electrical job history
TRANSCRIPT
-
8/13/2019 Electrical Job History
1/23
DATE DESCRIPTION OF WORK
MATERAIL
REPLACE
STATUS OF
WORKS DEPARTMENT CATEGORY REM
5/3/2013
1250 KVA Transformer silicagel was become (pink) so make it dry in sun and colour
change into ( blue) NOT OK ELECTRICAL MINOR
6/3/2013 FOR new thyrestor 2 NOS chanel cutting and 5 mm dia hole making fixing work NOT ok ELECTRICAL MINOR
7/3/2013 fixing of thyrestor NOT 0K ELECTRICAL MINOR
8/3/2013 Detemination of weight of all motor NOT 0K ELECTRICAL MINOR
8/3/2013 95 sq mm cupper 12 nos copper lugging work done for thyrestor 12 nos lugs 0K ELECTRICAL MINOR
9/3/2013 95 sq mm cupper 12 nos copper lugs lighting work in threstor NOT 0k ELECTRICAL MINOR
10/3/20123 95 sq mm copper cable connection done NOT OK ELECTRICAL MINOR
12/3/2013 1sq mm 2 core PVC insulated flexible cable layied between DCS room to MCC room NOT OK ELECTRICAL MINOR
13/3/2013
plant under shur down checked (MAC) oil heater setting 80 deg again set it at it original
position NOT ELECTRICAL MINOR
13/3/2013 GAN comp greasing done NOT OK ELECTRICAL MINOR
MAC oil cooler cleaning work done NOT OK ELECTRICAL MINOR
15/3/2013 checked temp of oil 39.5 deg OK ELECTRICAL MINORMACbody temp 52 deg OK ELECTRICAL MINOR
GAN comp PANEL ROOM TEMP 36 DEG OK ELECTRICAL MINOR
18/3/2013 Check all panel cooling fan NOT OK ELECTRICAL MINOR
Shut don for EVC pump for cleaning water strainer OK MINOR
19/3/2013 all earth pits cover handle works weilding rod OK ELECTRICAL MINOR
60 watts lamp change in pota cabin 60 watt lamp OK ELECTRICAL MINOR
Checked GOX space heater not OK ELECTRICAL MINOR
20/3/2013 Earth pit cover handle making work weilding rod OK ELECTRICAL MINOR
21/3/2013 Connection of power & contol cable connection done as per instruction of PARTY NOT OK ELECTRICAL MINOR
JOB HISTORY FOR THE MONTH OF MARCH-2013
-
8/13/2019 Electrical Job History
2/23
22/03/2013 plant shut down for changing the AOP pump hose pipe changing MECHANICAL MINOR
PROBLEM IN GAN 22/03/2013 TION TAKEN1 Gan comp MCCB tripped from MCCroom in runnig time OK ELECTRICAL MAJOR
2
Take shut down & open local panel found burning smell was cominig from in side the
motor OK ELECTRICAL MAJOR
3 Disconnect the all out going terminals from contactors OK ELECTRICAL MAJOR
4 Take the (IR) value with MEGGER two winnding shows short OK ELECTRICAL MAJOR
5
Open the all power contactor for checking the power contactors kit conditions found
main contactor Y phase kit was damage
CHANGE
ABB A-260
110 V AC OK ELECTRICAL MAJOR
6
Checked operation of control CKT it was not tripping immedaitely on motor O/L so
modification done. in which new connection given with O/L NC to emergency push
button to trip the contcol CKT immediately
Modification
done in
control
wiring OK ELECTRICAL MAJOR
in which new connection given with O/L NC to emergency push button to trip the
contcol CKT immediately.Also existing O/L range was more than required
tested O/L
procured by OK ELECTRICAL MAJOR
23/03/2013
New motor mounting done , connections given , check the direction of motor ON NO
load 135 amps.and at 4 kg pressure 280 amps OK ELECTRICAL MAJOR
Greasing done of GAN compresser OK ELECTRICAL MINOR
24/03/2013 New Connection given for new thyrestor cooling fan OK ELECTRICAL MINOR
28/03/2013 A/C no 08 breakdown due to fan broken so party change the cooling fan OK ELECTRICAL MINOR
29/03/2013 A/C NO 5,6 7,8 complete maintenance done also checked compressur gas pressure OK ELECTRICAL MINOR
30/3/2013 A/C NOS1,2,3 full maintenance done OK ELECTRICAL MINOR
-
8/13/2019 Electrical Job History
3/23
DATE DESCRIPTION OF WORK
MATERAIL
REPLACE
STATUS OF
WORKS DEPARTMENT CATEGORY RE
1/4/2013 Emergency light No.2 & 3 not charging. The light open and cheked NO OK ELECTRICAL MINOR
The GAN compressor load value taken R-278 amps, Y-280 amps, B-280.5amps.
