• Overview
• Design and Public Engagement
• Current Progress
• Next Steps
• Q & A
AGENDAWhat will we discuss tonight?
2
• Overview• Design and Public Engagement
• Current Progress
• Next Steps
• Q & A
• Design and Public Engagement
• Current Progress
• Next Steps
• Q & A
3
• Strengthen Coastal Defenses
• Upgrade Buildings
• Protect Infrastructure and Services
• Make Neighborhoods Safer and More Vibrant
Coastal Protection Initiative 21: Install an integrated flood protection system in Lower Manhattan,
including the Lower East Side
A STRONGER, MORE RESILIENT NEW YORKThe City’s 257 initiatives comprise a comprehensive, citywide plan to reduce the risk of extreme weather and climate change
4
REBUILD BY DESIGN COMPETITIONThe RBD proposal focused on flood protection for the East Side of Manhattan
55
AUGUST2013
NOVEMBER2013
BIG TEAMPRESENTS
TO HUD JURY
HUD SELECTSBIG TEAM TO
FOCUS ON MANHATTAN
APRIL2014
REBUILD BY DESIGNCOMPETITION
START
JUNE2014
HUD AWARDS$335 MILLION
FEDERAL FUNDINGTO CITY FOR THE
EAST SIDE
DECEMBER2013
JUNE2013
CITY REQUESTSFOCUS ONEAST SIDE
CITY RELEASESA STRONGER,
MORE RESILIENT NEW YORK
REBUILD BY DESIGN
COMPETITION TIMELINERBD was a 9-month ideas competition administered by HUD
6
ESCR
23RD STREET
MONTGOMERY STREET
PROJECT LOCATIONThe City received HUD funding for the area from E. 23rd St. to Montgomery St. andwe are using City and State funds to advance planning south of Montgomery St.
7
DECEMBER2014
CONCEPT DESIGNSTART
DECEMBER2015
CONCEPT DESIGNCOMPLETION
JUNE2014
CITY PROJECT TEAMESTABLISHED
SEPTEMBER2014
CITY ISSUESRFP FOR
CONCEPT DESIGN
JUNE2017
PROJECTCONSTRUCTION
START
ENVIRONMENTAL REVIEW
PERMITTING
DESIGN REFINEMENT
EAST SIDE COASTAL RESILIENCY PROJECT
PROJECT TIMELINEThe ESCR Project is on an ambitious timeline, with construction anticipated in 2017
8
3
45
7
8
1
6
9
2
PROJECT LIST1 EAST SIDE COASTAL RESILIENCY PROJECT
LOWER MANHATTAN COMPREHENSIVE PROTECTION PLAN (ORR)
3 MULTI-PURPOSE LEVEE STUDY(EDC)
4 PIER 42 PARK (DPR)
5 LOWER EAST SIDE ECOLOGY CENTER (DPR)
6 RESILIENT NEIGHBORHOODS STUDY(DCP)
7 CON EDISON
8 SOLAR ONE
9 HOSPITAL ROW INVESTMENTS
2
2ND
AVE
1ST A
VE
AVE
A
PITT
ST
14TH ST
9TH ST
HOUSTON ST
23RD ST
MON
TGOM
ERY
ST EAST
RIV
ER
COMPLEMENTARYINITIATIVESThe ESCR Project will becoordinated with otherinitiatives in the area
9
TEAM STRUCTUREThe city has hired ateam of technical anddesign professionals tocoordinate with local input
CITYCITY
COMMUNITYENGAGEMENT
DDC / DPR / ORR
URBANDESIGN
BIG
STARR WHITEHOUSE
ONE ARCHITECTURE
JAMES LIMA P+D
FITZGERALD & HALLIDAYCOMMUNITY ENGAGEMENT
PUBLIC POLICY
LANDSCAPE ARCHITECTURE
PLANNING
LEAD
ENGINEERINGDESIGN
FLOOD PROTECTION + MODELING
LANDSCAPE ARCHITECTURE
MARINE ENGINEERING
MATHEWS NIELSEN
ARCADIS
CH2MHILL
MANAGING LEADAKRF
10
• Listen to input from East Side residents
• Collaborate on design options with East Side community
• Explore opportunities and trade-offs together
COMMUNITY ENGAGEMENT GOALSWorking with East Side residents and stakeholders is important to the ESCR project
11
• Overview
• Design and Public Engagement• Current Progress
• Next Steps
• Q & A
• Current Progress
• Next Steps
• Q & A
• Overview
12
PROJECTAREA
1
PROJECTAREA
2
2ND
AVE
1ST A
VE
AVE
A
PITT
ST
14TH ST
9TH ST
HOUSTON ST
23RD ST
MON
TGOM
ERY
ST EAST
RIV
ER
ESCR STUDY AREA Where are we working?
