Efforts toward CHPS Implementation at NERFC
When we last met…Issues on the table for NERFC included:
Commence migration activitiesTransition to GFE QPF productionTest & Evaluate Daily QC as a means for MAPTransition to GFFGWork with Deltares on HEC-RASLOT to develop a Parallel Ops plan
Progress report Migration is nearly complete
A few lingering issues migrating the Hudson
Latest batch of RTI segments to be tested and implemented by Sept ‘09
NERFC issuing all QPFs via GFEStaff trained, worked out the
kinks with the Verification folks and took care of in-house scripts for web graphics
Progress report Daily QC grids being run
dailyHAS unit leading this effortComparison data sets
available back to April 2009Staff to be trained Aug/Sept
GFFG up/running in parallel2 x a day – posted to a web
pageWFOs evaluating in real-time
Progress report Continuing to work closely
with Deltares on HEC-RASConnecticut river running on
laptopIncludes a dam with gates and
a leveeSuccessfully runs over 3
month period including spillway activation and levee breach
Still awaiting CHPS/LINUX version
Progress report Local Implementation Plan
for Parallel Operations has been developedUnder final review at this
timeItems addressed include:
Forcings and Forecast comparisons/validation
Forecaster assignments Workload assessment
Challenges in Migration ProcessMigration has been time consuming
Frustration over failure of migration scripts following various upgrades and installations
Embedded nature of variables being referenced in many different locations has made trouble shooting very difficult and solutions are not always intuitive
Migration training was too short – needed to include in depth discussion of system, file structure and trouble shooting What was provided was excellent Note that NERFC was brought into process late but we may
actually be a good litmus test for the remaining 9 RFCsOn-line system still not functioning as expected
Hopeful that Sys Admin training will address its configuration, functionality, differences with Off-line system
Challenges in Migration ProcessMigration has been very rewarding
Great deal of satisfaction when you get a basin to work!Each phone call to Peter or Matthijs during the various
“challenges” is a learning experience in itself!Deltares support has been very good
Best results have come from combination of email/list server and one-on-one visits and phone calls
Two-day visits following the Testing workshops have been packed, very rushed – really need more than 2 days at this point
Efforts toward CHPS Implementation at NERFC