º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ : ACCEPTANCE LETTER No.W.496/LDRJ/ROB438/01 dt. 17/01/2017
Ref: Tender Notice no. : CAO/CN/BNC/081/16 dated 08/09/2016 (LDRJ/ROB‐438/01) Technical Bid Opened on : 20/10/2016 Price bid Opened on: 23/12/2016.
Dear Sir(s) 1. Your offer for the above work for Rs.10,90,83,362/‐ (RUPEES TEN CRORE NINETY LAKH EIGHTY THREE
THOUSAND THREE HUNDRED AND SIXTY TWO ONLY ) is accepted by the competent authority. The accepted schedule of items showing the rates and quantities is enclosed herewith. The completion period of the work is 12 (TWELVE) months from the date of issue of this letter. This Letter of Acceptance constitutes a binding contract between you and the Railway Administration. Please quote UCC in all further correspondence.
2. The Security Deposit (SD) for the contract is Rs.54,54,168/‐ (RUPEES FIFTY FOUR LAKH FIFTY FOUR THOUSAND
ONE HUNDRED AND SIXTY EIGHT ONLY). The Earnest Money Deposit of Rs.7,41,910/- remitted vide DR of Kuber Yojana Deposit Scheme No.123115 dated 18/10/2016 issued by UCO BANK, HYDERABAD, by you along with the offer is adjusted towards a part of the SD. The balance SD of Rs.47,12,258/-will be recovered from the running bills of the contract @ 10% of bill amount from each bill. Please note that no interest will accrue on the Security Deposit.
3. A Performance Guarantee (PG) for Rs.54,54,168/‐ (RUPEES FIFTY FOUR LAKH FIFTY FOUR THOUSAND ONE
HUNDRED AND SIXTY EIGHT ONLY) is to be submitted by you within 30 (thirty) days from the date of issue of this letter in the forms mentioned in clause 4.0 (b) of Special Conditions of Contract. The PG shall be valid up to 60 days beyond the stipulated date of completion.
4. Please report to Dy. Chief Engineer/II/CN/UBL. along with the detailed programme of work. Other conditions,
details and milestones are mentioned overleaf. This letter consists of two enclosures as given below. Please acknowledge the receipt of this letter.
ENCL: 1. PG Form, Yours faithfully 2. Schedule of items.
(V. SRIDHAR)
Dy. Chief Engineer/Works/Construction South Western Railway, Bangalore46 for and on behalf of President of India
(Please Turn over)
UCC 74242 Name of work: Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches Value of work : Rs.10,90,83,362/‐ Completion period : 12 months
To M/s TSR NIRMAAN PRIVATE LIMITED PLOT NO 2, H.NO.8-2-277/2, ROAD NO.3, BANJARA HILLS HYDERABAD - 500 034 TELANGANA
nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä SOUTH WESTERN RAILWAY
Office of the Chief Administrative Officer
(Construction), 18, Millers’ Road,
BANGALORE – 560 046
º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER No.W.496/LDRJ/ROB438/01 dt. 17/01/2017 Other conditions and details: 1. Extension of time for submission of PG beyond 30 (thirty) days and up to 60 (sixty) days from the date of issue of this letter may
be accorded by the Contract Agreement signing Authority. However, a penal interest of 15% per annum shall be charged for the delay beyond 30 (thirty) days on a daily basis i.e., from 31st day of the date of issue of LOA. In case you fail to submit the requisite PG even after 60 days from the date of issue of LOA, the contract shall be terminated duly forfeiting the EMD and other dues, if any payable against the contract and you shall also be debarred from participating in re‐tender for the work. The PG will be released after satisfactory completion of the work as per the contract conditions. If the contract is rescinded, the SD shall be forfeited and, the PG shall also be encashed. Further, you will be debarred from participating in the tender for executing the balance work
2. You shall execute an agreement for the work within seven days from the date of receipt of notice by Railways regarding
readiness of the agreement. The detailed programme of work to be submitted by you in conformity with the milestones given below or even earlier, shall be as stipulated in the special conditions. The programme shall indicate the time schedule of various items of works in the form of Bar Chart/PERT Chart/CPM Chart. The programme should also include the details of organization (in terms of labour and supervisors), plant and machinery intended to be utilized from time to time for execution of the work within the stipulated date of completion. In case of non‐submission of acceptable programme of work within 15 days of issue of this letter, you are liable for penal action including levying fine up to Rs. 50,000/‐.
MILE STONE CHART
‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Copy to: CAO/CN, CE/CN/UBL, DY.FA&CAO/CN/UBL, HQ‐Vigilance branch/UBL, Ch.OS/Contracts, The Regional Labour Commissioner (Central) BUDA complex, Opp. Mothi Talkies, BELLARY‐583101 for information. Copy to : Dy.CE/II/CN/UBL, XEN/CN/UBL – for information and necessary action. NOTE: The rates of ScheduleB are SPECIAL RATES and shall not be compared for future tenders. In case of any increase in quantities beyond agreement quantities, negotiation shall be conducted for reduction of rates. However effort should be made to execute quantities upto agreement quantities only. (Encl: 1 copy of TC minutes & LOA with copy of schedule and conditions).
SL.No. ACTIVITY TDC
1 Mobilisation & site clearance 1st to 2nd Month
2 Excavation of foundation 2nd to 4th Month
3 Construction of Abutments & Casting Bowstring Girder
4th to 8th Month
4 Making of RE panels 3rd to 7th Month
5 Execution of approaches 5th to 10th Month
6 Launching of Bowstring Girder 10th Month
7 Miscellaneous works 11th to 12th Month
South Western Railway (Construction)
Annexure -I
LOA No. W496/LDRJ/ROB-438/01 Date : 17/01/2017 of UCC Code :74242
Print Date : 17/01/2017
Name of Work :
Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels forApproaches. (TWO PACKET SYSTEM)
Name of the Contractor : T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
ABSTRACT
Sl. No.
Departmental Value asper Tender
Contractor % ScheduleTotal
Schedule
Description
1
A
Items of works covered by USSOR 2011 60,32,762.47 ‐5% 57,31,124.35
2
B
Items of works pertains to Earthwork
1,44,715.00 +5% 1,51,950.75
3
C
Items of works pertains to Supply of Cement
74,51,850.00 ‐1% 73,77,331.50
4
D
Items of works pertains to Concrete works
1,36,05,800.00 ‐5% 1,29,25,510.00
5
E
Items of works pertains to Supply of Steel
1,89,03,350.00 ‐5% 1,79,58,182.50
6
F
Items of Blanketting of formation,COE & Bridge approaches
12,66,000.00 ‐5% 12,02,700.00
7
H
Items of Collection & Supply of Ballast
49,600.00 ‐5% 47,120.00
8
L
Items of Supply, Fabrication & Erection/ Launching of Steel girder
1,67,32,910.00 ‐19% 1,35,53,657.10
9
M
Items of works pertains to RE Panel items
3,72,68,200.00 ‐9% 3,39,14,062.00
10
N
Items of works pertains to Road works
1,02,18,600.00 ‐1% 1,01,16,414.00
11
O
Items pertains to Miscellaneous Bridge works
66,86,595.00 ‐9% 60,84,801.45
12
P
Items of works pertains to track linking works( During Non-
20,716.00 ‐1% 20,508.84
Total Value : 10,90,83,362.49
Discount 0 % 0.00
10,90,83,362.49
Net Value :
( Rupees Ten Crore Ninety Lakh Eighty Three Thousand Three Hundred and Sixty Two ONLY)
Signature of Contractor Schedule Page No: 1 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'A'
USSOR 2011 ITEMS
Sl. No.
Description of Items
CODE
1
181021
Demolishing plain cement concrete including disposal of material within 50m lead : 1:2:4 orricher mix with max. 20 mm coarse aggregate
Quantity
Rate
Unit
Amount
25.00
555.62
1 CUM
13,890.50
( Rupees Five Hundred and Fifty Five And Paise Sixty Two )
Contractor's % : 0 Discount : 0
2
181030
Demolishing R.C.C. work including cutting and stacking of steel bars and disposal of unserviceablematerial within 50m lead. (Extra payment for scraping, cleaning and straightening of bars to be made separately)
Quantity
Rate
Unit
Amount
25.00
810.58
1 CUM
20,264.50
( Rupees Eight Hundred and Ten And Paise Fifty Eight )
Contractor's % : 0 Discount : 0
3
182033
Demolishing stone rubble masonry including stacking of serviceable material and disposal ofunserviceable material within 50m lead : In cement mortar
Quantity
Rate
Unit
Amount
15.00
560.34
1 CUM
8,405.10
( Rupees Five Hundred and Sixty And Paise Thirty Four )
Contractor's % : 0 Discount : 0
4
183062
Dismantling including stacking of serviceable material and disposal of unserviceable materialwithin 50m lead : Bituminous top layer of road
Quantity
Rate
Unit
Amount
3000.00
98.72
1 SQM
2,96,160.00
( Rupees Ninety Eight And Paise Seventy Two )
Contractor's % : 0 Discount : 0
5
183061
Dismantling including stacking of serviceable material and disposal of unserviceable materialwithin 50m lead : Under layer of road of water bound macadam/ stone soling etc.
