From the desk of Gabriele Wood E-mail: [email protected] _____________________________________ 19 April 2016 Dear Stakeholder ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PUBLIC PARTICIPATION PROCESS ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR VALLEY PARK, NORTHERN CAPE NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar power (CSP) plants, is in the process of investigating additional CSP facilities immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the Karoshoek Solar Valley Development on sites located approximately 30 km east of Upington within the Khara Hais Local Municipality in the Northern Cape. The facilities are proposed on the following farm portions: Lot 944 Karos Settlement; Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of Matjiesrivier 41. The purpose of the additional CSP facilities to be investigated is to facilitate the increase in capacity of each authorised facility to 150MW in order to meet the generating capacity thresholds specified by the Department of Energy’s (DoE) in its Expedited Bid Window of the Renewable Energy Independent Power Producers Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from time to time). Through a previous environmental process undertaken for the broader Karoshoek development, a number of CSP facilities were authorised as follows: Table 1: Authorised CSP Facilities Site reference Project Name and Description DEA Reference No. Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294 Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299 Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298 Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296 Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

Upload: others

Post on 07-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected] _____________________________________

19 April 2016

Dear Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated

solar power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos

Settlement; Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion

RE of Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

Page 2: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects

together with the already authorised projects, each project to be developed as a

single 150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across

both authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the

National Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo

Holdings (Pty) Ltd require authorisation from the National Department of

Environmental Affairs (DEA), as the competent authority, for the construction and

operation of the proposed CSP facilities. In terms of sections 24(5) of NEMA, the

and Government Notices R982 to R985; Scoping and EIA processes are required

to be undertaken for each project. In order to obtain authorisation,

comprehensive, independent environmental studies must be undertaken in

accordance with the EIA Regulations, 2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all

the potential environmental impacts associated with the proposed project, and

propose appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

Page 3: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed

projects have been prepared by Savannah Environmental and are available for

review and comment by Interested and/or Affected Parties (I&APs). The 30-day

review period for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as

written submission of fax, post or email.

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

Page 4: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

» Associated infrastructure including grid connection infrastructure, roads

and pipeline (These projects are being assessed under separate EIA

processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the

proposed projects and to further discuss possible issues of specific concern which

you may need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 5: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1)

ASSOCIATED WITH AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE

KAROSHOEK SOLAR VALLEY PARK, NORTHERN CAPE - NOTICE OF

AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Assigned to: 19/04/2016 16.43

Teams: Global Project: Karoshoek Solar Valley (Incl. N10)

From: Gabriele Wood <[email protected]>

To:

Cc:

Bcc: Amanda Bester <[email protected]>, Johan van der Merwe <[email protected]>, Annemarie

Kotze <[email protected]>, T van Heerden <[email protected]>, Herman Husselmann

<[email protected]>, Frikkie Truter <[email protected]>, J.J Eksteen <[email protected]>,

Frikkie Rupping <[email protected]>, Andrea van Gensen <[email protected]>,

Michael Ryall <[email protected]>, Johan Steenkamp <[email protected]>, Steven Shibambu

<[email protected]>, Samantha Ralston <[email protected]>, Brian Fisher

<[email protected]>, Jaco Strauss <[email protected]>, Jaco Burger <[email protected]>, Adrian

Tiplady <[email protected]>, Constant Hoogstad <[email protected]>, Marius Spangenberg

<[email protected]>, Jean Lombard <[email protected]>, Simon

Gear <[email protected]>, Teresa Scheepers <[email protected]>, Barend

van Staden <[email protected]>, Fritz Janse van Rensburg <[email protected]>,

Leonard Shaw <[email protected]>, Simphiwe Khumalo <[email protected]>, Dirk

Ambraal <[email protected]>, Shaun Cloete <[email protected]>, John Geeringh

<[email protected]>, Suzanne Erasmus <[email protected]>, Ratha Andrew Timothy

<[email protected]>, Phillip Hine <[email protected]>, Lizell Stroh <[email protected]>,

Annalize Naicker <[email protected]>, Nonnie Van Vuuren <[email protected]>, Pancho

