ebis accelerator readiness review hazards and controls for pressure systems may 4-7, 2010 1
TRANSCRIPT
![Page 1: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/1.jpg)
EBIS Accelerator Readiness Review
Hazards and Controls
for Pressure Systems
May 4-7, 2010
1
![Page 2: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/2.jpg)
2
Pressurized Systems
• Cryogenic Systems
Superconducting Solenoid Magnet System (SSMS)
• Cooling Water Systems– NSRL Power Supply DI Water System– Booster Magnet Water System– Mini-chillers for RF Cavity Cooling
• Compressed Air/Gas– Utility Compressed Air for Instrumentation/Valves– Vacuum System Bleed-up– SF6 for RF Coax/Circulators
EBIS Accelerator Readiness Review – May/2010
![Page 3: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/3.jpg)
3
Cryogenic Systems - SSMS
EBIS Accelerator Readiness Review – May/2010
![Page 4: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/4.jpg)
4
Cryogenic Systems - SSMS
EBIS Accelerator Readiness Review – May/2010
![Page 5: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/5.jpg)
5
Cryogenic Systems - SSMS
• Is the magnet system safely designed?
(Review by the LESHC)
• Is the installation safe and will it be safely operated?
(Review by ASSRC)
EBIS Accelerator Readiness Review – May/2010
![Page 6: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/6.jpg)
6
Cryogenic Systems – SSMS ODH Calculation
EBIS Accelerator Readiness Review – May/2010
SSMS
O2 % is calculated to be 18.3% after He release. ODH Class is unclassified.
Helium Gas Vented to Outside
![Page 7: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/7.jpg)
7
EBIS Accelerator Readiness Review – May/2010
A
Cryogenic Systems – SSMS Relief Devices and Venting to Outside
View A
BD 490 mB
RV 350 mB
RV Vent 100 mB
Vacuum Vessel BD 450 mB
![Page 8: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/8.jpg)
8
EBIS Accelerator Readiness Review – May/2010
A
Cryogenic Systems – SSMS Relief Devices and Venting to Outside
![Page 9: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/9.jpg)
9
Cryogenic Systems – SSMS and ASME Equivalency LESHC
• ASME Equivalency Ruling on SSMS by LESHC for Design, Manufacture, and Inspection Requirements– LESHC Review of Pre-Manufactured Design – 8 June
2006 with manufacturer ACCEL (now BASC)– LESHC Meeting - 2 February 2009 – ASME Equivalency is
granted upon resolution of Actions Items.
EBIS Accelerator Readiness Review – May/2010
![Page 10: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/10.jpg)
10
Cooling Water Systems – DI Water
EBIS Accelerator Readiness Review – May/2010
Code: ANSI/ASME B31.9Materials: Copper, Type L SST304
Water Expansion Tank Interlock: Pump Shut-down~25 gallon loss. Alarm at ~16 gallons loss.
![Page 11: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/11.jpg)
11
Cooling Water Systems – Magnet Water and RF Cavity Water
EBIS Accelerator Readiness Review – May/2010
Code: ANSI/ASME B31.9Materials: Copper, Type L
![Page 12: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/12.jpg)
12
Cooling Water Systems – Magnet Water and RF Cavity Water
EBIS Accelerator Readiness Review – May/2010
![Page 13: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/13.jpg)
13
HP Gas Bleed-up to Vacuum Systems
EBIS Accelerator Readiness Review – May/2010
Typical RV – Circle Seal L500 with Viton seals
![Page 14: EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7, 2010 1](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfa41a28abf838c971a6/html5/thumbnails/14.jpg)
14
SF6 for RF Coax and Circulators
EBIS Accelerator Readiness Review – May/2010
Typical RV – Circle Seal L559 with Buna-N seals