BRIEF ON ON EKITI STATE COMMUNITY AND SOCIAL DEVELOPMENT AGENCY (EKCSDA) MARCH 21, 2012 Ekiti State Community And Social Dev. Agency (EKCSDA)

Upload: government-of-ekiti-state-nigeria

Post on 18-Nov-2014

1.449 views

Category:

Business


2 download

DESCRIPTION

Brief on Ekiti State Community and Social Development Agency.

TRANSCRIPT

Page 1: Ekiti State Community  and Social Development Agency (ECKSDA)

BRIEF

ON ON

EKITI STATE COMMUNITY AND

SOCIAL DEVELOPMENT AGENCY

(EKCSDA)

MARCH 21, 2012

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 2: Ekiti State Community  and Social Development Agency (ECKSDA)

CSDP - PROJECT GOAL & OBJECTIVE� Goal of the CSDP is to improve access to services for

Human Development (HD)

� PDO is to sustainably increase access of poor people to improve social and natural resource infrastructure to improve social and natural resource infrastructure services.

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 3: Ekiti State Community  and Social Development Agency (ECKSDA)

Specifically, the CSDP is to:� Empower communities to plan, part-finance,

implement, monitor and maintain sustainable and socially inclusive multi-sectoral micro-projects.

� Facilitate and increase Community-LGA partnership � Facilitate and increase Community-LGA partnership on HD-related projects; and

� Increase the capacity of LGAs, State and Federal Agencies to implement and monitor CDD policies and interventions.

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 4: Ekiti State Community  and Social Development Agency (ECKSDA)

EVOLUTION OF CSDPThe fulcrum of operation of the new development paradigm shift is based on community driven-development (CDD) concept in design, implementation and evaluation.

It is based on service delivery mechanisms that are demand-driven, multi-sectoral, bottom-up and purely demand-driven, multi-sectoral, bottom-up and purely participatory in planning, implementation, monitoring and evaluation.

It is imperative to note that Community-Based Poverty Reduction Project (CPRP) one of the most successful projects in the world bank shelf (2001-2009) metamorphosed to CSDP in the pilot states, Ekiti state inclusive.

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 5: Ekiti State Community  and Social Development Agency (ECKSDA)

CSDP AGRREEMENTSThe World Bank Board of Directors approved $200Million to the Federal Government of Nigeria for the implementation of CSDP on July 1, 2008 in Washington DC.

Financing Agreement was signed by the FGN and Financing Agreement was signed by the FGN and World Bank on 24th November, 2008 for $200m.

Subsidiary Agreement was signed by FGN and Ekiti State Government on 1st April, 2009 for $5m.

Project Duration: Five Years (2009-2013)

Beneficiaries: Twenty-Six (26) States, Ekiti State inclusive.

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 6: Ekiti State Community  and Social Development Agency (ECKSDA)

LOAN REPAYMENTThe Loan is payable in 30 years.

Repayment starts on September 1, 2018.

Final repayment is March 1, 2048.

� Credit - Nigeria� Credit - Nigeria

� Loan - State

� Grant - Beneficiary Community

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 7: Ekiti State Community  and Social Development Agency (ECKSDA)

FUNDABLE (ELIGIBLE) MICRO-

PROJECTSPhysical Infrastructure (Feeder Roads-construction and rehabilitation, culverts, bridges, etc)

Social Infrastructure (Health Facilities, Water, Electricity, etc)Electricity, etc)

Other Infrastructure (Vocational training centres, Market, etc)

Environmental and Natural Resources Management (Erosion Control, Flood Control, Drainage System, etc)

Safety Net Support (Fee Waiver, Workfare, etc)

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 8: Ekiti State Community  and Social Development Agency (ECKSDA)

NON-FUNDABLE PROJECTSPrivate Goods (Oba’s Palace, Saw mills)

Worshipping Centres (Church, Mosque)

Mega Projects (Airport, Dam, etc)

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 9: Ekiti State Community  and Social Development Agency (ECKSDA)

EKCSDA FINANCIAL OPERATIONSOperational Accounts:

� Drawdown Account – in which IDA funds are domiciled.