Ndebele <[email protected]>, Onkemeste Gill <[email protected]>, Andre Burger

<[email protected]>, Natasha Higgitt <[email protected]>, Ellewee van Zyl

<[email protected]>, Jasper Nieuwoudt <[email protected]>, Skumsa Mancotywa

<[email protected]>, Ordain Riba <[email protected]>, Hennie Auret

<[email protected]>, Gog van der Colff <[email protected]>, Melanie Miles

<[email protected]>, Ella Swanepoel <[email protected]>, Jacoline Mans

<[email protected]>, Dalixolo Eric Ngxanga <[email protected]>, Andries Leon

Diergaardt <[email protected]>, Jonny van Rooyen <[email protected]>, Diana Van

Der Merwe <[email protected]>, Eric Ngxanga <[email protected]>,

Jacobus Spangenberg <[email protected]>, Thys van der Hout <[email protected]>, Johan

Koegelenberg <[email protected]>, Jacob Barend Maree

<[email protected]>, Waldo Nel <[email protected]>, Marius Bernard Orffer

<[email protected]>, Johan van der Colff <[email protected]>, Samantha

De la Fontaine <[email protected]>, Pule Ramaleho Ramaleho Saila

<[email protected]>, Thoko Buthelezi <[email protected]>, Anga Yaphi

<[email protected]>, Stephan van Huyssteen <[email protected]>, Tamai Hore

<[email protected]>, Abe Abrahams <[email protected]>, Sunday Mabaso

<[email protected]>, Sylvia Moholo <[email protected]>, Theunis Eksteen

<[email protected]>, Dries Visser <[email protected]>, Karen van Schalkwyk

Forward

Projects Organisations Stakeholders Calendar Reports Emails more

Search

© 2012 SugarCRM Inc.

EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CS... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action...

1 of 4 19/04/2016 16:44

Page 6: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

<[email protected]>, Mashudu Marubini <[email protected]>, Nestor Stirling Strauss

<[email protected]>, Pheladi Masipa <[email protected]>, Samuel Esau

<[email protected]>, Kholikile Nogwili <[email protected]>, René de Kock

<[email protected]>

Subject: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR VALLEY PARK,

NORTHERN CAPE - NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC

OPEN DAY

Body: Dear Stakeholder

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar power (CSP)

plants, is in the process of investigating additional CSP facilities immediately adjacent to

authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the Karoshoek Solar Valley Development on

sites located approximately 30 km east of Upington within the Khara Hais Local Municipality in the

Northern Cape. The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the generating capacity

thresholds specified by the Department of Energy’s (DoE) in its Expedited Bid Window of the

Renewable Energy Independent Power Producers Procurement (REIPPP) Programme (Tender No:

DOE/003/13/14 – as amended from time to time). In this regard, the following is proposed:

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower height of

270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

Savannah Environmental has been appointed as the independent environmental consultant to

undertake the required Scoping and EIA processes to identify and assess all the potential

environmental impacts associated with the proposed project. Separate Environmental Impact

Assessment Reports have been prepared for each of the aforementioned projects and will be

available for review and comment by Interested and Affected Parties as outlined in the attached

letter. Kindly refer to the attached notification letter for further details regarding the public review

periods and the details of the public open day meeting which will be held for these projects.

Please do not hesitate to contact me if you have any queries in this regard.

Kind regards

Mrs Gabriele Wood

Public Participation and Social Consultant

Savannah Environmental (Pty) Ltd

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CS... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action...

2 of 4 19/04/2016 16:44

Page 7: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Fax: 086 684 0547

Email: [email protected]

www.savannahsa.com

Show Plain Text

Attachments: Karoshoek CSP DEIAr Letter 19.04.2016.pdf

Activities

(0 - 0 of 0)

Subject Status ContactDue Date Assigned

User

Attachments

(1 - 1 of 1)

Subject ContactLastModified

Karoshoek CSP DEIAr Letter 19.04.2016.pdf19/04/201616.43

Accounts

(0 - 0 of 0)

Account Name Town/City Phone

Contacts

(0 - 0 of 0)

Name Organisation Email

Email Stakeholders

(1 - 10 of 86)

Name Organisation Email

Abe AbrahamsDepartment of Waterand Sanitation

[email protected]

Dirk Ambraal//Khara Hais LocalMunicipality

[email protected]

Hennie Auret//Khara Hais LocalMunicipality

[email protected]

edit

Create

Create

edit

edit

edit

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CS... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action...