Temprature DE-58.4, NDE-40.41, comp-61.51, Motor Body-55.2.
3/4/2013 GAN Compressor Vaibration Cheked
NDE V H A
Velocity 2.9 03 02 OK ELECTRICAL MINOR
Displacement 18 16 14
DE V H A
Velocity 2.5 2.8 1.8
Displacement 05 08 10
4/4/2013 Earth pit No.1,2,3 & 4 water pooring work OK ELECTRICAL MINOR
A/c. No6/7. & Shut down due to Compressor side fan damaged NO OK ELECTRICAL MINOR
5/4/2013
A/c. no.7 removed the damage fan and A/c. No. 6 Compressor under shut down due to
Compressor side fan more Vaibration. NO OK ELECTRICAL MINOR
6/4/2013 MCC Room cleaning work carried out. OK ELECTRICAL MINOR
7/04/013
1250 Kva transformer SILICAGEL colour become pink so removed it & make dry it in sun
colour become Blue OK ELECTRICAL MINOR
1250 KVA transformer Oil leakage arrested from top cover and top side dummy by
using taflon tap and M seal OK ELECTRICAL MINOR
/04/52013 Cleaning of all MCC room done OK ELECTRICAL MINOR
JOB HISTORY FOR MONTH OF APRIL-2013
-
8/13/2019 Electrical Job History
4/23
A.C NOS 7 fan fitting done ,jointed fan NO OK ELECTRICAL MINOR
9/4/2013 GOX Compressor area cleaning work carried out OK ELECTRICAL MINOR
11/4/2013 Transformer Yard cleaning and jally equal level work carried out OK ELECTRICAL MINOR
Check all Motor bearing sound, the sound is normal. OK ELECTRICAL MINOR
A/c. No.7 Damege fan replaced and new fan fixed. The A/c Running normal condition YES OK ELECTRICAL MINOR
12/4/2013
Check all cooling fan in MCC romm panel and GAN Compressor fan. The Fan sound is
normal condition OK ELECTRICAL MINOR
14/4/13 MAC front side 250W Lighting fault rectification work carried out. OK ELECTRICAL MINOR
15/4/13 Cooling water pump A (45 KW) following maintenance work carried out MINOR
I) Terminalbox open and terminal tightness cheked and CTC applied
II) Greasing Applied for DE and NDE
III) Motor fully cleaning work carried out. NO OK ELECTRICAL
16/4/13 All Earth Bit Earth testing and IR value taken OK ELECTRICAL MAJOR
17/4/13 Oxygen Compressure De greasing work carried out. OK ELECTRICAL MAJOR
19/4/2013 Transformer Top cover Nuts and Bolt tightness cheking and cleaning work carried out. OK ELECTRICAL MINOR
Gan Compressor Stoped for filling purpose the same time Physically see local pannel. OK ELECTRICAL MINOR
20/4/13 Transformer Yard HT incommer cable hole coverd by using Aluminum sheet and Glass wool. OK ELECTRICAL MINOR
Make a drainege arrengement for roof water PVC pipe pine in Transformer yard. OK ELECTRICAL MINOR
22/4/2013
Take the measurement of cable for f low meter which is to be mounting in make up
water/ blow down line OK ELECTRICAL MINOR
24/4/2013
Plant under shut down to maintanance the IGV valve so we checked the motor terminal
connections of PLNT SHUR DOWN
-
8/13/2019 Electrical Job History
5/23
cooling tower fan found ok IGV Proble OK ELECTRICAL MINOR
Greasing done of circulating water pump B OK ELECTRICAL MINOR
5/4/2013
Regeneration heater NO -3 going to off during heating period so cheaked all control
connection found ok OK ELECTRICAL MINOR
0/4/2013
300 Kw GOX comp in trial taken time not going to start so removed it control card try
again & again but not ok OK ELECTRICAL MINOR
-
8/13/2019 Electrical Job History
6/23
DATE DESCRIPTION OF WORK
MATERAIL
REPLACE
STATUS OF
WORKS DEPARTMENT
CATEGORY
1/5/2013300 Kw GOX comp in trial taken time not going to start so removed it control card and re-putit.Then re-start the compressor. Compressor start and runnuing normal condition. Initial
Current (Unload) - 179 Amps.
