el salvador presentation for april 2-5, 2013
DESCRIPTION
pptTRANSCRIPT
EL SALVADOR CITY DIVISION STRATEGIC PLAN FY 2014Pinnacle Hotel, Davao City
April 2- 5, 2013
Republic of the PhilippinesDEPARTMENT OF EDUCATION
Region X
DIVISION OF EL SALVADOR CITYCagayan de Oro City
BRIEF HISTORYThe Division of El Salvador City was
created parallel to the establishment of El Salvador City as chartered city last July 28, 2011. The Interim Division started its operation as the 14th Division of DepEd Region X. By August 30, 2012, a Memorandum from DepEd Secretary Armin Luistro was received, advising constituents the regularization of the El Salvador Division.
VISIONThe Division with committed stakeholders
aims to develop the child’s full potential in a value-centered-driven environment to enable him/her to carve his/her destiny in the global
community.
MISSION STATEMENTThe Division shall provide basic education to
produce graduates who are functionally literate, morally responsible, nationalistic and
contributory to the development of the society.
DIVISION PROFILEELEMENTARY SECONDARY TOTAL
Districts 2 0 2
Schools
Public 15 3 18
Private 4 4 8
Monograde Schools 12 0 12
Multigrade Schools 3 0 3
Primary Schools 0 0 0
SPED Centers 1 0 1
Tech-Voc Schools 0 0 0
Integrated Schools 0 0 0
Personnel (PSIPOP FY 2013)
Teaching 174 66 240
Non-Teaching 6 0 6
ENROLMENT DATA
SPED KINDERGARTEN ELEMENTARY SECONDARY
Public 0 1,124 5,812 1,896
Private 0 304 585 734
Total 0 1,428 6,397 2,630
ACCESSGROSS ENROLMENT RATE 2009-2010 2010-2011 2011-2012
Kindergarten 122.35
Elementary 84.76
Secondary 67.91
NET ENROLMENT RATE 2009-2010 2010-2011 2011-2012
Kindergarten 81.72
Elementary 84.76
Secondary 67.91
EFFICIENCYCOHORT SURVIVAL RATE 2010-2011 2011-2012 2012-2013
Elementary 78.08% 84.70% 81.76%
Secondary 91.48% 92.89% 87.04%
COMPLETION RATE 2010-2011 2011-2012 2012-2013
Elementary 59.01% 75.45% 67.90%
Secondary 75.66% 77.31% 61.44%
SCHOOL LEAVER RATE 2010-2011 2011-2012 2012-2013
Elementary 13.68% 8.60% 11%Secondary 5.65% 4.65% 11.95%
QUALITYACHIEVEMENT RATE (ELEMENTARY)
2009-2010 2010-2011 2011-2012
MPS Results 72.80 72.49 69.48
By Subject Area
Math 70.10 76.22 76.29
English 72.84 71.72 74.22
Science 68.53 65.33 64.22
Filipino 78.35 77.54 63.81
HEKASI 74.18 71.61 68.85
QUALITYACHIEVEMENT RATE (SECONDARY)
2009-2010 2010-2011 2011-2012
MPS Results 46.07% 50.93% 58.06%
By Subject Area
Math 44.26% 53.29%
English 47.71% 49.13%
Science 44.47% 40.99%
Filipino 54.72% 54.15%
Araling Panlipunan 39.17% 57.55%
DEPLOYMENT OF RESOURCES
As of July SY 2012-2013 Elementary Secondary
Pupil/Student Ratio 1:36 1:35
Classroom-Pupil/Student Ratio 1:44 1:54
Pupil/Student-Seat Ratio 1.63 1.07
SOCIAL
EXTERNAL ASSESSMENT
OPPORTUNITIES THREATS
STATEMENT EVIDENCE STATEMENT EVIDENCE
SOCIAL
Growing population
Population increase from 43,619 in 2011 to 48,053 in 2012
Because of growing population there are more unemployed than the employed
Employment ratio is 49.52% versus the unemployed of 50.33%
Increase demand of Job
18 factories and enterprises
Lack of skilled workers
Presence of child labor
TECHNOLOGICAL
EXTERNAL ASSESSMENT
OPPORTUNITIES THREATS
STATEMENT EVIDENCE STATEMENT EVIDENCE
TECHNOLOGICAL
Presence of Telecommuni- cations Companies
SMART GLOBE PLDT and MISORTEL
Presence of Internet Cafes even in barangays. Students sometimes escape classes and are in internet cafes
