中興工程顧問股份有限公司 2015年 月 日Štorsa適切使用方式.pdf ·...

46
中興工程顧問股份有限公司 2015616

Upload: others

Post on 30-Aug-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

  • 2015616

  • 1

    AB

  • 2

    RIDO

    TORSA

    TORSA

  • 4

    -

  • 5

    -

  • 6

    IH+

    (>)

    (

  • 7

    RIDO (RFL)

    TORSA ()

    FLAC 2D ()

    PLAXIS 2D ()

    FLAC 3D ()

    PLAXIS 3D ()

    MIDAS GTS ()

  • 9

  • 10

    SPT-N

  • 11

    -

  • 12

    FA=+

    LA= FA

    Ms=

    Fp=

    Lp= Fp

    -

  • 13

    Mr=

    Md=

    Su=

    W=X

    -

  • 14

    ti=

    hi=

    Uw=

    -

  • 15

    sub=

    D=

    w=

    Hw=

    -

  • 16

    RIDO

    RIDOWinkler

    RIDO

    RIDO

  • 17

    Rido

    KSE=Kh+KRA

    KRA=100fsL2/(B/N) fs = Su (Clay) (t/m2)

    fs = 0.2N (Sand) (t/m2)

    =KP+KP*

    KP*=KPtand2L/(B/N)

    Depth(m)

    t(t/m3)

    N C' ' Ka Ko Kp Kh /

    KRA(t/m3)

    KSE=Kh+KRA

    (t/m3)

    KP* KP+KP*

    1 SM 8 2.03 11.0 0 300.330 0.500 4.143 1100 0.33 362 1462 1.191 5.334

    2 SM 16.8 2.03 11.0 0 300.333 0.500 4.143 1100 0.33 362 1462 1.191 5.334

    3 SM 23 2.00 17.0 0 32 0.307 0.470 4.679 1700 0.33 560 2260 1.437 6.116

    4 SM 26 2.00 17.0 0 32 0.307 0.470 4.679 1700 0.33 560 2260 1.437 6.116

  • 18

    RIDO

    ** R I D O 4.01 (C) R.F.L ** NAKANG PROJECT 308 WestSouth 2 D/W (WS2-DW SECTION) ** PAGE 48 **

    =======================================================================================================

    ** SINOTECH - TAIWAN ** ** 09-02-09 **

    -------------------------------

    *** MAXIMUM DISPLACEMENT IN PHASE Nb 11 = 66.758 mm IN FINAL PHASE Nb 19 = 62.761 mm

    *** MAXIMUM MOMENT IN PHASE Nb 11 = -220.101 m.T/m IN FINAL PHASE Nb 19 = -189.042 m.T/m

    -----------------------------------------------------------------------------

    | STRUT/ANCHOR | PRELOAD | MAXIMUM | FINAL STATE |

    -----------------------------------------------------------------------------

    | NUMBER LEVEL | PHASE FORCE | PHASE FORCE | PHASE FORCE |

    | | | | |

    | 1 2.00 | 2 -60.00 | 3 -101.22 | 19 REMOVED |

    | 2 5.30 | 4 -190.00 | 16 -366.09 | 17 REMOVED |

    | 3 8.60 | 6 -160.00 | 14 -302.33 | 15 REMOVED |

    | 4 11.80 | 8 -280.00 | 9 -503.81 | 14 REMOVED |

    | 5 15.00 | 10 -280.00 | 12 -491.97 | 13 REMOVED |

    | 6 16.92 | 12 0.00 | 16 -223.08 | 19 -200.39 |

    | 7 8.70 | 16 0.00 | 18 -80.51 | 19 -62.41 |

    | 8 7.26 | 18 0.00 | 19 -40.95 | 19 -40.95 |

    | | | | |

    | m | T | T | T |

    -----------------------------------------------------------------------------

  • 19

    RIDO

  • 20

    RIDO

    0

    5

    10

    15

    20

    25

    30

    35

    40

    -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300

    (t-m/m)

    (m)

    0

    5

    10

    15

    20

    25

    30

    35

    40

    D3

    2@

    15

    0 m

    mD

    32

    @1

    50

    mm

    D3

    2@

    15

    0 m

    m +

    D3

    2@

    15

    0 m

    m

    D3

    2@

    15

    0 m

    mD

    32

    @1

    50

    mm

    SINOTECH ENGINEERING CONSULTANTS, LTD.Date :

    Sheet :

    By :

    Ch'k by :

    of

    Project

    Subject 1.0m TYPE 3(WS2)308

    D3

    2@

    15

    0 m

    m+

    D2

    5@

    30

    0 m

    m

    0

    5

    10

    15

    20

    25

    30

    35

    40

    -175 -150 -125 -100 -75 -50 -25 0 25 50 75 100 125 150 175 200

    (t/m)

    (m)

    0

    5

    10

    15

    20

    25

    30

    35

    40

    1.0m TYPE 3(WS2)

    Project Subject

    SINOTECH ENGINEERING CONSULTANTS, LTD.Date :

    Sheet :

    By :

    Ch'k by :

    of

    2D

    13

    , S

    h=

    15

    0 m

    m ,

    Sv

    =3

    00

    mm

    2D

    13

    , Sh

    =1

    50

    mm

    , Sv

    =3

    00

    mm

    V

    c

    V

    c

    Vc

    V

    c

    1D

    13

    , S

    h=

    15

    0 m

    m ,

    Sv

    =3

    00

    mm

    1D

    13

    , Sh

    =1

    50

    mm

    , Sv

    =3

    00

    mm

  • 21

  • 22

  • 24

    24

    TORSA

    1 2

    3 4 5

  • 2525

    TORSA

    DMS

    1

    2

    2 4 5

    &

  • 26

    26

    2

  • 27

    -TORSA

  • 2828

    -

    TORSA

    (=0.7)

  • 29

    29

    Hsieh, P. G. and Ou, C. Y. (1998),Shape of ground surface settlement profiles caused by excavation, Canadian Geotechnical Journal, Vol. 35, No.6, pp.1004-1017.

    TORSA

    -

  • 30

    30

    TORSA

  • 31

    31

    76p.39-50

    TORSA

  • 32

    :5m

    :5m

  • 33

    33

    TORSA

  • 34

    (40)

    34

    TORSA

    1

    23

  • 35

    35

    (=0)

    TORSA

  • 36

    36

    TORSA

    1

    2

    4 5

  • 37

  • 38

    38

    TORSA

  • 40

    ()

    TORSA

    TORSA2.0

  • 41

    (Ka Kp Ko)

    ()

  • 42

    (TT)(5m~12m)

  • 43

    /SuTORSA

    (5m)SuSu/v(3~5m)Su

  • 44