No ok ELECTRICAL MINOR
2/5/2013 i) 300 KwGox Compressor Cleaning work carried out.
ii) Gan Compressor (200KW) taken Body temperature and Bearing (DE& NDE)
Body temperature Right Side - 59.8 ok ELECTRICAL MINOR
Left Side - 57.5
Drive End - 51.5
Non - Drive End - 43.0
iii) At 14.35 Hrs. ABB service engineer came and attan the LV card change work for 300KW
Gox Compressor Motor. Replce the old LV card and new one fixed. At 15.10 Hrs complete the
work. Then taken two time trail run at 15.15 Hrs. and 15.25 Hrs.Compressor running normal
condition. Taken Unload current - 176 Amps. AT 15.30 Hrs Again Start the Gox Compressor andgive the 50% load the Compressor teken current for 215 Amps, after 5 minits give full load
Compressor taken current 325 Amps.
LV Card ok ELECTRICAL MAJOR
3/5/2013 Office Container left side wall mounting ELCB Board and MCB box removed. No ok ELECTRICAL MINOR
JOB HISTORY
-
8/13/2019 Electrical Job History
7/23
4/5/2013
At. 02:10 Hrs Gox Compressor start. The Compressor not start due to soft starter side fault
indication (line fault / Delta). Immideatly SESA Engineer's came and attan the fault but problem
not solved. Same fault indication again. Then after taken shut down work at 04 : 50 Hrs.
Recheck all controll wiring after two time try to start the compressor but not start . Then check
the soft starter PCB board removed and re put it. again strat the Gox compressor. The Motor
start and running normal condition. At. 7 : 15 Hrs Started Gox compressor.
No ok ELECTRICAL MAJOR
5/5/2013 AT 2. AM Gox comp try to start but same fault (Line FAULT/DELTA ) removed its card
again try but not started so again removed its L.V card and start Gox comp AT 7.15
IN SS&CO cabin 40 ELCB Provided MINOR
7/5/2013 PLANT SHUT DOWN Follwing works taken maintenance
1.4 MW Soft Starter party came and open all side cover clean it with hand blower
and AMC maintenance done. Main Air Compressor HT panel taken AMC and
UPS 1 & 2 ,
No ok ELECTRICAL MAJOR
8/5/2013 All Ht panel cleaning work carried out. No ok ELECTRICAL MINOR
200 KW GAN compressor Old Motor 1 Over hauling work completed for Joyel electrical. Then
Motor brought to PIG plant Electrical work shop.9/5/2013 Transformer (1250 KVA) change the old silicagel and new silicagel fillied done. No ok ELECTRICAL MINOR
300KW Gox compressor soft starter service work carried out. The work attan by ABB service
Engg. Remove out going cable and check soft starter thyrister Ohms value. Value R,Y&B phase
50 ohms. Normal value. Note: The service person told ( Before every start the Gox Compressor
check i/p voltage and tripping time also i/p chek.) Then re connect the cable and take two time
trail. Motor running normal condition.
No ok ELECTRICAL MAJOR
########200 KW GAN Compressor Moto - I (old Motor) check IR value. Winding to body 20Mohm
(R,Y&B). Then taken trail run. Motor running normal condition and initial peak load - 483 A.
Unload current R-Ph-31A,Y-ph-32A & B-Ph-35 (Delta Connection)
MAJOR
-
8/13/2019 Electrical Job History
8/23
Cooling water pump B (45KW) (Mechanical) pump side service work carried out. Then taken trail
run at 10 minits. Pump running normal condition. Un load current - 36 ANo ok ELECTRICAL MINOR
######## Grinding Machine, Blower Machine & Drilling Machine Inspection date renewed up to
10/8/2013 Approved by SESA GOA.