17 Internet Cafes in the city; Almost all barangays have internet café
Availability of Internet Connection – Online Resources
17 Internet Cafes in the city; Almost all barangays have internet café
Internet cafes offer online gaming
Students skip classes and go to internet cafes to play online games like DOTA
ECONOMICAL
EXTERNAL ASSESSMENT
OPPORTUNITIES THREATS
STATEMENT EVIDENCE STATEMENT EVIDENCE
ECONOMICAL High Employment Opportunities
Presence of factories and other business establishments
Job mismatched Unskilled graduates
ECOLOGICAL
EXTERNAL ASSESSMENT
OPPORTUNITIES THREATS
STATEMENT EVIDENCE STATEMENT EVIDENCE
ECOLOGICAL
Presence of Waterfalls and Springs
5 Waterfalls and springs
Some barangays became flood- prone areas affecting the families of students and teachers
There are 4 barangays which are flood-prone; Kalabaylabay Sambulawan
POLITICAL
EXTERNAL ASSESSMENT
OPPORTUNITIES THREATS
STATEMENT EVIDENCE STATEMENT EVIDENCE
POLITICAL
SEF funds have addressed Educational Gaps
A classroom is built for every school
Change of Administration may mean change of style in disbursement of SEF
Changing policies on use of LSB funds
Each school is provided classroom repair from the SEF
Provision of School Supplies and Materials
Full downloading of MOOE
CURRICULUMINTERNAL
ASSESSMENTSTRENGTHS WEAKNESSES
STATEMENT EVIDENCE STATEMENT EVIDENCE
CURRICULUM
Implementation of the K to 12 curriculum
Mass training of Grade 1 and Grade 7 Teachers, Grade 2 and Grade 8 Teachers
Readiness of Secondary Schools for the opening of Senior High School
Secondary schools have not yet decided and prepared in the track they will offer in Senior High School
Universal Kindergarten
Absence of regular kindergarten teacher
Only 1 regular kindergarten teacher for the entire division
Alternative Delivery Mode
Availability of the modules in DepEd BSE portals
Students recruitment has not started for open High School
Funding requirement not available
Implementation of the ALS Program BLP as well as A and E
No. of ALS sessions organized - 9 sessions; No of mobile teachers-2; No. of DAPSC – 1
Few A and E teachers and BLP enrollees
Survival Rate is 77.5% for A and E Survival Rate for BLP is 89.75%
INSTRUCTION
INTERNAL ASSESSMENT
STRENGTHS WEAKNESSES
STATEMENT EVIDENCE STATEMENT EVIDENCE
INSTRUCTION
Teachers updated with latest trends
Conduct of INSET Computer assisted instruction cannot be provided
Only 1 computer is given per school by the LSB for office use only
Low NAT Results in the secondary level
Achievement rate for Secondary is 58.06%
Availability of Supplies and materials
100% downloading of MOOE
Availability of Internet Facility
Some schools do not have internet connection
LEARNING RESOURCES
INTERNAL ASSESSMENT
STRENGTHS WEAKNESSES
STATEMENT EVIDENCE STATEMENT EVIDENCE
LEARNING RESOURCES
Availability of Curriculum Guide
1:1 ratio for curriculum guide
Availability of textbooks
Insufficient copies of textbook for student use
LEARNING ENVIRONMENT
INTERNAL ASSESSMENT
STRENGTHS WEAKNESSES
STATEMENT EVIDENCE STATEMENT EVIDENCE LEARNING ENVIRONMENT
No. of Schools Increase number of schools in the secondary
Open secondary schools in barangays
Furniture are not enough for student use
Old furniture were recycled and repaired for newly open secondary school