13
1.4
1.2
1.1
1.3
PROJECT AREA 22.1 CON ED
2.2 ELEVATED FDR
2.3 23RD STREET TIE-BACK
PROJECT AREA 11.1 PROTECTIVE BERM
1.2 PEDESTRIAN BRIDGES AND ACCESS
1.3 WATERFRONT AND CONNECTIONS
1.4 PIER 42 PARK/MONTGOMERY TIE-BACK
2.3
2.2
2.1
2ND
AVE
1ST A
VE
AVE
A
PITT
ST
14TH ST
9TH ST
HOUSTON ST
23RD ST
MON
TGOM
ERY
ST EAST
RIV
ER
PROJECT ELEMENTS Customized flood protection
14
DEPLOYABLE
FLOOD WALL
BERM / LEVEE
TYPES OF FLOOD PROTECTIONThe options for resiliency have different degrees of reliability
26
MARCH2015
RE-ENGAGEMENTMEETINGS:
How do you use the waterfront?
WORKSHOPS:How do we combine
the options?
JUNE/JULY2015
DECEMBER2014
CONCEPT DESIGNSTART
DECEMBER2015
CONCEPT DESIGNCOMPLETION
APRIL/MAY2015
OCTOBER2015
WORKSHOPS:What are the options?
WORKSHOPS:Final Concept Design:
Input and feedback
PUBLIC MEETINGS
1 3
2 4
COMMUNITY ENGAGEMENT TIMELINEMeetings with East Side residents and stakeholders throughout the year
28
• Overview
• Design and Public Engagement
• Current Progress• Next Steps
• Q & A
• Next Steps
• Q & A
• Overview
• Design and Public Engagement
29
• Overview
• Design and Public Engagement
• Current Progress
• Next Steps• Q & A• Q & A
• Overview
• Design and Public Engagement
• Current Progress
39
RELIABILITY ENVIRONMENTALIMPACTS
CONSTRUCTIBILITYand
COST
TIMEand
PERMITTING
URBAN DESIGN
EVALUATION CRITERIAThere are many factors to consider when assessing resiliency options
41
TASKFORCEMEETINGSSTAKEHOLDER
MEETINGS
COMMUNITYWORKSHOPS
ONGOING PUBLIC ENGAGEMENTWorkshops like tonight’s are just one way to participate in the ESCR project
42
PEDESTRIAN BRIDGE CONNECTIONS• Locations• Bridge Design
BIKEWAY/WALKWAY• Narrow Segments• Emergency and Maintenance Access WATERFRONT VIEW CORRIDORS• Height and Width of Flood Protection Elements• Look and Feel
PARK ECOLOGY• Plants & Trees• Upland Connections
NEW ISSUES...
KEY ISSUES IDENTIFIED BY COMMUNITY DURING RBD
45
COMMUNITYENGAGEMENT CONCEPT
DESIGN
URBANDESIGN
ENGINEERINGDESIGN
COLLABORATIONLocal knowledge with technical expertise leads to one concept design for the project
46
EAST RIVER PARK /PROJECT AREA 1
MAP YOUR NEIGHBORHOOD!
SHARE YOUR THOUGHTS!
SURVEY
STUYVESANT COVE PARK / PROJECT AREA 2
48
NEXT STEPS
FOR MORE INFORMATION ABOUT
THE EAST SIDE COASTAL RESILIENCY PROJECT EMAIL US AT:
SIGN IN AT THE FRONT DESK TO STAY IN TOUCH AND HEAR
ABOUT UPCOMING MEETINGS AND ANNOUNCEMENTS!
49
THIS MEETING WILL BE REPEATED:MARCH 23rdAT WASHINGTON IRVING HIGH SCHOOL40 IRVING PLACE
TELL YOUR FRIENDS!
40 IRVING PLACE
17TH ST
IRVI
NG P
L
LEXI
NGTO
N AV
E
50
THE NEXT COMMUNITY TASKFORCE MEETING WILL BE HELD:APRIL 7thUNIVERSITY SETTLEMENT CORNERSTONECAMPOS PLAZA611 EAST 13TH ST.
HOPE TO SEE YOU THERE!611 EAST 13TH ST
13TH ST
AVE
C
51
• Overview
• Design and Public Engagement
• Current Progress
• Next Steps
• Q & A
• Overview
• Design and Public Engagement
• Current Progress
• Next Steps
53