Quantity
Rate
Unit
Amount
3000.00
50.52
1 SQM
1,51,560.00
( Rupees Fifty And Paise Fifty Two )
Contractor's % : 0 Discount : 0
6
192011
Earth work in excavation for foundations and floors of the bridges, retaining walls etc., includingsetting out, dressing of sides, ramming of bottom, getting out the excavated material, back fillingin layers with approved material and consolidation of the layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with alllabour and material complete as per drawing and technical specification as directed by Engineer in charge : All kinds of soils
Quantity
Rate
Unit
Amount
2500.00
182.73
1 CUM
4,56,825.00
( Rupees One Hundred and Eighty Two And Paise Seventy Three )
Contractor's % : 0 Discount : 0
Signature of Contractor Schedule Page No: 2 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'A'
USSOR 2011 ITEMS
Sl. No.
Description of Items
CODE
7
192012
Earth work in excavation for foundations and floors of the bridges, retaining walls etc., including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back fillingin layers with approved material and consolidation of the layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineerin charge : Ordinary rock
Quantity
Rate
Unit
Amount
300.00
237.64
1 CUM
71,292.00
( Rupees Two Hundred and Thirty Seven And Paise Sixty Four )
Contractor's % : 0 Discount : 0
8
192014
Earth work in excavation for foundations and floors of the bridges, retaining walls etc., includingsetting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with alllabour and material complete as per drawing and technical specification as directed by Engineerin charge : Hard rock ( blasting prohibited )
Quantity
Rate
Unit
Amount
150.00
451.19
1 CUM
67,678.50
( Rupees Four Hundred and Fifty One And Paise Nineteen )
Contractor's % : 0 Discount : 0
9
192020a
Extra for the quantity of works, executed in or underwater and/ or liquid mud including pumpingout water as required : All kinds of soils (corresponding to item no.192011)
Quantity
Rate
Unit
Amount
850.00
36.55
1 CUM
31,067.50
( Rupees Thirty Six And Paise Fifty Five )
Contractor's % : 0 Discount : 0
10
252390
Stone Boulder Weighing minimum 35 Kg Each
Quantity
Rate
Unit
Amount
125.00
455.40
1 CUM
56,925.00
( Rupees Four Hundred and Fifty Five And Paise Forty )
Contractor's % : 0 Discount : 0
11
222280
Supplying, spreading and filling coarse sand (No cohesive materials to be used) of approvedquality including watering and ramming in foundation, plinth, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction ofEngineer‐in‐charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line, etc.complete with contractors labour, materials, tools and plant
Quantity
Rate
Unit
Amount
350.00
1,270.33
1 CUM
4,44,615.50
( Rupees One Thousand Two Hundred and Seventy And Paise Thirty Three )
Contractor's % : 0 Discount : 0
12
222140
Providing, cutting, fabricating, treating, fixing structural steel as per IS: 2062 in access ladders (top of girder/slab to pier cap), inserts, platforms, railing, trolley refuges, drain pipes etc. bydrilling holes and grouting with C.C as per specifications including painting with two coats ofapproved paint over two coats of primer. (Cement for grouting shall be paid separately)
Quantity
Rate
Unit
Amount
0.50
73,927.14
1 MT
36,963.57
( Rupees Seventy Three Thousand Nine Hundred and Twenty Seven And Paise Fourteen )
Contractor's % : 0 Discount : 0
Signature of Contractor Schedule Page No: 3 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'A'
USSOR 2011 ITEMS
Sl. No.
Description of Items
CODE
13
222170
Providing and fixing of Drainage Spouts of 100 mm UPVC complete as per drawing and Technicalspecification
Quantity
Rate
Unit
Amount
26.00
447.75
1 METRE
11,641.50
( Rupees Four Hundred and Forty Seven And Paise Seventy Five )
Contractor's % : 0 Discount : 0
14
211141
Supplying, fitting and fixing in position true to line and level POT‐PTFE bearing consisting of ametal piston supported by a disc or un reinforced elastomer confined within a metal cylinder,sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completeassembly to be of cast steel / fabricated structural steel, metal and elastomer elements completeas per IS 2062, IS:1030, AISI:304, AISI:316, IS:6911, BS:3784, IS:3400, IS:226, BS‐5400, Bridge code and as per drawing and approved Technical Specifications. The design of the bearings shallbe submitted by the manufacturers/contractor and got approved from Railway before fixing. Test report of the bearings should be got approved before the materials are lifted from themanufacturer premises. Payment is based on 250 MT capacity of Bearing : POT‐PTFE Bearing
Quantity
Rate
Unit
Amount
1800.00
437.58
1 MT BEARING C
7,87,644.00
( Rupees Four Hundred and Thirty Seven And Paise Fifty Eight )
Contractor's % : 0 Discount : 0
15
242030
Providing 1.8m high fencing with 2.5m sal balli posts, 30cm girth (min) placed every 2.5m apart,embedded in cement concrete blocks and every 15th post (or nearer if there is abrupt change ofground slope) , last but one end post and corner post shall be strutted on both sides and end post one side only, and struts embedded in cement concrete blocks, provided with 5 horizontal linesand two diagonals of G.I. barbed wire 9.38kg per 100metres (min) between the two posts fittedand fixed with G.I. staples driven into the posts including two coats of coal tarring of balliescomplete (cost of posts, struts and concrete to be paid for separately).
Quantity
Rate
Unit
Amount
500.00
69.41
1 METRE
34,705.00
( Rupees Sixty Nine And Paise Forty One )
Contractor's % : 0 Discount : 0
16
061013
Random rubble masonry with hard stone in foundation and plinth including levelling up withconcrete as per specifications, upto plinth level with : : Cement mortar 1:6 (1cement: 6coarse sand)
Quantity
Rate
Unit
Amount
50.00
2,023.44
1 CUM
1,01,172.00
( Rupees Two Thousand Twenty Three And Paise Forty Four )
Contractor's % : 0 Discount : 0
17
114041
Pointing on stone work with cement mortar 1:3 (1cement: 3fine sand) : Flush/ Ruled pointing
Quantity
Rate
Unit
Amount
20.00
84.82
1 SQM
1,696.40
( Rupees Eighty Four And Paise Eighty Two )
Contractor's % : 0 Discount : 0
Signature of Contractor Schedule Page No: 4 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'A'
USSOR 2011 ITEMS
Sl. No.
Description of Items
CODE
18
051032
Brick work with machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 ‐1991 in superstructure from beyond plinth level upto 6m above plinth level in cementmortar 1:6 (1 cement : 6 coarse sand) : With Modular bricks
Quantity
Rate
Unit
Amount
30.00
3,115.97
1 CUM
93,479.10
( Rupees Three Thousand One Hundred and Fifteen And Paise Ninety Seven )
Contractor's % : 0 Discount : 0
19
111011
12 mm cement plaster of mix ‐ : 1:4 (1cement: 4 fine sand)
Quantity
Rate
Unit
Amount
100.00
75.30
1 SQM
7,530.00
( Rupees Seventy Five And Paise Thirty )
Contractor's % : 0 Discount : 0
20
111031
20 mm cement plaster of mix ‐ : 1:4 (1cement: 4 fine sand)
Quantity
Rate
Unit
Amount
100.00
102.19
1 SQM
10,219.00
( Rupees One Hundred and Two And Paise Nineteen )
Contractor's % : 0 Discount : 0
21
222160
Providing weep holes by making suitable opening or drilling in existing Brick masonry/Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extendingthrough the full width of the structure complete
Quantity
Rate
Unit
Amount
10.00
459.23
1 METRE
4,592.30
( Rupees Four Hundred and Fifty Nine And Paise Twenty Three )
Contractor's % : 0 Discount : 0
22
237050
Supplying and laying precast Kerb Stone of concrete M25 Grade 30cmX 20 cm (In Section /including chamfering as per design if any) including fixing in 1:6 cement sand mortar andpointing with 1:2 cement mortar (1cement:2 Sand ordinary) including all excavation /refilling, ramming and other incidental works as required.
Quantity
Rate
Unit
Amount
1200.00
391.42
1 METRE
4,69,704.00
( Rupees Three Hundred and Ninety One And Paise Forty Two )
Contractor's % : 0 Discount : 0
23
141012
Providing, laying and jointing glazed stoneware pipes grade `A' as per IS:651 including bends etc.with stiff mixture of cement mortar in the proportion of 1:1 (1cement : 1fine sand) includingtesting of joints etc. complete : 150mm diameter
Quantity
Rate
Unit
Amount
50.00
271.76
1 METRE
13,588.00
( Rupees Two Hundred and Seventy One And Paise Seventy Six )
Contractor's % : 0 Discount : 0
24
192030
Providing and laying Plain Cement Concrete 1:3:6 with graded stone aggregate of 40 mmnominal size, in foundation and floors, retaining walls of bridges including mechanical mixing,vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technicalspecifications as directed by Engineer
Quantity
Rate
Unit
Amount
400.00
1,538.08
1 CUM
6,15,232.00
( Rupees One Thousand Five Hundred and Thirty Eight And Paise Eight )
Contractor's % : 0 Discount : 0
Signature of Contractor Schedule Page No: 5 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'A'
USSOR 2011 ITEMS
Sl. No.
Description of Items
CODE
25
211170
Painting steel works (New bridges) with two cover coats of red oxide paint conforming to IS 123‐62 as per IRS‐B1‐2001 to given an even shade with all labour & material including scaffolding, shuttering and strutting along with provision of Jhoola/ hanging scaffolding where required.
