Whatisanimpact?Theimpactofanactivityisadeviation(achange)fromthebaselinesituationthatiscausedbytheactivity.
To measure an impact, you
must know what the
baseline situation is.
The baselinesituation is the
existing
environmental
situation or
condition in the
absence of the
activity.
The baselinesituation is a key
concept in EIA.
-
8/14/2019 EIA_345.pdf
2/21
ThebaselinesituationDescribingthebaselinesituation
requiresdescribingboththenormalvariabilityinenvironmental
components¤ttrendsinthesecomponents.
time
Watertable
This chart of
groundwater levels
shows both variability
and a trend over t ime.
Both are part of the
groundwater baseline
situation.
-
8/14/2019 EIA_345.pdf
3/21
Review:DefinitionofEIAEnvironmentalImpact
Assessment
isA formal process for identifying:
Likely effects of activities or
projects on the
ENVIRONMENT, and on
human health and welfare.
Means and measures to
mit igate & monitor theseimpacts
Environment is
broadly interpreted:
physical, biological,and social.
-
8/14/2019 EIA_345.pdf
4/21
It is ESSENTIAL in EIA
to focus on the most
significant impacts.
Dont waste effort & time
analyzing and discussingimpacts that are less
important.
Specifically,
-
8/14/2019 EIA_345.pdf
5/21
Typesofimpacts&theirattributesDirect & indirect
impacts
Short-term & long-term impacts
Adverse & beneficial
impacts
Cumulative impacts
The EIA process is
concerned with
all types of impacts andmay describe them in a
number of ways
Intensity
DirectionSpatial extent DurationFrequency
Probability
But all impacts are
NOT treated
equally.
-
8/14/2019 EIA_345.pdf
6/21
TheEIAprocessPhase I:
Initial inquiries
Phase II:
Full EIA study(if needed)
Understand proposed
activities
Screen
Conduct preliminary
assessment (if needed)
-
8/14/2019 EIA_345.pdf
7/21
Phase 1 of the EIA Process
Screen the
activity
Based on the
nature of theactivity what
level of
environmental
review is
indicated?
Conduct a
Preliminary
Assessment
A rapid,simplified EIA
study using
simple tools
(e.g. IEE)
ACTIVITY IS
OF MODERATEOR UNKNOWN
RISK
SIGNIFICANT
ADVERSEIMPACTS
POSSIBLE
SIGNIFICANT
ADVERSE
IMPACTS
VERY UNLIKELY
ACTIVITY IS LOW
RISK (Of its nature,very unlikely to have
significant adverseimpacts)
ACTIVITY IS
HIGH RISK (Of itsnature, likely to have
significant adverse
impacts)
Phase IIPhase IUnderstand
proposed
activity
Why is theactivity being
proposed?
What is being
proposed?
BEGIN
FULLEIA
STUDY
STOP
the EIA
process
-
8/14/2019 EIA_345.pdf
8/21
Phase1oftheEIAprocess:Understand
the
proposed
activity
Understand
the proposedactivities
Why is the
activity being
proposed?What is being
proposed?
ALL EIA processes begin with
understanding WHAT is being proposed,and WHY.
The question
WHY IS THE ACTIVITY BEING PROPOSED?Is answered with the development objective (D.O.).
If we dont
understand
it, we cantassess it!
building a road
increasing accessto markets
We must understand the
Development Objective to identify
environmentally sound alternatives
Not a D.O.!
Is a D.O.
-
8/14/2019 EIA_345.pdf
9/21
Phase1oftheEIAprocess:
Understandthe
proposed
activity
Understand
the proposedactivities
Why is the
activity being
proposed?
What is being
proposed?
Once we understand the development
objective, we must fully understand
WHAT is being proposed.
This includes associated actions!
PRIMARY ACTIVITY:
construct ion of dam & irrigation
canal
ASSOCIATED ACTIONS:
Survey
negotiate land tenure
establish construction camp
construct temporary
diversion structure dispose of soil, debris
-
8/14/2019 EIA_345.pdf
10/21
Phase1oftheEIAprocess:
ScreentheactivityScreen eachactivity
Based on thenature of the
activity, what
level of
environmental
analysis isindicated?
SCREENING is the process of asking
a very basic set of questions aboutthe nature of activity.
These questions:
do NOT require analysis.
do NOT require detailed knowledge
about the proposed sites, techniques or
methodsExample screening questions:
Does the activity involve:
Villages relocation?
Large-scale irrigation?