LEARNING ENVIRONMENT
INTERNAL ASSESSMENT
STRENGTHS WEAKNESSES
STATEMENT EVIDENCE STATEMENT EVIDENCE LEARNING ENVIRONMENT
Facilities Internet Connectivity
For office use only
Absence of Internet Laboratory facilities for student
Only Molugan NHS has internet Laboratory facilities for students
Absence of Division Website;
No available technical man to do it
Science Equipment not available in many schools
LSB provided science equipment for few schools only
Availability of facilities for 1the opening of - Tech Voc School - Science Elementary/ Secondary School
No VocTech School No Science Elementary/ Secondary School
INTERNAL ANALYSISSTRENGTHS 1. Implementation of the K to 12 program
2. Availability of ADM Modules
3. Implementation of ALS program BLP and A and E
4. Teachers updated with latest trends
5. Availability of curriculum Guide
6. Increase No. of Schools in the Secondary Level
7. Internet Connectivity 8. Increase GER and NER
EXTERNAL ANALYSIS 9. Increase AR in the elementary
OPPORTUNITIES STRENGTH vs. OPPORTUNITIESA. Growing Population ABCD123689B. Increase Demand of Job FG457C. Presence of Telecommunication Companies Improve more schools (classrooms) with furniture
D. High Employment Opportunities and facilities through SEF and adopt a school
E. Presence of Waterfalls and Springs program (ASP)
F. SEF to address educational gaps
G. Provision of School Supplies & Materials
INTERNAL ANALYSISWEAKNESSES 1. Low Achievement Result in the Secondary
2. No available regular kindergarten teacher
3. Low achievement rate for the A & E passers
4. Computer Assisted Instruction not available
5. Insufficient textbook
6. No Secondary School with STVEP and science curriculum
7. Absence of Division Website 8. Demand of facilities for opening of
VocTech & Science Schools
EXTERNAL ANALYSIS
OPPORTUNITIES WEAKNESSES vs. OPPORTUNITIESA. Growing Population ABC1256B. Increase Demand of Job DEF8964
C. Presence of Telecommunication Companies
Identification, Creation and Implementation of
D. High Employment Opportunities - Redesigned Technical Vocational ProgramE. Presence of Waterfalls and Springs - Open High School F. SEF to address educational gaps - Science Elementary/ Secondary SchoolG. Provision of School Supplies & Materials
INTERNAL ANALYSISSTRENGTHS 1. Implementation of the K to 12 program
2. Availability of ADM Modules
3. Implementation of ALS program BLP and A and E
4. Teachers updated with latest trends
5. Availability of curriculum Guide
6. Increase No. of Schools in the Secondary Level
7. Internet Connectivity 8. Increase GER and NER
EXTERNAL ANALYSIS 9. Increase Achievement Rate in the elementary
THREATS STRENGTHS vs. THREATSA. Low employment rate ADE1238B. Presence of students in Internet Cafes BCF4567C. Job mismatch due to unskilled graduates
Continuing capacity-building and skills training for teachers
D. Child Labor Compulsory Supervisory Development E. Flood prone barangays Program of School Heads
F. Environmental Hazards brought about by industries and factories
INTERNAL ANALYSISWEAKNESSES 1. Low Achievement Result in the Secondary
2. No available regular kindergarten teacher
3. Low achievement rate for the A & E passers
4. Computer Assisted Instruction not available
5. Insufficient textbook
6. No Secondary School with STVEP and science curriculum
