STANDARDS/MANUALS/
GUIDELINES FORSMALL HYDRO DEVELOPMENT
Electro-Mechanical Works
Selection of Switchyard Equipment for SHP(Including Power Transformer and Circuit Breaker)
Sponsor:
Ministry of New and Renewable EnergyGovt. of India
Lead Organization:
Alternate Hydro Energy CenterIndian Institute of Technology Roorkee
May 2011
-
8/11/2019 Electrical Phase to Phase Clearance
2/98
CONTENTS
Sl. No. Items Page No.
1.0
Section 1
Guide for Design of Outdoor Step up Sub-Station
And Selection of Equipment
INTRODUCTION 1
2.0 DESIGN REQUIREMENTS 1
2.1 General 1
2.2 Seismic Consideration 2
2.3 Basic Insulation Level and Insulation Co-ordination 2
2.4 Electrical Clearances for Installing Equipment in the Field 8
2.5 Insulators Creepage Distance 11
2.6 Insulator Type 12
-
8/11/2019 Electrical Phase to Phase Clearance
3/98
2.7
2.8
2.9
2.10
2.11
2.12
1.0
2.0
3.0
3.1
3.2
3.3
3.4
3.5
3.63.7
3.8
3.9
4.0
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
5.0
Switchyard Structures
GIS Substations
Power Line Carrier Equipment
Substation Auxiliary Facilities
Bus Bar Schemes
Inspection and Maintenance
ANNEXURE 1.1
ANNEXURE 1.2
Section 2
Selection of Switchyard Equipment
BUS BAR
CIRCUIT BREAKERS
ISOLATORS
Temperature Rise
Rating
Isolator Insulation
Arcing Horn & Arcing Contacts
Load Break Switches
Terminal ConnectorsInterlocks
Supporting Structures
Fire Extinguishing System
CURRENT TRANSFORMERS
Type and Rating
Details of Current Transformer
General Requirements
Terminal Connectors 33 kV and Above
Type of Mounting
Tests
External Insulation (12 kV & Above)
Fittings and Accessories (12 kV & Above)
POTENTIAL TRANSFORMER AND COUPLING VOLTAGE
TRANSFORMER
12
15
16
17
17
17
18
19
20
21
21
21
22
22
23
23
2323
24
24
24
25
25
26
27
27
28
28
28
28
-
8/11/2019 Electrical Phase to Phase Clearance
4/98
5.1
5.2
5.3
5.4
6.0
7.0
8.0
9.0
10.0
11.0
12.0
1.0
2.0
3.0
4.0
5.06.0
7.0
8.0
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9
8.10
Type and Rating of Potential Transformer
Temperature Rise
11 kV Voltage Transformer
Coupling Voltage Transformer (36 kV & Above)
TRANSFORMERS
LIGHTNING ARRESTORS
EQUIPMENT FOR CUMMUNICATION, RELAYING AND TELE
METERING AND OFF-SITE CONTROL
AUXILIARIES
REPAIR / INSPECTION FACILITIES
PALE FENCING
SWITCHYARD LAYOUT
Section 3
Selection of Power Transformer
GENERAL
GENERATOR TRANSFORMERS
TRANSFORMER RATING
STANDARD RATING
COOLINGTEMPERATURE RISE, OVERLOAD CAPACITY AND
CONTINUOUS RATING
TRANSFORMER STUDIES
ELECTRICAL CHARACTERISTICS
Type of Transformer and Operating Conditions
Continuous Maximum Rating and Overloads
Voltage Ratio
Duty Under Fault Condition
Electrical Connections
Flux Density
Current Density
Short Circuit Strength
Frequency and System Voltage
Parallel Operation
29
30
30
31
31
31
35
35
35
36
36
51
52
52
53
54
55
55
55
55
56
56
56
57
57
57
57
58
58
-
8/11/2019 Electrical Phase to Phase Clearance
5/98
8.11
8.12
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
1.
2.
3.
3.1
3.2
3.3
3.4
4.
5.
6.
7.
Vibration and Noise
Basic Insulation Levels (BIL)
IMPEDANCE
TRANSFORMER EFFICIENCY
TERMINAL BUSHINGS
TANKS
PRESSURE RELIEF DEVICE
ANTI EARTHQUAKE CLAMPING DEVICE
FITTINGS AND ACCESSORIES
DIELECTRIC TESTS
ACCESSORIES
OIL CONTAINMENT AND FIRE PROTECTION SYSTEM
FACTORY AND FIELD TESTING
ERECTION, MAINTENANCE TESTING AND COMMISSIONING
TYPICAL TRANSFORMER RATING AND CHARACTERISTICS
ANNEXURE 3.1
ANNEXURE 3.2
ANNEXURE 3.3
ANNEXURE 3.4
Section 4
Selection of Circuit Breaker
INTRODUCTION
CLASSIFICATION
TYPE OF CIRCUIT BREAKER
Vacuum Circuit Breaker
Advantages and Disadvantages
Evaluation of SF6 and Vacuum Switching Technologies
Protection Classes for Switchgear Installation
RATED CHARACTERISTICS
STANDARD RATINGS OF CIRCUIT BREAKERS
CO-ORDINATION OF RATED VALUES
TESTS
58
58
58
59
60
61
61
61
61
63
63
63
64
64
64
65
67
69
70
71
71
71
73
73
73
75
76
77
84
86
-
8/11/2019 Electrical Phase to Phase Clearance
6/98
8.
