  • 8/14/2019 EIA_345.pdf

    1/21

    Whatisanimpact?Theimpactofanactivityisadeviation(achange)fromthebaselinesituationthatiscausedbytheactivity.

    To measure an impact, you

    must know what the

    baseline situation is.

    The baselinesituation is the

    existing

    environmental

    situation or

    condition in the

    absence of the

    activity.

    The baselinesituation is a key

    concept in EIA.

  • 8/14/2019 EIA_345.pdf

    2/21

    ThebaselinesituationDescribingthebaselinesituation

    requiresdescribingboththenormalvariabilityinenvironmental

    components&currenttrendsinthesecomponents.

    time

    Watertable

    This chart of

    groundwater levels

    shows both variability

    and a trend over t ime.

    Both are part of the

    groundwater baseline

    situation.

  • 8/14/2019 EIA_345.pdf

    3/21

    Review:DefinitionofEIAEnvironmentalImpact

    Assessment

    isA formal process for identifying:

    Likely effects of activities or

    projects on the

    ENVIRONMENT, and on

    human health and welfare.

    Means and measures to

    mit igate & monitor theseimpacts

    Environment is

    broadly interpreted:

    physical, biological,and social.

  • 8/14/2019 EIA_345.pdf

    4/21

    It is ESSENTIAL in EIA

    to focus on the most

    significant impacts.

    Dont waste effort & time

    analyzing and discussingimpacts that are less

    important.

    Specifically,

  • 8/14/2019 EIA_345.pdf

    5/21

    Typesofimpacts&theirattributesDirect & indirect

    impacts

    Short-term & long-term impacts

    Adverse & beneficial

    impacts

    Cumulative impacts

    The EIA process is

    concerned with

    all types of impacts andmay describe them in a

    number of ways

    Intensity

    DirectionSpatial extent DurationFrequency

    Probability

    But all impacts are

    NOT treated

    equally.

  • 8/14/2019 EIA_345.pdf

    6/21

    TheEIAprocessPhase I:

    Initial inquiries

    Phase II:

    Full EIA study(if needed)

    Understand proposed

    activities

    Screen

    Conduct preliminary

    assessment (if needed)

  • 8/14/2019 EIA_345.pdf

    7/21

    Phase 1 of the EIA Process

    Screen the

    activity

    Based on the

    nature of theactivity what

    level of

    environmental

    review is

    indicated?

    Conduct a

    Preliminary

    Assessment

    A rapid,simplified EIA

    study using

    simple tools

    (e.g. IEE)

    ACTIVITY IS

    OF MODERATEOR UNKNOWN

    RISK

    SIGNIFICANT

    ADVERSEIMPACTS

    POSSIBLE

    SIGNIFICANT

    ADVERSE

    IMPACTS

    VERY UNLIKELY

    ACTIVITY IS LOW

    RISK (Of its nature,very unlikely to have

    significant adverseimpacts)

    ACTIVITY IS

    HIGH RISK (Of itsnature, likely to have

    significant adverse

    impacts)

    Phase IIPhase IUnderstand

    proposed

    activity

    Why is theactivity being

    proposed?

    What is being

    proposed?

    BEGIN

    FULLEIA

    STUDY

    STOP

    the EIA

    process

  • 8/14/2019 EIA_345.pdf

    8/21

    Phase1oftheEIAprocess:Understand

    the

    proposed

    activity

    Understand

    the proposedactivities

    Why is the

    activity being

    proposed?What is being

    proposed?

    ALL EIA processes begin with

    understanding WHAT is being proposed,and WHY.

    The question

    WHY IS THE ACTIVITY BEING PROPOSED?Is answered with the development objective (D.O.).

    If we dont

    understand

    it, we cantassess it!

    building a road

    increasing accessto markets

    We must understand the

    Development Objective to identify

    environmentally sound alternatives

    Not a D.O.!

    Is a D.O.

  • 8/14/2019 EIA_345.pdf

    9/21

    Phase1oftheEIAprocess:

    Understandthe

    proposed

    activity

    Understand

    the proposedactivities

    Why is the

    activity being

    proposed?

    What is being

    proposed?

    Once we understand the development

    objective, we must fully understand

    WHAT is being proposed.

    This includes associated actions!

    PRIMARY ACTIVITY:

    construct ion of dam & irrigation

    canal

    ASSOCIATED ACTIONS:

    Survey

    negotiate land tenure

    establish construction camp

    construct temporary

    diversion structure dispose of soil, debris

  • 8/14/2019 EIA_345.pdf

    10/21

    Phase1oftheEIAprocess:

    ScreentheactivityScreen eachactivity

    Based on thenature of the

    activity, what

    level of

    environmental

    analysis isindicated?

    SCREENING is the process of asking

    a very basic set of questions aboutthe nature of activity.

    These questions:

    do NOT require analysis.

    do NOT require detailed knowledge

    about the proposed sites, techniques or

    methodsExample screening questions:

    Does the activity involve:

    Villages relocation?

    Large-scale irrigation?

