LAN(Ethernet)━ Features ━
• Energy and production data from the CC-Link terminal are collected only by the setting, no programming.
• The measurement data is graphed by Web browser without the addition of software in the PC.
•EcoWebServerⅢ is a data collection server for energy saving.•Easy, Convenience, and Compact•Visualization of energy and production information
EcoWebServerⅢ
3
Externals and part names and functions
Power supply100-240VAC
Ethernet10/100M
CC-LinkI/F
Out put
Unused(for future)
State of operation LED
CC-Link Transmission rate setting switch
114mm
98m
m
122.5mm
Product name:::: Data Collecting Server
Type name ::::MES3-255C-ENPet name ::::EcoWebServerⅢⅢⅢⅢ
4
Feature 1: Easy setting
A minimum setting necessary to operate is three items.
necessary minimum setting is three items
5
Feature 1
一覧から端末を選択一覧から端末を選択一覧から端末を選択一覧から端末を選択
Data is selected from the list.
A set value is downloaded by way of Ethernet.
Energy information and production information from the CC-Link terminal are only set.
The CC-Link measurement terminal and the measurement data can be set by
an easy mouse and the keyboard operation by the use of the configuration
software of the attachment.
A basic graph can be displayed only by setting three items.
group
6
Feature 2: The addition is unnecessary of the program and software.
Ethernet
It is possible to display it by graphing the measurement data by Web a browser.
7
Feature 2Input Internet Protocol address which was set to EcoWebServerⅢ
Select the kind of the graph 、 the graph is displayed on a central screen
Select the date of data
The data of the graph can
be taken into the PC as
csv file.
8
Feature 2
Investigate the cause of the specific consumption deterioration, and plan.
⇒Energy conservation
From all measuring point registered① Select energy amount in the numerator.
② Select the production in the denominator.
③ Register
Ethernet
Download the set value
EcoWebServer makes the
specific consumption graph.
((((HourHourHourHour))))Daily Daily Daily Daily graph:Specificgraph:Specificgraph:Specificgraph:Specific consumptionconsumptionconsumptionconsumptionBaseunitpoint00000000001 Baseunitpoint00000000001 Baseunitpoint00000000001 Baseunitpoint00000000001 Specific consumption graph BaseunitBaseunitBaseunitBaseunitkWhkWhkWhkWh
※※※※Get the production from MELCEC PLC By way of CC-Link.
9
Virtual measuring point:the computation result between measuring points
????
• The main circuit is calculated by adding
up energy information on the branching
circuit.
• The branching circuit is calculated by
subtracting energy information on the
main circuit.
Feature 2
10
Feature 3:External output function of data and information
Ethernet
SMTPServer
FTPServer
Transfer the csv format data files to the FTP ServerUpper/lower limit monitoring and mail report, contact output
Setting can be set by the option setting menu of the configuration software.
11
Feature 3
About the following monitoring 、EcoWebServer can e-mail report and contact output .
・Upper/lower limit monitoring
・Operating status monitoring
・Unit requirement target value monitoring
・Unergy plan value monitoring
・System error
Measurement
value
Target value for
upper limit
monitoring
time
Over the target
value
Under the target
value
Upper limit alarm
Occurrence data
Upper limit alarm
Reset data
10sIn case of one-shot
In case of Output
condition interlocking
Contact output
method
E-mail report
occurrence/reset date:the kind of error
occurrence/reset date:the kind of error
occurrence/reset date:the kind of error::The record remains in the system log file.
Ethernet
The state of the contact can be confirmed
even on the Web screen.
lamp
buzzer:Sample of upper/lower limit monitoring
E-mail report
12
Feature 3
Ethernet
SNTPserver
※It’s possible to set it with the configuration software or Web sreen.
EcoWebServerⅢ can automatically adjust the time of it’s clock to SNTP server.
In case of adjustment software In case of Web screen
13
WiringWiring for LAN cable
Power supply and earth
Wiring for CC-Link cable
Wiring for output
AC100/200V
or
DC24V
AC100/200V
or
DC24V
Type D
Earth
14
Wiring
The maximum overall cable length changes by setting the CC-Link transmission speed.
Please wire so as not to exceed the maximum overall cable length according to the
table below.
100m160m400m900m1200mMaximum overall
cable length
20cm以上20cm以上20cm以上20cm以上20cm以上Cable length between
stations
10Mbps5Mbps2.5Mbps625bps156kbpsTransmission speed
15
Wiring
Terminal list that can be registered
ME96NSR EMU2-RD3-CEMU2-RD5-CEMU2-RD7-CEMU2-RD2-C-4WEMU2-RD4-C-4W
MDU-ACAE-SW(BIF-CC)
AJ65BT-68TDAJ65BT-64RD3
Temperature input modules
AJ65BT-64AD
Analog input modules
AJ65SBTB1-8DAJ65SBTB1-16DAJ65SBTB1-32DAJ65SBTB1-16DTAJ65SBTB1-32DT
Remote IO modules CC-Link Module((((Local station))))
QJ61BT11N
EMU3-DP1-C
16
Wiring
QJ61BT11N
QE81WH QE82LG
EcoWebServerⅢQJ61BT11N is added to the PLC
and set as the local station、EcoWebServerⅢ can take the
production information stored in the device of PLC.
For example 、the data of QE81WH and QE82LG.
(necessary to make ladder program)
Production informationFor example, the number of production
17
Production site...
• To activate the energy conservation activities、it’s important to have all employees to be considered “the energy
conservation “.
• For that、the usage condition of the energy managed in the limited section such as departments of management is opened
to the public on Web by way of Intranet. And sharing information (visible management)becomes more important..• EcoWebServerⅢ support the energy conservation activities by visible management as an easy, convenient, compact
energy conservation activity supporting tool.
EcoWebServerⅢ support the energy
conversation activities by visible management.
1.Energy management of each section
2.Specific consumption management
3.Management by objective every month、every year
4.Watch the status of the equipment
5.Management and record of energy data
Plant manager
employee
Management by objective Improvement activitiesWatch the status of the equipment
18
END