No ok ELECTRICAL MINOR
200 KW GAN Compressor Moto - I (old Motor) fully covered by using PVC sheet No ok ELECTRICAL MINOR
########(Loc : Cold box floor I & II) fault in two nos. HPSV light fitting rectification work carried out
No ok ELECTRICAL MINOR
15/5/2013 (Loc : Control Room) fault in 1 No. Tube light fitting rectification work carried out No ok ELECTRICAL MINOR
All Junction Box covered by using PVC sheet ( Lighting Pole) No ok ELECTRICAL MINOR
16/5/2013Cable laying work carried out from MCC room to cooling tower and Gan compressor back side
for Instrumentation flow meter work.No ok ELECTRICAL MINOR
17/5/2013 Mcc room ACDB panel side cable termination work carried out for instrumet flow meter No ok ELECTRICAL MINOR
18/5/2013
At 05:50 Hrs plant tripped due to MOP problem. At 07:10 Hrs taken MOP maintanence for
Mechanical Dept. So immediately MAC VCB rack out position and MOP MPCB isolated. At 12:10
Hrs MOP maintenance work completed and shut down permit closed. At 12:15 Hrs MOP started
running normal condition. At 12:30 Hrs MAC VCB rack in position. At 12:50 Hrs. Plant startedand running normal condition.
No ok ELECTRICAL MAJOR
18/5/2013
Gox Compressor started at 20 : 20 Hrs. Gox Compressor was not started due to electrical
problem (Fault Line/Delta). Taken shut down at 21:25 Hrs and checked all terminals tightness
abd taken trail run. But again Compressor was not started due to same fault. Then checked Gox
compressor i/p voltage. RY-414V, YB-413V, BR-409V and RN-333, YN-334, BN-109. fault was
identified, the problem was un-balanced i/p voltage. So again terminal tightness re-checked and
trail run was taken at 24:30 Hrs. But again the compressor not started. Then we taken re-trail at
05:25 & 06:20 Hrs.(19/5/2013)
No ok ELECTRICAL MAJOR
-
8/13/2019 Electrical Job History
9/23
19/5/2013
At 08:30 Hrs Checked i/p voltage of Gox Compressor, voltage was normal. At 08:40 Hrs We
taken trail run Compressor running normal condition. The problem only for night time. So we
checked the all lighting load voltage inside N2O2 plant. Voltage was found normal. The same
time extarnel power supply which is going to Dspatch dep. We re-stared Gox compressor at
19:30 Hrs. but due to same electrical problem (Fault Line/ Delta) Compressor was not started.
Then we checked the i/p voltage, which was obseved as RN-333, YN-331, BN-90.We also
identified that at this same time when we starting the Gox Compresoor despatch load was inON condition. Then we tried to start Gox Compressor by switching OFF the line which is going to
despatch & checked the voltage of Gox compressor the voltage was found normal RN-YN-BN-
233V. At 20:00 Hrs we again started Gox compressor & Compressor was running smoothly.
Hence we conformed that the problem was in the line going to desptch depat.
No ok ELECTRICAL MAJOR
21/5/2013
At 11:30 Hrs. MCC room despatch load i/p voltage was checked RN-YN-BN-237. Body to Neutral
- 149V at the same time Despatch High Mass light ON condition. So we went there to Despatch
Dept. Cheked line voltage as well as phase to Neutral.(MCC room to Despatch Incommer,
Despatch Incommer to High Mass light Junction Box, HML junction to HML pole). Finaly we
found the problem is in between HML pole to light fitting supply cable. As per the instruction of
SESA GOA Engg. isolated B phase after cheking all 3 phase separatly. Then we have taken trail
run of Gox Compressor running smoothly and the Gox compressor voltage ic MCC room is in
noemal condition.( RY- YB- BR- 417V, RN- YN- BN- 238V & Body to Neutral - 0 V)
No OK ELECTRICAL MAJOR
21/5/2014
At 11:30 Hrs. MCC room despatch load i/p voltage was checked RN-YN-BN-237. Body to Neutral
- 149V at the same time Despatch High Mass light ON condition. So we went there to Despatch
Dept. Cheked line voltage as well as phase to Neutral.(MCC room to Despatch Incommer,
