elc 347 project management week 5. agenda assignment 2 re-graded –missing case 2.3 found and...

26
ELC 347 project management Week 5

Post on 20-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

ELC 347 project management

Week 5

Page 2: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Agenda

• Assignment 2 re-graded– Missing case 2.3 found and graded

• Assignment 3 Graded– Could have used more effort– case 3.1.xls

• First Quiz Will be graded by next class• Integrative Project

– Outline of deliverables (posted in WebCT)

• Scope Management – Using MS project

Page 3: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Scope Management

Chapter 5

Page 4: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case
Page 5: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Project Scope

Project scope is everything about a project – work content as well as expected outcomes.

Scope management is the function of controlling a project in terms of its goals and objectives and consists of:

1) Conceptual development 4) Scope reporting

2) Scope statement 5) Control systems

3) Work authorization 6) Project closeout

Page 6: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Conceptual Development

The process that addresses project objectives by finding the best ways to meet them.

Key steps in information development:

1. Problem/need statement

2. Information gathering

3. Constraints

4. Alternative analysis

5. Project objectives

Page 7: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Problem Statements

Successful conceptual development requires:

• Reduction of overall project complexity

• Goals and objects are clearly stated– Reference points are provided

• Complete understanding of the problem

• You cannot solve a problem till you UNDERSTAND the problem

Page 8: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Statement of Work (SOW)

A SOW is a detailed narrative description of the work required for a project.

Effective SOWs contain1. Introduction and background2. Technical description

1. The more specific the better

3. Timeline and milestones1. Anticipated (hoped-for)

4. Client expectations1. What constitutes a project well done

Page 9: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

The Scope Statement Process

1. Establish the project goal criteria (deliverables)a) costb) schedulec) performanced) deliverablese) review gates

2. Develop the management plan for the project3. Establish a work breakdown structure4. Create a scope baseline

Page 10: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Work Breakdown Structure

a process that sets a project’s scope by breaking down its overall mission into a cohesive set of synchronous, increasingly specific tasks.

What does WBS accomplish? Echoes project objectives Offers a logical structure Establishes a method of control Communicates project status Improved communication Demonstrates control structure

Page 11: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

WBS and goals

Page 12: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Example WBS

Page 13: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Work Breakdown Structure and Codes

Work Packages are individual project activities

1.0

1.2 1.3 1.4

1.2.1

1.2.2

1.2.3

1.3.1

1.3.2

1.2.3.1

1.2.3.2

Deliverables are major project components

Subdeliverables are supporting deliverables

The project is the overall project under development

Page 14: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Examples

Page 15: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Sample WBS in MS Project

Page 16: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Work Packages

Lowest level in WBS X.X.X.X

Deliverable result

One owner

Miniature projects

Milestones

Fits organization

Trackable

Page 17: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Organizational Breakdown Structure

Organizational Breakdown Structure (OBS) allows• Work definition• Owner assignment of work packages• Budget assignment to departments

OBS links cost, activity & responsibility

Page 18: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Intersection of WBS and OBS

Page 19: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Responsibility Assignment Matrix

Notification Responsible SupportApproval

LEAD PROJECT PERSONNELBob

ISDave Sue

HRAnn

R&DJim

R&D

Task & CodeDeliverable IS

Match IT toOrg. Tasks

proposalPrepare

1.3

1.1

Identify ISuser needs

1.2

ProblemAnalysis

Developinfo

Interview users

showDevelop

Gain user “buy in”

Find cost/benefit info

1.1.1

1.1.2

1.2.1

1.2.2

1.2.3

1.3.1

Page 20: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Work Authorization

The formal “go ahead” to begin work

Follows the scope management steps of:

1. scope definition

2. planning documents

3. management plans

4. contractual documents

Page 21: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Contractual Documentation

Most contracts contain:

Requirements

Valid consideration

Contracted terms

Contracts range from:

Lump Sum Cost Plusalso called “Turnkey”

Page 22: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Scope Reporting

determines what types of information reported, who receives copies, when, and how information is acquired and disseminated.

Typical project reports may contain

1. Cost status

2. Schedule status

3. Technical performance

Page 23: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Types of Control Systems

o Configuration

o Design

o Trend monitoring

o Document

o Acquisition

o Specification

Page 24: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case
Page 25: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Project Closeout

The job is not over until the paperwork is done…

Closeout documentation is used to:Resolve contractual disputesTrain project managersFacilitate auditing

Closeout documentation includes:Historical recordsPost project analysisFinancial closeout

Page 26: ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case

Using MS project 2003

• Many of the required functions/reports in Project management are part of MS project 2003– Industry wide acceptance

• Do not use Wizard till you are comfortable with MS project

• File ->New• Enter Project and all

– Deliverables– Sub deliverables– Work packages

• Indent using arrows to show decomposition – Template– Actual project