    DATE DESCRIPTION OF WORK

    MATERAIL

    REPLACE

    STATUS OF

    WORKS DEPARTMENT CATEGORY REM

    5/3/2013

    1250 KVA Transformer silicagel was become (pink) so make it dry in sun and colour

    change into ( blue) NOT OK ELECTRICAL MINOR

    6/3/2013 FOR new thyrestor 2 NOS chanel cutting and 5 mm dia hole making fixing work NOT ok ELECTRICAL MINOR

    7/3/2013 fixing of thyrestor NOT 0K ELECTRICAL MINOR

    8/3/2013 Detemination of weight of all motor NOT 0K ELECTRICAL MINOR

    8/3/2013 95 sq mm cupper 12 nos copper lugging work done for thyrestor 12 nos lugs 0K ELECTRICAL MINOR

    9/3/2013 95 sq mm cupper 12 nos copper lugs lighting work in threstor NOT 0k ELECTRICAL MINOR

    10/3/20123 95 sq mm copper cable connection done NOT OK ELECTRICAL MINOR

    12/3/2013 1sq mm 2 core PVC insulated flexible cable layied between DCS room to MCC room NOT OK ELECTRICAL MINOR

    13/3/2013

    plant under shur down checked (MAC) oil heater setting 80 deg again set it at it original

    position NOT ELECTRICAL MINOR

    13/3/2013 GAN comp greasing done NOT OK ELECTRICAL MINOR

    MAC oil cooler cleaning work done NOT OK ELECTRICAL MINOR

    15/3/2013 checked temp of oil 39.5 deg OK ELECTRICAL MINORMACbody temp 52 deg OK ELECTRICAL MINOR

    GAN comp PANEL ROOM TEMP 36 DEG OK ELECTRICAL MINOR

    18/3/2013 Check all panel cooling fan NOT OK ELECTRICAL MINOR

    Shut don for EVC pump for cleaning water strainer OK MINOR

    19/3/2013 all earth pits cover handle works weilding rod OK ELECTRICAL MINOR

    60 watts lamp change in pota cabin 60 watt lamp OK ELECTRICAL MINOR

    Checked GOX space heater not OK ELECTRICAL MINOR

    20/3/2013 Earth pit cover handle making work weilding rod OK ELECTRICAL MINOR

    21/3/2013 Connection of power & contol cable connection done as per instruction of PARTY NOT OK ELECTRICAL MINOR

    JOB HISTORY FOR THE MONTH OF MARCH-2013

  • 8/13/2019 Electrical Job History

    2/23

    22/03/2013 plant shut down for changing the AOP pump hose pipe changing MECHANICAL MINOR

    PROBLEM IN GAN 22/03/2013 TION TAKEN1 Gan comp MCCB tripped from MCCroom in runnig time OK ELECTRICAL MAJOR

    2

    Take shut down & open local panel found burning smell was cominig from in side the

    motor OK ELECTRICAL MAJOR

    3 Disconnect the all out going terminals from contactors OK ELECTRICAL MAJOR

    4 Take the (IR) value with MEGGER two winnding shows short OK ELECTRICAL MAJOR

    5

    Open the all power contactor for checking the power contactors kit conditions found

    main contactor Y phase kit was damage

    CHANGE

    ABB A-260

    110 V AC OK ELECTRICAL MAJOR

    6

    Checked operation of control CKT it was not tripping immedaitely on motor O/L so

    modification done. in which new connection given with O/L NC to emergency push

    button to trip the contcol CKT immediately

    Modification

    done in

    control

    wiring OK ELECTRICAL MAJOR

    in which new connection given with O/L NC to emergency push button to trip the

    contcol CKT immediately.Also existing O/L range was more than required

    tested O/L

    procured by OK ELECTRICAL MAJOR

    23/03/2013

    New motor mounting done , connections given , check the direction of motor ON NO

    load 135 amps.and at 4 kg pressure 280 amps OK ELECTRICAL MAJOR

    Greasing done of GAN compresser OK ELECTRICAL MINOR

    24/03/2013 New Connection given for new thyrestor cooling fan OK ELECTRICAL MINOR

    28/03/2013 A/C no 08 breakdown due to fan broken so party change the cooling fan OK ELECTRICAL MINOR

    29/03/2013 A/C NO 5,6 7,8 complete maintenance done also checked compressur gas pressure OK ELECTRICAL MINOR

    30/3/2013 A/C NOS1,2,3 full maintenance done OK ELECTRICAL MINOR

  • 8/13/2019 Electrical Job History

    3/23

    DATE DESCRIPTION OF WORK

    MATERAIL

    REPLACE

    STATUS OF

    WORKS DEPARTMENT CATEGORY RE

    1/4/2013 Emergency light No.2 & 3 not charging. The light open and cheked NO OK ELECTRICAL MINOR

    The GAN compressor load value taken R-278 amps, Y-280 amps, B-280.5amps.

