eis-eir plates 1-09 - safca phase3drafteis-eir/02plates1_8.pdfusace and safca 3 plates source:...

10
PLATES

Upload: duongkiet

Post on 18-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

PLATES

NLIP Phase 3 Landside Improvements Project DEIS/DEIR USACE and SAFCA 1 Plates

Source: Adapted by EDAW in 2007 based on CASIL Layers; SAFCA 2007a

Project Location Plate 1

NLIP Phase 3 Landside Improvements Project DEIS/DEIR USACE and SAFCA 2 Plates

Source: Adapted by EDAW in 2006 based on data from MBK Engineers

Sacramento River Flood Control Project Plate 2

NLIP Phase 3 Landside Improvements Project DEIS/DEIR USACE and SAFCA 3 Plates

Source: Aerial Image SACOG 2007; adapted by EDAW in 2008 based on data from HDR and Wood Rodgers

Levee Segments Requiring Seepage Remediation and Levee Height Increases Plate 3

NLIP Phase 3 Landside Improvements Project DEIS/DEIR USACE and SAFCA 5 Plates

Source: SAFCA 2007b

Underseepage and Through-Seepage Levee Risks Plate 4

NLIP Phase 3 Landside Improvements Project DEIS/DEIR USACE and SAFCA 6 Plates

Source: Aerial image SACOG 2007; adapted by EDAW in 2007 based on data from SAFCA 2007b

Natomas Basin Erosion Sites Plate 5

NLIP Phase 3 Landside Improvements Project DEIS/DEIR USACE and SAFCA 7 Plates

Source: Photographs taken by EDAW in 2007

Examples of Waterside Encroachments on the Sacramento River East Levee Plates 6a and b

NLIP Phase 3 Landside Improvements Project DEIS/DEIR USACE and SAFCA 8 Plates

Source: Aerial image SACOG 2007, adapted by EDAW in 2007 based on data from HDR and Wood Rodgers

Sacramento International Airport Plate 7

NLIP Phase 3 Landside Improvements Project DEIS/DEIR USACE and SAFCA 9 Plates

Source: Aerial image SACOG 2007, adapted by EDAW in 2007 based on data from The Natomas Basin Conservancy in 2008

Natomas Basin Conservancy Lands Plate 8

NLIP Phase 3 Landside Improvements Project DEIS/DEIR USACE and SAFCA 10 Plates

This page intentionally blank.