Page 1: EDEN - Acumentrics Comparison Chart

ACUMENTRICS 5 KW System

Sstem description:

Gas supply 0,84 Nm3/h NG (8.5kW)Electric power DC 3.5kW

AC 3kW (not grid connected!!!)Heat recovery 3kWEfficiency (on ) Electrical 34%

Overall 70%Technology Stack Acumentrics (tubular, non

pressurized, POX reforming without recirculation)

System AcumentricsReferences (field trials) Dr. Dennis Witmer

Director, Arctic Energy Technology Development Laboratory (AETDL)Tel: 1-907-474-7082Email: [email protected] BuckleyPresident, Energy AlternativesMobile: 1-907-227-7191Email: [email protected] West (suggested contact)ELCO-MTS GroupyTel: 49 (0) 7471 187 427Email: [email protected]

State of art Product developmentFuture market UPS, power generation, residential,

military (several kW)

Gary Allen

Luis Leydateqma,[email protected]. 116. 08810 Sant Pere de Ribes (Barcelona)tf.- 93 896 4852fax.- 93 896 4272 639 [email protected]

TECHNICAL ADVICE

Technology

Advantages:- Large experince- Inherent strength and tolerance to rapid temperature change- Lowest cost per kW- System development for system up to MW- POX reforming without recirculation, no operating problems with the high CO2 in the form of

carbon (Steam reforming and recirculation option for the end of this year)- Inverter and other parts of the BOP were also developed by Acumentrics

Disadvantages:- Maintenance; training for client. Replacement of the stack, only technician from US

Experience SOFC systems

31 units delivered to the field, 16 for 2007Field Demonstrations operating now for over 3.000 hours (cells proven at 14.000 hours)

Page 2: EDEN - Acumentrics Comparison Chart

Experience with biogas

Little experience in operating on biogas. Some adjustments can be made to run the system on a fuel different from natural gas.

System suitable for demo yes

ITEM COST / TIME INCLUDED NOT INCLUDED

DELIVERY COST EVALUATION

System US$210.000

Freight rate

Freight charges and other shipping costs shall be

paid by Buyer.

Shipping of Equipment returned to Acumentrics

shall be at Buyer's expense.

The risk of loss or damage to Equipment in transit shall be upon Buyer.

Insurances

Delivery Time Q3 2007

Terms of payment

Either

(a) 50% pre-pay and 50% NET 30 upon delivery with Acumentrics credit approval OR (b) C.O.D.

OPERATION COSTS EVALUATION

Start-up US$10.500 Also commissioning Travel & living expenses

MonitoringUS$2.500/month

minimum 6 months

Operation costsOperating costs can

be determined based on local fuel costs.

MaintenanceEstimate only: US

$5000/yr.

Warranty

6 months or

1.000 operating hours

or 25 thermal cycles

Only covers faulty partsReplacement parts and

warranty labor

After-sales service (logistics)

System support provided by Acumentrics Corp. and represented by TEQMA, Spain.

Page 3: EDEN - Acumentrics Comparison Chart