7. Absence of Division Website 8. Demand of facilities for opening of
VocTech & Science Schools
EXTERNAL ANALYSIS
THREATS WEAKNESSES vs. THREATSA. Low employment rate BDE1234B. Presence of students in Internet Cafes AC5867C. Job mismatch due to unskilled graduates
D. Child Labor Strengthen the ALS program E. Flood prone barangays Accreditation of ES/Secondary Schools F. Environmental Hazards brought about by industries and factories
in PASBE
INDICATIVE DIVISION TARGETSPerformance Indicators
(QUALITY)
2013-2014 2014-2015 2015-2016(EFA Targets)
DivisionTargets
R-X Targets
Gross Enrolment Rate
KINDERGARTEN 109.00%
ELEMENTARY 119.00%
SECONDARY 104.00%
Net Enrolment Rate
KINDERGARTEN 100.00%
ELEMENTARY 100.00%
SECONDARY 82.00%Net Intake Rate
ELEMENTARY 100.00%
INDICATIVE DIVISION TARGETSPerformance Indicators
(EFFICIENCY)
2013-2014 2014-2015 2015-2016(EFA Targets)
DivisionTargets
R-X Targets
Cohort Survival Rate
ELEMENTARY 84.00%
SECONDARY 83.00%
Completion Rate
ELEMENTARY 83.00%
SECONDARY 83.00%
School Leaver Rate
ELEMENTARY 0.00%
SECONDARY 0.00%
INDICATIVE DIVISION TARGETS
Performance Indicators
(QUALITY)
2013-2014
2014-2015
2015-2016(EFA Targets)
DivisionTargets
R-X Targets
Achievement Rate
ELEMENTARY 75.00%
SECONDARY 75.00%
INDICATIVE DIVISION TARGETSGOVERNANCE 2013-2014 2014-2015 2015-2016
SBM ACCESs Implementation
ELEMENTARY
Level 2
Level 3
SECONDARY
Level 2
Level 3
MAJOR CHALLENGES
Build more classrooms and open more secondary schools
Support and partnership with home, school and community
Capacity and capability building for School Heads and
teachers
Sustainability of ALS program
CORE STRENGTHS AND OPPORTUNITIESCORE WEAKNESSES AND THREATS
CORE STRENGTHS AND OPPORTUNITIES
CORE WEAKNESSES AND THREATS
SEF to address educational gaps Absence of Internet Laboratory facilities and science equipment for schools
Willingness of teachers and School Heads to undergo training
Child labor
Acceptance of K to 12 among teachers and the community
Low Achievement Rate (AR) in the Secondary LevelUnskilled graduates
Low Employment Rate
STRATEGIESS1: Improve more schools (classrooms with furniture and facilities) through SEF and Adopt
a School Program (ASP)
S2: Identification, Creation and Implementation of - Redesigned Technical Vocational Program
- Open High School - Science Elementary/Secondary School
S3: Continuing capacity building and skills training for teachers
S4: Compulsory Supervisory Development program of School Heads
S5: Acquisition of Science Equipment and internet facilities through ASP
S6: Accreditation of ES/Secondary Schools in PASBE
S7: Strengthen ALS
S-P-A-T RESOURCES NEEDEDS1: Improve more schools (classrooms with furniture and facilities) through SEF and Adopt a School Program (ASP)
People Physical Pesos
P1a: Eskwelahan mo, Responsibilidad ko! P3,000,000
A1: Inventory of schools needing classroom construction and repairs.
T1: Visit schools. T2: Shortlist schools needing assistance. T3: Prepare and submit final list to the PLGU/ASP secretariat.
Division PFCDivision PFC
Division PFC, Principal
Supplies, travelSupplies, travel
Supplies, travel
P 5,000.00
A2: Validation of the proposed recipient schools.
T1: Conduct of ocular inspection of schools. T2: Prepare validation reports.
Provl Engr, DPFC
-do-
Supplies, travel
Supplies, travel
5,000.00
A3: Approval of Proposed recipient schools.
