eim hq series quarter-turn electric actuator...installation, operation and maintenance manual...

16
Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006 / Manual HQ-402-0606

Upload: others

Post on 02-Apr-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

May 2020

EIM HQ Series Quarter-Turn Electric ActuatorModels HQ-006 / Manual HQ-402-0606

Page 2: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

NotesMay 2020

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

This page intentionally left blank

Page 3: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

i

Table of Contents

Section 1: GeneralGeneralities ............................................................................................................. 1

Section 2: Actuator MountingActuator Mounting ................................................................................................. 2

Section 3: External ConstructionExternal Construction ............................................................................................. 3

Section 4: Standard Wiring DiagramStandard Wiring Diagram ........................................................................................ 4

Section 5: Manual OverrideManual Override ..................................................................................................... 5

Section 6: Electrical ConnectionElectrical Connection .............................................................................................. 6

Section 7: Limit Switch Setting InstructionsLimit Switch Setting Instructions ............................................................................. 7

Section 8: LubricationLubrication .............................................................................................................. 8

Section 9: MDPI SettingsMDPI Settings ......................................................................................................... 9

Section 10: Maintenance and StorageMaintenance and Storage ..................................................................................... 10

Section 11: TroubleshootingTroubleshooting ................................................................................................... 11

Section 12: Product Features and SpecificationsProduct Features and Specifications ...................................................................... 12

Table of ContentsMay 2020

Table of Contents

Page 4: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

May 2020

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

1

Section 1: GeneralHQ series electric actuators are design to provide reliable and efficient operation of 90° quarter-turn valves, dampers, etc.

!WARNINGUse caution when working in, with, or around valves and actuators. High pressures, forces, voltages and flammable media can be present. Failure to follow instructions for proper electrical wiring, storage, set-up and maintenance may cause serious injury, damage equipment, or void warranty.

Section 1: General

General

Page 5: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

May 2020

2

Section 2: Actuator MountingThe actuator may be mounted in any position. The HQ-006 actuator is supplied with a female output drive and adaptor bushings. ISO5211 FO3/FO5 and FO7 Bolt patterns are provided for actuator mounting.

Figure 1 Actuator Mounting Flange and Adapter Bushings

F03, F05 and F07 Bolt Circles

11 mm ID

9 mm ID

Section 2: Actuator Mounting

Actuator Mounting

Page 6: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

May 2020

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

3

Section 3: External Construction

Figure 2

CABLE ENTRY2 Plcs PG 0.531" (13.5) (1/4" - 1/2" Wire Cable)

Section 3: External Construction

External Construction

Page 7: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

May 2020

4

Section 4: Standard Wiring Diagram

Figure 3 INCOMING POWER

1 PH (110 OR 220 V A C)

LIV

E

NEU

TRA

L

BASE EARTH

HEATER 2W

OPENSTOPCLOSEOPEN LAMP

CLOSE LAMP

AUX. CONTACT 2 EXTRA SWITCHES MAX. 250 V AC 3 A

Section 4: Standard Wiring Diagram

Standard Wiring Diagram

Page 8: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

May 2020

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

5

Section 5: Manual Override

The HQ-006 actuator comes standard with a manual override nut. This is located on the bottom of the unit, and can be easily operated with a 5M wrench.

Figure 4

Section 5: Manual Override

Manual Override

Page 9: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

May 2020

6

Section 6: Electrical Connection• Move valve to mid-position by override nut. This will allow sufficient time to stop

actuator in case of improper hook-up.

• Identify means of removing power during hook-up.

• Be sure no erroneous remote control signals can be received causing actuator to energize.

• Electrically operate the valve in the open direction. If the valve closes, actuator must be stopped and checked for improper field wiring.

• Set all field conduit entries in accordance with National Electric Code Requirements.

Section 6: Electrica l Connection

Electrica l Connection

Page 10: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

May 2020

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

7

Section 7: Limit Switch Setting Instructions• Operate the actuator manually to closed position

• Using a hex wrench, loosen the cam adjustment screw in the CLS limit switch cam

• Rotate the CLS cam towards limit switch lever until the switch ‘clicks’

• Tighten set screw with hex wrench

• Operated the actuator manually to open position

• Using a hex wrench, loosen the cam adjustment screw in the OLS limit switch cam

• Rotate the OLS can towards limit switch lever until the switch ‘clicks’

• Tighten set screw with hex wrench

• Repeat for AOLS and ACLS

Figure 5

Limit SwitchCam

Cam adjustment

screw

Section 7: Limit Switch Setting Instructions

Limit Switch Setting Instructions

Page 11: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

May 2020

8

Section 8: Lubrication

The HQ series actuators are totally enclosed units with a permanently lubricated gear trains (Moly EP Grease). Once installed lubrication should not be required. However, periodic preventative maintenance will extend the operating life of the actuator.