Quantity
Rate
Unit
Amount
750.00
93.01
1 SQM
69,757.50
( Rupees Ninety Three And Paise One )
Contractor's % : 0 Discount : 0
26
238050
Providing and applying 2.5mm thick road marking strips (retro‐reflective) of specified shade/colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicatormachine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P,cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as perdirection of Engineer‐in‐charge and in accordance with applicable specifications
Quantity
Rate
Unit
Amount
150.00
479.92
1 SQM
71,988.00
( Rupees Four Hundred and Seventy Nine And Paise Ninety Two )
Contractor's % : 0 Discount : 0
27
238060
Providing and fixing of raised pavement markers made of polycarbonate moulded body andreflective panels with micro prismatic lens made of polycarbonate with abrasion resistantcoating. The length, weight and width of body shall not exceed 95 mm, 18mm and 105mmrespectively. The lower surface of the RPM shall be supported with two nylon shanks, each oflength not less than 25mm. Fixed to the road by using twin nylon shanks using bituminousadhesive on bitumen roads or without nylon shanks with epoxy resin adhesive on concrete roads as per directions of Engineer Incharge. The RPM should conform to the quality standards as laiddown in IR Standard Specifications
Quantity
Rate
Unit
Amount
250.00
669.14
1 EACH
1,67,285.00
( Rupees Six Hundred and Sixty Nine And Paise Fourteen )
Contractor's % : 0 Discount : 0
28
222290
Providing Boulder backing behind wing wall, return wall, retaining wall with hand packedboulders & cobbles with smaller size boulders toward the back including all lead, lift, labour &other incidental charges as complete work in all respect. Payment for boulder / cobbles will bedone extra.
Quantity
Rate
Unit
Amount
50.00
178.76
1 CUM
8,938.00
( Rupees One Hundred and Seventy Eight And Paise Seventy Six )
Contractor's % : 0 Discount : 0
29
221070
Providing and laying Filter material As Per RDSO Specifications underneath pitching in slopescomplete as per drawing and Technical specification
Quantity
Rate
Unit
Amount
850.00
1,648.61
1 CUM
14,01,318.50
( Rupees One Thousand Six Hundred and Forty Eight And Paise Sixty One )
Contractor's % : 0 Discount : 0
30
231010
Preparation of subgrade by excavating earth upto 22.5cm depth, dressing to camber andconsolidating with power road roller of 8 to 12 tonne capacity including making good the undulations etc. and disposal of surplus earth with lead upto 50 metres
Quantity
Rate
Unit
Amount
6000.00
49.66
1 SQM
2,97,960.00
( Rupees Forty Nine And Paise Sixty Six )
Contractor's % : 0 Discount : 0
Signature of Contractor Schedule Page No: 6 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'A'
USSOR 2011 ITEMS
Sl. No.
Description of Items
CODE
31
231070
Providing and laying 4 cm thick moorum surfacing (Consolidated Thickness) on platforms,pathways, etc including spreading watering and consolidation with 3 T Roller or light power roller complete
Quantity
Rate
Unit
Amount
1500.00
22.17
1 SQM
33,255.00
( Rupees Twenty Two And Paise Seventeen )
Contractor's % : 0 Discount : 0
32
233011
Providing and applying tack coat using bitumen emulsion (Rapid setting) complying with IS:8887‐ 1995, spraying the bitumen emulsion with mechanically operated spray unit, cleaning andpreparing the existing road surface as per specification : On W.B.M. @ 0.4kg/ sqm
Quantity
Rate
Unit
Amount
9000.00
19.49
1 SQM
1,75,410.00
( Rupees Nineteen And Paise Forty Nine )
Contractor's % : 0 Discount : 0
60,32,762.47
(No. of Items 32 ONLY)
Schedule A Departmental Value :
-3,01,638.12
BELLOW ‐5 %
57,31,124.35
Schedule A Total :
Rupees in Words ( Rupees Fifty Seven Lakh Thirty One Thousand One Hundred and Twenty Four And Paise Thirty
Signature of Contractor Schedule Page No: 7 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'B'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
EW03‐301
Mechanical compaction of earth work: Mechanical compaction of embankment, approaches to bridges etc., in specified layers using specified capacity vibratory power rollers as per type of soil,to achieve specified dry density of earth/other material using contractor`s power rollers, toolsand plants, consumables, labour, watering etc., all complete as per specification & special conditions and as directed by Engineer‐in‐charge. Note: If any other roller or other equipment is used for compaction, payment for the completelayer shall be reduced by 20 percent of the accepted rate for mechanical compaction.
Quantity
Rate
Unit
Amount
10000.00
10.50
1 cu.m
1,10,250.00
( Rupees Ten And Paise Fifty )
Contractor's % : 5 Discount : 0
2
EW03‐304
Fixing reference pegs: Striking out of centre line of railway alignment using total station or anyother latest survey equipment and fixing centre line pegs of adequate size with Railway's tie bars/cut rails at every 100m on straight and 25m in curves, at bridges etc., with contractorssurveyor, equipment, all consumables, labour etc. Note : (i) The reference pegs shall be fixed along the alignment at appropriate locations to provide information for execution of formation, bridges, ballasting and linking of trackthroughout the period of construction. (ii) Contractor is responsible for maintaining the reference pegs including shifting in case ofshifting of alignment or to facilitate construction. (iii) The reference pegs shall be usable as temporary bench marks wherever required.
Quantity
Rate
Unit
Amount
50.00
154.30
1 EACH
8,100.75
( Rupees One Hundred and Fifty Four And Paise Thirty )
Contractor's % : 5 Discount : 0
3
SE03‐101
Soil investigation in all types of soil including soft rock at cutting locations up to 2m below proposed formation level or hard rock or at embankments upto 2m below the natural groundlevel or the formation level as per RDSO guide lines and IS Specifications including collection ofsamples (Disturbed/undisturbed) at each location at arate of one number/2m depth andconducting the following field tests on each sample. (i) Classification of soil. (ii) Specific gravity ofsoil. (iii) Bulk density and water content. (iv) Grain site analysis (sieve & hydrometer). (v) Liquid and plastic limits. (vi) Chemical tests on soil for Choloride, Sulphur and pH value. (vii) MDD andOMC. (viii) Swelling index. (ix) C&Phi analysis of soil and Standard penetration Test (SPT) atevery 1.5m interval or where there is change in strata. (x) crushing strength test additionally on soft rock at 1.0 m depth of rock.(xi) Bore chart should show the layers of soil with SPT value etc.The report should be submitted with recommendations for use of cut spoil for fillingembankment in case of cutting and recommendations for forming embankment over the existingsub‐soil including the necessity and mode of special treatment to be done, if any.
Quantity
Rate
Unit
Amount
30.00
437.00
1 RM
13,765.50
( Rupees Four Hundred and Thirty Seven )
Contractor's % : 5 Discount : 0
Signature of Contractor Schedule Page No: 8 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'B'
VETTED ITEMS
Sl. No.
Description of Items
CODE
4
SE03‐102
Soil investigation in hard rock at Cutting/other locations up to 2m below formation level as perRDSO guide lines and IS Specifications including collection of samples (Disturbed/undisturbed)at each location at one sample/2m depth or less and conducting the following field tests. (i)Crushing strength test. (ii) Specific gravity of rock. (iii) Water absorption of rock. (iv) KRD & CWCrecovery values of rock. (v) Bore chart should show the layers of rock with SPT value / Recoveryetc. Report should be submitted with recommendations on slope stability and on use of cut spoil for filling embankment.
Quantity
Rate
Unit
Amount
10.00
1,419.00
1 RM
14,899.50
( Rupees One Thousand Four Hundred and Nineteen )
Contractor's % : 5 Discount : 0
5
DD03‐101
Plotting initial levels: Computer Plotting of the theoretical cross section profile based on theinitial levels of ground, recorded in the level books for cuttings/embankments at intervals of 25mor less including computation of theoritical profile/quantities duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet withcontractor's material, man power, consumables, tools and plants etc., and as directed byEngineer‐in‐charge. Note: i) Plottings and calculations are to be submitted to Railway in 3 sets. (ii) One cross section in one A4 size sheet is required.
Quantity
Rate
Unit
Amount
0.50
4,700.00
1 KM
2,467.50
( Rupees Four Thousand Seven Hundred )
Contractor's % : 5 Discount : 0
6
DD03‐102
Plotting final levels: Computer plotting of the theoretical & actual final finished cross sectionprofile, duly indicating different type of strata available/ excavated in the x‐section, based on the final levels recorded in the level books for banks/ cuttings at intervals of 25m or less, including computation of theoritical/actual quantities done as per classification of different types ofsoil/blanketing material as certified by Engineer‐in‐charge duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor'smaterial, man power, consumables, tools and plants etc., and as directed by Engineer‐in‐charge. Note: i) Plottings and calculations are to be submitted to Railway in 3 sets ii) One cross section in one A4 sheet is required. iii) For embankments, computation of different soils viz., cut spoils, contractor's own earth,blanketing material are to be shown separately as per measurement recorded.
