ekurhuleni transport masterplans presentation to …
TRANSCRIPT
![Page 1: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/1.jpg)
EKURHULENI TRANSPORT MASTERPLANS
PRESENTATION TO SA ROAD FEDERATION
27 OCTOBER 2015
Philip du [email protected]
![Page 2: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/2.jpg)
1. INTRODUCTION
2. IRPTN
3. TRANSPORT INFRASTRUCTURE STRATEGY
4. NMT STRATEGY
5. TDM
Contents
![Page 3: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/3.jpg)
Components of the IRPTN Solution
![Page 4: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/4.jpg)
• Operational Plan
• Business Plan
• IRPTN System management
• Marketing, Comm. & Brand management
• Industry transition
• Bus Fleet Ownership, Funding & Procurement
• Infrastructure components
Components of the IRPTN Solution
![Page 5: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/5.jpg)
WE HAVE A NAME!!!
Marketing & Brand Management
![Page 6: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/6.jpg)
Marketing & Brand Management
![Page 7: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/7.jpg)
Marketing & Brand Management
• “An event held to raise funds for a charitable purpose”
• “Working together in unity” or “Pull together”
![Page 8: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/8.jpg)
Full Network Design
8
![Page 9: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/9.jpg)
Phase 1 of the IRPTN
• The approved Full Phase 1 will runfrom Tembisa in the north toVosloorus in the south.
![Page 10: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/10.jpg)
Key indicators, patronage and fares
Household Travel Survey 2013 indicates the following daily patrons are
likely to use the system during Phase 1A:
Route
CodeDescription Route Type
Route
Length
(km)
No of Stations
No. of
Passengers
Boarding (Peak
Hour)
T01Tembisa Civic -
RhodesfieldTrunk 37
14 trunk
stations5,054
C01 Tembisa-Isando Complementary 47Bus Stops only
(on non trunk)7,541
FAll Feeder routes of
1AFeeder 173 Bus Stops only 6,008
TOTAL 257 18,603
![Page 11: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/11.jpg)
• Roadways (Trunk, Complementary & Feeder routes) (R1,4bn)
• Stations (R200m)
• Bus stops
• Street Lighting (R190m)
• Depots/Holding areas (R400m)
• Walkways & Cycle lanes (NMT) (R100m)
• Pedestrian bridges (R90m)
• ITS & Transport Management Centre (R400m)
Infrastructure
![Page 12: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/12.jpg)
Station Concept
Based on the idea of mimicking a floating wing of anaeroplane
![Page 13: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/13.jpg)
Stations
![Page 14: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/14.jpg)
Stations
![Page 15: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/15.jpg)
Non-Motorized Transport
• Intersection Conceptual Layouts
![Page 16: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/16.jpg)
Non-Motorized Transport
![Page 17: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/17.jpg)
Non-Motorized Transport
![Page 18: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/18.jpg)
Non-Motorized Transport
![Page 19: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/19.jpg)
Non-Motorized Transport
![Page 20: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/20.jpg)
Pedestrian Bridges
![Page 21: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/21.jpg)
Pedestrian Bridges
![Page 22: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/22.jpg)
Is a key enabler and Includes:
ITS – Intelligent Transport Systems
22
Automatic Fare Collection (AFC)
Transport Demand
Management
Traveller information
Fleet management
Transport safety and
security
Communication and integration
![Page 23: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/23.jpg)
ITS Building Blocks
TMC
On-Bus Equipment
Station Equipment
Depot Equipment
• AFC APTMS
• UTC CCTV
• AFC APTMS
• CCTV Wi-Fi
• AFC APTMS
• CCTV Wi-Fi
• AFC Server Wi-Fi
• APTMS Server
23
Information and Communication Technology
![Page 24: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/24.jpg)
TRANSPORT MANAGEMENT CENTRE (TMC)
Functions within TMC
APTMS which includes:
• CCTV monitoring;
• AVL;
• Incident Management;
• Law Enforcement;
• Performance Management;
• Bus Scheduling;
• Route changes;
• Real Time Bus to TMC
Communication;
• Real Time Passenger
Information (VMS)
AFC
UTC
![Page 25: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/25.jpg)
Implementation Strategy
![Page 26: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/26.jpg)
IMPLEMENTATION STRATEGY
• Conventional:
Concept, Preliminary Design, Design, Bid, Construction.
• EMM IRPTN:
Preliminary Design to Bid. Design in time.
“As and When Required” construction contracts (Rates).Separate contracts for Roads, Stations, Lighting etc.
Two contractors per contract (with % preference).
(Lack of Standards!!)
![Page 27: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/27.jpg)
Progress: Infrastructure
![Page 28: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/28.jpg)
1
4
3A
2
3B
13/14: 2km
14/15: 2,2km
15/16 0,8km
15/16 6,0km
14/15: 5,0km
Trunk Route(Tembisa)
![Page 29: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/29.jpg)
4
5
6
7
14/15: (5,0km)
16/17 & 17/18: 7,0km
15/16: 0,7km
Trunk Route(Kempton Park)
![Page 30: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/30.jpg)
Trunk Route
![Page 31: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/31.jpg)
Trunk Route
![Page 32: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/32.jpg)
Launch Program
![Page 33: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/33.jpg)
PROPOSED GO LIVE DATES
• Stage P (Pilot Service):
Vosloorus to Boksburg: April 2016
• Stage 1:
Leralla to Isando: July 2016
Service between Vosloorus and Rhodesfield included.