    Temprature DE-58.4, NDE-40.41, comp-61.51, Motor Body-55.2.

    3/4/2013 GAN Compressor Vaibration Cheked

    NDE V H A

    Velocity 2.9 03 02 OK ELECTRICAL MINOR

    Displacement 18 16 14

    DE V H A

    Velocity 2.5 2.8 1.8

    Displacement 05 08 10

    4/4/2013 Earth pit No.1,2,3 & 4 water pooring work OK ELECTRICAL MINOR

    A/c. No6/7. & Shut down due to Compressor side fan damaged NO OK ELECTRICAL MINOR

    5/4/2013

    A/c. no.7 removed the damage fan and A/c. No. 6 Compressor under shut down due to

    Compressor side fan more Vaibration. NO OK ELECTRICAL MINOR

    6/4/2013 MCC Room cleaning work carried out. OK ELECTRICAL MINOR

    7/04/013

    1250 Kva transformer SILICAGEL colour become pink so removed it & make dry it in sun

    colour become Blue OK ELECTRICAL MINOR

    1250 KVA transformer Oil leakage arrested from top cover and top side dummy by

    using taflon tap and M seal OK ELECTRICAL MINOR

    /04/52013 Cleaning of all MCC room done OK ELECTRICAL MINOR

    JOB HISTORY FOR MONTH OF APRIL-2013

  • 8/13/2019 Electrical Job History

    4/23

    A.C NOS 7 fan fitting done ,jointed fan NO OK ELECTRICAL MINOR

    9/4/2013 GOX Compressor area cleaning work carried out OK ELECTRICAL MINOR

    11/4/2013 Transformer Yard cleaning and jally equal level work carried out OK ELECTRICAL MINOR

    Check all Motor bearing sound, the sound is normal. OK ELECTRICAL MINOR

    A/c. No.7 Damege fan replaced and new fan fixed. The A/c Running normal condition YES OK ELECTRICAL MINOR

    12/4/2013

    Check all cooling fan in MCC romm panel and GAN Compressor fan. The Fan sound is

    normal condition OK ELECTRICAL MINOR

    14/4/13 MAC front side 250W Lighting fault rectification work carried out. OK ELECTRICAL MINOR

    15/4/13 Cooling water pump A (45 KW) following maintenance work carried out MINOR

    I) Terminalbox open and terminal tightness cheked and CTC applied

    II) Greasing Applied for DE and NDE

    III) Motor fully cleaning work carried out. NO OK ELECTRICAL

    16/4/13 All Earth Bit Earth testing and IR value taken OK ELECTRICAL MAJOR

    17/4/13 Oxygen Compressure De greasing work carried out. OK ELECTRICAL MAJOR

    19/4/2013 Transformer Top cover Nuts and Bolt tightness cheking and cleaning work carried out. OK ELECTRICAL MINOR

    Gan Compressor Stoped for filling purpose the same time Physically see local pannel. OK ELECTRICAL MINOR

    20/4/13 Transformer Yard HT incommer cable hole coverd by using Aluminum sheet and Glass wool. OK ELECTRICAL MINOR

    Make a drainege arrengement for roof water PVC pipe pine in Transformer yard. OK ELECTRICAL MINOR

    22/4/2013

    Take the measurement of cable for f low meter which is to be mounting in make up

    water/ blow down line OK ELECTRICAL MINOR

    24/4/2013

    Plant under shut down to maintanance the IGV valve so we checked the motor terminal

    connections of PLNT SHUR DOWN

  • 8/13/2019 Electrical Job History

    5/23

    cooling tower fan found ok IGV Proble OK ELECTRICAL MINOR

    Greasing done of circulating water pump B OK ELECTRICAL MINOR

    5/4/2013

    Regeneration heater NO -3 going to off during heating period so cheaked all control

    connection found ok OK ELECTRICAL MINOR

    0/4/2013

    300 Kw GOX comp in trial taken time not going to start so removed it control card try

    again & again but not ok OK ELECTRICAL MINOR

  • 8/13/2019 Electrical Job History

    6/23

    DATE DESCRIPTION OF WORK

    MATERAIL

    REPLACE

    STATUS OF

    WORKS DEPARTMENT

    CATEGORY

    1/5/2013300 Kw GOX comp in trial taken time not going to start so removed it control card and re-putit.Then re-start the compressor. Compressor start and runnuing normal condition. Initial

    Current (Unload) - 179 Amps.

