-Safety Always

Page 21: Electrical Power Experience1

Profile Maintenance on an ABB 230kV

Single pressure (SP) puffer type

circuit breaker with AHMA

hydraulic-spring mechanism

21Safety First-Safety Always

Page 22: Electrical Power Experience1

Profile

Corrective Maintenance on

ABB SF6 48PM.

Degasification, changing

interrupters, and bushings

22

Safety First-Safety Always

Page 23: Electrical Power Experience1

Profile

Corrective Maintenance on a GE FKA 339 (3000amp),

replacing bushings, bullets, and interrupters

Safety First-Safety Always 23

Page 24: Electrical Power Experience1

Profile

Corrective Maintenance on a GE

FKA 339 (3000amp), replacing

bushings, bullets, and interrupters24

Safety First-Safety Always

Page 25: Electrical Power Experience1

Profile

Corrective Maintenance on a GE

FKA 339 (3000amp), replacing

bushings, bullets, and interrupters

25

Safety First-Safety Always

Page 26: Electrical Power Experience1

Profile

Corrective Maintenance on a GE FKA 339 (3000amp),

replacing bushings, bullets, and interrupters

Safety First-Safety Always 26

Page 27: Electrical Power Experience1

Profile

Doble Testing and timing of

S&C circuit switcher

Safety First-Safety Always 27

Page 28: Electrical Power Experience1

GIS-Substation

Timing and Doble testing of a

230kV SF6 encapsulated bus

system

Safety First-Safety Always

28

Page 29: Electrical Power Experience1

GCB Commissioning, Testing, Gas

Gassing, Timing, CTs, Doble

testing of a 340kV SF6 ABB

GCB

Safety First-Safety Always 29

Page 30: Electrical Power Experience1

GCB Commissioning, Testing, Gas

Gassing, mech placement, Timing, CTs,

Doble testing of a 230kV SF6 ABB GCB

Safety First-Safety Always 30

Page 31: Electrical Power Experience1

GCB Commissioning, Testing, Gas

Gassing, mech placement, Timing, CTs,

Doble testing of a 230kV SF6 ABB GCB

Safety First-Safety Always 31

Page 32: Electrical Power Experience1

Profile

Corrective Maintenance on 230KV gang

operated disconnect

Safety First-Safety Always 32

Page 33: Electrical Power Experience1

Mobile Substation Scheduling, Commissioning,

Testing, and Maintenance

230-34.5kV Mobile substation.

Test and commissioned

Safety First-Safety Always 33

Page 34: Electrical Power Experience1

Profile

Commission of 20MVA 34.5-

12/7.2kV mobile substation

Safety First-Safety Always 34

Page 35: Electrical Power Experience1

Profile

Commission of 20MVA 34.5-

12/7.2kV mobile substation

Safety First-Safety Always 35

Page 36: Electrical Power Experience1

Profile

Emergency Removal,

replacement, and

commissioning of

24MVA Mobile

Substation

Safety First-Safety Always 36

Page 37: Electrical Power Experience1

Profile

Commissioning of

New 24MVA Mobile

Substation

Safety First-Safety Always 37

Page 38: Electrical Power Experience1

“Protection and Control” and Relays

Commissioning and Testing

Functional Trip checks, Load angle checks, secondary

injection during commission of a new 34.5kv ABB breaker

Safety First-Safety Always 38

Page 39: Electrical Power Experience1

“Protection and Control” and Relays

Commissioning and Testing

Electromechanical Relays maintenance testing

Safety First-Safety Always 39

Page 40: Electrical Power Experience1

Commissioning of

SEL 251/351 and

487 SEL relays

Safety First-Safety Always 40

Page 41: Electrical Power Experience1

Profile

Kelman Portable DGA analysis

Safety First-Safety Always 41

Page 42: Electrical Power Experience1

Substation Battery Commission Routine

Maintenance and Testing

Impedance, Specific Gravity, 80% capacity Load Testing and

Commissioning

Safety First-Safety Always 42

Page 43: Electrical Power Experience1

Substation Battery Commission Routine

Maintenance and Testing

TORKEL840/860 - Battery Load

Tester - Megger

80% capacity Load Testing and

Commissioning

Safety First-Safety Always 43

Page 44: Electrical Power Experience1

Miscellaneous Projects

Replacement/Repairs 230kV Bus

work. No weep holes resulted Thermal

expansion that compromised “A”

structure

Safety First-Safety Always 44

Page 45: Electrical Power Experience1

Miscellaneous Projects

Commissioning and testing

230 Kv double grounded

WYE capacitor bank, GCB

45Safety First-Safety Always

Page 46: Electrical Power Experience1

Miscellaneous Projects

Testing,

Commissioning, and

phasing Cable

…Inspecting Ground

Sleeve cable and

back bone for new

subdivision

Safety First-Safety Always 46

Page 47: Electrical Power Experience1

Miscellaneous Projects

Installation of ground sleeve, cables, Load Break Elbows phasing

Safety First-Safety Always 47

Page 48: Electrical Power Experience1

Miscellaneous Projects

Repairing faulty 34.5kV 1000kcmil

cable, L.A.s, and insulators terminated

into MOD Sub

Safety First-Safety Always 48

Page 49: Electrical Power Experience1

Miscellaneous Projects

ABB Type ESVA 12kV vacuum type circuit breaker

Replace bushings, interrupters, and test

Safety First-Safety Always 49

Page 50: Electrical Power Experience1

Thank You

Safety First-Safety Always 50