• Stage 2:
• Hospital View to Isando: December 2016
• Stage 3:
• Hospital View to Rhodesfield plus all feeders: October
2017
![Page 34: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/34.jpg)
CHALLENGES
• Industry Transition
• Bus procurement
•Water Use Licenses
• Funding shortfall
• Capacity of Entity
![Page 35: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/35.jpg)
TRANSPORT INFRASTRUCTURE
![Page 36: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/36.jpg)
TRANSPORT INFRASTRUCTURE
CITP
&
CAPITAL INVESTMENT
FRAMEWORK
![Page 37: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/37.jpg)
N3
N17
R2
1
R24
N12
M2
N3
R21
N3
R21
N12
Legend
EMM Boundary
National Roads
Railways Lines
IRPTN Phase 1A Buffer
IRPTN Phase 1B Buffer
IRPTN Phase 1C Buffer
IRPTN Trunk Routes
Industrial
Township Regeneration
Aerotropolis Core Node
Priority Primary Nodes
Primary Nodes
Housing Projects (curren t)
Housing Projects (propo sed)
Major Investments
Inland Port
Kaalfontein Immediate Catchment Area
Priority Water Bodies
New Parks
Urban Edge
Geographic Priority Areas
The structuring
elements/Projects:
IRPTN
Industrial Areas
Township
Regeneration
Aerotropolis
Primary Nodes
Housing current and
proposed
Major investments
Lakes and Dams
Urban Edge
![Page 38: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/38.jpg)
Critical Class 3 & 4 Links for Short-term Upgrading in Next 5 Years
70 Links48 kmR480 million
![Page 39: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/39.jpg)
Top Ten Class 2 Links for Short-
Term Upgrading
Class 1 Top Ten:
All Existing
Freeways
PWV13, PWV14 &
PWV16
![Page 40: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/40.jpg)
TRANSPORT INFRASTRUCTURE
• Approve Roads Master Plan as part of CITP
• Allocate at least R200 million for major road upgrades for Class 3 & 4
• Discuss and agree 5-yr Class 1 & 2 priorities with SANRAL and Gauteng DRT for funding and implementation
• Council to approve Class 1 & 2 Roads, and implement access management plan to maintain lower order classification and access spacing
• RMP to be regularly updated and refined
CITP Recommendations:
![Page 41: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/41.jpg)
TRANSPORT INFRASTRUCTURE
• Infrastructure funding be prioritised and focussed along priority
corridors to upgrade public transport on a corridor by corridor basis. The IRPTN, IPTN and CIF programs are following this approach and integration of these programs need to further refined in future
CITP Recommendations:
![Page 42: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/42.jpg)
NMT STRATEGY
![Page 43: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/43.jpg)
NMT STRATEGYVISION AND OBJECTIVES
EMM will be a people-friendly Metropolitan Municipality
where all users feel safe to walk and cycle. Facilities within
EMM will be accessible to all users including non-motorised
transport users.
• Objectives to meet the above vision:
1. To promote NMT as a key mode of transport in EMM;
2. To integrate NMT and public transport;
3. To ensure the safe movement of pedestrians and cyclists; and
4. To provide a transport system that addresses the needs of persons with disabilities.
![Page 44: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/44.jpg)
NMT MASTERPLANS
![Page 45: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/45.jpg)
Tembisa NMT Masterplan
![Page 46: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/46.jpg)
TRAVEL DEMAND MANAGEMENT
![Page 47: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/47.jpg)
TRAVAEL DEMAND MANAGEMENT
The objectives of TDM Strategy are:
• To reduce vehicle km travelled
• To improve parking management
• To reduce the mode share of single occupant car driving during peak periods
• To increase the peak and all weekday mode share of public transport
• To increase the peak and all day mode share of walking
• To increase the peak and all day mode share of bicycles
![Page 48: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/48.jpg)
TDM: Selected Measures
• Ride share / Lift clubs
• Employer Travel Plans
• Park-and-ride at rail stations and bus stops
• HOV lanes leading into major employment centers
• Parking pricing
• NMT
• Cycle ways leading into major employment centers and higher order educational institutions
• Pedestrian side walks
![Page 49: EKURHULENI TRANSPORT MASTERPLANS PRESENTATION TO …](https://reader031.vdocuments.us/reader031/viewer/2022020701/61f8c5d56baa9d7b5b250b1e/html5/thumbnails/49.jpg)
STEEL FIXING – ZUURFONTEIN RD
COMPLEMENTARY RD LAYERWORKSNMT - ANDREW MAPHETHO DRIVECOMPLEMENTARY RD – CABLE DUCTS
TRENCHES
NMT - REVEREND RTJ NAMANE DRIVE CONCRETE BUS LANES – ZUURFONTEIN RD
Thank You