� Government Contribution Account – in which Annual � Government Contribution Account – in which Annual State Government Contributions are domiciled.

� Interest Account – in which all interest earned from the 2 Accounts are domiciled.

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 10: Ekiti State Community  and Social Development Agency (ECKSDA)

EKITI STATE SUPPORTEstablishment of the Agency by Law

Provision of Office accommodation

Payment of N100m Government Contribution AnnuallyAnnually

Constitution and Inauguration of Board of Directors

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 11: Ekiti State Community  and Social Development Agency (ECKSDA)

ACCOUNT STATUS� Expected Draw Down from IDA –N750m

� Total Government Contribution to date – N200Million

� Outstanding Government Contribution (GC) till date – N200Million– N200Million

� Draw Down to date – N718.7M

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 12: Ekiti State Community  and Social Development Agency (ECKSDA)

APPROVED COMMUNITY

DEVELOPMENT PLANS (CDP)� No of Approved Community Development Plans –

Sixty One (61) CDPs.

� No of Micro Projects in approved CDPs –

One Hundred and Ninety (190)One Hundred and Ninety (190)

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 13: Ekiti State Community  and Social Development Agency (ECKSDA)

MICRO PROJECTS PER SECTORSECTOR APPROVED

MPON-GOING MP

COMPLETED & FUNCTIONAL MP

EDUCATION 41 5 17

RURALELECTRIFICATION

28 4 9

ENVIRONMENT & 3 1 1ENVIRONMENT & NATURAL RESOURCES

3 1 1

GENDER & VULNERABLE

2 0 1

HEALTH 25 6 8

SOCIO-ECONOMIC 33 6 10

TRANSPORT 38 7 13

WATER 20 6 7

TOTAL 190 35 66Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 14: Ekiti State Community  and Social Development Agency (ECKSDA)

ACHIEVEMENTS� Four hundred and eighty eight (488) Community

Project Management Committees (CPMC) had been empowered to develop, part finance, implement and monitor micro social infrastructural projects across monitor micro social infrastructural projects across sectors in the state.

� Sixteen (16) Local Government Chairmen, Local Government Review Committees (LGRC) have had their capacity/skills strengthened to support communities and build progressive partnership between them.

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 15: Ekiti State Community  and Social Development Agency (ECKSDA)

ACHIEVEMENTS� Out of Nominal marching allocation of ($5Million )=

N750Million, N718.7Million / (96%) has been drawn down till date.

� Communities already imbibed Community Driven � Communities already imbibed Community Driven Development (CDD) approach to their developmental desires.

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 16: Ekiti State Community  and Social Development Agency (ECKSDA)

CHALLENGES� Two years Government Contribution (GC) outstanding

� Local Government are yet to incorporate Community Development Plans (CDP) into their budget and also replicating Community Driven Development (CDD) replicating Community Driven Development (CDD) approach to governance

� Non functional of LGRC in some LGAs.

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 17: Ekiti State Community  and Social Development Agency (ECKSDA)

IWOROKO COMMUNITYBEFOREA stream as one of the sources of water in the community

NOW

Production of water from Motorized Borehole

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 18: Ekiti State Community  and Social Development Agency (ECKSDA)

OOTUNJA COMMUNITYBEFORERented shop used as Health Centre NOW

Constructed Basic Health Centre

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 19: Ekiti State Community  and Social Development Agency (ECKSDA)

IBEDOYIN COMMUNITY: PROJECT I

BEFORE

Poor access road

NOWConstructed box culvert, drainage and grading of road.

c

Page 20: Ekiti State Community  and Social Development Agency (ECKSDA)

ODO-ORO COMMUNITYBEFORE

Collapsed exams hall at Odo-Oro High School.

NOW

Constructed Examination Hall at Odo-Oro High School

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 21: Ekiti State Community  and Social Development Agency (ECKSDA)

ORUN COMMUNITY, ISE/ORUN LGA

BEFORE

Dilapidated science laboratory

NOW

Renovated science laboratory at Orun

Community High School.