8.1
8.2
8.3
8.4
8.5
FAULT CALCULATION
Staged Short Circuit Tests
Circuit Breaker Rating for Short Circuit Duty
Simplified Methods for Calculation Short Circuit Current
E/X Simplified method as per IEEE std. C37010-1999
Simplified Method
86
87
87
87
88
89
-
8/11/2019 Electrical Phase to Phase Clearance
7/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
8/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
9/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
10/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
11/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
mU
-
8/11/2019 Electrical Phase to Phase Clearance
12/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
13/98
-
8/11/2019 Electrical Phase to Phase Clearance
14/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
15/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
16/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
17/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
18/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
19/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
20/98
-
8/11/2019 Electrical Phase to Phase Clearance
21/98
-
8/11/2019 Electrical Phase to Phase Clearance
22/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
23/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
24/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
25/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
26/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
27/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
28/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
29/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
30/98
-
8/11/2019 Electrical Phase to Phase Clearance
31/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
32/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
33/98
-
8/11/2019 Electrical Phase to Phase Clearance
34/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
35/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
36/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
37/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
38/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
39/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
40/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
41/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
42/98
AHEC/MNRE/SHP Standards/E&M Works- Guidelines for Selection of Switchyard SHP Station
-
8/11/2019 Electrical Phase to Phase Clearance
43/98
-
8/11/2019 Electrical Phase to Phase Clearance
44/98
-
8/11/2019 Electrical Phase to Phase Clearance
45/98
-
8/11/2019 Electrical Phase to Phase Clearance
46/98
-
8/11/2019 Electrical Phase to Phase Clearance
47/98
-
8/11/2019 Electrical Phase to Phase Clearance
48/98
-
8/11/2019 Electrical Phase to Phase Clearance
49/98
-
8/11/2019 Electrical Phase to Phase Clearance
50/98
-
8/11/2019 Electrical Phase to Phase Clearance
51/98
-
8/11/2019 Electrical Phase to Phase Clearance
52/98
-
8/11/2019 Electrical Phase to Phase Clearance
53/98
-
8/11/2019 Electrical Phase to Phase Clearance
54/98
-
8/11/2019 Electrical Phase to Phase Clearance
55/98
-
8/11/2019 Electrical Phase to Phase Clearance
56/98
-
8/11/2019 Electrical Phase to Phase Clearance
57/98
-
8/11/2019 Electrical Phase to Phase Clearance
58/98
-
8/11/2019 Electrical Phase to Phase Clearance
59/98
-
8/11/2019 Electrical Phase to Phase Clearance
60/98
-
8/11/2019 Electrical Phase to Phase Clearance
61/98
-
8/11/2019 Electrical Phase to Phase Clearance
62/98
-
8/11/2019 Electrical Phase to Phase Clearance
63/98
-
8/11/2019 Electrical Phase to Phase Clearance
64/98
-
8/11/2019 Electrical Phase to Phase Clearance
65/98
-
8/11/2019 Electrical Phase to Phase Clearance
66/98
-
8/11/2019 Electrical Phase to Phase Clearance
67/98
-
8/11/2019 Electrical Phase to Phase Clearance
68/98
-
8/11/2019 Electrical Phase to Phase Clearance
69/98
n
n
rr
r
n
n
rr
r
n
n
rr
r
-
8/11/2019 Electrical Phase to Phase Clearance
70/98
-
8/11/2019 Electrical Phase to Phase Clearance
71/98
nn
C rrrEnn
rrr
nr
nr
n
n
rr
r
-
8/11/2019 Electrical Phase to Phase Clearance
72/98
-
8/11/2019 Electrical Phase to Phase Clearance
73/98
-
8/11/2019 Electrical Phase to Phase Clearance
74/98
-
8/11/2019 Electrical Phase to Phase Clearance
75/98
-
8/11/2019 Electrical Phase to Phase Clearance
76/98
2.5
-
8/11/2019 Electrical Phase to Phase Clearance
77/98
-
8/11/2019 Electrical Phase to Phase Clearance
78/98
a
Code
First Digit Degree of protection against contact
And ingress of foreign bodies
Second Digit Degree of protection against ingress
Of water
Supplementary Sealing material between code letter
floor, ceiling or wall
IP 4 3 B
Protection Class
-
8/11/2019 Electrical Phase to Phase Clearance
79/98
-
8/11/2019 Electrical Phase to Phase Clearance
80/98
-
8/11/2019 Electrical Phase to Phase Clearance
81/98
kAkV
-
8/11/2019 Electrical Phase to Phase Clearance
82/98
-
8/11/2019 Electrical Phase to Phase Clearance
83/98
-
8/11/2019 Electrical Phase to Phase Clearance
84/98
-
8/11/2019 Electrical Phase to Phase Clearance
85/98
-
8/11/2019 Electrical Phase to Phase Clearance
86/98
-
8/11/2019 Electrical Phase to Phase Clearance
87/98
-
8/11/2019 Electrical Phase to Phase Clearance
88/98
-
8/11/2019 Electrical Phase to Phase Clearance
89/98
voltageoperating
voltageimumRated
-
8/11/2019 Electrical Phase to Phase Clearance
90/98
-
8/11/2019 Electrical Phase to Phase Clearance
91/98
-
8/11/2019 Electrical Phase to Phase Clearance
92/98
-
8/11/2019 Electrical Phase to Phase Clearance
93/98
-
8/11/2019 Electrical Phase to Phase Clearance
94/98
xx
x
-
8/11/2019 Electrical Phase to Phase Clearance
95/98
-
8/11/2019 Electrical Phase to Phase Clearance
96/98
AC
DC
I
xI
-
8/11/2019 Electrical Phase to Phase Clearance
97/98
Vr is recovery voltage stated in terms of voltage between phases at service frequency
Vrc is recovery voltage component existing across the breaks of each pole.
-
8/11/2019 Electrical Phase to Phase Clearance