Despatch Incommer to High Mass light Junction Box, HML junction to HML pole). Finaly we
found the problem is in between HML pole to light fitting supply cable. As per the instruction of
SESA GOA Engg. isolated B phase after cheking all 3 phase separatly. Then we have taken trail
run of Gox Compressor running smoothly and the Gox compressor voltage ic MCC room is in
noemal condition.( RY- YB- BR- 417V, RN- YN- BN- 238V & Body to Neutral - 0 V)
No OK ELECTRICAL MAJOR
-
8/13/2019 Electrical Job History
10/23
27/5/13 At 09:30 Hrs. Taken shut down for 300 KW GOX compressure due to change the LB card. At
10:30 Hrs. new LB card replaced by old LB card and a trail run was taken it was running normaly. Yes ok
ELECTRICAL MAJOR
Cable termination was done in temporary power supply from SESA Goa shed to O2/N2plantELECTRICAL MINOR
PLANT SHUT DOWN : Follwing works taken maintenance ELECTRICAL MAJOR
28/5/13
1250 KVA Transformer taken maintenance and following work was completed i)CheckingTerminations On Lt And Ht Side
ii)Checking Bucholz Trip Relay & Tripping
iii)Checking Of Winding Temperature Tripping
iv)Checking Of Oil Temperature Tripping
v)Checking Of Breather
vi)Checking For Neutral Earthing Earth Pit Connections
vii)Check And Record Meggering Of Windings
viii)Check For Ref Protection Stability
ix)Sealing Of Terminal Boxes & Gland Plate
x)General Inspection For Support Insulators, Tightness
xi)Checking Of Main Tank & Oltc Breather
No ok
ELECTRICAL MAJOR
Breaker Maintenance: Main Incomer, MAC & 1250 KVA Trf. VCB's taken Annual maintenance
(Close & Tripping) No okELECTRICAL MAJOR
ELECTRICAL MAJOR
Cleaning Of All Breakers, Panels, Busbars,Arc Chutes,Contacts, Etc. ok ELECTRICAL MAJOR
Checking The Tightness Of Busbars ok ELECTRICAL MAJOR
Checking Of Incoming/Outgoing Cable Terminations ok ELECTRICAL MAJOR
Tripping Of Relay/Breaker ok ELECTRICAL MAJOR
Sealing Of Panels Including Gland Plate ok ELECTRICAL MAJOR
Meggering Of GOX & GAN Compressor ok ELECTRICAL MAJOR
Meggering Of 1250 Transformer ok ELECTRICAL MAJOR
Indication Of Operating Voltage Level ok ELECTRICAL MAJOR
Checking For Earth Connections ok ELECTRICAL MAJOR
One Meter Clear Space Infront Of Panel ok ELECTRICAL MAJOR
-
8/13/2019 Electrical Job History
11/23
Checking Of Spring Charging, Closing, Tripping Electrically And Manually ok ELECTRICAL MAJO
29/5/13 MAC oil heater at field open and mannualy heter setting changed from 40 to 70 No ok ELECTRICAL MINO
-
8/13/2019 Electrical Job History
12/23
REMARKS
-
8/13/2019 Electrical Job History
13/23
-
8/13/2019 Electrical Job History
14/23
-
8/13/2019 Electrical Job History
15/23
-
8/13/2019 Electrical Job History
16/23
-
8/13/2019 Electrical Job History
17/23
-
8/13/2019 Electrical Job History
18/23
DATE DESCRIPTION OF WORK
1-Jun-13 Power supply given to near SS & Co container building from MCC romm
3-Jun-13 1.5 Sq.mm 3 Core cable layed between MCC room to MAC Air filtter unit for 110V AC. Supply
taken fromMCC room spare feeder (7.5 KW)
3.7 KW, 1440 RPM, MARATHON make Motor brought SESA store to O2/N2 plant for MAC
Aux.Oil. pump.
4-Jun-13Near GAN compressor. 20 A single phase Extention power supply board fitting and supply
provided.
5-Jun-13 Starter (DOL) prepared for 2.8 KW Sump Motor by using 20 A 3 pole MCB 1 No.Emergency push button and Start push button, Contactor and OLR. contol wiring also
completed
6-Jun-13 45 KW Water circulating pump (B) Motor taken for Maintenance.
7-Jun-13 EVC Pump - B (5.5KW) taken for maintenance
8-Jun-13 Porta cabin 1 No. faulted tube light fitting rectification work have been carried out.
At : 10:00 hrs. GAN Compressor (200KW) shut down due to Mechanical maintenance work
have been carried out by Mechanical Dept. at the same time GAN Compressor Local panel side
terminal tightness checked (Power & Control wiring) and Cleaning work have been carried out.
