eastham water system water supply development program board of selectmen update april 9, 2012

69
Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Upload: betrys

Post on 12-Jan-2016

46 views

Category:

Documents


2 download

DESCRIPTION

Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012. Agenda. Why water? Benefits of a water system Water quality studies documenting conditions Relationship with wastewater planning Water supply investigations Water system preliminary design - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Eastham Water SystemWater Supply Development

Program

Board of Selectmen Update

April 9, 2012

Page 2: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Why water? Benefits of a water system Water quality studies documenting

conditions Relationship with wastewater planning Water supply investigations Water system preliminary design Cost forecasting and allocation

2

Agenda

Page 3: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Drinking water wells in close proximity to septic systems

Water quality is steadily declining from septic system cross-contamination

Documented in several studies No official water quality monitoring,

management program for private wells

Why Water?

Page 4: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Provide clean, potable water from protected and managed sources remote from septic systems, and other activities that can impact private well water quality

Strict EPA/DEP quality monitoring program Provide Town-wide Fire Protection Reduce Home-owners Insurance Costs by

$400-$500/year for Average Home

Why Water?

Page 5: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Long-term community investment in infrastructure

Water System Immune to Power Outage as happened in August 2011

You’ll know what you’re drinking Regular testing under strict guidelines Annual public reporting

Why Water?

Page 6: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Sign at Town Hall after August 2011 storm

Page 7: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Nitrates are a risk factor for infants, but are also an indicator

Larger concern: other wastewater components

Not normally tested for, are expensive, but are often present along with nitrates

Why Should We Be Concerned?

Page 8: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Nitrate

c

Downgradient well

Leach field

Household Products

Pharmaceuticals

Page 9: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Drinking wells intercepting plume at different distances from plume source and therefore showing different concentrations of nitrate

Page 10: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 11: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Projected Use of Innovative/Alternative On-site Sewage Treatment Systems in Eastham, Under Current Regulations and Policies

Susan RaskBarnstable County Department of Health and

Environment

2007

Page 12: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 13: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Bedroom density and nitrate levels

“Short circuiting” is occurring due to small lot size and large number of wells and septic systems;

“45% of lots exceed 4 BR’s/Acre model”

High number of samples > 2mg/L validates that entire groundwater system is showing nitrogen impacts from septic systems – not likely to improve

Page 14: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Bedroom density and nitrate levels

70% of single family residences (7 out of 10 homes) exceed the Title 5 standard for density on nitrogen sensitive lots – Eastham 2012

Page 15: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

9,600 private wells tested since 2003 Approximately 1,000 per year Test only for Nitrates as low-$$ indicator Data analyzed by geographic map areas Clear geographic variability

North Eastham most severe South Eastham least severe

Eastham BOH Well Testing Program

Page 16: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 17: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 18: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 19: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 20: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 21: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

% of Wells > 5 ppm Nitrates

Red > 30%Orange 20 – 30%Yellow 10 – 20%Green 0 – 10%Remember: Nitrates are an indicator

of other septic systemcompounds.

Page 22: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Principal Conclusions

“The Town needs to protect the public health by providing a reliable public water supply from a protected source.”

Eastham Wastewater Mgmt PlanGHD Inc., 2009

Page 23: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Wastewater Mgmt PlanGHD, Inc.

• Nearly all properties served by a well and septic system on the same lot

• Private wells are becoming impacted by septic tank effluent

• Contamination is indicated by elevated nitrate

• Protect public health with a public water supply

Page 24: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

“Wastewater treatment alone will not remediate the existing human health need of safe drinking water.”

Wastewater Mgmt PlanGHD, Inc.

Page 25: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Wastewater Mgmt PlanGHD, Inc.

Sewer Service Areas• Not a Town-wide system

• Targeted embayments• Town Cove/Nauset

Estuary• Rock Harbor

Page 26: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Wastewater Mgmt PlanGHD, Inc.

Sewer Locations

Page 27: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Wastewater Mgmt PlanGHD, Inc.

Limited WW SystemCost estimate:$59 Million

Page 28: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Wastewater Mgmt PlanGHD, Inc.

“The human health wastewater needs are very clear and are best met with the development of a public water supply system from a protected water source.”

Page 29: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Sampled private wells across the Cape Tested for “Emerging Contaminants” from

septic systemsPharmaceuticals Cleaning SolutionsFlame retardants HormonesMetals Insect RepellentsPersonal Care Products

Possible health effects, unregulated, untested

2011 Silent Spring Institute Study

“Emerging Contaminants In Cape Cod Private Drinking Water Wells – 2011”

Page 30: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

27 different contaminants detected More nitrate = more contaminants

= higher concentrations 3 pharmaceuticals at highest levels in the U.S. There are no standards for these

contaminants Consider home filtration if nitrate >0.5 ppm Did not test for bacteria and viruses

Silent Spring Study: Findings

Page 31: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Provide clean, potable water from protected and managed sources remote from septic systems

Provide Town-wide Fire Protection Reduce Home-owners Insurance Costs

by $400 - $500/year for Average Home Water System Immune to Power

Outage as Happened in August 2011

Why Water?

