ehn1 extension – overhead cranes renovation r. rinaldesi – en/he 27/11/2014
TRANSCRIPT
![Page 1: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/1.jpg)
EHN1 Extension – Overhead Cranes Renovation
R. Rinaldesi – EN/HE27/11/2014
![Page 2: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/2.jpg)
Overhead cranes renovation
Existing cranesPresentation of technical specification
(scope of supply and main requirements)Planning
![Page 3: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/3.jpg)
PR 534 – PR 538
Manuafcturer: SEPAYear: 1976Capacity: 40 tonSpan: 46 mLifting height: 10 mPossibility to work in «tandem» mode
![Page 4: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/4.jpg)
PR 534 – PR 538
Command: cabin sliding along one girderSafe access: only from crane girder
Auxiliary hoist: 5 ton
![Page 5: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/5.jpg)
Technical specification• Technical specification prepared in 2013
(IT-3927)• Renovation will be ordered within contract
B1422 (frame contract)• Any technical requirements can still be
changed
![Page 6: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/6.jpg)
Scope of supply (as per IT-3927)• Replacement of hoist trolley (same
capacity)
![Page 7: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/7.jpg)
Scope of supply (as per IT-3927)• Replacement of long-travel mechanisms
(with the exception of wheels)
![Page 8: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/8.jpg)
Scope of supply (as per IT-3927)• Replacement of all electrical installations
(cubicles, cables, feeding line)
![Page 9: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/9.jpg)
Scope of supply (as per IT-3927)• New control cabin and auxiliary hoist (10
ton)
![Page 10: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/10.jpg)
Main requirements - Crane operating area
existing 7650!
![Page 11: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/11.jpg)
Main requirements – Access to the crane• Catwalks will be modified according to the
existing standards• Access to the cabin: a platform (provided by
crane manufacturer) will be installed on the end wall at the same height of the crane cabin
cabin
platform
![Page 12: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/12.jpg)
Main requirements – Control• Crane equipped with PLC; possibility to
set-up «safety zones»• Possibility to operate in tandem mode (only
after renovation of both cranes!)• Load attached to the hook measured and
visible on a display
![Page 13: EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014](https://reader030.vdocuments.us/reader030/viewer/2022032607/56649ed35503460f94be2bd5/html5/thumbnails/13.jpg)
Planning• Renovation of each crane: 4 weeks• Replacement of electrical feeding line: 3
weeks• Recommended period: PR 538 (extension side): end of 2015PR 534: beginning of 2016
• Proper area for the intervention shall be identified