3 of 4 19/04/2016 16:44

Page 8: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Print Back to top

Andre Burger [email protected]

Jaco Burger [email protected]

Koos Burger [email protected]

Thoko ButheleziDepartment ofAgriculture, Forestry &Fisheries

[email protected]

Shaun CloeteDepartment of Waterand Sanitation

[email protected]

René de KockSouth African National

[email protected]

Users

(0 - 0 of 0)

Name User Name Email Phone

Projects

(1 - 1 of 1)

Name Assigned To Start Date: End Date:

Karoshoek Solar Valley (Incl. Gabriele24/11/2014 30/06/2015

edit

edit

edit

edit

edit

edit

Select

Create

edit

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CS... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action...

4 of 4 19/04/2016 16:44

Page 9: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

!Kheis Local Municipality

Orania Street

Groblershoop

8850

Tel: 054-833-9500

Email: [email protected]

Dear Teresa Scheepers

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 10: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 11: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 12: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 13: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

!Kheis Local Municipality

Orania Street

Groblershoop

8850

Tel: 054-833-9500

Email: [email protected]

Dear Cllr. Samuel Esau

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 14: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 15: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 16: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 17: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

//Khara Hais Local Municipality

Market Street

Upington

8800

Tel: 054-338-7001

Email: [email protected]

Dear Dalixolo Eric Ngxanga

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 18: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 19: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 20: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 21: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

//Khara Hais Local Municipality

Market Street

Upington

8800

Tel: 054-338-7000

Email: [email protected]

Dear Cllr Dirk Ambraal

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 22: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 23: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 24: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 25: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Department of Agriculture, Forestry & Fisheries

Delpen Building, Office 270

Cnr Annie Botha & Union Streets

Pretoria

0084

Tel: 012-319-7619

Email: [email protected]

Dear Mashudu Marubini

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 26: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 27: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 28: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 29: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Department of Agriculture, Forestry & Fisheries

Delpen Building, Office 270

Cnr Annie Botha and Union Street

Pretoria

0084

Tel: 012-319-7634

Email: [email protected]

Dear Thoko Buthelezi

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 30: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 31: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 32: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 33: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Department of Agriculture, Forestry & Fisheries

DAFF Directorate: Forestry Management

Louisvale Road

Upington

8800

Tel: 054-338-5909

Email: [email protected]

Dear Jacoline Mans

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 34: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 35: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 36: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 37: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Department of Energy

192 Visagie Street

Pretoria

0002

Tel: 012-406-7650

Email: [email protected]

Dear Pheladi Masipa

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 38: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 39: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 40: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 41: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Department of Environmental Affairs

Environment House

473 Steve Biko Road

Pretoria

0001

Tel: 012-399-9514

Email: [email protected]

Attention: Acting Deputy-Director General: Biodiversity and Conservation

Dear Skumsa Mancotywa

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 42: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 43: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 44: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 45: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Department of Mineral Resources

Perm Building

65 Phakamile Mabija Street

Kimberley

8300

Tel: 053-807-1700

Email: [email protected]

Dear Sunday Mabaso

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 46: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 47: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 48: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 49: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Department of Mineral Resources

Hopley Centre, cnr of Van der stel & Van Riebeeck Streets

Springbok

8240

Tel: 027-712-8160

Email: [email protected]

Dear Jasper Nieuwoudt

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 50: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 51: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 52: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 53: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Department of Water and Sanitation

Louisvale Road

Upington

8800

Tel: 054-338-5827

Email: [email protected]

Dear Shaun Cloete

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 54: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 55: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 56: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 57: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Eskom Holdings SOC Ltd

120 Henry Street

Bloemfontein

9301

Tel: 0514042040

Email: [email protected]

Dear Andrea van Gensen

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 58: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 59: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 60: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 61: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Eskom Holdings SOC Ltd

Megawatt Park

Maxwell Drive

Sunninghill

2157

Tel: 011-516-7233

Email: [email protected]

Dear John Geeringh

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 62: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 63: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 64: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 65: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

!Kheis Local Municipality

Orania Stree

Groblershoop

8850

Tel: 054-833-9500

Email: [email protected]

Dear Cllr Andries Leon Diergaardt

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 66: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 67: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 68: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 69: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Ngwao-Boswa Ya Kapa Bokone

(Northern Cape Provincial Heritage Resources Authority)

