eix activity update 2011-05 and switch wishlist andy davidson hurricane electric / lonap / ixleeds /...

18
EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson [email protected] Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Upload: victor-ferguson

Post on 17-Jan-2018

217 views

Category:

Documents


0 download

DESCRIPTION

Switch wishlist Existing EIX document. Thanks to Mike Hughes, the original shepherd Certified to be the second most beautiful event from 2005……..

TRANSCRIPT

Page 1: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

EIX Activity Update2011-05 and Switch Wishlist

Andy Davidson [email protected] Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Page 2: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

2011-05 – one slide

• “Safeguarding the future of Internet Exchange Points”

• Special /16 from final /8• We discussed this at RIPE62, now please

support the policy (address-policy-wg)

• Policy has good support already – you are good people.

Page 3: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Switch wishlist

Existing EIX document.Thanks to Mike Hughes, the original shepherd

Certified to be the second most beautiful event from 2005……..

Page 4: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE
Page 5: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Beautiful because…

• Provides guidance to new IXPs on features they need from their switch

• Provides guidance to switch vendors about IXP requirements

• Provides hints to operators

Page 6: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Existing themes

• Security and Management Features• Scalability and Resilience• Environmental Monitoring• Physical Wishes

Page 7: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Aim of this project:

• Update the document– Removed any “solved problems”– Increase detail in “remaining problems”– Add and document features we use today– Add and document roadmap/future features

• Looking for volunteers– Will discuss my thoughts, please consider whether

you are an expert and offer help authoring

Page 8: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Missing Features Used Today

• Optical Port features– Detail on new WDM optics– Third Party Optics for funny edge cases– Would like to define what happens in the wild

• Port Density– How dense ? Backplane speeds– Over subscription features ?

Page 9: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Missing Features Used Today

• DOM / Ethernet OAM– Road map and current use

• Port Security– Update current mac learning / drop BPDU based

comments– DHCP Guard / RA Guard– Port Security per vlan– Exceed rules – document all in use, missing modes

Page 10: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Link Aggregation

• Document algorithms used today• Document desired options• Different behavior for ISL / peer ports?• Monitoring features desired, troubleshooting

Page 11: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Sflow

• Current document says “S-Flow Export Support” – is this enough detail?

Page 12: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

VPLS

• Is not mentioned in the current document• How do you do it ?• Port security in multi-mac mode ?

Page 13: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Roadmaps

• SPB / TRILL roadmap – what would we like to see as exchange operators ?

• Other loop-allowed protocols or operations modes.

Page 14: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Review Multicast Section

• PIM Snooping• Use cases..

Page 15: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

API

• Programmatic management• Automation• Customer self-service– E.g. port security reset– Data examination

Page 16: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Things I may have missed

• Everything else in the world• Everything• Ever

Page 17: EIX Activity Update 2011-05 and Switch Wishlist Andy Davidson Hurricane Electric / LONAP / IXLeeds / EIX-WG Chair RIPE63, VIE

Things nothing to do with switches

• Do we need a similar document for DWDM/optical path stuff?

• Maybe – Exchanges are buying them?• Maybe not – Our needs are not so different?