Quantity
Rate
Unit
Amount
0.50
4,700.00
1 KM
2,467.50
( Rupees Four Thousand Seven Hundred )
Contractor's % : 5 Discount : 0
Signature of Contractor Schedule Page No: 9 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'B'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1,51,950.75
(No. of Items 6 ONLY)
Schedule B Departmental Value :
0.00
1,51,950.75
Schedule B Total :
Rupees in Words ( Rupees One Lakh Fifty One Thousand Nine Hundred and Fifty And Paise Seventy Five ONLY )
SPECIAL RATES and shall not be compared for future tenders. In case of any increase in quantities beyond agreement quantities negotiation shall be conducted for reduction of rates. However effort should be made to execute quantities up to agreement quantities only
Signature of Contractor Schedule Page No: 10 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'C'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
CE1‐01A
Supply of Ordinary Portland cement of 43 / 53 grade conforming to IS 8112 / IS 12269 (uptodate)and/or Portland Pozzolana Cement conforming to IS/1489 (upto date), at site of work to the extent of the quantities required for various items of works in schedule items including all cost ofloading, unloading,leading, transporting, stacking, storing including making proper storagearrangements and all consumables, machinery, vehicles, labour etc., complete and as directed by the Engineer‐in‐charge. (a) Ordinary Portland Cement (43/53 Grade) NOTE :1) Use of Portland Pozzolona cement shall be restricted strictly to the permittedconstruction items only. Pozzolana cement shall not be used in PSC construction. 2) Admixtures such as super plasticizers will be permitted based on specific designs forpermitted construction items with the approval of the DY.Chief Engineer‐in‐charge. However, admixtures proposed shall be supplied free of cost by the Contractor and no compensation will be payable. 3. 33 Grade cement shall not be used in railway construction works.
Quantity
Rate
Unit
Amount
1175.00
6,342.00
1 T
73,77,331.50
( Rupees Six Thousand Three Hundred and Forty Two )
Contractor's % : ‐1 Discount : 0
73,77,331.50
(No. of Items 1 ONLY)
Schedule C Departmental Value :
0.00
73,77,331.50
Schedule C Total :
Rupees in Words ( Rupees Seventy Three Lakh Seventy Seven Thousand Three Hundred and Thirty One And Paise
Signature of Contractor Schedule Page No: 11 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'D'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
BRPC1
Plain Cement Concrete (M15 to M30 design mix) Cast‐in‐situ work (cement will be paid separately) with Contractors all materials including 40mm or below graded hard crushed stoneaggregate, sand, admixture, water, etc., of approved quality in foundations, abutments, piers, wing walls, return walls etc., of bridges and other structures as required, including fixing and removalof contractors shutter/ form work/ supports, vibrating/compacting, providing weep holes withcontractors AC pipes 75 to 100mm dia wherever necessary, providing normal/approved expansion joints with necessary materials as per design/drawings, curing of concrete,pumping/bailing out of water wherever necessary with Contractors own pump, power, fuel etc;,finishing the surfaces wherever required, etc., complete, with all lead, lift, transport, consumables,labour, tools and plant, materials, etc., as per approved drawings/specification /conditions and asdirected by the Engineer‐in‐charge. NOTES: (1) Single rate will apply for all mixes (M15,M20,M25 and M30) irrespective of proportion ofmaterials used (per cubic metre ( cum) of concrete).(2) All concrete shall be weigh batched, machine mixed, compacted with mechanical vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and other relevant specifications as prescribed. Weigh batching is mandatory for all PCC, RCC and PSCworks. (3) Rates shall include all materials, operations, etc., complete except for Cement, which will bepaid for separately. Steels including fabrication, if used, and excavations for foundations will bepaid under relevant SSR or other schedules separately.(4) Shuttering and supporting form work shall be of good quality materials only. For PSC/RCCgirders/slabs/beams/columns, only rigid plate steel shutters shall be used.(5) Mix design with requirement of all tests shall be arranged by the Contractor at his cost.(6) Admixtures as required/ as per designs shall be arranged by the Contractor at his cost.(7) All material and concrete tests as required shall be arranged by the contractor at his cost.(8) Rate includes placing of concrete in position for all heights by manual/concrete pump/craneetc.,
Quantity
Rate
Unit
Amount
75.00
2,500.00
1 CUM
1,78,125.00
( Rupees Two Thousand Five Hundred )
Contractor's % : ‐5 Discount : 0
2
BRPC2
Plain Cement Concrete (M15 to M30 design mix) Cast‐in‐situ work (cement will be paid separately) with Contractors all materials including 20mm/12.5mm graded hard crushed stoneaggregate, sand, admixture, water, etc., of approved quality in bed blocks, wearing coat, coping, ballast walls etc. of bridges and other structures as required, including fixing and removal ofcontractors shutter/form work/ supports, vibrating/compacting, providing weep holes withcontractors AC pipes 75 to 100mm dia wherever necessary, providing normal/approved expansion joints with necessary materials as per design/drawings, curing of concrete, pumping/bailing out of water wherever necessary with Contractors own pump, power, fuel etc;, finishingthe surfaces wherever required, etc., complete, with all lead, lift, transport, consumables, labour, tools and plant, materials, etc., as per approved drawings/specification / conditions and asdirected by the Engineer‐in‐charge. NOTES: (1) Single rate will apply for all mixes (M15,M20,M25 and M30) irrespective of proportion of materials used (per cubic metre (cum) of concrete)(2) All concrete shall be weigh batched, machine mixed, compacted with mechanical vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and other relevant specifications as prescribed. Weigh batching is mandatory for all PCC, RCC and PSC
Signature of Contractor Schedule Page No: 12 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'D'
VETTED ITEMS
Sl. No.
Description of Items
CODE
works. (3) Rates shall include all materials, operations, etc., complete except for Cement, which will be paid for separately. Steels including fabrication, if used, and excavations for foundations will bepaid under relevant SSR or other schedules separately.(4) Shuttering and supporting form work shall be of good quality materials only. For PSC/RCC girders/slabs/beams/columns, only rigid plate steel shutters shall be used.(5) Mix design with requirement of all tests shall be arranged by the Contractor at his cost.(6) Admixtures as required/ as per designs shall be arranged by the Contractor at his cost.(7) All material and concrete tests as required shall be arranged by the contractor at his cost.(8) Rate includes placing of concrete in position for all heights by manual/concrete pump/craneetc.,
Quantity
Rate
Unit
Amount
50.00
2,600.00
1 CUM
1,23,500.00
( Rupees Two Thousand Six Hundred )
Contractor's % : ‐5 Discount : 0
3
BRRC1
Reinforced Cement Concrete (M20 to M40 design mix) work (Cement & Steel will be paidseparately),with Contractors all materials including 20mm graded hard crushed stone aggregate, sand, admixture, water etc., of approved quality in foundations including below ground level,abutments, piers, pile caps, bed blocks, trestle beams, girders, pedestals, retaining walls,boxes/slabs for flat top bridges, deck slabs, girders, kerb walls, diaphrams, cross frames etc., ongirder bridges and other structures of any design/shape as required, above or below ground levelof any size and shape, including fixing and removal of contractors shutters/form work/ supports, vibrating/compacting, and providing weep holes with AC pipes 75mm to 100mm dia andnormal/approved expansion joints with necessary materials as per designs/drawings wherevernecessary, curing of concrete, pumping/bailing out of water wherever necessary with Contractors own pump, power, fuel etc., finishing the surfaces wherever required etc., complete and includinghandling, uncoiling, cutting, bending, cranking, tying M.S./Tor Rods/wires/other steel to formreinforcement with Contractors galvanizsed binding wire of size 18/20 SWG(0.90mm) to IS280, etc., fixing in position reinforcement gauge complete as required with all lead, lift, transport,materials, consumables, labour, tools and plant, etc., and including 2 coats of cement painting asper approved drawings/specifications/ conditions and as directed by the Engineer‐in‐charge. Plant produced Ready‐mix concrete shall be used only with the specific approval of the Dy.ChiefEngineer. NOTES: (1) Single rate will apply for all mixes (M20,M25, M30, M35 and M40) irrespective of proportion of materials used (per cubic metre (cum) of concrete). Rate is for site mixed concrete. For plantproduced Ready‐mix concrete, an extra payment of Rs.500/‐ per cum will be applicable. (2) All concrete shall be weigh batched, machine mixed, compacted with mechanical vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and otherrelevant specifications as prescribed. Weigh batching is mandatory for all PCC, RCC and PSCworks. (3) Rates shall include all materials, operations, etc., complete except for Cement and Steel andexcavation for foundations and substructure, if required, which will be paid for separately underrelevant SSR/other schedules. Similarly, neoprene bearing pads, expansion joints and steelladders attached to the PSC girder/slab will also be paid for separately. (4) Shuttering and supporting form work shall be of good quality materials only. For PSC/RCCgirders/slabs/beams/columns, only rigid plate steel shutters shall be used. (5) Mix design with requirement of all tests shall be arranged by the Contractor at his cost. (6) Admixtures, binding wires, clamps/anchors etc., as required/ as per designs shall be arrangedby the Contractor at his cost. (7) 75% of the value of the work completed will be paid initially and remaining 25% will be paidafter all tests connected with concrete including materials and 7 days cube tests are
Signature of Contractor Schedule Page No: 13 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'D'
VETTED ITEMS
Sl. No.