At : 14:30 Hrs. Maintenance work completed. At: 14:45 Hrs. GAN Compressor started,and it is
running normally.
At : 16:45 Hrs. EVC pump (5.5 KW) A-B changed.
10-Jun-13
1250 KVA Transformer HT side terminal box and LT side terminal box and Busbar duct fully
covered by using Plastic thin sheet
11-Jun-13 All panel roofs were checked for periodic maintenance.
Water sumped from cable duct.
12-Jun-13 230V power supply has been given to flow transmitter (Loc. Near by Gan Compressor)
A.c No.7 was not working properly after tightness check, now working normal condition.
14-Jun-13 Greasing shedule updated
15-Jun-13 Tools review
1.5 HP Spare sump motor's (single phase) Capacitor was replaced with new one, trail run was
taken and found it was running normaaly.
JOB HISTORY
-
8/13/2019 Electrical Job History
19/23
16-Jun-13 Spare material's reviwe was done
17-Jun-13 2.8 KW Motor pump was taken by Miss. Akshatha (SESA. Eng)
27-Jun-13 45 KW Watter Circulating Pump A Motor Greasing Done
200 KW Watter Circulating Pump A Motor Greasing Done
28-Jun-13 For Changing the MOP of MAC it was taken shut down from 10:00 to 17:30 Hrs. The MOPreplaced with new Motor for that supported Mechanical Dept.
18.5 KW Cooling tower fan taken for maintenance, terminal tightness checked and CRC applied
for rust same motor terminal checked at panel side.
In 110V Battery Charger taken under AMC. The work carried out by (DEKAM Engg.Pvt.Ltd)
Service Engg. During preventive maintenance we found that 250ma transformer was getting
fault. So it will be replaced by tomorrow (29/6/13_
7.5 KW Cooling tower fan taken for maintenance, terminal tightness checked and CRC applied
for rust same motor terminal checked at panel side.
29-Jun-133.7 KW AOP motor both side bearing 6206 ZZ changed. load on no load 4.00 Amps 3.88, 3.70&
also windimg resistance 5.70 ohm in each windingBattery changer service engg came from DEKEM Engg He checkrd stand by charger one No
transformer270 V/22-0-22 Burn so new transformer change & connection given trial taken
found ok
45KW Watter circulating pump A cleaning work carried out.
-
8/13/2019 Electrical Job History
20/23
MATERAIL
REPLACE
STATUS OF
WORKSDEPARTMENT CATEGORY REMARKS
No Ok ELECTRICAL MINOR
2 Nos. 6 A single pole
MCCB fixed
Ok ELECTRICAL MINOR
ELECTRICAL MINOR
20 A Power Extention
board new one fixed
Ok ELECTRICAL MINOR
Ok ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
No Ok ELECTRICAL MAJOR
No Ok ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
ELECTRICAL MINOR
ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
MINOR
No Ok ELECTRICAL MINOR
-
8/13/2019 Electrical Job History
21/23
No Ok ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
Old Motor 3.7 KW Ok ELECTRICAL MINOR
NoOk ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
NoOk ELECTRICAL MINOR
Bearing replaced Ok ELECTRICAL MINOR
270V/22-0-22 V AC
transformerOk ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
-
8/13/2019 Electrical Job History
22/23
DATE DESCRIPTION OF WORK
1-Jul-13 5.5KW EVC Pump B preventive maintenance done, (Motor & Panel side)
45KW Water Circulating pump B Preventive maintenance done, (Motor & Panel side)
4-Jul-13 Welding Connection give to SS&Co Container to work place
Welding Connection give to MCC room to near By SESA Container work place
6-Jul-13
At 10:00 Hrs Plant shut down. That time following feeders maintenance works carried out.
I) Water circulating Pump-B (45KW) terminals tightness checked at panel side.
II) Regeneration Heater (80KW) 1,2 & 3 terminals tightness checked at panel side.
III) Lin Pump (5.5KW) A & B terminals tightness checked at panel side.
IV) EVC Pump (5.5KW) A&B terminals tightness checked at panel side.
JOB HISTORY
-
8/13/2019 Electrical Job History
23/23
MATERAIL
REPLACE
STATUS OF
WORKSDEPARTMENT CATEGORY REMARKS
No Ok ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
No Ok ELECTRICAL MINOR
No OK ELECTRICAL MINOR