Page 32: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

FY 2010 Annual Town Meeting, Article 17 Conduct pump tests to establish the

quantity and quality of water available from…Districts G, H and Nauset Regional High School and perform permitting necessary to provide up to 1 MGD from each site.

Evaluate feasibility of obtaining 0.5 MGD or more water from Orleans

32

Water Supply Investigation Program

GOAL

Page 33: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Town-wide Water

System

6667 Lots Served

Annual average day 1.00 MGD Summer average day 1.88 MGDPeak Day

2.65 MGD

Page 34: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 35: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

.

Supply Sources

NRHS

District G

District H

Page 36: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 37: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012
Page 38: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Well Development

Page 39: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Approximate Salt Water Interface

N

NW: Sand to ~100’; silt/clay to 400’+SW: Sand to 400’; silt and clay layers

District G

District H

NRHS

Geology: Glacial Deposits

Page 40: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

9

Nauset Lens

Groundwater Model

Page 41: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Groundwater Modeling of Potential Water Supply Withdrawals

Page 42: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Ground Water ModelingWater Supply Goal

Long-term effects on aquifer conditions

100-year period modeled Use annual average demand (1.0

MGD) Represents average demand at full

build-out of system

Page 43: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

NRHS Site

0.882 MGD

Page 44: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

NRHS Survey Map

Page 45: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

District G

0.995 MGD

Page 46: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

District H

1.30 MGD

Page 47: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

District H

Town of Eastham

NPS

NPS

Page 48: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

04/21/23 48McLane Environmental, LLCMcLane Environmental, LLCDRAFT

VP-09

OW-1A,B,C,DTPW-1B

OW-2A,B,C,DTPW-2C

OW-3A,B,C,TPW-3B

OW-4 A,B,C

VP-01

VP-11

District H – Surveyed Site Plan

Page 49: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Aquitard (Silty clay and silt / Silty sand )

Aquifer (Fine to medium sand with traces of coarser sand and gravel) 49

Northwest Southeast

A

D

B

C

Aquitard

Aquitard

Aquitard

Till or weathered bedrock

Gamma (cps)

8, 16, 32 Inch Normal Resistivity (ohm-m)

EM Conductivity (m/Sm)

Ele

vati

on

(ft

NA

VD

88)

Distance (ft)

McLane Environmental, LLC

Water Table- May 2, 2011

District H – Site Stratigraphy

Page 50: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Groundwater and Vernal Pool Monitoring

Monitor water levels in surface water, peat, and water table

Monitor three nearest vernal pools VP-01, VP-09 and VP-11

VP-9 and OW-4 Well Cluster

Page 51: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Vernal Pool VP-09

Page 52: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Orleans as a water supply?

Eastham can be entirely self-sufficient

Not enough available from Orleans to meet Eastham’s demands

Far less costly for Eastham to supply its own water

Interconnection for emergencies

Page 53: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Water System

Preliminary Design.

Page 54: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Phase 1

• Wellfields

• Transmission Mains

• Storage Tanks

• 1,391 Connections

Page 55: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Phase 1Fire Protection

•1000’ radius from mains

•Lower insurance rates

•Encompasses 75% of all lots

Page 56: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Fire Protection and Home Insurance Applies to all properties w/in 1000’ of system

and 5 miles of fire station

Wellfleet experience

ISO Rating dropped from Category 9 to 4

Reduced insurance for $400,000 home by $500 - $700/year

Projected insurance decrease for Eastham: $400 - $500/yr (for $400,000 home)

Page 57: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Phase 21126 Connections

95% fire protection

Page 58: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Phase 3

1117 Connections

Page 59: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Phase 4

1079 Connections

Page 60: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Phase 5

1502 Connections

Page 61: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Phase 6Seashore Area

284 Connections

Page 62: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Service Connections Program

Page 63: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

System Cost

$111,000 construction cost(includes inflation through construction)

Construction in six phasesStarting 2015Two years each

Financing done in two-year increments

Page 64: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Cost Allocation Approaches

Taxes

Betterments

Connection Fees

Page 65: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Betterment Program

Every lot assessed based on value

Start-up betterment Final betterment

Page 66: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Betterment Program

Borrowing Period 20 yrsInterest Rate 2% - 4%Betterment Payback 20 yrs

Pursue grants and low-interest loans (SRF, USDA) and abatements

Page 67: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Financing the System

Low Interest Loans or Conventional Loans/ Grants

Betterment

Page 68: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Financing

$17,000 for 20 years at 2% (for average property at $400,000)

Average annual betterment: $400-$600/year

Homeowners insurance savings: $400 - $500/year

Water fees (if connected): $200/year Abatement program

Page 69: Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Discussion