earned value managementhypercache.h5i.s3.amazonaws.com/clients/1105/file... · earned value...
TRANSCRIPT
www.quantumpm.com
EEAARRNNEEDD VVAALLUUEE
Simplified for New Missions
By Kris Athey
1.0 INTRODUCTION & HISTORY
Earned Value Management has long been
accepted as an invaluable tool in the
management of large, hundred-million dollar
project efforts. The intent of this whitepap
to show how simplified Earned Value
Management techniques can be just as
powerful in much smaller projects and can also
provide some very unique benefits.
First, let’s start with a nutshell history:
of “Earned Value” (EV) as a metric in a
formalized process “Earned Value
Management” (EVM) has been a well defined
best practice in Project Management since the
early 1960s. At that time the U.S. Government
needed a method to ensure that progress was
being made, and money was being
effectively, on large space and defense projects.
The application of EV methods proved a very
effective way to achieve this goal. It enabled the
government to keep the focus on the overall
mission and better predict when work would be
completed. As data was collected over time
analysis of EV project reports across decades of
projects tracked by the U.S. Government
established that a disciplined EVM approach
EVM – Simplified for New Missions
Copyright © 2008 QuantumPM, LLC
EE MMAANNAAGGEEMMEENNTT
Simplified for New Missions
long been
accepted as an invaluable tool in the
million dollar
of this whitepaper is
to show how simplified Earned Value
just as
and can also
some very unique benefits.
a nutshell history: The use
metric in a
has been a well defined
practice in Project Management since the
Government
needed a method to ensure that progress was
spent
efense projects.
pplication of EV methods proved a very
. It enabled the
keep the focus on the overall
when work would be
s data was collected over time,
analysis of EV project reports across decades of
projects tracked by the U.S. Government
established that a disciplined EVM approach
could accurately predict the final cost of a
project to within 10% as early as 1/5
way through the project. This ability for early
and accurate cost forecasting opened the door
to more general EVM use in support of project
tracking and also in proactive
management of projects within
Recognizing the value of EVM, the US
Department of Defense tried for many years to
get private industry to adopt it. Finally, in 1998
the DoD succeeded as ANSI-EIS
established as a Standard in the private sector.
The DoD immediately rewrote their internal
standards to reference the ANSI
and by 1999 the responsibility for EVM had
officially passed to the private sector. Since
then an entire industry has evolved around
ANSI-748 to ensure that it is used correctly
US “President’s Management Age
continued to force adoption in Civil Agencies
and Contractors doing business with Civil
Agencies. With this level of focus, EVM
evolved to be seen as either a friend or a foe, a
cost saving tool or an overhea
as intended, it is a great tool for management. If
not well understood, it strikes fear in the hearts
of those required to comply.
Simplified for New Missions
QuantumPM, LLC – All rights reserved
Page 1 of 5
could accurately predict the final cost of a
project to within 10% as early as 1/5th
of the
way through the project. This ability for early
and accurate cost forecasting opened the door
to more general EVM use in support of project
also in proactive selection and
management of projects within a portfolio.
he value of EVM, the US
Department of Defense tried for many years to
get private industry to adopt it. Finally, in 1998
EIS-748-A was
established as a Standard in the private sector.
The DoD immediately rewrote their internal
andards to reference the ANSI-748 Standard
and by 1999 the responsibility for EVM had
officially passed to the private sector. Since
entire industry has evolved around
to ensure that it is used correctly. The
US “President’s Management Agenda” has
continued to force adoption in Civil Agencies
and Contractors doing business with Civil
With this level of focus, EVM has
evolved to be seen as either a friend or a foe, a
cost saving tool or an overhead burden. If used
s a great tool for management. If
not well understood, it strikes fear in the hearts
www.quantumpm.com
2.0 THE VALUE IN EVM
EVM has been proven on large projects but the overhead of using EVM is generally assumed to be too
expensive to use on smaller projects. This is patently
at what EVM is doing/providing. The EVM concept
project into “value” pieces (this is where we get the “V” in EVM). The cost of each Value component is
estimated and the duration over which that cost is
is to understand that you are measuring the value of “what” is created, not “how” it was done. H
the Value is achieved (typically shown
EVM.
For simplicity, the lowest level “value
work-package, the actual cost/schedule, the original cost/schedule and the deviation
different from the model of real life that we capture in a project schedul
For example, in the military space, there is a great deal of history around logistic plans. This history can
take the form of models or schedule templates.
might have general components like th
rescue effort,” “establish food distribution points
“work-packages” and their associated tasks and activities.
(very quickly/early) how reality differs from the logistical
emergency. Knowledge that the muddy terrain in a specific flood relief effort is impacting the relief
EVM – Simplified for New Missions
Copyright © 2008 QuantumPM, LLC
EVM has been proven on large projects but the overhead of using EVM is generally assumed to be too
expensive to use on smaller projects. This is patently not the case when used correctly
The EVM concept requires that you initially decompose the scope of a
project into “value” pieces (this is where we get the “V” in EVM). The cost of each Value component is
estimated and the duration over which that cost is expended is captured. The key to proper use of E
is to understand that you are measuring the value of “what” is created, not “how” it was done. H
typically shown via tasks and activities modeled in a schedule) is not the focus of
For simplicity, the lowest level “value” pieces are called “work-packages.” At the completion of each
package, the actual cost/schedule, the original cost/schedule and the deviations are captured as
data points. As the set of data points grows
(the result of completion of more and more
work-packages), the individual deviations
between the original plan and the
trying to fulfill on that plan form trends that
can be extended out to completion and
provide better and better estimates of final
project cost.
