electrical appendix

16
APPENDIX A a.1.2. Assessment Area TRAINING REGULATIONS FOR CONSTRUCTION INDUSTRY ( ELECTRICAL SECTOR) ELECTRICAL INSTALLATION AND MAINTENANCE NC II TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY East Service Road, South Superhighway, Taguig City, Metro Manila

Upload: federico-estrada

Post on 18-Sep-2015

228 views

Category:

Documents


0 download

DESCRIPTION

ok

TRANSCRIPT

APPENDIX A

a.1.2. Assessment Area

ELECTRICAL INSTALLATION AND MAINTENANCE NC IITRAINING REGULATIONSFOR

CONSTRUCTION INDUSTRY( ELECTRICAL SECTOR)

TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITYEast Service Road, South Superhighway, Taguig City, Metro Manila

TABLE OF CONTENTS

CONSTRUCTION INDUSTRY - ELECTRICAL SUB-SECTOR

ELECTRICAL INSTALLATION & MAINTENANCE NC II

Page No.Section 1. ELECTRICAL INSTALLATION & MAINTENANCE NC II QUALIFICATION 1 - 2

Section 2. COMPETENCY STANDARDS3 - 48

Basic Competencies Common Competencies Core Competencies - Electrical Installation & Maintenance NC II3 1617 3233 - 48

COMPETENCY MAP49

Section 3. TRAINING STANDARDS50 - 59

3.1 Curriculum Design50

Basic Competencies50

Common Competencies51

Core Competencies52 53

3.2 Training Delivery54 - 55

3.3 Trainee Entry Requirements55

3.4 List of Tools, Equipment and Materials56 57

3.5 Training Facilities58

3.6 Trainer's Qualifications58

3.7 Institutional Assessment59

Section 4. NATIONAL ASSESSMENT AND CERTIFICATION ARRANGEMENTS60-61

ACKNOWLEDGEMENTS62- 63

3.5 TRAINING FACILITIES 3.5 TRAINING FACILITIESELECTRICAL INSTALLATION & MAINTENANCE NC II

Based on a class intake of 25 students/trainees, below are the space requirement & their sizes:

SPACE REQUIREMENTSSIZE IN METERSAREA IN SQ. METERSTOTAL AREA IN SQ. METERS

Student/Trainee Working Space2.50 x 2.50 per student/trainee6.25 per student156.25

Contextual Learning Laboratory4 x 52020

Learning Resource Center4 x 52020

Facilities/Equipment/Circulation area10 x 66060

TOTAL AREA256.25

a.2.1 Assessment room or LaboratoriesAPPENDIX BA.2 Lighting And Ventilation

*Based on Accreditation of Assessment Center Self-Assessment Check List, TSU-CT is within the minimum TESDA requirement lighted at an average of 30-40 foot-candle with minimal tolerance dark spot.

a.2.3 Blowers/ Fans

a.3.1. Store Room APPENDIX CA.3 Auxiliary Room

*Based on TESDA Accreditation of Assessment Center Self-Assessment Check List, the tools are kept in a customize cabinets.

a.3.2. Room for Performance Assessment *Based on TESDA Accreditation of Assessment Center Self-Assessment Check List, TSU-CT can accommodate at least 10 candidates/ batch

a.3.3. Chairs and Tables *Based on TESDA Accreditation of Assessment Center Self-Assessment Check List, TSU-CT is provided with chairs, tables, chalkboard/whiteboards, and other needed furniture as needed in the laboratory.

a.3.3. Comfort Rooms

*Based on TESDA Accreditation of Assessment Center Self-Assessment Check List, TSU-CT is neat and orderly maintained by the universitys General Services Office (GSO).

A.4 ASSESSMENT EQUIPMENT, HAND TOOLS, SUPPLIES MATERIALS

LABORATORY UPGRADING MODERNIZATION

TOOLS

No. UnitItem Specification Unit CostQTYTotal Amount

1 pcsSpirit level70053500

2 pcs Hack saw30051500

3 pcsPipe cutter25051250

4 pcs Plumb bob50052500

5 pcsPipe reamer45052250

6 pcsPipe threader50052500

7 pcsPipe bender2500512500

8 pcsBolt cutter80054000

9 pcsJack hammer set100055000

10 pcsElectrician Pliers7002517500

11 pcsScrewdrivers set7002517500

12 pcsWrench box10002525000

13 pcsWire splicer300257500

14 pcsWire stripper300257500

15 pcsElectrician knife300257500

16 pcsTools holster5002512500

17 pcsPush-pull 0-5 mtrs30051500

18 pcsClaw hammer40052000

19 pcsBallpeen hammer40052000

20 pcsPrick punch40052000

21 pcsHeat gun 1200 watts2000510000

22 pcsHeavy-duty soldering iron 1000 watts30051500

23 pcsFlat file smooth 820051000

Total 150000

EQUIPMENT

No. UnitItem Specification Unit CostQTYTotal Amount

1 unitsPower drill3,500517500

2 unitsPortable grinder2,000510000

3 unitPower saw3,500517500

4 unitsFire alarm system5,000525000

5 unitsPipe-in Music/ Paging5,000525000

6 unitsSecurity equipment10,000550000

7 units CCTV10,000550000

8 unitsMATV Master10,000550000

9 unitsCar park ramp detector5,0001050000

10unitsMulti-tester3,5002587500

11 unitsMega-ohmmeter3,5002070000

12 unitsClamp ammeter3,5002070000

13 unitsMegger4,0002080000

14 unitsHigh potential tester40002080000

15 unitsEarth resistance tester40002080000

16 unitsLabeling machine40002080000

17 unitFire extinguisher KGS ABC350013500

18 unitOHP350013500

19 unitsIndustrial Fan5000420000

Total 869500

Materials

No. UnitItem Specification Unit CostQTYTotal Amount

1BoxWire TW AWG#123500310500

2BoxWire TW AWG#14280038400

3pcElectrical Tape2030600

4pcswoodscrew 3/16 X 1/2"0.5800400

5pcsCPC Terminal Connector 1/2" diameter101501500

6pcsPVC Terminal Connector 1/2" diameter101501500

7pcsPVC Strap 1/2" diameter2300600

8PcPVC 1/2" diameter70302100

9PcsMetal Conduit 1/2" diameter200122400

10mCPC 1/2" diameter5130650

11PcsJunction box (4x4)25401000

12PcsUtility box (2x4)25601500

13sets3-way switch90302700

14setssingle switch60201200

15setConvenience Outlet6010600

16setSpecial Outlet (ACU)100101000

17PcPanel Board (4 Branches)80021600

18PcsCircuit Breaker (15Amp Single Phase)3003900

19PcsCircuit Breaker (20Amp Single Phase)3003900

20PcsCircuit Breaker (30Amp Single Phase)3003900

21PcsCircuit Breaker (40Amp Single Phase)3003900

Total 41850

LABORATORY UPGRADING MODERNIZATION

Equipment150,000

Tools869,500

Material41,850

Total1,061,350

a.5.1 Medicine CabinetAPPENDIX DA.5 Safety Provisions

A first-aid cabinet for antidotes and neutralizing solution are present on the laboratory

a.5.2 Open Floor SpacesAre appropriately grouped to provide ease of movement

a.5.4. Fire Extinguisher

a.5.4. Equipment LayoutTraining equipment are arrange according to sequence of operation

a.5.6. Color Coded Buttons

Industrial training equipment emergency buttons are well color coded and ergonomically installed for safety.

35