ee/cs 481 spring 2008 110/28/2015 1:18:59 pm university of portland school of engineering project...
TRANSCRIPT
EE/CS 481 Spring 2008
104/20/23 05:04 AMUniversity of Portland School of Engineering
Project ChitwoodeNVy
TeamWill Dana
Mike Dillon
John Guptill
AdvisorDr. Van De Grift
Industry RepresentativeMs. Lynnette Nguyen
EE/CS 481 Spring 2008
2University of Portland School of Engineering
Overview
• Introduction
• Scorecard
• Additional Accomplishments
• Plans
• Issues/Concerns
• Conclusions
EE/CS 481 Spring 2008
3University of Portland School of Engineering
Introduction
• Network Visualization tool to view both network topology and traffic patterns
• Sensors capture data and send to user
EE/CS 481 Spring 2008
4University of Portland School of Engineering
Scorecard
• TSP completed and functions on its own• Traffic Generators used for testing this
• TSP able to detect 4 virtual machines
• Tested integration of UIS and TSP back ends
• Able to successfully see traffic passing to a single node from Google
EE/CS 481 Spring 2008
5University of Portland School of Engineering
Additional Accomplishments
• Built testing server• 2 NICs and 5 virtual machines
• Good team-instructor meeting
• Network Topology Screen and Traffic Histogram Screen on their way to being completed
EE/CS 481 Spring 2008
6University of Portland School of Engineering
Plans
• Start working on integration of the final components
• Finish up the GUI frontends
• Tie GUI to the backend
• Continue testing project
EE/CS 481 Spring 2008
7University of Portland School of Engineering
MilestonesNumber Description Target Date Completed Date
11 Theory of Operations Version .9 11/28/2008 11/28/08
12 UIS Back End: Gather/Process Data From Sensors 1/16/09 1/16/09
13 UIS Front End: Traffic Summary 1/16/09 1/16/09
14 Theory of Operations Version .95 1/19/09 1/19/09
15 Testing of Processing Data From Sensors 1/23/2009 1/30/09
16 Theory of Operations Version 1.0 1/30/2009 2/3/09
17 UIS Front End: Traffic Histogram 2/6/09
18 Integrate Traffic Sensor and UIS 2/13/2009 2/12/09
19 UIS Front End: Traffic Topology 2/20/09
20 Traffic Generator 2/20/09 1/30/09
21 Test Entire Application 2/27/2009
22 Bug Fixes 3/13/2009
23 User Tests 3/20/2009
24 Demonstration to Advisors 3/27/2009
25 Founder's Day Presentation Demo 4/3/2009
26 Founder's Day Presentation 4/7/2009
27 Final Report Version .9 4/10/2009
28 Final Report Version .95 4/17/2009
29 Final Report Version 1.0 4/24/2009
EE/CS 481 Spring 2008
8University of Portland School of Engineering
Concerns/Issues• GUI
• Java graphics packages are not as flexible as previously hoped
• Resorting to custom coded controls is eating up time
• Both deadlines for both major screens missed
• Integration• Some of it done, still worried about bringing
together the GUI with the rest of functioning system
• Time commitments• Each team member has very loaded schedules
EE/CS 481 Spring 2008
9University of Portland School of Engineering
Conclusions• Things are going well
• The heart of eNVy (packet capturing and filtering) done and working
• The soul of eNVy (GUI) still under development, but we have a month of buffer time to get it done
• We will have it done by Founder’s Day
• Design is solid and other than the missed GUI deadlines, we’re on schedule
• Any Questions?