  • 8/13/2019 EHTCL-001-1

    1/1

    C. Material Storage, Handlin g, and Preservati on

    C6Heat tracing materials do not stack boxes that are partially crushed, even

    if the products are intact.

    NECA-202

    Sec 4.1.3 c

    &

    Vendor Manual

    C1

    A. Docum ent Review

    A1

    B. General Requiremen ts

    Review documents for Material Receiving.Schedule Q

    Att. IV Sec.3

    C4

    NECA-202

    Sec 4.1.3 a

    &

    Vendor Manual

    Store heat tracing material in raise above floor and possible water levels,

    and warp in protective plastic sheet.

    Store material in a clean, dry location at temperatures between -40F

    and 140F (-40C and 60C).

    NECA-202

    Sec 4.1.3 a

    &

    Vendor Manual

    Store heat tracing material carefully to prevent damages. Observe

    warning and stacking instructions on packing or shipping materials.

    NECA-202

    Sec 4.1.3 b

    &

    Vendor Manual

    Documentation for traceability reviewed and implemented.Schedule Q

    Att. IV Sec. 4

    C8

    Verify the protection of heat tracing cable, it should be provide for the

    ends of all heat tracing cables to preclude water entrance and migration

    in the heat tracing cables.

    NECA-202

    Sec 4.1.3 e

    &

    Vendor Manual

    REV 0

    A2 Identification procedure reviewed and implemented.Schedule Q

    Att. IV Sec. 4

    B2

    Electrical Heat Tracing System Material Receiving, Storage,

    Handling and PreservationEHTCL-0001 ELECT-

    INSPECTION CHECKLISTC HEC KL IS T N UMBE R D ATE AP PR OVE D CR NU MB ER

    SCHEDULED INSPECTION DATE & TIME

    PROJECT TITLE BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

    EQUIPMENT DESCRIPTION

    LAYOUT DRAWING NUMBER

    PLANT NO.

    REV. NO.

    EQUIPMENT ID NUMBER(S)

    PURCHASE ORDER NUMBER

    ITP ACTIVITY NUMBER

    ACTUAL INSPECTION DATE & TIME

    WORK PERMIT REQUIRED?

    CLIENT INSPECTION LEVEL

    LOCATION

    ACCEPTANCE CRITERIA REFERENCE PASS FAIL RE-INSP DATE

    CONTRACTOR INSPECTION LEVEL

    N/AITEM

    No.

    ITP NUMBER

    C3Avoid areas where water accumulate or where significant airborne dust

    or dirt is present.

    NECA-202

    Sec 4.1.3 a

    &

    Vendor Manual

    C7

    Verify that any event occur, such as a water leak, which could damage

    stored heat tracing material, immediately re inspect it and obtain

    replacements for damaged good.

    NECA-202

    Sec 4.1.3 d

    &

    Vendor Manual

    Schedule Q

    Att. IV, Sec.5

    The CONTRACTOR shall include procedures for handling, storage, and

    preservation of material as specified in all applicable specifications,

    manufacturer recommendations and SAUDI Aramco's standards.

    C2

    C5

    B1 Materials shall be new and unused.Schedule Q

    Sec. 2

    B3

    As Designed -Electrical materials shall be in accordance with the Saudi

    Aramco-approved project-specific design drawings, diagrams,

    schedules, lists, databases, and associated documents.

    Schedule Q

    Sec. 4

    B4

    Verify that the contractor or it's Saudi Aramco approved third party

    inspector performed the quality activities at the supplier and sub-supplier

    locations as required by the inspection level assigned for the materials

    and equipment identified in SAER-1972 Inspection Requirements.

    Schedule Q

    Att. III Sec. 1.2

    B5

    Free of Damage - Electrical materials shall be free of damage. All

    Incoming material shall be visually inspected for damage and

    conformance to all applicable

    Schedule Q

    Att. IV Sec. 7.1