    No ok ELECTRICAL MINOR

    2/5/2013 i) 300 KwGox Compressor Cleaning work carried out.

    ii) Gan Compressor (200KW) taken Body temperature and Bearing (DE& NDE)

    Body temperature Right Side - 59.8 ok ELECTRICAL MINOR

    Left Side - 57.5

    Drive End - 51.5

    Non - Drive End - 43.0

    iii) At 14.35 Hrs. ABB service engineer came and attan the LV card change work for 300KW

    Gox Compressor Motor. Replce the old LV card and new one fixed. At 15.10 Hrs complete the

    work. Then taken two time trail run at 15.15 Hrs. and 15.25 Hrs.Compressor running normal

    condition. Taken Unload current - 176 Amps. AT 15.30 Hrs Again Start the Gox Compressor andgive the 50% load the Compressor teken current for 215 Amps, after 5 minits give full load

    Compressor taken current 325 Amps.

    LV Card ok ELECTRICAL MAJOR

    3/5/2013 Office Container left side wall mounting ELCB Board and MCB box removed. No ok ELECTRICAL MINOR

    JOB HISTORY

  • 8/13/2019 Electrical Job History

    7/23

    4/5/2013

    At. 02:10 Hrs Gox Compressor start. The Compressor not start due to soft starter side fault

    indication (line fault / Delta). Immideatly SESA Engineer's came and attan the fault but problem

    not solved. Same fault indication again. Then after taken shut down work at 04 : 50 Hrs.

    Recheck all controll wiring after two time try to start the compressor but not start . Then check

    the soft starter PCB board removed and re put it. again strat the Gox compressor. The Motor

    start and running normal condition. At. 7 : 15 Hrs Started Gox compressor.

    No ok ELECTRICAL MAJOR

    5/5/2013 AT 2. AM Gox comp try to start but same fault (Line FAULT/DELTA ) removed its card

    again try but not started so again removed its L.V card and start Gox comp AT 7.15

    IN SS&CO cabin 40 ELCB Provided MINOR

    7/5/2013 PLANT SHUT DOWN Follwing works taken maintenance

    1.4 MW Soft Starter party came and open all side cover clean it with hand blower

    and AMC maintenance done. Main Air Compressor HT panel taken AMC and

    UPS 1 & 2 ,

    No ok ELECTRICAL MAJOR

    8/5/2013 All Ht panel cleaning work carried out. No ok ELECTRICAL MINOR

    200 KW GAN compressor Old Motor 1 Over hauling work completed for Joyel electrical. Then

    Motor brought to PIG plant Electrical work shop.9/5/2013 Transformer (1250 KVA) change the old silicagel and new silicagel fillied done. No ok ELECTRICAL MINOR

    300KW Gox compressor soft starter service work carried out. The work attan by ABB service

    Engg. Remove out going cable and check soft starter thyrister Ohms value. Value R,Y&B phase

    50 ohms. Normal value. Note: The service person told ( Before every start the Gox Compressor

    check i/p voltage and tripping time also i/p chek.) Then re connect the cable and take two time

    trail. Motor running normal condition.

    No ok ELECTRICAL MAJOR

    ########200 KW GAN Compressor Moto - I (old Motor) check IR value. Winding to body 20Mohm

    (R,Y&B). Then taken trail run. Motor running normal condition and initial peak load - 483 A.

    Unload current R-Ph-31A,Y-ph-32A & B-Ph-35 (Delta Connection)

    MAJOR

  • 8/13/2019 Electrical Job History

    8/23

    Cooling water pump B (45KW) (Mechanical) pump side service work carried out. Then taken trail

    run at 10 minits. Pump running normal condition. Un load current - 36 ANo ok ELECTRICAL MINOR

    ######## Grinding Machine, Blower Machine & Drilling Machine Inspection date renewed up to

    10/8/2013 Approved by SESA GOA.