  • 8/14/2019 EIA_345.pdf

    11/21

    Phase1oftheEIAprocess:Screentheactivity

    Screen each

    activity

    Based on thenature of the

    activity, what

    level of

    environmental

    analysis isindicated?

    screening classifies the activity into

    a RISK CATEGORY:

    VERY LOW RISK

    VERY HIGH RISK

    MODERATE OR

    UNKNOWN RISK

    EIA process ends

    Do full EIA study

    Do preliminary

    assessment

    The outcome of the

    screening process

    determines the next step

    in the EIA process

  • 8/14/2019 EIA_345.pdf

    12/21

    Phase1oftheEIAprocess:ThePreliminaryAssessment

    Conduct a

    Preliminary

    Assessment

    A rapid,

    simplified EIA

    study using

    simple tools

    (e.g. the IEE)

    The purpose of a preliminary

    assessment is to providedocumentation and analysis that:

    Screeningdetermines whether

    the preliminary

    assessment is

    necessary

    !

    Allows the preparer to

    determine whether or not

    significant adverse impacts are

    likely

    Allows the reviewer to agree or

    disagree with the preparers

    determinations

    Sets out mitigation and

    monitoring for adverse impacts

  • 8/14/2019 EIA_345.pdf

    13/21

    Phase1oftheEIAprocess:ThePreliminaryAssessment

    Typical Preliminary

    Assessment outline

    1. Background (Developmentobjective, list of activities)

    2. Description of the baseline

    situation

    3. Evaluation of potential

    environmental impacts

    4. Mitigation & monitoring

    5. Recommended Findings

    For each activity it covers, a

    preliminary assessment has

    3 possible findings:

    The project is very unlikely

    to have significant adverse

    impacts. (EIA process ends)

    With specified mitigation

    and monitoring, the project

    is unlikely to have

    significant adverse impacts

    The project is likely to have

    significant adverse impacts(ful l EIA study is required)

  • 8/14/2019 EIA_345.pdf

    14/21

    Whatismitigation?The implementation of

    measures designed to

    reduce the undesirableeffects of a proposed

    action on the

    environment

    Mitigation is the upcoming topic !

  • 8/14/2019 EIA_345.pdf

    15/21

    Toarriveatfindings:Identify,PredictandJudge

    Identify potential

    impacts

    Judge the

    significance of

    potential impacts

    Predict potential

    impacts

    Arriving at the FINDINGS in a preliminary

    assessment requires 3 steps:

    Many resources describe the potential

    impacts of typical small-scale activities.

    Determine which potential impacts are likely

    to become actual, and quantify these

    impacts to the extent possible.

    1

    2

    3

    Determine whether the predicted impacts are

    indeed significant!

    THIS WILL OFTEN DEPEND ON HOWEFFECTIVE THE PROPOSED MITIGATION

    MEASURES ARE!

  • 8/14/2019 EIA_345.pdf

    16/21

    We only proceed to

    Phase II of the EIA process

    ifPhase I indicates that

    a FULL EIA STUDY

    is required

    !

    Most small-scale activities do

    not require a full EIA study!

  • 8/14/2019 EIA_345.pdf

    17/21

    Phase2oftheEIAprocess:TheFullEIAstudy

    ThefullEIAstudyhasverysimilarobjectivesandstructuretoapreliminaryassessment.

    However,thefullEIAstudydiffersin

    importantways:

    A formal scoping process

    Analysis of environmental

    impacts is much more

    detailed

    Alternatives must be

    formally defined. The

    impacts of each

    alternative must be

    identified & evaluated,

    and the results compared.

    Public participation isusually required.

    A professional EIA team

    is usually required.

    !

    !

    !

    !

  • 8/14/2019 EIA_345.pdf

    18/21

    Phase2oftheEIAprocess:TheFullEIAstudy

    Withafewadditions,thebasicoutlineofthepreliminaryassessmentisthetemplateforthestepsinvolvedinafullEIAstudy:

    Scope

    Evaluate baseline

    situation

    Identify & choose

    alternativesIdentify and characterize

    potential impacts of

    proposed activity and

    each alternativeCompare alternatives

    Develop mitigation and

    monitoring

    1. Background (Development

    objective, list of activities)

    2. Description of the baseline

    situation

    3. Evaluation of potentialenvironmental impacts

    4. Mitigation & monitoring

    5. Recommended Findings

    Basic steps of the full

    EIA studyCommunicate&

    Documentthrough

    out

  • 8/14/2019 EIA_345.pdf

    19/21

    Insummary,The full EIA study is a farmore significant effort than

    the preliminary assessment.

    Phase 2 of the EIA process:

    The Full EIA study

  • 8/14/2019 EIA_345.pdf

    20/21

    EIA is undertaken early enough

    to affect project designMitigation and monitoring

    developed in the EIA process is

    implemented.

    MakingEIAeffectiveTobeaneffectivetoolEIAmustbe:aintegralpartoftheprojectdevelopmentcycle.

    Honest

    Transparent&accessible

    The full EIA study must

    consider real alternatives

    Impacts must be assessed

    honestly.

    The EIA products must be clear

    and accessible to key actors.

  • 8/14/2019 EIA_345.pdf

    21/21

    Defining the Scope of EIA :

    Define the proposed action

    Enlist the cooperation of agencies

    Indentify whats important & whats not

    Set time limits on studies

    Determine requirements of the study team

    Collect background information

    Identify required permits

    Identify other regulatory requirements

    Determine the range of alternatives.