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 22: Ekiti State Community  and Social Development Agency (ECKSDA)

UPPERLAND COMMUNITYBEFORE Improvised wooden culvert

NOW

Constructed Twin Box Culvert

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 23: Ekiti State Community  and Social Development Agency (ECKSDA)

KAJOLA-ISE COMMUNITY

EXISTING DILAPIDATED HEALTH CENTRE

CONSTRUCTED BASIC HEALTH CENTRE

Ekiti State Community And Social Dev. Agency (EKCSDA)

Page 24: Ekiti State Community  and Social Development Agency (ECKSDA)

BOLORUNDURO COMMUNITYON-GOING RE-CONSTRUCTION OF A TWIN-BOX CULVERT CONSTRUCTED TWIN BOX CULVERT

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 25: Ekiti State Community  and Social Development Agency (ECKSDA)

COVENANT COMMUNITYBEFOREBAD CONDITION OF ROAD AT COVENANT COMMUNITY

NOW

CONSTRUCTED TWIN BOX CULVERT.

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 26: Ekiti State Community  and Social Development Agency (ECKSDA)

ABA EDE COMMUNITY, ISE

BEFORE

A STREAM AS SOURCE OF WATER IN

THE COMMUNITY

NOW

PRODUCTION OF WATER FROM

MOTORIZED BOREHOLE PROJECT

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 27: Ekiti State Community  and Social Development Agency (ECKSDA)

OSIN COMMUNITYBEFOREOLD BLOCK OF 4 CLASSROOMS , HALL AND OFFICES AT OSIN HIGH SCHOOL

NOWREHABILITATED BLOCK OF 4 CLASSROOMS, HALL AND OFFICES

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 28: Ekiti State Community  and Social Development Agency (ECKSDA)

ORISUNMBARE COMMUNITY, IJERO

BEFORE

EXISTING EXAMINATION HALL

CONSTRUCTED EXAMINATION HALL AT

COMMUNITY HIGH SCHOOL,

ORISUNMBARE

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 29: Ekiti State Community  and Social Development Agency (ECKSDA)

IROPORA COMMUNITY: PROJECT I Construction of Information and Skill

Acquisition Centre with facilities (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 30: Ekiti State Community  and Social Development Agency (ECKSDA)

IROPORA COMMUNITY: PROJECT IIConstruction of six unit lock up shops (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 31: Ekiti State Community  and Social Development Agency (ECKSDA)

IROPORA COMMUNITY PROJECT IVConstruction of box culvert and drainage (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 32: Ekiti State Community  and Social Development Agency (ECKSDA)

IBEDOYIN COMMUNITY: PROJECT IConstruction of a box culvert, drainage and grading of road (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 33: Ekiti State Community  and Social Development Agency (ECKSDA)

IBEDOYIN COMMUNITY PROJECT IIChannelization (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 34: Ekiti State Community  and Social Development Agency (ECKSDA)

IBEDOYIN COMMUNITY PROJECT IIIConstruction of (750X830)mm Ring Culvert with Line Drains (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 35: Ekiti State Community  and Social Development Agency (ECKSDA)

IWOROKO COMMUNITY PROJECT 1Construction of bore hole (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 36: Ekiti State Community  and Social Development Agency (ECKSDA)

IWOROKO COMMUNITY PROJECT 11Construction of 12 units lock up shops (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 37: Ekiti State Community  and Social Development Agency (ECKSDA)

IGEDE COMMUNITY PROJECT 1Construction of 8km Igede- Erijiyan Feeder Road with Culverts (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 38: Ekiti State Community  and Social Development Agency (ECKSDA)

ESURE EKITI – PROJECT Iconstruction of Administrative block

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 39: Ekiti State Community  and Social Development Agency (ECKSDA)

ESURE EKITI – PROJECT 11Construction of community hall

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 40: Ekiti State Community  and Social Development Agency (ECKSDA)

COVENANT COMMUNITYConstruction of culvert (completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 41: Ekiti State Community  and Social Development Agency (ECKSDA)

UPPERLAND COMMUNITYConstruction of twin box culvert at Upperland

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 42: Ekiti State Community  and Social Development Agency (ECKSDA)

IFEOLUWA COMMUNITY, ADO EKITIExtension of Electricity (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 43: Ekiti State Community  and Social Development Agency (ECKSDA)