    No ok ELECTRICAL MINOR

    200 KW GAN Compressor Moto - I (old Motor) fully covered by using PVC sheet No ok ELECTRICAL MINOR

    ########(Loc : Cold box floor I & II) fault in two nos. HPSV light fitting rectification work carried out

    No ok ELECTRICAL MINOR

    15/5/2013 (Loc : Control Room) fault in 1 No. Tube light fitting rectification work carried out No ok ELECTRICAL MINOR

    All Junction Box covered by using PVC sheet ( Lighting Pole) No ok ELECTRICAL MINOR

    16/5/2013Cable laying work carried out from MCC room to cooling tower and Gan compressor back side

    for Instrumentation flow meter work.No ok ELECTRICAL MINOR

    17/5/2013 Mcc room ACDB panel side cable termination work carried out for instrumet flow meter No ok ELECTRICAL MINOR

    18/5/2013

    At 05:50 Hrs plant tripped due to MOP problem. At 07:10 Hrs taken MOP maintanence for

    Mechanical Dept. So immediately MAC VCB rack out position and MOP MPCB isolated. At 12:10

    Hrs MOP maintenance work completed and shut down permit closed. At 12:15 Hrs MOP started

    running normal condition. At 12:30 Hrs MAC VCB rack in position. At 12:50 Hrs. Plant startedand running normal condition.

    No ok ELECTRICAL MAJOR

    18/5/2013

    Gox Compressor started at 20 : 20 Hrs. Gox Compressor was not started due to electrical

    problem (Fault Line/Delta). Taken shut down at 21:25 Hrs and checked all terminals tightness

    abd taken trail run. But again Compressor was not started due to same fault. Then checked Gox

    compressor i/p voltage. RY-414V, YB-413V, BR-409V and RN-333, YN-334, BN-109. fault was

    identified, the problem was un-balanced i/p voltage. So again terminal tightness re-checked and

    trail run was taken at 24:30 Hrs. But again the compressor not started. Then we taken re-trail at

    05:25 & 06:20 Hrs.(19/5/2013)

    No ok ELECTRICAL MAJOR

  • 8/13/2019 Electrical Job History

    9/23

    19/5/2013

    At 08:30 Hrs Checked i/p voltage of Gox Compressor, voltage was normal. At 08:40 Hrs We

    taken trail run Compressor running normal condition. The problem only for night time. So we

    checked the all lighting load voltage inside N2O2 plant. Voltage was found normal. The same

    time extarnel power supply which is going to Dspatch dep. We re-stared Gox compressor at

    19:30 Hrs. but due to same electrical problem (Fault Line/ Delta) Compressor was not started.

    Then we checked the i/p voltage, which was obseved as RN-333, YN-331, BN-90.We also

    identified that at this same time when we starting the Gox Compresoor despatch load was inON condition. Then we tried to start Gox Compressor by switching OFF the line which is going to

    despatch & checked the voltage of Gox compressor the voltage was found normal RN-YN-BN-

    233V. At 20:00 Hrs we again started Gox compressor & Compressor was running smoothly.

    Hence we conformed that the problem was in the line going to desptch depat.

    No ok ELECTRICAL MAJOR

    21/5/2013

    At 11:30 Hrs. MCC room despatch load i/p voltage was checked RN-YN-BN-237. Body to Neutral

    - 149V at the same time Despatch High Mass light ON condition. So we went there to Despatch

    Dept. Cheked line voltage as well as phase to Neutral.(MCC room to Despatch Incommer,

    Despatch Incommer to High Mass light Junction Box, HML junction to HML pole). Finaly we

    found the problem is in between HML pole to light fitting supply cable. As per the instruction of

    SESA GOA Engg. isolated B phase after cheking all 3 phase separatly. Then we have taken trail

    run of Gox Compressor running smoothly and the Gox compressor voltage ic MCC room is in

    noemal condition.( RY- YB- BR- 417V, RN- YN- BN- 238V & Body to Neutral - 0 V)

    No OK ELECTRICAL MAJOR

    21/5/2014

    At 11:30 Hrs. MCC room despatch load i/p voltage was checked RN-YN-BN-237. Body to Neutral

    - 149V at the same time Despatch High Mass light ON condition. So we went there to Despatch

    Dept. Cheked line voltage as well as phase to Neutral.(MCC room to Despatch Incommer,

    Despatch Incommer to High Mass light Junction Box, HML junction to HML pole). Finaly we

    found the problem is in between HML pole to light fitting supply cable. As per the instruction of

    SESA GOA Engg. isolated B phase after cheking all 3 phase separatly. Then we have taken trail

    run of Gox Compressor running smoothly and the Gox compressor voltage ic MCC room is in

    noemal condition.( RY- YB- BR- 417V, RN- YN- BN- 238V & Body to Neutral - 0 V)