T1: Approve list submitted. T2: Submit list to City Eng’g Dep’t.
Local School Board Committee
A4: Project Implementation
T1: Making of POWs. T2: Procurement of materials. T3: Brigada Eskwela.
Provl Engr.PBAC, Finance DeptTeachers, volunteers
SuppliesConstruction materials, food
3,000,000 50,000
S-P-A-T RESOURCES NEEDEDS2: Identification, Creation and Implementation of - Redesigned Technical Vocational Program - Open High School - Science Elementary/Secondary School
People Physical Pesos
P1: Pangarap Mo, Itaguyod Ko! P1,393,000
A1: Identifying recipient schools. T1: Screening of pupils and students in the Elementary and Secondary Schools T2: Prepare list of recipient schools A2: Identifying potential resources A3: Preparation of learning materials for ADM T1: Reproduction of Learning modules A4: Training of Teachers on the use of learning modules of Open High School T1: School mapping for project recipients A5: Advocacy of the Open High School
Teachers, parentsDivision and School ICT Coordinators
Travel, FoodSuppliesTravelFood
S-P-A-T RESOURCES NEEDEDS3: Continuing capacity building and skills training for teachers
P1: Eskwela ang Tanan Maestra! P 71, 000.00
A1: TSNA database generation at Division level A2: Crafting of training plan for every training need of teachers. T1: Submission of training design by school A3: Funding requirement generation through INSET funds and SEF T1: Submission of the project proposal to the SEF A4: Capacity building Activities
S-P-A-T RESOURCES NEEDEDS4: Compulsory Supervisory Development program of School Heads
People Physical Pesos
P2: Edukasyon Ko, Para Sa ‘yo! SDS, ASDS, EPS, SH
Supplies, IT, P 41,000
A1: Conduct training for School Heads T1: Preparation of supervisory plan and supervisory schedule T2: Preparation of training design for instructional supervision T3: Distribute materials for the training
SDS, PSDS, SHs
S-P-A-T RESOURCES NEEDEDS5: Acquisition of Science Equipment and internet facilities through ASP
People Physical Pesos
P1: iLab My Lab! SDS, ASDS, EPS, SH
Venue. IT equipment, training materials,
P1,000,000
A1: Identification of Source of funds A2: Prepare project proposal A3: Funding requirement generation through SEF
S-P-A-T RESOURCES NEEDEDS6: Accreditation of ES/Secondary Schools in PASBE
People Physical Pesos
P1: PASBE! SDS, SHs, PSDS, Teachers
Venue – Community Learning Center. IT equipment, training materials,
P 1,050,000
A1: Advocacy on PASBE - do -
T1: Preparation of campaign materials T2: Attending barangay assemblies T3: Analyze results.
A2: Identification of SBM recipient schools based on criteria
T1: Identify trainers. T2: Training of trainers. T3: Preparation of training schedules.
A3: Generate resources.
T1: Prepare project proposals - budgetary requirements. T2: Identification of sources of funds- donors & sponsors.
S-P-A-T RESOURCES NEEDEDS7: Strengthen ALS People Physical Pesos
P1: May Diploma na, May skills pa! PSDS, ALS, SH, DALSC, Mobile Teachers, Literacy Volunteers, LGU
Venue – Community Learning Center. IT equipment, training materials,
P 500,000.00
A1: Advocacy and social mobilization - do -
T1: Preparation of campaign materials T2: Attending barangay assemblies T3: Analyze results.
A2: Conduct training of DALSC’s, MT’s, Literacy Volunteers
T1: Identify trainers. T2: Training of trainers. T3: Preparation of training schedules. T4: Conduct mass training.
A3: Generate resources.
T1: Prepare project proposals - budgetary requirements. T2: Identification of sources of funds- donors & sponsors.
A4: Implement ALS Program (BLP and A&E) T1: Community Literacy Mapping T2: Organized Learning Sessions T3: Production of modules T4: Monitoring