Description of Items
CODE
completed and results are accepted. Any concrete which is not passing the design/codal requirements shall be summarily rejected. (8) Rates include cost of launching, lifting and placing of slabs/ girders on bearings if required. (9) This item will apply for all standard/special designs required in the work where such design is not specially provided for in any other schedule/item. (10) Rate includes placing of concrete in position for all heights by manual/concrete pump/craneetc.,
Quantity
Rate
Unit
Amount
3250.00
3,600.00
1 CUM
1,11,15,000.00
( Rupees Three Thousand Six Hundred )
Contractor's % : ‐5 Discount : 0
4
BRGL1A
Supply and laying of RCC Hume pipes of dia 900mm/1200mm of NP4/RDSO designs suitable forall types of Railway loading standards including providing levelling course, jointing, compactionas per approved drawings with contractor's fixing materials, collars, aggregates and all othermaterials as required with all lead, lift, transport, consumables, labour, tools and plant, etc.,complete as directed by the Engineer‐in‐charge. (per running metre length of pipe to be quoted). (a) Laying with 900mm pipe NOTES: (1) Rates include all materials, operations etc., complete except cement used which will be paidfor separately. (2) Contractor shall produce design/ test reports to prove the suitability of the Hume Pipe. Decision regarding standard of pipe to be used by the Engineer‐in‐charge is final and binding onthe contractor. (3) Rates include local transport within the section only. Transport from factory upto thesection/office of the Engineer‐in‐charge will be paid under relevant SSR items.
Quantity
Rate
Unit
Amount
25.00
5,000.00
1 RM
1,18,750.00
( Rupees Five Thousand )
Contractor's % : ‐5 Discount : 0
5
BRGL1B
Supply and laying of RCC Hume pipes of dia 900mm/1200mm of NP4/RDSO designs suitable for all types of Railway loading standards including providing levelling course, jointing, compactionas per approved drawings with contractor's fixing materials, collars, aggregates and all othermaterials as required with all lead, lift, transport, consumables, labour, tools and plant, etc.,complete as directed by the Engineer‐in‐charge. (per running metre length of pipe to be quoted). (b) Laying with 1200mm pipe NOTES: (1) Rates include all materials, operations etc., complete except cement used which will be paid for separately. (2) Contractor shall produce design/ test reports to prove the suitability of the Hume Pipe.Decision regarding standard of pipe to be used by the Engineer‐in‐charge is final and binding on the contractor. (3) Rates include local transport within the section only. Transport from factory upto the
Signature of Contractor Schedule Page No: 14 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'D'
VETTED ITEMS
Sl. No.
Description of Items
CODE
section/office of the Engineer‐in‐charge will be paid under relevant SSR items.
Quantity
Rate
Unit
Amount
25.00
5,800.00
1 RM
1,37,750.00
( Rupees Five Thousand Eight Hundred )
Contractor's % : ‐5 Discount : 0
6
BRGL2
Supplying and providing special type of Elastomeric strip seal type Expansion joints capable ofmovement of +/‐ 40mm to 60mm complete as per drawing/as per specifications in bridges with PSC BOX/ I or U girders for the complete width of the deck slab as per approved drawings/specifications with contractorãs steel, dowels, plates, rubber pads, elastomers, bitumen and othermaterial, including fabrication, galvanising and fixing with all lead, lift, transport, consumables,labours, tools & plants etc., as directed by the Engineer‐in‐charge. (per running metre length of expansion joint to be quoted) NOTE: (1) Rate shall include all materials, operations, etc., except cement which will be paid for separately. (2) All tests as required shall be carried out by the contractor at his cost.
Quantity
Rate
Unit
Amount
26.00
10,800.00
1 RM
2,66,760.00
( Rupees Ten Thousand Eight Hundred )
Contractor's % : ‐5 Discount : 0
7
BRGL4
Drilling of 25mm/40mm dia holes in concrete/stone masonry/hard rock underground/overground, to a depth of 400mm for dowelling/ anchoring including fixing of steeldowels/angles/flats and grouting with cement mortar (1:3) with Contractors all materials, drilling equipment, lead, lift, labour, transport, tools & plant, consumables, etc., complete(excluding cement & steel) as per specifications and as directed by the Engineer‐in‐charge. NOTES:‐ (1) Rate includes all materials, operations etc., excluding cement and steel, which will be paidunder other relevant schedules.
Quantity
Rate
Unit
Amount
250.00
150.00
1 NOS
35,625.00
( Rupees One Hundred and Fifty )
Contractor's % : ‐5 Discount : 0
8
BRGL5
Supplying, providing and removing heavy duty shoring for excavation in foundation trenches forbridges and buildings only near existing bridge/track/building to a depth not less than 3.0m asper specific shoring plans issued by the Dy.Chief Engineer‐in‐charge based on Railways Sketch No:ST/CN/BNC/06‐2009, with Contractorãs all materials (excluding rails to be supplied by theRailways free of cost but to be returned by the Contractor), with all lead, lift, labour, transport,tools & plant, consumables, etc., complete and as directed by the Engineer‐in‐charge. NOTES:‐ (1) Rate is per square metre (sqm) of elevational area of the shoring. (2) The item shall be operated with the specific approval and drawing issued by the Dy.ChiefEngineer and shall be used only in unsafe/instability conditions involving depth of excavations tomore than 3.0m below the ground level/existing foundations/to slope of existing formationsleeper than 1:1. (3) Total payment under this item shall be restricted to a maximum of 10% of the payment for earthwork and/or concreting done upto 3.0m below ground level/existing foundation levelonly.as specified.
Signature of Contractor Schedule Page No: 15 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'D'
VETTED ITEMS
Sl. No.
Description of Items
CODE
Quantity
Rate
Unit
Amount
1000.00
1,000.00
1 SQM
9,50,000.00
( Rupees One Thousand )
Contractor's % : ‐5 Discount : 0
1,29,25,510.00
(No. of Items 8 ONLY)
Schedule D Departmental Value :
0.00
1,29,25,510.00
Schedule D Total :
Rupees in Words ( Rupees One Crore Twenty Nine Lakh Twenty Five Thousand Five Hundred and Ten And Paise
Signature of Contractor Schedule Page No: 16 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'E'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
ST02‐001
Supply of High Yield Strength Deformed reinforcement steel bars / Fe 415 / Fe 415D / Fe 415S /Fe 500D / Fe 500S / Fe 550 / Fe 550D / Fe 600 conforming to IS 1786:2008 (with latest amendment) at site of work to the extent actually required for the work including all cost ofloading, unloading, leading, transporting, stacking, storing, labour, consumables, machinery,vehicles etc., complete and as directed by the Engineer‐in‐charge. NOTE: (1) The rate quoted for this item is applicable for Fe500, Fe550 and Fe 600 and theirvariants viz. Fe 500D, Fe 500S and Fe 550D. If Fe 415 grade or its variants Fe 415D or Fe 415Sare used, they will be paid at a reduction of Rs.2000/‐ per MT from agreed rates. (2) Stage payment for supply of steel shall be limited to 75% of the agreed rates subject toproduction of Bank Guarantee/ Indemnity Bond as specified, Test certificates, Insurance,limitation in quantity supplied at a time, conditions for stacking/storing/ preserving at site. However, this payment will be restricted to a maximum of 30% of the Schedule quantity at anypoint of time. (3) Payment for reinforcement rods will be made as per actual used including over laps, cranks,bends, etc., if any, as per approved drawing and as per Special Conditions for use of steel.However, no payment will be made for any wastage. Quantity will be calculated for nominaldiameter of the bars using standard weights per running metre or as per actual weights whichever is less. (4) Binding wire, clamping materials etc., used in construction shall not be treated as supplyitems under this schedule and shall be governed by the Schedule and Special Conditions underthe relevant items of concreting etc., and no extra payment shall be made. (5) Reinforcement steel shall be supplied and used as per approved drawings and as perinstructions of the Engineer‐in‐charge
Quantity
Rate
Unit
Amount
365.00
51,790.00
1 T
1,79,58,182.50
( Rupees Fifty One Thousand Seven Hundred and Ninety )
Contractor's % : ‐5 Discount : 0
1,79,58,182.50
(No. of Items 1 ONLY)
Schedule E Departmental Value :
0.00
1,79,58,182.50
Schedule E Total :
Rupees in Words ( Rupees One Crore Seventy Nine Lakh Fifty Eight Thousand One Hundred and Eighty Two And Paise
Signature of Contractor Schedule Page No: 17 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'F'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
EW03‐202
Earth work in filling with COE: Earthwork in embankment in making formation with contractorsown earth of approved quality in specified layers not exceeding 300mm thickness from approved earth quarries outside railway limits in all soils with loading, unloading, all lead and lifts,rehandling, transportation, spreading in layers, benching of slopes, sectioning to profile, clearingof debris/garbage/ vegetation/shrubs etc., in the railway alignment using contractor's vehicles, machinery, labour, consumables etc., as per technical specification & special conditions and asdirected by Engineer‐in‐charge. Note: (i) Payment shall be made based on cross section measurement only. (ii) The rate includes all charges, taxes, royalty, seignorage etc., and for pretesting of soil qualityat quarry for every 20000 cum or change of layer and testing at site for every 5000 cum or changeof layer for assessing the suitability of the soil for use in embankments and all other tests as specified in the specifications. (iii) No extra payment for lead etc., is admisible. (iv) Only 75 percent payment for the quantity executed in a particular bill is payable initially. 15percent of the balance amount shall be released after the L section and profile are prefectlyreached and the formation is handed over to Railways. Remaining 10 percent shall be releasedonly after the formation in the full block section or identitifed length is completed in all respectsand handed over. (v) Only soils of category I or II or III or IV as per clause 15 of Technical Specifications ispermitted. Payment for category III will be reduced by 5 percent and for cateogory IV will bereduced by 10 percent of the accepted rates. Accepted rates apply to soil with PI upto 7. For PI beyond 7 and upto 20, a further reduction of 10 percent in accepted rates shall apply. Use ofcategory V soil as per clause 15 of Technical Specifications is banned. (vi) Formation width at top shall be made with 500mm extra on either side initially and aftercompaction be cut to standard profile. No extra payment shall be made for this purpose. If theextra width is not made at any single location of less than 100 m length, payments due shall bereduced by 5% for that entire 100 m stretch.
