ecj parking lot redesign ut austin: group 5
DESCRIPTION
ECJ Parking lot redesign UT AUSTIN: Group 5. BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER. Overview. Define Study Area Current Operation & Problems Research & Design Challenges Calculations Final Design Decision Next Steps. Step 1: Representation. Step 1: Representation. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/1.jpg)
BENJAMIN CHILTON
STEVEN ANDREW MARTIN
ROSE SCHNEIDER
ECJ PARKING LOT REDESIGNUT AUSTIN: GROUP 5
![Page 2: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/2.jpg)
OVERVIEW
• Define Study Area• Current Operation & Problems • Research & Design Challenges• Calculations• Final Design Decision• Next Steps
![Page 3: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/3.jpg)
STEP 1: REPRESENTATION
![Page 4: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/4.jpg)
STEP 1: REPRESENTATION
![Page 5: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/5.jpg)
STEP 2: PROCESS
• Average Annual Rainfall: 32.15 in
• Roof flow piped directly into Waller Creek
• Flow from parking lot to Waller Creek
![Page 6: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/6.jpg)
STEP 3: EVALUATION
• Inadequate drainage• Unfiltered runoff• Large obtrusive wall• Erosion of soil• Uncontrolled flow• Wasted space
![Page 7: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/7.jpg)
STEP 4: CHANGE
• Remove and replace the existing wall
• Porous pavement
• Rain garden
![Page 8: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/8.jpg)
POROUS PAVEMENT
• Pavement surface with a stone reservoir underneath
• Temporarily stores surface runoff before infiltrating it into the subsoil
• Incorporates void spaces that allow infiltration
![Page 9: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/9.jpg)
RAIN GARDEN
• Capture stormwater and provide for natural infiltration
• Decrease flooding risks• Filter pollutants• Alleviate erosion
![Page 10: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/10.jpg)
DESIGN LAYOUT
Total area: 35,300 ft2
Asphalt: 14,700 ft2
Porous pavement: 17,900 ft2
Rain garden: 2,717 ft2
![Page 11: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/11.jpg)
STEP 5: IMPACT, RAIN GARDEN
![Page 12: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/12.jpg)
STEP 5: IMPACT, POROUS PAVEMENT
![Page 13: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/13.jpg)
![Page 14: ECJ Parking lot redesign UT AUSTIN: Group 5](https://reader034.vdocuments.us/reader034/viewer/2022051700/5681611b550346895dd0737e/html5/thumbnails/14.jpg)
STEP 6: DECISION