Unique benefits and applications can be
visualized when we understand the
difference between the model and reality
EVM provides the method to measure (and
subsequently leverage) how
from the model of real life that we capture in a project schedule.
there is a great deal of history around logistic plans. This history can
models or schedule templates. For a disaster relief effort, these models and templates
might have general components like the proven way to “setup a field HQ,” “establish a
“establish food distribution points,” etc. Each of these can be broken down into a set of
” and their associated tasks and activities. EVM can be used in this arena to determine
differs from the logistical plans that were pulled off the shelf for this
emergency. Knowledge that the muddy terrain in a specific flood relief effort is impacting the relief
Simplified for New Missions
QuantumPM, LLC – All rights reserved
Page 2 of 5
EVM has been proven on large projects but the overhead of using EVM is generally assumed to be too
when used correctly. Let’s look again
requires that you initially decompose the scope of a
project into “value” pieces (this is where we get the “V” in EVM). The cost of each Value component is
The key to proper use of EVM
is to understand that you are measuring the value of “what” is created, not “how” it was done. How”
via tasks and activities modeled in a schedule) is not the focus of
At the completion of each
s are captured as
As the set of data points grows
(the result of completion of more and more
packages), the individual deviations
between the original plan and the reality of
trying to fulfill on that plan form trends that
completion and
provide better and better estimates of final
lications can be
understand the
the model and reality.
method to measure (and
subsequently leverage) how real life is in fact
there is a great deal of history around logistic plans. This history can
a disaster relief effort, these models and templates
a search and
” etc. Each of these can be broken down into a set of
in this arena to determine
that were pulled off the shelf for this
emergency. Knowledge that the muddy terrain in a specific flood relief effort is impacting the relief
www.quantumpm.com
plans is information that can be tracked, trended
remainder of the relief effort. Later analysis of the adjustments made to the original off
can be used to provide better coverage/planning
Examples like this are only possible if EVM
techniques are simplified and
incorporated into the planning/scheduling
process. The techniques must be intuitive
and support the process without
defocusing the overall efforts. Defocusing
can be caused by spending a large amount
of time to maintain the model or adding
unnecessary complexity that leads to
confusion and misapplication of data. The
tools used must be tools already accepted
in the field, with a broad base of users so
they can be easily maintained by many
people and be easily understood. You need to use tools that your users are already familiar with
tools should make it easy to follow industry best practices
required: 1) Decompose the work into log
work breakdown structure or WBS). 2) Model the lowest level of the work (work packages) in a schedule
of how that work will be accomplished. 3) Monitor performance of the
package level. 4) Use the results to either adjust the planning going
expectations around the projected completion of the
project.
3.0 EVM AND SCHEDULING
With over 20 million users, there is no question that
Microsoft Office Project is the desktop scheduling engine of
choice. It is an effective way to model
get done to accomplish a goal. QuantumPM
Manager (EVManager) was created as an integral
component inside MS Project to provide the integration of
EVM – Simplified for New Missions
Copyright © 2008 QuantumPM, LLC
that can be tracked, trended, and used to adjust the tactics and plans for the
effort. Later analysis of the adjustments made to the original off
can be used to provide better coverage/planning in the future.
xamples like this are only possible if EVM
incorporated into the planning/scheduling
intuitive
. Defocusing
a large amount
or adding
complexity that leads to
confusion and misapplication of data. The
tools used must be tools already accepted
in the field, with a broad base of users so
many
You need to use tools that your users are already familiar with
tools should make it easy to follow industry best practices for EVM. In the simplest form,
required: 1) Decompose the work into logical components that describe what must be accomplished (a
work breakdown structure or WBS). 2) Model the lowest level of the work (work packages) in a schedule
that work will be accomplished. 3) Monitor performance of the value earned at the work
the results to either adjust the planning going forward or better set the
expectations around the projected completion of the
is no question that
Microsoft Office Project is the desktop scheduling engine of
It is an effective way to model how work needs to
QuantumPM Earned Value
was created as an integral
to provide the integration of
Simplified for New Missions
QuantumPM, LLC – All rights reserved
Page 3 of 5
and used to adjust the tactics and plans for the
effort. Later analysis of the adjustments made to the original off-the-shelf plans
You need to use tools that your users are already familiar with. The
simplest form, four things are
must be accomplished (a
work breakdown structure or WBS). 2) Model the lowest level of the work (work packages) in a schedule
earned at the work
or better set the
www.quantumpm.com
EVM best practices with the schedule.
proven methods of EVM.