Quantity
Rate
Unit
Amount
10000.00
126.60
1 cu.m
12,02,700.00
( Rupees One Hundred and Twenty Six And Paise Sixty )
Contractor's % : ‐5 Discount : 0
Signature of Contractor Schedule Page No: 18 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'F'
VETTED ITEMS
Sl. No.
Description of Items
CODE
12,02,700.00
(No. of Items 1 ONLY)
Schedule F Departmental Value :
0.00
12,02,700.00
Schedule F Total :
Rupees in Words ( Rupees Twelve Lakh Two Thousand Seven Hundred And Paise Twelve ONLY )
Signature of Contractor Schedule Page No: 19 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'H'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
BA12‐1A
Collection, Supply and stacking of MACHINE CRUSHED 50mm hard, durable, graded angular,cubical graded stone ballast of Granite geological variety, conforming to Railway specifications atspecified Depots and/or on cess/formation along the alignment at places within the railway limitincluding making of approach roads , crossing of railway line/nallahs/any obstructions, clearing of shrubs/bushes/rubble, making the ground level, preparing stacking area, handling/rehandlingwhere ever required, observing all safety precautions, furnishing test reports of ballast samplesat each stage of measurements, assisting railways in measurement of stacks and sieve analysisand tests, numbering stacks, sprinkling lime after measurement and resprinkling whenevernecessary for identification, including Seignorage /Royalty charges , sales tax and any other taxes /octroi /duties leviable by the local bodies/State /Central Govt. with the contractor's material,labour, crew, tools, plant, machinery , rail/road vehicles, consumables, with all ascents, descents,lead, lift, etc., complete as per special conditions, specifications and regulations and as directed by the Engineer‐in‐Charge. a) For supply along the alignment between Km.... to Km...... NOTES: 1.1 Each tenderer at the time of tendering shall submit the test report of ballast forimpact value, abrasion value and water absorption value from railway laboratories or approvedlaboratories mentioned in tender document in accordance with the Railway specification and IScodes as per provision of "Specification of Track Ballast, IRS‐GE‐1, failing which the offer is liable to be rejected. Test report shall indicate the name of the quarry from where the sample issubmitted. 1.2 Tenderer shall submit along with offer, adequate proof of having made sufficientarrangements by way of tie up of either existing quarries or new quarries intended to be setup for timely supply of ballast. 1.3 The tenderer shall also furnish an undertaking that the ballast supply at all times willconform to Specification for track Ballast as specified by Railways. 1.4 Ballast's sample should satisfy the following physical properties in accordance with IS 2386Pt‐IV‐1963 when tested as per the procedure laid down in Specification of Ballast IRS‐GE‐1 June 2004 and amended from time to time. Abrasion Value ‐ 30% maxImpact Value ‐ 20% maxWater absorption ‐ 1%. 1.5 Ballast should satisfy the following size and gradation: a) Retained on 65mm sq mesh sieve ‐ 5% Maximumb) Retained on 40mm sq mesh sieve ‐ 40% to 60%c) Retained on 20mm sq mesh sieve ‐ Not less than 98%. 1.6 In case gradation of ballast in a stack does not conform to required gradation, payment for thestack will be reduced as below: i) In case ballast retained on 65mm sieve exceeds 5% but does not exceed 10% payment at 5%reduction in agreement rate shall be made for full stack. ii) In case ballast retained on 40mm square mesh sieve exceeds 60% limit prescribed payment
Signature of Contractor Schedule Page No: 20 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'H'
VETTED ITEMS
Sl. No.
Description of Items
CODE
at the following reduced rates shall be made for the full stack in addition to the reduction worked out at (i) above. a) 5% reduction in agreement rates if retention on 40mm sq.mesh sieve is between 60%(excluding) and 65% (including). b) 10% reduction in contracted rates if retention on 40mm sq. mesh sieve is between 65% (excluding) and 70% (including). iii) In case retention on 40mm square mesh sieve exceeds 70%, the stack shall be rejected. 1.7 Ballast in the satck, deviating in size and gradation shall be rejected under any of thefollowing: i) Retention on 65mm square mesh sieve is more than 10%.ii) Retention on 40mm square mesh sieve is more than 70%.iii) Retention on 40mm Sq.mesh sieve is les than 40%.iv) Retention on 20mm square mesh sieve is less than 98%. 1.8 All reduction in payments as above shall apply over the agreemental rates. 1.9 The contractor shall have no claims whatsoever for the reduced
Quantity
Rate
Unit
Amount
50.00
992.00
1 CUM
47,120.00
( Rupees Nine Hundred and Ninety Two )
Contractor's % : ‐5 Discount : 0
47,120.00
(No. of Items 1 ONLY)
Schedule H Departmental Value :
0.00
47,120.00
Schedule H Total :
Rupees in Words ( Rupees Forty Seven Thousand One Hundred and Twenty And Paise Forty Seven ONLY )
Signature of Contractor Schedule Page No: 21 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'L'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
BRGR‐1A
SUPPLY ,FABRICATION AND ERECTION/LAUNCHING OF STEEL GIRDER (PLATE GIRDER/BOWSTRING GIRDER):Supply of structural steel viz steel plates conforming to quality B0 or BR or C of Gradedesignation E250 or higher Grade designation as per Approved Drawing, Steel sections such as channels, angles, I‐Beams conforming to Quality A E250 of IS:2062 or of higher Grade designation as per ApprovedDrawing. Stud Steel conforming to IS 3935‐66, MS Rivets conforming to IS 1148 ‐ 1962, IS 2155 ‐ 1962, bolts conforming to IS 3640, IS 1363, Fabrication, assembling, transportation, erection/launching (launching during traffic/ and power block ) of Steel girder ( to be utilized as composite girder) including riveting, welding (MMAW/SAW/CO2), bolting (HSFG/Normal bolts), drifts withcontractors materials, consumables, fuel, labour, taxes/levies, lead lift, plant and machinery, hire chargesequipments, staging, scaffolding, temporary arrangements, deployment of caution watchman,Non destructive testing of raw materials and welds and other tests as required etc., templates, zigs, fixtures, backup supports, accessories, transporting various components from fabricationshop to the site including loading, unloading, lift etc., launching by means of road crane ofadequate capacity ( including a standby working crane of the same or higher capacity ) etc., complete as per the relevant IS specifications, IRS B1 ‐2001, IRS BS‐110 (with up‐to date correction slip) issued by RDSO and as per the other relevant IRS/IS/IRC as detailed in Additionalspecial conditions ( ASC‐FAB‐ERC‐CG‐1 & ASC‐FAB‐ERC‐CG‐2), as directed by Engineer‐in‐charge. The launching has to be done as per the scheme supplied by the contractor and approved byRailways. The launching has to be done with help of contractor's road cranes of suitable capacity/ launching nose etc. as approved by Railway during traffic block and /or power block as approved byRailway. The Rates quoted is inclusive of :‐a.Cost of steel materials, Rivets, nuts, bolts and welding etc. Including fabrication, fabricationmaterials, templates, fixtures, equipments, tools & plants required for the work.b.Transportation of raw materials.c.Skilled/ Unskilled labourers required for the work.d. Excise Duty, Octori, Sales Tax and other taxes as applicable.e.All lead and lift etc. complete.f.Transportation of fabricated girder parts to site.g.Cold straightening of deformed and bent girder parts before their assembling and otherancillary steel structures wherever necessary for proper level and alignment.h. Supply, erection and dismantling of staging and scaffolding and other temporary arrangementswherever required for the purpose of assembly and erection and launching of girders.i.All required number of non‐destructive testing as per the directions of Engineer‐in‐charge / TPIA (Third Party Inspecting Agency), such as dye penetration test (D.P.T). Radiographic Test(R.T) and Ultrasonic Test (U.T)j.Hiring and deployment of plant and machinery including road cranes.NOTE: 1.For launching of steel girders, the contractor has to submit the launching scheme of the girder after award of contract to Railway and obtain the approval of the competent authority.2.If the launching is done with help of Road cranes, the contractor has to arrange stand‐by
Signature of Contractor Schedule Page No: 22 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'L'
VETTED ITEMS
Sl. No.
