ece 553: testing and testable design of digital systes

25
ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES Motivation and Introduction

Upload: kyros

Post on 14-Jan-2016

33 views

Category:

Documents


1 download

DESCRIPTION

ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES. Motivation and Introduction. Overview. Motivation About the Course and the Instructor Conduct Outline Coursepack Introduction VLSI realization process Contract between design house and fab vendor Test v/s verification - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

ECE 553: TESTING AND TESTABLE DESIGN OF

DIGITAL SYSTES

Motivation and Introduction

Page 2: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 2

Overview• Motivation• About the Course and the Instructor

– Conduct– Outline– Coursepack

• Introduction– VLSI realization process– Contract between design house and fab vendor– Test v/s verification– Need for testing: doing business, ideal v/s real testing– Levels of testing – rule of 10 (or 20)– Cost of manufacturing

Page 3: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 3

Motivation

• Where do the manufacturing $ go?

• Overhead of one or two photomicrographs– What is test on a chip?

• Course conduct– Your responsibilities and mine

• Course outline

• Course material information– References and reading material

Page 4: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

Motivation: Moore’s LawComplexity Growth of VLSI circuits

Source (Copp, Int. AOC EW Conf., 2002)

04/21/23 4

Page 5: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 5

Page 6: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

Moore’s Law – Other Effects

04/21/23 6

Page 7: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 7

Thermal Effect of Moore’s lawMoore’s law Greater packaging densities

Higher power densities

Higher temperature

Effects ReliabilityPerformancePower Cooling cost

Page 8: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

Introduction: Challenges under deep submicron technologies (Yao)

Chip size decreasesPower density increases

Leakage power make it worseChip becomes hotter

Source: IntelSource: Intel

Source: Wang et al. ISPD2003

Page 9: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 9

Microprocessor Cost per TransistorCost of testing will EXCEED cost of design/manufacturing

(Source: ITR-Semiconductor, 2002)

Page 10: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 10

VLSI Realization Process

Determine requirements

Write specifications

Design synthesis and Verification

FabricationManufacturing test

Chips to customer

Customer’s need

Test development

Page 11: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

Technology Directions: SIA RoadmapYear 1999 2002 2005 2008 2011 2014

Feature size (nm) 180 130 90 45 32 22

Mtrans/cm2 7 14-26 47 115 284 701

Chip size (mm2) 170 170-214 235 269 308 354

Signal pins/chip 768 1024 1024 1280 1408 1472

Clock rate (MHz) 600 800 1100 1400 1800 2200

Wiring levels 6-7 7-8 8-9 9 9-10 10

Power supply (V) 1.8 1.5 1.2 0.9 0.6 0.6

High-perf power (W) 90 130 160 170 174 183

Battery power (W) 1.4 2.0 2.4 2.0 2.2 2.4

http://www.itrs.net/ntrs/publntrs.nsf

Present and Future

Page 12: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 12

Contract between a design house and a fab vendor

• Design is complete and checked (verified)• Fab vendor: How will you test it?• Design house: I have checked it and …• Fab vendor: But, how would you test it?• Desing house: Why is that important? It is between

I and my clients – it is none of your business• Fab vendor – Sorry you can take your business

some where else.

complete the story and determine the reasons for the importance of test generation etc.

Page 13: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 13

Contract between design …Hence:• “Test” must be comprehensive• It must not be “too long”Issues:• Model possible defects in the process

– Understand the process

• Develop logic simulator and fault simulator• Develop test generator• Methods to quantify the test efficiency

Page 14: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 14

Verification v/s Testing

Definitions• Design synthesis: Given an I/O function, develop a

procedure to manufacture a device using known materials and processes.

• Verification: Predictive analysis to ensure that the synthesized design, when manufactured, will perform the given I/O function.

• Test: A manufacturing step that ensures that the physical device, manufactured from the synthesized design, has no manufacturing defect.

Page 15: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 15

Verification v/s Testing • Verifies correctness of

design.

• Performed by simulation, hardware emulation, or formal methods.

• Performed once prior to manufacturing.

• Responsible for quality of design.

• Verifies correctness of manufactured hardware.

• Two-part process:– 1. Test generation: software process

executed once during design

– 2. Test application: electrical tests applied to hardware

• Test application performed on every manufactured device.

• Responsible for quality of devices.

Page 16: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 16

Need for testing• Functionality issue

– Does the circuit (large or small) work?

• Density issue– Higher density higher failure probability

• Application issue– Life critical applications

• Maintenance issue– Need to identify failed components

• Cost of doing business• What does testing achieve?

– Discard only the “bad product”? – see next three slides

Page 17: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 17

Problems of Ideal Tests

• Ideal tests detect all defects produced in the manufacturing process.

• Ideal tests pass all functionally good devices.• Very large numbers and varieties of possible

defects need to be tested.• Difficult to generate tests for some real defects.

Defect-oriented testing is an open problem.

Page 18: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 18

Real Tests• Based on analyzable fault models, which may not map on real defects.• Incomplete coverage of modeled faults due to high complexity.• Some good chips are rejected. The fraction (or percentage) of such chips is called the yield loss.• Some bad chips pass tests. The fraction (or percentage) of bad chips among all passing chips is called the defect level.

Page 19: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 19

Testing as Filter Process

Fabricatedchips

Good chips

Defective chips

Prob(good) = y

Prob(bad) = 1- y

Prob(pass test) = high

Prob(fail test) = high

Prob(fail test) = lowPro

b(pass

te

st) =

low

Mostlygoodchips

Mostlybad

chips

Page 20: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 20

Levels of testing (1)• Levels

– Chip

– Board

– System• Boards put together

• System-on-Chip (SoC)

– System in field

• Cost – Rule of 10– It costs 10 times more to test a device as we move to

higher level in the product manufacturing process

Page 21: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 21

Levels of testing (2)• Other ways to define levels – these are important

to develop correct “fault models” and “simulation models”– Transistor– Gate– RTL– Functional– Behavioral– Architecture

• Focus: Chip level testing – gate level design

Page 22: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 22

Cost of Testing• Design for testability (DFT)

– Chip area overhead and yield reduction

– Performance overhead

• Software processes of test– Test generation and fault simulation

– Test programming and debugging

• Manufacturing test– Automatic test equipment (ATE) capital cost

– Test center operational cost

Page 23: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 23

Cost of Manufacturing Testing in 2010+

• 0.5-1.0GHz, analog instruments,1024 digital pins: ATE purchase price– = $4.0M + 1,024 x $5,000 = $9.12M

• Running cost (five-year linear depreciation)– = Depreciation + Maintenance + Operation

– = $1.80M + $0.185M + $1.5M– = $3.485M/year

• Test cost (24 hour ATE operation)– = $3.485M/(365 x 24 x 3,600)– = 11.05 cents/second

Page 24: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 24

Roles of Testing• Detection: Determination whether or not the device

under test (DUT) has some fault.• Diagnosis: Identification of a specific fault that is

present on DUT.• Device characterization: Determination and

correction of errors in design and/or test procedure.• Failure mode analysis (FMA): Determination of

manufacturing process errors that may have caused defects on the DUT.

Page 25: ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES

04/21/23 25

Summary• About the course

• Expectations

• Why test?

• Cost issue – First look