Analysis of the Harlem River waterfront reveals fragmented patches of ecological habitat, brownfield contamination, degraded water quality due to storm and CSO discharge and unnatural river edges. Our plan aims to improve the overall ecological health of the river through a series of "eco-puncture" interventions aimed at restoring ecological connectivity along the river and addressing contamination and built up edges from industrialization.TRANSCRIPT
![Page 1: Eco-Puncture: Pier 5 Remediation Zone](https://reader034.vdocuments.us/reader034/viewer/2022042705/568c53501a28ab4916ba41c1/html5/thumbnails/1.jpg)
Pier 5: Remediation Zone
-17 FT
-35 FT
BRICK, CONCRETE, GRAVEL, CINDERS, ASH, ASPHALT
ORGANIC SILT
-40 FT
-90 FT
BEDROCK
-48 FT
-60 FT
WATER TA
BLE
Geologyat Bronx Terminal Market
VOCs SVOCs
VOCs
VOCs
PbCH4CH4
CH4
Scene I: Scrape + Clean Scene II: Plant + Pile Scene III: Bronx Gateway
Excavation Area
Phytoremediation Circles
Major Deegan
Piles of cleaned Soil
Wetland
Rain Garden
DIY Education tents
Eco-Island and Oyster beds
Gateway Signage
Boat Access