Description of Items
CODE
cranes before commencement of the block.3.The entire launching has to be done within specified line/ power block.4.The fabrication has to be done in a well established covered factory/workshop having guided submerged arc welding facilities.5.The work should be done as per the welding processing Standards System (WPSS), Qualityassurance Programme (QAP) prepared by the agency and approved by TPIA (Third PartyInspecting Agency) like WRI‐BHEL/Trichy, or any other agency with specific approval of Chief Engineer/Construction. 6.No extra payment will be made for idling of men and machineries of the programmed trafficand/power block is not granted
Quantity
Rate
Unit
Amount
140.00
1,13,983.00
1 MT
1,29,25,672.20
( Rupees One Lakh Thirteen Thousand Nine Hundred and Eighty Three )
Contractor's % : ‐19 Discount : 0
2
BRGR‐3
DECK SHEETING:1. Designing, supplying, fabricating and providing of trapezoidal roll formed deck sheetingprofiles of 50mm depth made of galvanised steel troughed metal decking plate over crossgirders/supports for cast‐in‐situ deck slab of ROB. Thickness of deck plate shall be 1.00mm(minimum) and shall serve as permanent shuttering to deck slab of 250mm (max) thicknessmeasured over crest of metal decking and shall have adequate strength to support the weight ofgreen concrete and imposed loads during concreting over a span of 2000mm between supports.Deck sheets to be embossed to facilitate enhanced sheet to concrete bonding with contractor's allmaterials, men, equipment, tools and plant, fixing arrangements, all lead and lift and the work tobe carried out above Railway tracks and 25 KV OHE electrified area without affecting Railway traffic and damage to Railway properties as directed by Engineer‐in‐charge.NOTE: 1. The rate includes submission of manufacturers design calculations/test reports,technical details and the supply to be taken from reputed manufacturing firms.
Quantity
Rate
Unit
Amount
430.00
1,803.00
1 SQM
6,27,984.90
( Rupees One Thousand Eight Hundred and Three )
Contractor's % : ‐19 Discount : 0
1,35,53,657.10
(No. of Items 2 ONLY)
Schedule L Departmental Value :
0.00
1,35,53,657.10
Schedule L Total :
Rupees in Words ( Rupees One Crore Thirty Five Lakh Fifty Three Thousand Six Hundred and Fifty Seven And Paise
Signature of Contractor Schedule Page No: 23 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work : Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'M'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
BRRE‐1
RE PANELS:Designing, supplying and erecting diamond shaped or any other architectural finish as directed,precast concrete facia panels of suitable thickness and a concrete grade of M30/M35 as approved, including supplying and providing required reinforcing stripes (hot dipped galvanised)of suitable section with all fixtures accessories, bolts, nuts , joint fillers for vertical joints betweenpanels for horizontal joints between panels bearing plates for horizontal joints between panelscomplete all as per relevant IS codes, MOST specifications and IRC codes and technicalspecifications of reinforced earth and as directed by Engineer‐in‐charge. NOTE: 1 Design of the structure shall be carried out based on locally available back fill materialor a practically achievable blended material. Preliminary designs shall be submitted along withthe tender.2 Rate for this item shall include the cost of the cement and reinforcement steel requiredfor the work.
Quantity
Rate
Unit
Amount
6200.00
4,711.00
1 SQM
2,65,79,462.00
( Rupees Four Thousand Seven Hundred and Eleven )
Contractor's % : ‐9 Discount : 0
2
BRRE‐2
Supplying and providing well graded crushed aggregate of size varying from 19.5mm to 9.1mmas drainage bay backing provide along the retaining wall/ RE Wall including supplying and providing perforated drainage pipes connecting to the nearby drain including compaction of thefilled material at a specified layer thickness as per approved by the Engineer‐in‐charge.
Quantity
Rate
Unit
Amount
2000.00
1,140.00
1 CUM
20,74,800.00
( Rupees One Thousand One Hundred and Forty )
Contractor's % : ‐9 Discount : 0
3
BRRE‐3
EARTH WORK BEHIND PRECAST FACIA PANELS:Filling coarse grained soil/earth in embankment for road approach as per approvedreinforcement earth technology behind the precast facia panels with contractors supply of backfill materials which shall be free from organic or other deleterious materials and shall conform tothe mechanical and physio‐chemical requirements including mechanical compaction as perreinforced earth technology specification. NOTE: This work shall be carried out as per approved reinforced earth technology which shall besubmitted by the contractor and got approved from railways. The work is to be done along withreinforcing strips provided with concrete facia panels.
Quantity
Rate
Unit
Amount
20000.00
289.00
1 CUM
52,59,800.00
( Rupees Two Hundred and Eighty Nine )
Contractor's % : ‐9 Discount : 0
Signature of Contractor Schedule Page No: 24 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'M'
VETTED ITEMS
Sl. No.
Description of Items
CODE
3,39,14,062.00
(No. of Items 3 ONLY)
Schedule M Departmental Value :
0.00
3,39,14,062.00
Schedule M Total :
Rupees in Words ( Rupees Three Crore Thirty Nine Lakh Fourteen Thousand Sixty Two And Paise Thirty Three ONLY )
Signature of Contractor Schedule Page No: 25 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'N'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
BRRD‐01
Construction of granular sub‐base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motorgrader on prepared surface and compacting with vibratory power roller to achieve the desireddensity, complete as per drawings and specifications and as directed by the Engineer‐in‐charge.
Quantity
Rate
Unit
Amount
2000.00
770.00
1 cu.m
15,24,600.00
( Rupees Seven Hundred and Seventy )
Contractor's % : ‐1 Discount : 0
2
BRRD‐2
Supplying , providing, laying, spreading & compacting specified graded hard granite stoneaggregate wet mix macadam as per specifications including pre mixing the materials with water to OMC in mechanical mixer (pugmill) carriage of mixed material by tipper to site with all lead &lift laying in uniform layers complete as per specifications.
Quantity
Rate
Unit
Amount
1500.00
1,250.00
1 CUM
18,56,250.00
( Rupees One Thousand Two Hundred and Fifty )
Contractor's % : ‐1 Discount : 0
3
BRRD‐3
Supplying, providing applying primer coat over prepared surface of deck slab and wet mixmacadam with bitumen heated in bitumen boiler fitted with sprayer with spray set usingcutback MC 70 emulsion at 10kg/10sqm. Including all lead and lift as per specifications.
Quantity
Rate
Unit
Amount
9200.00
38.00
1 SQM
3,46,104.00
( Rupees Thirty Eight )
Contractor's % : ‐1 Discount : 0
4
BRRD‐4
Supplying, providing & laying 75 mm thick bituminous macadam on prepared surfacewith specified graded crushed hard granite aggregates for base/binding course including loading of aggregate with FE loader and not mixing of stone aggregate and 80/100 grade bitumen ofapproved grade with 3.5% by weight in 40‐60 TPH hot mix plant transporting the mixed material in tipper to paver and laying mixed material with mechanical paver finished to the required level and grade, roller by power roller and vibratory roller to achieve the desired density including thecost of labour, material, hire charges of machinery including all lead & lift loading unloading etc.,as per specifications.hard granite aggregates for base/binding course including loading ofaggregate with FE loader and not mixing of stone aggregate and 80/100 grade bitumen ofapproved grade with 3.5% by weight in 40‐60 TPH hot mix plant transporting the mixed materialin tipper to paver and laying mixed material with mechanical paver finished to the required leveland grade, roller by power roller and vibratory roller to achieve the desired density including thecost of labour, material, hire charges of machinery including all lead & lift loading unloading etc., as per specifications.
Quantity
Rate
Unit
Amount
650.00
6,741.00
1 CUM
43,37,833.50
( Rupees Six Thousand Seven Hundred and Forty One )
Contractor's % : ‐1 Discount : 0
Signature of Contractor Schedule Page No: 26 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'N'
VETTED ITEMS
Sl. No.
Description of Items
CODE
5
BRRD‐5
Supplying providing and laying 40mm thick bituminous concrete with 5% bitumen & 3% filler onprepared surface with specified graded stone aggregate for wearing course including loading ofaggregate with FE loader and hot mix of bitumen filler of 60/70 grade with aggregate in hot mix plant 40/60 TPH capacity, including transporting mixed material with tipper to paver and layingwith mechanical paver finishing to the required level and grade and rolling wit2h powerroller & vibratory roller/pneumatic roller to achieve the desired density including cost of all materials labour hire charges of machinery all lead & lift loading unloading stacking etc., completebut excluding cost of primer/tack coat.
Quantity
Rate
Unit
Amount
350.00
5,921.00
1 CUM
20,51,626.50
( Rupees Five Thousand Nine Hundred and Twenty One )
Contractor's % : ‐1 Discount : 0
1,01,16,414.00
(No. of Items 5 ONLY)
Schedule N Departmental Value :
0.00
1,01,16,414.00
Schedule N Total :
Rupees in Words ( Rupees One Crore One Lakh Sixteen Thousand Four Hundred and Fourteen ONLY )
Signature of Contractor Schedule Page No: 27 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'O'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
BRMS‐1
BASE PIPE FOR FIXING OF ELECTRICAL POLES : Providing and fixing MS/GI pipes 150mm dia(inner dia) for fixing the electrical poles to the crashbarrier including all materials, labour, lead and lift with two coats of red‐oxide paint and basement, poles should be welded with base plate complete as per the direction of Engineer‐in‐charge
Quantity
Rate
Unit
Amount
686.00
2,150.00
1 EACH
13,42,159.00
( Rupees Two Thousand One Hundred and Fifty )
Contractor's % : ‐9 Discount : 0
2
BRMS‐2
JUNCTION BOX:Supplying and fixing junction box of size 18"x9"x6" made of 18 gauge MS platewith clamping arrangement to fix the connectors inside the box as per the drawing andinstruction of Engineer‐in‐charge.
