금속기와 시방서 (로자본드)-영문rosa.ngelnet.com/download/roser bond...
TRANSCRIPT
> INSTALLATIONBook
TOOLS REGUIRED.01ROSER BOND Ruler
HammerSafety Shoes
Snips
PencilSealant
Nails
MORE TOOLS REQUIRED.02
Cutter
Benders.
Do not use electronic cutter!
Installers are reminded to wear the proper
gears when handling objects with sharp edges.
17mm(0.6”)
ROSER BOND ACCESSORIES.03Ridge hip cap Mission Trim
Mission Trim 210
Shake Cap
N. Side Flashing
Box barge cover
Front side flashing Ridge cap
THE FIRST BATTEN.04
The first batten should be fixed right
above the eaves where a fixed Front Side
Flashing will be able to line straight.
270mm MAX
※
※
Batten size should
be at least 40mm X 40mm
The space between
the first batten and
the second battern
should be maximum
270mm.
First Batten
Second Batten
Waterproof Sheet(Underlayment)
FIX THE OTHER BATTENS.05
370mm
370mm
The space between the battens from the second batten till the last batten should be fixed at 370MM as shown below.
Waterproof Sheet(Underlayment)
FIX THE TIMBER FOR BARGE FINISH.06
Nail a minimum
40mm X 40mm timber
as shown.
Slatebatten
GableRunner Batten
Rafter
40
mm
40mm
Waterproof Sheet(Underlayment)
LAY ROSER BOND FROM BOTTOM TO TOP.07For best appearance lay away
from principal line of sight.
First Nails
Bend t
he ed
ge of
tile u
pwar
d to a
bout
25mm
Roser Boond can be laid from right to left or vice versa.
Point of overlapping
FOR BEST APPEARANCE, THE FIRST TILE OF
EACH COURSE NEAR THE GABLE RUNNER
BATTEN SHOULD BE CUT AT RANDOM WIDTHS.
08
Bend the edge of tile
upward against gable
runner batten.
THE ROOF SHOULD LOOK LIKE
THIS AFTER LAYING THE TILES.09
Laying the Roser Bond tiles
one above the other.
5 NAILING POINTS PER TILE.10
The 5 nailing points are
as shown in drawning.
Length of cover : 1280mm
Overall length : 1350mm
THE NAILING POINT FOR THE EAVES COURSE
SHOULD BE DIRECTLY FROM TOP OF TILE
TO THE EAVES BATTEN.
11
After finshing the entire roof, cover all nail
heads by using the sealant and stone chips
from the Finishing Kit.
SealantFinishing KIt
RIDGE COURSE MISSION TRIM.12Lay the Mission Trim as shown below. Notice the top course of
Roser Bond tiles are bent upward about 25mm to suit Mission Trim.
Mission Trim are
tapered to allow for lap.
about 25mm
COVERING THE EDGES OF THE ROOF BY
USING BOX BARGE COVER.13
Box Barge Cover are tapered to
allow for lap.
Notice the edges of
Roser Bond tiles are
bent upward against
barge timber.
FIX THE MISSION TRIM
TO THE EDGE OF THE ROOF.14
Nail a 40mm X 40mm gable
runner batten to vertical face
of rafter.
Note the nailing points.
Nail
Nail
Nail
Nail
Nail
N-SIDE FLASHING.15
Bend the edge of Roser Bond tile
upward to about 80mm and use
N. Side Flashing to cover the bent edges.
Extra attention is needed to
prevent water entering from above.
HIPS.16
The nearest Roser Bond tiles to the hip batten should be
at least 90mm.
The edge of Roser Bond tile should be
bend upward against the hip batten
on either side of hips.
Size of Hip Batten
40mm X 40mm
Minimum<90mm>
HIPS.17For best appearance, the first tile of
each course near the hip batten
should be cut at random widths.
A = Bending upward 25mm
A
A finished hip should look like this.
Minimum<90mm>
FIXING RIDGE CAP TO RIDGE
AND FINISHING ENDS.18
The Ridge Cap overlap by 90mm; cut and bend to
fit the end of ridge.
The folded end and the nailed
points as shown.
Cut the end as shown.
A
FINISHING END OF MISSION TRIM.19
Cut the sides of
the Mission Trim as in the picture.
Mission Trim
Trim End
After laying, seal the cut part
with sealant and stone chips
from the Finishing Kit.
Nail
VALLEYS.20Lay valley boards at rafter level.
Battens projecting over the valley at about 70mm.
Cut Roser Bond tile to suit
and bend downward to cover battens.
> INSTALLATIONBook
TM
ESR-1763BBA
BRITISHBOARD OFAGREMENT
TECHNICAL APPROVALS FOR CONSTRUCTION
One Bldg.12F., 648-26, Yeoksam-Dong,
Kangnam-Gu, Seoul, KOREA.
[email protected] [email protected]
HEAD OFFICE / FACTORY SEOUL MARKETING OFFICE
400,Nae-Ri, Apryang-myeon, Gyongsan-si,
Gyongsangbuk-do, KOREA.
TEL: +82 53 817 5000 TEL: +82 2 566 7663FAX: +82 53 817 5454 FAX: +82 2 563 7663