East Jordan Iron Works Infra-riser installation for Georgia DOT evaluation

Upload: guest7c4ecf

Post on 04-Jul-2015

722 views

Category:

Economy & Finance


2 download

DESCRIPTION

Infra-riser Installation

TRANSCRIPT

Page 1: East Jordan Iron Works

East Jordan Iron Works

Infra-riser installation for Georgia DOT evaluation

Page 2: East Jordan Iron Works

Advantages of the Infra-riser

• Reduces traffic vibration into the manhole structure which great extends the life of the structure and surrounding pavement.

• When installed properly, the Infra-riser reduces water infiltration into the structure.

• Meets LEED requirements for recycled materials. All Infra-riser adjustment risers are made from 92% recycled materials.

• Infra-riser is a lightweight alternative to concrete risers and/or brick and mortar which reduces installation time and injuries.

Page 3: East Jordan Iron Works

Georgia Convention Center location center lane MH1A.

Page 4: East Jordan Iron Works

Georgia Convention Center location center lane used 26”x34”x1/2” riser. MH1B

Page 5: East Jordan Iron Works

Adhesive used on both sides of riser, installed on existing V-1480 ring. MH1C

Page 6: East Jordan Iron Works

Placing manhole on top of structure. MH1C

Page 7: East Jordan Iron Works

Concrete finishing. MH1D

Page 8: East Jordan Iron Works

Completed manhole MH1E

Page 9: East Jordan Iron Works

Planet Smoothie MH2A using V-1326 ring and 26”x34”x1/2” Infra-riser.

Page 10: East Jordan Iron Works

Planet Smoothie MH2B.

Page 11: East Jordan Iron Works

Planet Smoothie MH2C located 200yds west of N. Commerce Dr.

Page 12: East Jordan Iron Works

Planet Smoothie MH3A using USF 170 ring and cover located 300yds west of N. Commerce Dr.

Page 13: East Jordan Iron Works

Planet Smoothie MH3B using 26”x34”x1” Infra-riser.

Page 14: East Jordan Iron Works

Planet Smoothie MH3C completed installation.

Page 15: East Jordan Iron Works

North Commerce Drive intersection with USF 170 ring and V-1326 12 hole cover. Installation required 26”x34”x1/2” riser

and 26”x34”x1 ½” riser for 2” rise. MH4A.

Page 16: East Jordan Iron Works