-
8/14/2019 EIA_345.pdf
11/21
Phase1oftheEIAprocess:Screentheactivity
Screen each
activity
Based on thenature of the
activity, what
level of
environmental
analysis isindicated?
screening classifies the activity into
a RISK CATEGORY:
VERY LOW RISK
VERY HIGH RISK
MODERATE OR
UNKNOWN RISK
EIA process ends
Do full EIA study
Do preliminary
assessment
The outcome of the
screening process
determines the next step
in the EIA process
-
8/14/2019 EIA_345.pdf
12/21
Phase1oftheEIAprocess:ThePreliminaryAssessment
Conduct a
Preliminary
Assessment
A rapid,
simplified EIA
study using
simple tools
(e.g. the IEE)
The purpose of a preliminary
assessment is to providedocumentation and analysis that:
Screeningdetermines whether
the preliminary
assessment is
necessary
!
Allows the preparer to
determine whether or not
significant adverse impacts are
likely
Allows the reviewer to agree or
disagree with the preparers
determinations
Sets out mitigation and
monitoring for adverse impacts
-
8/14/2019 EIA_345.pdf
13/21
Phase1oftheEIAprocess:ThePreliminaryAssessment
Typical Preliminary
Assessment outline
1. Background (Developmentobjective, list of activities)
2. Description of the baseline
situation
3. Evaluation of potential
environmental impacts
4. Mitigation & monitoring
5. Recommended Findings
For each activity it covers, a
preliminary assessment has
3 possible findings:
The project is very unlikely
to have significant adverse
impacts. (EIA process ends)
With specified mitigation
and monitoring, the project
is unlikely to have
significant adverse impacts
The project is likely to have
significant adverse impacts(ful l EIA study is required)
-
8/14/2019 EIA_345.pdf
14/21
Whatismitigation?The implementation of
measures designed to
reduce the undesirableeffects of a proposed
action on the
environment
Mitigation is the upcoming topic !
-
8/14/2019 EIA_345.pdf
15/21
Toarriveatfindings:Identify,PredictandJudge
Identify potential
impacts
Judge the
significance of
potential impacts
Predict potential
impacts
Arriving at the FINDINGS in a preliminary
assessment requires 3 steps:
Many resources describe the potential
impacts of typical small-scale activities.
Determine which potential impacts are likely
to become actual, and quantify these
impacts to the extent possible.
1
2
3
Determine whether the predicted impacts are
indeed significant!
THIS WILL OFTEN DEPEND ON HOWEFFECTIVE THE PROPOSED MITIGATION
MEASURES ARE!
-
8/14/2019 EIA_345.pdf
16/21
We only proceed to
Phase II of the EIA process
ifPhase I indicates that
a FULL EIA STUDY
is required
!
Most small-scale activities do
not require a full EIA study!
-
8/14/2019 EIA_345.pdf
17/21
Phase2oftheEIAprocess:TheFullEIAstudy
ThefullEIAstudyhasverysimilarobjectivesandstructuretoapreliminaryassessment.
However,thefullEIAstudydiffersin
importantways:
A formal scoping process
Analysis of environmental
impacts is much more
detailed
Alternatives must be
formally defined. The
impacts of each
alternative must be
identified & evaluated,
and the results compared.
Public participation isusually required.
A professional EIA team
is usually required.
!
!
!
!
-
8/14/2019 EIA_345.pdf
18/21
Phase2oftheEIAprocess:TheFullEIAstudy
Withafewadditions,thebasicoutlineofthepreliminaryassessmentisthetemplateforthestepsinvolvedinafullEIAstudy:
Scope
Evaluate baseline
situation
Identify & choose
alternativesIdentify and characterize
potential impacts of
proposed activity and
each alternativeCompare alternatives
Develop mitigation and
monitoring
1. Background (Development
objective, list of activities)
2. Description of the baseline
situation
3. Evaluation of potentialenvironmental impacts
4. Mitigation & monitoring
5. Recommended Findings
Basic steps of the full
EIA studyCommunicate&
Documentthrough
out
-
8/14/2019 EIA_345.pdf
19/21
Insummary,The full EIA study is a farmore significant effort than
the preliminary assessment.
Phase 2 of the EIA process:
The Full EIA study
-
8/14/2019 EIA_345.pdf
20/21
EIA is undertaken early enough
to affect project designMitigation and monitoring
developed in the EIA process is
implemented.
MakingEIAeffectiveTobeaneffectivetoolEIAmustbe:aintegralpartoftheprojectdevelopmentcycle.
Honest
Transparent&accessible
The full EIA study must
consider real alternatives
Impacts must be assessed
honestly.
The EIA products must be clear
and accessible to key actors.
-
8/14/2019 EIA_345.pdf
21/21
Defining the Scope of EIA :
Define the proposed action
Enlist the cooperation of agencies
Indentify whats important & whats not
Set time limits on studies
Determine requirements of the study team
Collect background information
Identify required permits
Identify other regulatory requirements
Determine the range of alternatives.