    No OK ELECTRICAL MAJOR

  • 8/13/2019 Electrical Job History

    10/23

    27/5/13 At 09:30 Hrs. Taken shut down for 300 KW GOX compressure due to change the LB card. At

    10:30 Hrs. new LB card replaced by old LB card and a trail run was taken it was running normaly. Yes ok

    ELECTRICAL MAJOR

    Cable termination was done in temporary power supply from SESA Goa shed to O2/N2plantELECTRICAL MINOR

    PLANT SHUT DOWN : Follwing works taken maintenance ELECTRICAL MAJOR

    28/5/13

    1250 KVA Transformer taken maintenance and following work was completed i)CheckingTerminations On Lt And Ht Side

    ii)Checking Bucholz Trip Relay & Tripping

    iii)Checking Of Winding Temperature Tripping

    iv)Checking Of Oil Temperature Tripping

    v)Checking Of Breather

    vi)Checking For Neutral Earthing Earth Pit Connections

    vii)Check And Record Meggering Of Windings

    viii)Check For Ref Protection Stability

    ix)Sealing Of Terminal Boxes & Gland Plate

    x)General Inspection For Support Insulators, Tightness

    xi)Checking Of Main Tank & Oltc Breather

    No ok

    ELECTRICAL MAJOR

    Breaker Maintenance: Main Incomer, MAC & 1250 KVA Trf. VCB's taken Annual maintenance

    (Close & Tripping) No okELECTRICAL MAJOR

    ELECTRICAL MAJOR

    Cleaning Of All Breakers, Panels, Busbars,Arc Chutes,Contacts, Etc. ok ELECTRICAL MAJOR

    Checking The Tightness Of Busbars ok ELECTRICAL MAJOR

    Checking Of Incoming/Outgoing Cable Terminations ok ELECTRICAL MAJOR

    Tripping Of Relay/Breaker ok ELECTRICAL MAJOR

    Sealing Of Panels Including Gland Plate ok ELECTRICAL MAJOR

    Meggering Of GOX & GAN Compressor ok ELECTRICAL MAJOR

    Meggering Of 1250 Transformer ok ELECTRICAL MAJOR

    Indication Of Operating Voltage Level ok ELECTRICAL MAJOR

    Checking For Earth Connections ok ELECTRICAL MAJOR

    One Meter Clear Space Infront Of Panel ok ELECTRICAL MAJOR

  • 8/13/2019 Electrical Job History

    11/23

    Checking Of Spring Charging, Closing, Tripping Electrically And Manually ok ELECTRICAL MAJO

    29/5/13 MAC oil heater at field open and mannualy heter setting changed from 40 to 70 No ok ELECTRICAL MINO

  • 8/13/2019 Electrical Job History

    12/23

    REMARKS

  • 8/13/2019 Electrical Job History

    13/23

  • 8/13/2019 Electrical Job History

    14/23

  • 8/13/2019 Electrical Job History

    15/23

  • 8/13/2019 Electrical Job History

    16/23

  • 8/13/2019 Electrical Job History

    17/23

  • 8/13/2019 Electrical Job History

    18/23

    DATE DESCRIPTION OF WORK

    1-Jun-13 Power supply given to near SS & Co container building from MCC romm

    3-Jun-13 1.5 Sq.mm 3 Core cable layed between MCC room to MAC Air filtter unit for 110V AC. Supply

    taken fromMCC room spare feeder (7.5 KW)

    3.7 KW, 1440 RPM, MARATHON make Motor brought SESA store to O2/N2 plant for MAC

    Aux.Oil. pump.

    4-Jun-13Near GAN compressor. 20 A single phase Extention power supply board fitting and supply

    provided.

    5-Jun-13 Starter (DOL) prepared for 2.8 KW Sump Motor by using 20 A 3 pole MCB 1 No.Emergency push button and Start push button, Contactor and OLR. contol wiring also

    completed

    6-Jun-13 45 KW Water circulating pump (B) Motor taken for Maintenance.

    7-Jun-13 EVC Pump - B (5.5KW) taken for maintenance

    8-Jun-13 Porta cabin 1 No. faulted tube light fitting rectification work have been carried out.

    At : 10:00 hrs. GAN Compressor (200KW) shut down due to Mechanical maintenance work

    have been carried out by Mechanical Dept. at the same time GAN Compressor Local panel side

    terminal tightness checked (Power & Control wiring) and Cleaning work have been carried out.