1 Monridge Office Park

Cnr Kekewich Drive & Memorial Road

Kimberley

8301

Tel: 053-831-2537

Email: [email protected]

Dear Ratha Andrew Timothy

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 70: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 71: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 72: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 73: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Northern Cape Department of Agriculture, Land Reform & Rural Development

Kimberlite Building

162 George Street

Kimberley

8301

Tel: 053-838-9102

Email: [email protected]

Dear Wonders Dimakatso Viljoen Mothibi

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 74: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 75: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 76: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 77: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Northern Cape Department of Environment and Nature Conservation

Provincial Building (First Floor)

Cnr. Rivier & Nelson Mandela Rd

Upington

8800

Tel: 072-860-5478

Email: [email protected]

Dear Samantha De la Fontaine

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 78: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 79: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 80: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 81: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Northern Cape Department of Environment and Nature Conservation

Sasko Building

90 Long Street

Kimberley

8301

Tel: 053-807-7431

Email: [email protected]

Dear Brian Fisher

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 82: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 83: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 84: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 85: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Northern Cape Department of Roads and Public Works

9-11 Stokroos Street

Squarehill Park

Kimberley

8301

Tel: 0538382109

Email: [email protected]

Dear Kholikile Nogwili

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 86: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 87: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 88: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 89: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

South African National Roads Agency Limited

1 Havenga Street

Oakdale

Bellville

7530

Tel: 021-957-4600

Email: [email protected]

Dear René de Kock

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 90: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 91: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 92: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 93: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

Square Kilometre Array (SKA): South Africa

SKA Office, 1st Floor

17 Baker Street

Rosebank

2196

Tel: 011-442-2434

Email: [email protected]

Dear Adrian Tiplady

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 94: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 95: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 96: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 97: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

From the desk of Gabriele Wood

E-mail: [email protected]_____________________________________

19 April 2016

ZF Mgcawu District Municipality

c/o Hill and Le Roux Street

Upington

8800

Tel: 054-337-2800

Email: [email protected]

Dear Frikkie Rupping

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP TOWER 1) ASSOCIATED WITH

AUTHORISED CSP SITES (1.3, 1.4, 3, 4 & 5) WITHIN THE KAROSHOEK SOLAR

VALLEY PARK, NORTHERN CAPE

NOTICE OF AVAILABILITY OF EIA REPORTS FOR REVIEW AND PUBLIC OPEN DAY

Emvelo Holdings (Pty) Ltd, an independent power developer of concentrated solar

power (CSP) plants, is in the process of investigating additional CSP facilities

immediately adjacent to authorised CSP sites (1.3, 1.4, 3, 4 & 5) within the

Karoshoek Solar Valley Development on sites located approximately 30 km east

of Upington within the Khara Hais Local Municipality in the Northern Cape.

The facilities are proposed on the following farm portions: Lot 944 Karos Settlement;

Portion 3 of Matjiesrivier 41; Portion 2 of Matjiesrivier 41; and Portion RE of

Matjiesrivier 41.

The purpose of the additional CSP facilities to be investigated is to facilitate the

increase in capacity of each authorised facility to 150MW in order to meet the

generating capacity thresholds specified by the Department of Energy’s (DoE) in its

Expedited Bid Window of the Renewable Energy Independent Power Producers

Procurement (REIPPP) Programme (Tender No: DOE/003/13/14 – as amended from

time to time).

Page 98: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

Through a previous environmental process undertaken for the broader Karoshoek

development, a number of CSP facilities were authorised as follows:

Table 1: Authorised CSP Facilities

Site

reference

Project Name and Description DEA Reference No.

Site 1.3 Karoshoek PT (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/294

Site 1.4 Karoshoek LFT 2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/299

Site 3 Karoshoek Tower 1 (1 x 50MW Tower) 14/12/16/3/3/2/298

Site 4 Karoshoek LFTT 1 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/296

Site 5 Karoshoek LFTT2 (1 x 100 MW Parabolic Trough) 14/12/16/3/3/2/295

In order to meet generating capacity thresholds of 150MW for CSP facilities as

specified by Department of Energy’s (DoE) Expedited Bid Window for REIPPP

Programme (Tender No: DOE/003/13/14 as amended from time to time),

additional projects are proposed immediately adjacent to each of the above

authorised projects. In this regard, the following is proposed:

Table 2: Additional Proposed CSP Facilities

Authorised

Sites

(as described in

Table 1 above)

Additional Projects Proposed DEA Reference No.