OKE ASO/OSUN COMMUNITY,ADO EKITI IRehabilitation of feeder road (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 44: Ekiti State Community  and Social Development Agency (ECKSDA)

OKE ASO/OSUN COMMUNITY,ADO EKITI II

Construction of health centre(Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 45: Ekiti State Community  and Social Development Agency (ECKSDA)

IGBAYE-AAYE COMMUNITY IConstruction of Basic Health Centre (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 46: Ekiti State Community  and Social Development Agency (ECKSDA)

IGBAYE-AAYE COMMUNITY IIConstruction of Borehole (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 47: Ekiti State Community  and Social Development Agency (ECKSDA)

IGBAYE-AAYE COMMUNITY IIIRehabilitation of feeder road (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 48: Ekiti State Community  and Social Development Agency (ECKSDA)

KAJOLA-ISE COMMUNITY PROJECT 1Completed Staff Quarters at Arinjale High School

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 49: Ekiti State Community  and Social Development Agency (ECKSDA)

KAJOLA-ISE COMMUNITY IIConstruction of Basic Health Centre (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 50: Ekiti State Community  and Social Development Agency (ECKSDA)

ORUN COMMUNITY IRenovation of Science and Computer Laboratory (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 51: Ekiti State Community  and Social Development Agency (ECKSDA)

ORUN COMMUNITY IIExtension of Electricity (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 52: Ekiti State Community  and Social Development Agency (ECKSDA)

OBADA COMMUNITY , ISE IRehabilitation of a block of 3 classrooms and offices (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 53: Ekiti State Community  and Social Development Agency (ECKSDA)

OBADA COMMUNITY, ISE IIConstruction of Science Laboratory and Computer room (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 54: Ekiti State Community  and Social Development Agency (ECKSDA)

ABA EDE COMMUNITY, ISE PROJECT IProduction of water from borehole project (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 55: Ekiti State Community  and Social Development Agency (ECKSDA)

ABA EDE COMMUNITY, ISE PROJECT IIExtension of Electricity (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 56: Ekiti State Community  and Social Development Agency (ECKSDA)

ABA EDE COMMUNITY, ISE PROJECT IIIProcurement and Installation of Transformer (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 57: Ekiti State Community  and Social Development Agency (ECKSDA)

IKOLE COMMUNITYConstruction of examination hall at Ikole City College (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 58: Ekiti State Community  and Social Development Agency (ECKSDA)

OOTUNJA COMMUNITY-PROJECT IConstruction of health Center

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 59: Ekiti State Community  and Social Development Agency (ECKSDA)

OOTUNJA COMMUNITY-PROJECT II

Construction of feeder and Culvert (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 60: Ekiti State Community  and Social Development Agency (ECKSDA)

OOTUNJA COMMUNITY-PROJECT IIIConstruction of feeder and Culvert (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 61: Ekiti State Community  and Social Development Agency (ECKSDA)

ODO ORO COMMUNITY PROJECT IConstruction of examination hall at Odo Oro High School

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 62: Ekiti State Community  and Social Development Agency (ECKSDA)

ODO ORO COMMUNITY PROJECT IIConstruction of a block of 3 classrooms and toilets

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 63: Ekiti State Community  and Social Development Agency (ECKSDA)

ODO ORA COMMUNITY I

Construction of 10 unit lock-up shops with toilets (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 64: Ekiti State Community  and Social Development Agency (ECKSDA)

IDO EKITI COMMUNITY PROJECT I

Extension of electricity at Alapo Quarters (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 65: Ekiti State Community  and Social Development Agency (ECKSDA)

IDO EKITI COMMUNITY PROJECT IIConstruction of Water Storage tank at 16 locations (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 66: Ekiti State Community  and Social Development Agency (ECKSDA)

IDO EKITI COMMUNITY PROJECT IIIConstruction of drainage (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 67: Ekiti State Community  and Social Development Agency (ECKSDA)

EJIGAN COMMUNITYConstruction of 4 Nos Culverts (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 68: Ekiti State Community  and Social Development Agency (ECKSDA)

ILASA COMMUNITY PROJECT IPurchase and Installation of 200kva Transformer (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 69: Ekiti State Community  and Social Development Agency (ECKSDA)