    At : 14:30 Hrs. Maintenance work completed. At: 14:45 Hrs. GAN Compressor started,and it is

    running normally.

    At : 16:45 Hrs. EVC pump (5.5 KW) A-B changed.

    10-Jun-13

    1250 KVA Transformer HT side terminal box and LT side terminal box and Busbar duct fully

    covered by using Plastic thin sheet

    11-Jun-13 All panel roofs were checked for periodic maintenance.

    Water sumped from cable duct.

    12-Jun-13 230V power supply has been given to flow transmitter (Loc. Near by Gan Compressor)

    A.c No.7 was not working properly after tightness check, now working normal condition.

    14-Jun-13 Greasing shedule updated

    15-Jun-13 Tools review

    1.5 HP Spare sump motor's (single phase) Capacitor was replaced with new one, trail run was

    taken and found it was running normaaly.

    JOB HISTORY

  • 8/13/2019 Electrical Job History

    19/23

    16-Jun-13 Spare material's reviwe was done

    17-Jun-13 2.8 KW Motor pump was taken by Miss. Akshatha (SESA. Eng)

    27-Jun-13 45 KW Watter Circulating Pump A Motor Greasing Done

    200 KW Watter Circulating Pump A Motor Greasing Done

    28-Jun-13 For Changing the MOP of MAC it was taken shut down from 10:00 to 17:30 Hrs. The MOPreplaced with new Motor for that supported Mechanical Dept.

    18.5 KW Cooling tower fan taken for maintenance, terminal tightness checked and CRC applied

    for rust same motor terminal checked at panel side.

    In 110V Battery Charger taken under AMC. The work carried out by (DEKAM Engg.Pvt.Ltd)

    Service Engg. During preventive maintenance we found that 250ma transformer was getting

    fault. So it will be replaced by tomorrow (29/6/13_

    7.5 KW Cooling tower fan taken for maintenance, terminal tightness checked and CRC applied

    for rust same motor terminal checked at panel side.

    29-Jun-133.7 KW AOP motor both side bearing 6206 ZZ changed. load on no load 4.00 Amps 3.88, 3.70&

    also windimg resistance 5.70 ohm in each windingBattery changer service engg came from DEKEM Engg He checkrd stand by charger one No

    transformer270 V/22-0-22 Burn so new transformer change & connection given trial taken

    found ok

    45KW Watter circulating pump A cleaning work carried out.

  • 8/13/2019 Electrical Job History

    20/23

    MATERAIL

    REPLACE

    STATUS OF

    WORKSDEPARTMENT CATEGORY REMARKS

    No Ok ELECTRICAL MINOR

    2 Nos. 6 A single pole

    MCCB fixed

    Ok ELECTRICAL MINOR

    ELECTRICAL MINOR

    20 A Power Extention

    board new one fixed

    Ok ELECTRICAL MINOR

    Ok ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    No Ok ELECTRICAL MAJOR

    No Ok ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    ELECTRICAL MINOR

    ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    MINOR

    No Ok ELECTRICAL MINOR

  • 8/13/2019 Electrical Job History

    21/23

    No Ok ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    Old Motor 3.7 KW Ok ELECTRICAL MINOR

    NoOk ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    NoOk ELECTRICAL MINOR

    Bearing replaced Ok ELECTRICAL MINOR

    270V/22-0-22 V AC

    transformerOk ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

  • 8/13/2019 Electrical Job History

    22/23

    DATE DESCRIPTION OF WORK

    1-Jul-13 5.5KW EVC Pump B preventive maintenance done, (Motor & Panel side)

    45KW Water Circulating pump B Preventive maintenance done, (Motor & Panel side)

    4-Jul-13 Welding Connection give to SS&Co Container to work place

    Welding Connection give to MCC room to near By SESA Container work place

    6-Jul-13

    At 10:00 Hrs Plant shut down. That time following feeders maintenance works carried out.

    I) Water circulating Pump-B (45KW) terminals tightness checked at panel side.

    II) Regeneration Heater (80KW) 1,2 & 3 terminals tightness checked at panel side.

    III) Lin Pump (5.5KW) A & B terminals tightness checked at panel side.

    IV) EVC Pump (5.5KW) A&B terminals tightness checked at panel side.

    JOB HISTORY

  • 8/13/2019 Electrical Job History

    23/23

    MATERAIL

    REPLACE

    STATUS OF

    WORKSDEPARTMENT CATEGORY REMARKS

    No Ok ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    No Ok ELECTRICAL MINOR

    No OK ELECTRICAL MINOR