Site 1.3 Ilanga CSP 2 50MW Parabolic Trough 14/12/16/3/3/2/861

Site 1.4 Ilanga CSP 5 50MW Parabolic Trough 14/12/16/3/3/2/864

Site 3 Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

14/12/16/3/3/2/866

Site 4 Ilanga CSP 3 50MW Parabolic Trough 14/12/16/3/3/2/862

Site 5 Ilanga CSP4 50 MW Parabolic Trough 14/12/16/3/3/2/868

It is the intention of the developer to develop the above proposed projects together

with the already authorised projects, each project to be developed as a single

150MW facility in total. In the instance of the tower plant environmental

authorisations, this would result in only a single tower being developed across both

authorised projects.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

In terms of the EIA Regulations published in terms of Section 24(5) of the National

Environmental Management Act (NEMA, Act No. 107 of 1998), Emvelo Holdings

(Pty) Ltd require authorisation from the National Department of Environmental

Affairs (DEA), as the competent authority, for the construction and operation of the

proposed CSP facilities. In terms of sections 24(5) of NEMA, the and Government

Notices R982 to R985; Scoping and EIA processes are required to be undertaken

for each project. In order to obtain authorisation, comprehensive, independent

Page 99: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

environmental studies must be undertaken in accordance with the EIA Regulations,

2014.

Savannah Environmental has been appointed as the independent environmental

consultant to undertake the required Scoping and EIA to identify and assess all the

potential environmental impacts associated with the proposed project, and propose

appropriate mitigation and management measures in an Environmental

Management Programme (EMPr). As part of these environmental studies,

Interested and Affected (I&APs) will be actively involved through the public

involvement process.

AVAILABILITY OF ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR

REVIEW

Environmental Impact Assessment (EIA) Reports for each of the proposed projects

have been prepared by Savannah Environmental and are available for review and

comment by Interested and/or Affected Parties (I&APs). The 30-day review period

for each report is as follows:

Additional Projects Proposed Public Review Period

Ilanga CSP 2 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/861)

22 April 2016 – 24 May 2016

Ilanga CSP 5 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/864)

25 April 2016 – 30 May 2016

Ilanga Tower 1 100MW (with a maximum tower

height of 270m)

(DEA Ref. No. 14/12/16/3/3/2/866)

22 April 2016 – 24 May 2016

Ilanga CSP 3 50MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/862)

22 April 2016 – 24 May 2016

Ilanga CSP 4 50 MW Parabolic Trough

(DEA Ref. No. 14/12/16/3/3/2/868)

19 April 2016 – 23 May 2016

The EIA Reports can be viewed at the Upington Public Library in Upington. The

reports can also be downloaded from www.savannahSA.com.

Please could you kindly submit your formal comments by sending written

correspondence in this regard. All comments received will be included in the final

EIA Reports which will be submitted to the DEA. Comments can be made as written

submission of fax, post or email.

Page 100: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL

PUBLIC OPEN DAY

Interested and/or Affected Parties are hereby invited to attend a Public Open Day

as follows:

Date: Thursday 5 May 2016

Time: 15:30 – 18:30

Venue: NG Kerk, Groot Rivier (Sultana-oord)

The aim of the Public Open Day is to provide you with more information (including

technical details, project processes and timeframes) on the following projects:

» Ilanga CSP 2 – 5 and CSP Tower 1

» Ilanga CSP 7, 8 and 9 (These projects are being assessed under separate

EIA processes.)

» Associated infrastructure including grid connection infrastructure, roads and

pipeline (These projects are being assessed under separate EIA processes.)

In addition, the Public Open Day aims to provide a summary of the findings of the

environmental impact assessments undertaken, to invite comment on the proposed

projects and to further discuss possible issues of specific concern which you may

need to be addressed.

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 101: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 102: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 103: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 104: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 105: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 106: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 107: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 108: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 109: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 110: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 111: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 112: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 113: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 114: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 115: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 116: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 117: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 118: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL
Page 119: EIA PROCESS - ADDITIONAL CSP FACILITIES (CSP 2 – 5 & CSP ...€¦ · From the desk of Gabriele Wood E-mail: gabriele@savannahSA.com _____ 19 April 2016 Dear Stakeholder ENVIRONMENTAL