AYAGBE COMMUNITY, OMUO PROJECT ICompletion of Community Hall (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 70: Ekiti State Community  and Social Development Agency (ECKSDA)

AYAGBE COMMUNITY, OMUO PROJECT IIChannelization (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 71: Ekiti State Community  and Social Development Agency (ECKSDA)

AYAGBE COMMUNITY, OMUO PROJECT IIIProduction of Water from hand pump at two different locations (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 72: Ekiti State Community  and Social Development Agency (ECKSDA)

OSIN COMMUNITY PROJECT I

Construction of block of classrooms (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 73: Ekiti State Community  and Social Development Agency (ECKSDA)

ILUPEJU COMMUNITY PROJECT 1Reconstruction and renovation of computer centre with equipment

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 74: Ekiti State Community  and Social Development Agency (ECKSDA)

IGOGO COMMUNITYProcurement of Science Laboratory and Computer equipments (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 75: Ekiti State Community  and Social Development Agency (ECKSDA)

IGOGO COMMUNITY PROJECT IIPurchase & Installation of 300kva 33/0.415kv transformer

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 76: Ekiti State Community  and Social Development Agency (ECKSDA)

AAYE OJA COMMUNITY PROJECT IConstruction of Science Laboratory and Computer room (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 77: Ekiti State Community  and Social Development Agency (ECKSDA)

AFAO/KAJOLA COMMUNITY, IKERE-PROJECT I

Purchase and Installation Of 200kva Transformer (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 78: Ekiti State Community  and Social Development Agency (ECKSDA)

AFAO/KAJOLA COMMUNITY, IKERE-PROJECT IIConstruction of Health Center (completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 79: Ekiti State Community  and Social Development Agency (ECKSDA)

AFAO/KAJOLA COMMUNITY, IKERE PROJECT IIIConstruction Of Culvert (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 80: Ekiti State Community  and Social Development Agency (ECKSDA)

JIOBA COMMUNITY, ODE EKITIProduction of water from hand pump

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 81: Ekiti State Community  and Social Development Agency (ECKSDA)

JIOBA COMMUNITY, ODE EKITIconstruction of health centre

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 82: Ekiti State Community  and Social Development Agency (ECKSDA)

IJAN COMMUNITY, Iconstruction of examination hall

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 83: Ekiti State Community  and Social Development Agency (ECKSDA)

ANIFOWOSHE, AISEGBA EKITI 1Production of water from hand pump

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 84: Ekiti State Community  and Social Development Agency (ECKSDA)

IDO-ILE COMMUNITY IConstruction of basic health centre

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 85: Ekiti State Community  and Social Development Agency (ECKSDA)

IGBAMITORO COMMUNITY PROJECT 1Construction of Computer and Science Laboratory (Completed)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 86: Ekiti State Community  and Social Development Agency (ECKSDA)

IGBAMITORO COMMUNITY PROJECT IICompletion of a block of 4 classrooms

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 87: Ekiti State Community  and Social Development Agency (ECKSDA)

SURULERE - IRE EKITI COMMUNITYConstruction of a block of three class rooms (on-going)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 88: Ekiti State Community  and Social Development Agency (ECKSDA)

ODE EKITI COMMUNITYConstruction of Box culvert (on-going)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 89: Ekiti State Community  and Social Development Agency (ECKSDA)

IPERE COMMUNITYConstruction of Science Laboratory (on-going)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 90: Ekiti State Community  and Social Development Agency (ECKSDA)

EDA-ILE COMMUNITYConstruction of open market stalls (on-going)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 91: Ekiti State Community  and Social Development Agency (ECKSDA)

ISAN COMMUNITYConstruction of block of three classrooms with two offices (on-going)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 92: Ekiti State Community  and Social Development Agency (ECKSDA)

ARAROMI-OKE COMMUNITYCompletion of Community Hall (On-going)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 93: Ekiti State Community  and Social Development Agency (ECKSDA)

OTUN EKITI COMMUNITYConstruction of science laboratory (on going)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 94: Ekiti State Community  and Social Development Agency (ECKSDA)