Section 8: Lubrication

Lubrication

Page 12: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

May 2020

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

9

Section 9: MDPI Settings• Manually rotate actuator to fully closed position

• Remove actuator cover

• Loosen indicator screw

• Adjust indicator to correct orientation

• Tighten indicator screw

• Replace cover

• Check indicator alignment

Section 9: MDPI Settings

MDPI Settings

Page 13: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

May 2020

10

Section 10: Maintenance and Storage

At least once a year a check should be made of your EIM HQ Series Actuator.

• Disconnect all power to actuator.

• Open electrical enclosure. Inspect and tighten all electrical connections.

• Visually inspect for any electrical or mechanical damage. Replace worn or damaged components.

• Check lubrication consistency and levels. Fill or replace if required.

Actuators must be stored in a clean, cool and dry area. The unit shall be stored with the cover installed and the conduit openings sealed. Storage must be off the floor, covered with a sealed dust protector.

Section 10: Maintenance and Storage

Maintenance and Storage

Page 14: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

May 2020

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

11

Section 11: Troubleshooting

The following instructions are offered for the most common difficulties encounter during installation and start-up.

Table 1.

SYMPTOM PROBABLE CAUSE CORRECTIVE ACTION

Motor will not runOpen in control circuit

Refer to appropriate wiring diagram and check for continuity

Insulation resistance breakdown in motor

Perform Megger Test

No power available to actuator

Tripped circuit breaker Reset circuit breaker

Manual override nut hard to turn

Valve stem improperly lubricated Lubricate with grease

Actuator lubrication has broken downClean out old grease and replace with recommended lubricant

Valve packing gland too tightLoosen packing gland nuts asnecessary

Jammed valve Refer to valve maintenanceValve only opens or closes partially with motor

Limit switch improperly set Check setting and reset if necessary

Manual override nut will not operate valve

Stripped gearing Replace as necessary

Broken handwheel shaft Replace as necessary

Broken valve stem Repair or replace as necessary

Motor runs but will not operate valve

Stripped gearing Replace as necessary

Troubleshooting

Section 11: Troubleshooting

Page 15: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1

May 2020

12

Section 12: Product Features and Specifications

Enclosure Rated Weatherproof IP67

Enclosure High grade aluminium alloy, corrosion coated

Power Supply 110/220 V AC, 1 PH, 50/60 Hz

Motor Reversible Motor

Limit Switches 4 x open/close SPDT, 250VAC 3 A rating

Stall Protection Built-in thermal protection

Indicator MDPI (Mechanical Dial Position Indicator)

Manual Override Manual Override Nut

Space Heater 2 W anti-condensation

Conduit Entries (2) x PG13.5

Lubrication Grease moly EP

Ambient Temperatur -20 °C – +70 °C

External Coating Dry powder polyester

Product Features and Specifications

Section 12: Product Features and Specifications

Page 16: EIM HQ Series Quarter-Turn Electric Actuator...Installation, Operation and Maintenance Manual VCIOM-15257-EN Rev. 1 May 2020 EIM HQ Series Quarter-Turn Electric Actuator Models HQ-006

www.emerson.com/eim

VCIOM-15257-EN ©2020 Emerson. All rights reserved.

The Emerson logo is a trademark and service mark of Emerson Electric Co. EIMTM is a mark of one of the Emerson family of companies.All other marks are property of their respective owners.

The contents of this publication are presented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our terms and conditions, which are available upon request. We reserve the right to modify or improve the designs or specifications of such products at any time without notice.

For complete list of sales and manufacturing sites, please visit www.emerson.com/actuationtechnologieslocations or contact us at [email protected]

MIDDLE EAST & AFRICA

P. O. Box 17033Jebel Ali Free ZoneDubaiT +971 4 811 8100

P. O. Box 10305Jubail 31961Saudi ArabiaT +966 3 340 8650

24 Angus CrescentLongmeadow Business Estate EastP.O. Box 6908 Greenstone1616 Modderfontein Extension 5South AfricaT +27 11 451 3700

EUROPE

Holland Fasor 6Székesfehérvár 8000HungaryT +36 22 53 09 50

Strada Biffi 16529017 Fiorenzuola d’Arda (PC)ItalyT +39 0523 944 411

NORTH & SOUTH AMERICA

19200 Northwest FreewayHouston TX 77065USAT +1 281 477 4100

Av. Hollingsworth325 Iporanga SorocabaSP 18087-105BrazilT +55 15 3413 8888

ASIA PACIFIC

No. 9 Gul Road#01-02 Singapore 629361T +65 6777 8211

No. 1 Lai Yuan RoadWuqing Development AreaTianjin 301700P. R. ChinaT +86 22 8212 3300

World Area Configuration Centers (WACC) offer sales support, service, inven-tory and commissioning to our global customers. Choose the WACC or sales office nearest you: