eastman business park an american manufacturing renaissance …creating a unique ‘m-ecosystem’
TRANSCRIPT
Eastman Business Park
An American Manufacturing Renaissance…creating a unique ‘m-ecosystem’
FOR OVER A CENTURY, KODAK WAS A WORLD UNTO ITSELF100 YEAR HEAD-START ON THE FUTURE
INVENTED HERE, MANUFACTURED HERE.
Eastman Business Park
Eastman Business Park
EBP FactsKodak
• 65 Buildings
• 9.1 MSF with 3.3 MSF available
• 687 acres of which ~ 100 acres are shovel ready
Tenants
• 47 tenants
• 1.1 MSF Premises
Other EBP Owners
• 45 Buildings (24 for RED-Roch)
• 6.6 MSF
SITE SHARED BUILDINGS & SHEDS – NEWCO OWNED
NEWCO OWNED LAND (687 ACRES)
KODAK MANUFACTURING LEASED BUILDINGS & SHEDS – NEWCO OWNED (4,742,779 SQFT)
UTILITIES BUILDINGS & SHEDS – RED OWNED (26,530 SQFT)
EXTERNAL TENANT OWNED BLDGS & SHEDS (1,052,074 SQFT)
EXTERNAL TENANT OWNED LAND
EASTMAN BUSINESS PARK EXTENTS
KEY:
EBP Utilities
125 MW Power Plant 12,000 Ton Chilled Water Plant
Bridging the commercialization gapHow EBP can help address
the ‘Invented Here, Made There’ scenario
The Missing Middle
RESEARCH/INTELLECTUAL
PROPERTY
PROOF OF CONCEPT
PROTOTYPING, BETA
MANUFACTURING
DEEPER CAPITAL
INVESTMENT
MARKET EXPANSION
Gap in Manufacturing Innovation
Nourish IP beyond lab from proof of concept into commercialization through: Utilization of existing assets Leverage of existing
workforce/intellectual capital Preservation of capital Reduction of risk and improved
predictability High tech start-ups become profitable,
self-sustaining, job-creating enterprises quicker
Driving US Commercialization StrengthSpeeding New Economy products to market
Creating a Biomaterials Advanced Manufacturing & Technology
Ecosystem at EBP…or “m-ecosystem”
• Specialty Chemicals Pilot and Mfg• Refining & Distillation• Coating & Extrusion
– Pilot coating and films development.– Logistics (e.g. packaging dynamics
and materials characterization) • Analytical Services• Environmental Test Chambers• Chemical wetlabs and lab services• Environment, Health and Safety services• Construction and Project Management
Access to R&D facilities, prototype development tools and technology resources help reduce risk and expense – improving predictability and time to market
EBP = a one-of-a-kind opportunity
Biorefinery of the Future
CO2
BiodieselBio-jet
C5 & C6Sugars
LocalAg Crops
BiochemBiofuel
BioplasticBiochembiofuel
Energy for EBP
Municipal SolidWasteGasification
FermentationCluster
BiofuelABC
Chemical Process
ABCSteam/Enzyme ABC & ZZZ
ABC
ABC & ZZZ ABC & ZZZ
ABC Algae
REDPowerplant
CO2
CO2
WoodCornstoverEnergy crops
Food waste
ABC
AD
WasteSolids
CellulosicMaterial for AD or Gasification
Biogas
Bioscience Manufacturing Centeraka Fermentation Facility
14
BIOSCIENCE FERMENTATION CENTER
• Operational Q1 2016• NYS funding $3M - $5M, $22M in private
investors• Estimated toll usage cost will be
$0.04/liter/day.Includes utilities and full operation, excludes materials
8 Year Vision
With an appropriate PPP, we can expect to see
~$500M-$750M of private investment from our region!!
Economic Impact – 2014 - 2018Company Segment Anticipated Date of
Agreement to locate at EBP
Jobs Capital 1Spend
Company A Biochemical 1st Q 2014 2050
Phase 1 = $10MPhase 2 = $50M
Company B Sugar Mfg 1st Q 2014 60-70 $50M
Company C Biochemical 4th Q 2014 50-75 $60 -$75M
Company D Bioplastic 1st Q 2014 50-60 $40-75M
Company E Sugar Mfg 2nd Q 2014 25-30 $15-$20M
Company F MSW to NRG 4th Q 2014 75 - 100 $100M - $150M
Company G Biofuel 4th Q 2014 25 $10-$15M
Company H Algae to biofuel
1st Q 20141st Q 2016
15100
Phase 1 = $10MPhase 2 = $200M
Company I Biofuel 2nd Q 2014 35- 50 $50M
TOTALS 500 - 600 $595M - $705M
17
KEY METRICS -- JOB GROWTH
2011 2012 2013 2014 2015 2016 20171000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
2931
3504
4439 46004800
52005600
EBP Tenant Only Jobs
Tenants
Goal
Thank You