ORIN EKITI COMMUNITYcompletion of Community Hall (on going)

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 95: Ekiti State Community  and Social Development Agency (ECKSDA)

PICTORIAL PRESENTATION OF PICTORIAL PRESENTATION OF

EKCSDA ACTIVITIESEKCSDA ACTIVITIESEKCSDA ACTIVITIESEKCSDA ACTIVITIES

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 96: Ekiti State Community  and Social Development Agency (ECKSDA)

SENSITIZATIONSENSITIZATION AT ORUN COMMUNITYSENSITIZATION AT OBADA COMMUNITY

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 97: Ekiti State Community  and Social Development Agency (ECKSDA)

PARTICIPATORY RURAL APPRAISAL (PRA) FACILITATION PRA AT EPE COMMUNITY MOBA LGA PRA AT IROPORA COMMUNITY

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 98: Ekiti State Community  and Social Development Agency (ECKSDA)

PARTICIPATORY RURAL APPRAISAL (PRA)

FACILITATION CONT’D

PRA AT OMUO OKE

A WOMAN CASTING HER VOTE

PRA AT OMUO OKE THE KABIYESI CASTING HIS VOTE FOR THE PROJECTS OF HIS CHOICE

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 99: Ekiti State Community  and Social Development Agency (ECKSDA)

COMMUNITY PROJECT MANAGEMENT COMMITTEE

(CPMC) AND 3 OTHER SUB-COMMITTEES ELECTION

FACILITATION

CPMC ELECTION AT ISAN CPMC ELECTION AT ILORO

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 100: Ekiti State Community  and Social Development Agency (ECKSDA)

FIELD APPRAISAL ODO OROFIELD APPRAISSAL TEAM AT THE PROPOSED SITE FOR THE CONSTRUCTION OF EXAM HALL AT ODO ORO HIGH SCHOOL

OOTUNJAFIELD APPRAISSAL TEAM AT THE PROPOSED SITE FOR THE CONSTRUCTION OF HEALTH CENTRE AT OOTUNJA COMMUNITY

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 101: Ekiti State Community  and Social Development Agency (ECKSDA)

CPMC & SUB COMMITTEE TRAINING ON

PROJECT MANAGEMENTRESOURCE PERSON TEACHING

THE PARTICIPANTSCROSS SECTION OF PARTICIPANTS

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 102: Ekiti State Community  and Social Development Agency (ECKSDA)

PROJECT LAUNCH SIGNING OF PROJECT AND FINANCING AGREEMENTS BETWEEN EKCSDA AND IWOROKO COMMUNITY

EXECUTIVE GOV. OF EKITI STATE, DR. KAYODE FAYEMI, FLANKED BY THE COMMUNITY LEADER, HRM, OBA ALADEJANA, THE ALAWOROKO OF IWOROKO AND TWO MEMBERS OF THE STATE EXECUTIVE COUNCIL AT THE PROJECT LAUNCH.

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 103: Ekiti State Community  and Social Development Agency (ECKSDA)

PROJECT LAUNCH CONT’DFOUNDATION LAYING CEREMONY OF AN EXAMINATION HALL BY FINANCE COMMISSIONER, HON. DAPO KOLAWOLE AT IKOLE CITY COLLEGE

COMMUNITY WOMEN REJOICING AT UPPERLAND COMMUNITY PROJECT LAUNCH

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 104: Ekiti State Community  and Social Development Agency (ECKSDA)

PROJECT LAUNCH AT ODO ORO

COMMUNITY

WOMEN OF THE COMMUNITY DANCING AT THE CEREMONY

CROSS-SECTION OF THE COMMUNITY MEMBERS AT THE PROJECT LAUNCH

Ekiti State Community And Social Dev.

Agency (EKCSDA)

Page 105: Ekiti State Community  and Social Development Agency (ECKSDA)

WORLD BANK MISSION VISIT TO EKITI

STATEThe WB Mission Team Leader, Prof. Falusi and other team members, Mrs. T. Buba (FPSU) and Mrs. Ogunmefun (FMF) at Ibedoyin.

Prof. Falusi at Ibedoyin Community

Ekiti State Community And Social Dev.

Agency (EKCSDA)