One of the biggest benefits of “marrying” the WBS and the Schedule in this manner is a much more
intuitive way to initially build schedules, as well as navigate
EVManager has a unique navigation view that keeps the focus on
and reporting in an extremely intuitive way.
can cause confusion or errors when updating
the schedule.
The reporting engine produces live, dynamic
charts that support on-the-fly analysis of
schedules in execution.
Because EVManager captures all field status
and EVM information inside MS Project plans,
it is easy to use Project Server to centralize
the information. Using Project Server with
EVManager provides new Earned Value
analysis opportunities across repositories and
EVM – Simplified for New Missions
Copyright © 2008 QuantumPM, LLC
with the schedule. This tight coupling simplifies the process and reinforces the
discipline.
EVManager places the initial focus
on the Work Breakdown Structure
decomposition of the scope
resulting work-packages
tracked and updated with actual
information that is used to generate
EV reports within project. WBS
elements can come from templates.
The import of actual cost information
can be accomplished through
simple spreadsheet
that can be simplified to 2
produces the EVM outputs.
EVManager makes it easy to use the
One of the biggest benefits of “marrying” the WBS and the Schedule in this manner is a much more
intuitive way to initially build schedules, as well as navigate through them during execution.
has a unique navigation view that keeps the focus on work-package scope, achievement,
and reporting in an extremely intuitive way. It can reduce or completely hide schedule complexity that
when updating
The reporting engine produces live, dynamic
fly analysis of
captures all field status
MS Project plans,
use Project Server to centralize
Using Project Server with
ned Value
analysis opportunities across repositories and
Simplified for New Missions
QuantumPM, LLC – All rights reserved
Page 4 of 5
This tight coupling simplifies the process and reinforces the
places the initial focus
on the Work Breakdown Structure
decomposition of the scope. The
packages are then
and updated with actual
information that is used to generate
EV reports within project. WBS
elements can come from templates.
The import of actual cost information
can be accomplished through a
simple spreadsheet import. A wizard
that can be simplified to 2-clicks
produces the EVM outputs.
makes it easy to use the
One of the biggest benefits of “marrying” the WBS and the Schedule in this manner is a much more
them during execution.
package scope, achievement,
schedule complexity that
www.quantumpm.com
new web-based ways to view Work elements within and across projects, opening the door to a larger
extended team concept and fast communication/collaboration methods.
4.0 BENEFITS OF INTEGRATED EVM
Integration of EVM inside the Microsoft Project platform provides
through complex systems on very large capital
all sizes can now reap the benefits of the science of
A few of the benefits are:
Scope management and WBS rules
packages.
The scope of the project is graphically visible so that it is easy to guard in the
The WBS can be used to filter the schedule
Users can create/customize their own
Financial data can be easily i
A WBS Data Dictionary is included and easily produced as an output report.
Reporting
A wizard that is simple to setup creates the
are generated and retained in the Project file.
Graphing of Time-phased Data
A few technical benefits:
All Object data and Reports (for all reporting periods)
(or database repository it is stored in).
The Work Breakdown Structure is maintained as
The Object Model and Events are exposed to VBA macro coding
for simple external system integration
for simple customer enhancements
Objects and their attributes
EVM is no longer a large overhead and complex undertaking. With the new, intuitive integration of EVM
into the MS Office Project platform accomplished by QuantumPM
applications is now possible.
EVM – Simplified for New Missions
Copyright © 2008 QuantumPM, LLC
based ways to view Work elements within and across projects, opening the door to a larger
extended team concept and fast communication/collaboration methods.
EVM
ration of EVM inside the Microsoft Project platform provides benefits that used to be available only
through complex systems on very large capital-intensive planning efforts. With EVManager
all sizes can now reap the benefits of the science of EVM. It doesn’t need to be complicated.
WBS rules are automatically enforced since all work must be in work
The scope of the project is graphically visible so that it is easy to guard in the WBS element
ilter the schedule and simplify navigation.
customize their own WBS “element level” and “project-level”
Financial data can be easily imported from spreadsheet to Time-phased attributes on
BS Data Dictionary is included and easily produced as an output report.
A wizard that is simple to setup creates the DOD CPR Report Formats 1
generated and retained in the Project file.
phased Data is easily and readily available in real-time.
All Object data and Reports (for all reporting periods) are maintained within the MS Project File
(or database repository it is stored in).
The Work Breakdown Structure is maintained as a totally separate Object Model
Object Model and Events are exposed to VBA macro coding inside MS Project:
for simple external system integration
for simple customer enhancements
Objects and their attributes are exportable to xml files accessible by other systems
overhead and complex undertaking. With the new, intuitive integration of EVM
form accomplished by QuantumPM EVManager, a whole new world of
Simplified for New Missions
QuantumPM, LLC – All rights reserved
Page 5 of 5
based ways to view Work elements within and across projects, opening the door to a larger
benefits that used to be available only
Manager, projects of
EVM. It doesn’t need to be complicated.
l work must be in work-
WBS elements.
level” attributes.
phased attributes on Nodes.
1-5. The reports
time.
maintained within the MS Project File
a totally separate Object Model
inside MS Project:
exportable to xml files accessible by other systems
overhead and complex undertaking. With the new, intuitive integration of EVM
a whole new world of