Quantity
Rate
Unit
Amount
8.00
953.00
1 EACH
6,937.84
( Rupees Nine Hundred and Fifty Three )
Contractor's % : ‐9 Discount : 0
3
BRMS‐3
HAND RAIL WITH PIPESupplying, hand rail comprising one row of MS pipe of 100mm dia (as per IS 1239) fixed to the vertical supporting MS brackets 16mm thick and of height 30cm above crash barrier which arefixed to the crash barrier parapet at 2.0m intervals including painting the hand rail/MS bracketsby one coat of red oxide primer and two coats of synthetic enamel painting of suitable colourwith contractor's all materials, tools & plants, labour, consumables, all lead & lift, etc complete asdirected by Engineer‐in‐charge
Quantity
Rate
Unit
Amount
17.00
76,383.00
1 MT
11,81,645.01
( Rupees Seventy Six Thousand Three Hundred and Eighty Three )
Contractor's % : ‐9 Discount : 0
4
BRMS‐13
Excavation along the alignment of signalling cable/OFC/power cable carefully and exposing thesame without any damage, and excavating the new trench along the railway alignment or alongthe alignment as specified by the railway Engineer‐in‐charge, laying or removed cable, filling up all complete with sand and laying a layer of brick with contractor's own material, tools and plantsetc., as directed by the Engineer‐in‐charge. NOTE:‐ 1 In case the cable is damaged cost of restoration and the cost of cable will be recoveredfrom the contractor. The decision of the railways with regard the cost to be recovered will befinal.
Quantity
Rate
Unit
Amount
200.00
207.00
1 MTR
37,674.00
( Rupees Two Hundred and Seven )
Contractor's % : ‐9 Discount : 0
Signature of Contractor Schedule Page No: 28 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'O'
VETTED ITEMS
Sl. No.
Description of Items
CODE
5
BRMS‐14
Dismantling of lifting barriers of the level crossing including dismantling of booms (twonumbers), winches, wire ropes, winch platform, AC sheet roofing if any complete to thesatisfaction of Engineer‐in‐charge and transporting the same and handing over toSE/PWAY/stores with Contractor's men tools and plants complete. (Note: Both side liftingbarrier)
Quantity
Rate
Unit
Amount
1.00
13,333.00
1 SET
12,133.03
( Rupees Thirteen Thousand Three Hundred and Thirty Three )
Contractor's % : ‐9 Discount : 0
6
BRMS‐15
COMPLETION DRAWING: Preparation and submission of GAD/Completion drawing for the Major bridges/ROBS/RUBsbased on soil exploration and water way calculation for fixing suitable span as per RDSO designand drawing in AutoCAD on 100micon film double mat finish as per Railway standard approved by the Engineer‐in‐charge to specified scales including submission of check print for proof checkto incorporate suggested corrections and modifications and supply final copy in compact disk and6 copies in ammonia print in A0 size with all contractor's materials, labours, tools, plants etc.,complete.
Quantity
Rate
Unit
Amount
1.00
14,427.00
1 EACH
13,128.57
( Rupees Fourteen Thousand Four Hundred and Twenty Seven )
Contractor's % : ‐9 Discount : 0
7
BRMS‐16
Supplying and providing UPVC rainwater pipe of 150mm dia of 6kg/sq cm working pressure(type B) conforming to IS13592 including specials as required and jointing with contractorsmaterials and fixing accessories.
Quantity
Rate
Unit
Amount
160.00
390.00
1 MTR
56,784.00
( Rupees Three Hundred and Ninety )
Contractor's % : ‐9 Discount : 0
8
BRMS‐17
METAL BEAM CRASH BARRIER:‐Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thickcorrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channelvertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/roadlevel, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform toIS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channelsection 150 x 75 x 5 mm, 330 mm long complete as per specifications and drawingNo.Dy.CE/CN/HAS/16‐2014 A & B
Quantity
Rate
Unit
Amount
1500.00
2,516.00
1 MTR
34,34,340.00
( Rupees Two Thousand Five Hundred and Sixteen )
Contractor's % : ‐9 Discount : 0
Signature of Contractor Schedule Page No: 29 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'O'
VETTED ITEMS
Sl. No.
Description of Items
CODE
60,84,801.45
(No. of Items 8 ONLY)
Schedule O Departmental Value :
0.00
60,84,801.45
Schedule O Total :
Rupees in Words ( Rupees Sixty Lakh Eighty Four Thousand Eight Hundred and One And Paise Forty Five ONLY )
Signature of Contractor Schedule Page No: 30 of
32 Signature of Contract Signing Authority
SOUTH WESTERN RAILWAY (CONSTRUCTION)
Annexure - II
Tender Ref No :-
LDRJ/ROB-438/01
Notice Date :-
08/09/2016
Dept : ENGINEERING
Project : 30653 ‐ Raybag‐chinchli‐Road over Bridge in lieu of LC 438
Agency: T0104 ‐ TSR NIRMAAN PRIVATE LIMITED
Name of the Work :Londa ‐ Miraj Section: Construction of Road Over Bridge (ROB) in lieu of LC No. 438 at Km. 698/000‐100 between Raybag ‐ Chinchli station as (1x36.00) Bowstring Girder (Railway portion) and RE panels for Approaches. (TWO PACKET SYSTEM)
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'P'
VETTED ITEMS
Sl. No.
Description of Items
CODE
1
PWNB‐
(i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom ofhigh banks as directed; (ii) Spreading the ballast on the formation as per standard section and required cushion with extra width on curves and; (iii) Boxing of ballast to standard sectional profile. All of the above shall be executed with contractor's skilled personnel, tools and plant, vehicles,machinery, fuel, consumables, loading, unloading with all incidental charges and in all kinds ofweather conditions and site conditions including crossing of tracks wherever required dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge and as per the note(s) below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for a lead of 150 m, the next 3 stages are for a lead between 150 m and 750 m and the last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stagesas instructed; 2. While operating sub‐items d, e and f, sub‐ items a, b and c need not be and shall not be operated as sub‐items d, e and f are all‐inclusive and not extra over sub‐ items a, b and c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated as sub‐items g, h and i are all‐inclusive and not extra over sub‐ items a, b and c; 3. Stage 1 i.e. dumping of ballast shall be done in two phases a) initial spreading and b) furtherdumping after laying the sleepers and linking the track as directed; 4. Stage ‐2 i.e. boxing of ballast to the required BG standard ballast profile as per the cushionspecified as per IRPWM includes finishing to the specified BG profile; 5. Payment shall be done as per stack measurement without deduction for any voids; 6. Stack wise prior written permission of Engineer‐in‐Charge shall be taken for dumping of ballast. No payment shall be made in case no such prior written permission is obtained by thecontractor. In addition, penal action shall be taken for disturbing the ballast stacks without thepermission of the competent authority of Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at thebottom of high banks on either side of the bank / cutting to the formation. For dumping of ballast on track for lead up to 150 m
Quantity
Rate
Unit
Amount
50.00
68.00
1 cu.m
3,366.00
( Rupees Sixty Eight )
Contractor's % : ‐1 Discount : 0
Signature of Contractor Schedule Page No: 31 of
32 Signature of Contract Signing Authority
Schedule of Items LOA No. W496/LDRJ/ROB438/01 Date 17/01/2017 of UCC 74242
Schedule 'P'
VETTED ITEMS
Sl. No.
Description of Items
CODE
2
PWNB‐030
(i) Fixing guard rails on bridges with 60 kg / 52 kg / 90R rails (supplied by Railways) as per the provisions of IRPWM without rail traffic block during day / night including cutting and bending ofrails with all fittings and fastenings and drilling of holes in PSC sleepers (if necessary) withcontractors drilling machine and contractors drill bits; (ii) Fixing Railways wooden nose blocks at the ends of guard rails on either end of the bridgeincluding fixing grip expansion bolts and nuts, M.S. clips, washers etc. All of the above shall be executed with contractor's skilled personnel, tools and plant, vehicles, machinery, fuel, consumables, loading, unloading with all incidental charges and in all kinds ofweather conditions and site conditions including crossing of tracks wherever required dulyobserving all safety precautions and including all lead, ascent, descent, taxes, duties, cess,surcharges, fees etc. completely as per the special conditions / specifications / regulations, asdirected by the Engineer‐in‐Charge and as per the note(s) below. Note: Drilling of holes in sleepers (if executed) shall be paid separately.
Quantity
Rate
Unit
Amount
52.00
333.00
1 track metre
17,142.84
( Rupees Three Hundred and Thirty Three )
Contractor's % : ‐1 Discount : 0
20,508.84
(No. of Items 2 ONLY)
Schedule P Departmental Value :
0.00
20,508.84
Schedule P Total :
Rupees in Words ( Rupees Twenty Thousand Five Hundred and Eight And Paise Eighty Four ONLY )
Signature of Contractor Schedule Page No: 32 of
32 Signature of Contract Signing Authority