0912 Erbil Refinery OSBL Facilities Pipelines - IRAQPiping Systems Between Erbil Refinery and Tank Farm Detailed EngineeringKAR Construction and Engineering (2009 - 2010)
0911 Nasiriya Oil Field Development - IRAQ2 Billion Barrels Reserv Capacity Oil Field Development Front End Engineering Design (FEED)Weatherford MENA (2009)
0909 Dogancay Railway Fuel Pipeline VariantFor 6 inch Pipeline (90 bar), 418 m Variant Construction, 30 m Railway Crossing with 10 inch Casing, Hydrostatic Test andCathodic Protection System Detailed EngineeringElen Energy Inc. (2009)
0908 Marmara Ereglisi Fuel Terminal250,000 cum Tank Farm and Sea Terminal Detailed EngineeringMarmara Depoculuk Hizmetleri Inc. (2009 - 2010)
0904 Istanbul Kurtkoy TEM Junction Fuel Pipeline VariantFor 6 inch NATO Pipeline 285 m Variant Construction and Cathodic Protection System Detailed EngineeringOrhan Evin - Kucukel Joint Venture (2009)
0901 Bogacay River Fuel Pipeline VariantFor 8 inch Pipeline (90 bar), 612 m Variant Construction, at 2 Location Total 30 m Road Crossing with 12 inch Casing,Hydrostatic Tests and Cathodic Protection System Detailed EngineeringMinistry of Defense (2009)
0818 Erbil Integrated Project Khurmala - IRAQ40 km 20 inch and 11 km 6 inch Crude Oil Pipelines and Manifold Stations Detailed EngineeringKar Construction and Engineering (2008 - 2009)
0817 TaqTaq Oil Field Crude Oil Trunk and Flow Lines - IRAQ15 km Crude Oil Pipelines Detailed EngineringZozik - Gorkem Joint Venture (2008 - 2009)
0816 Adapazari Mekece Fuel Pipeline Variants1,870 m Variant Construction, Hydrostatic Tests and Cathodic Protection System at 8 Location for 6 inch Pipeline (90 bar) onAnkara-Istanbul High Speed Train Railway Route at Adapazari Mekece Region Detailed EngineeringFirat Construction Ltd. (2008)
0808 TaqTaq Oil Field Crude Oil Flow Lines - IRAQ3300 m, 6 inch Crude Oil Flow Lines and Manifold Connection Detailed EngineringZozik - Grkem Joint Venture (2008)
0804 Izmit, Uskudar; Bandirma Fuel Storage Tanks RestorationRenewal of Tank Bottom Steel Plates and Epoxy Coating of the 4 each 1250 cum and 2500 cum Storage Tanks DetailedEngineering and Construction SupervisionMinistry of Defense (2008)
0717 2005 Fuel Pipelines VariantsFor 4,6,8 and 10 inch NATO Pipelines, at 12 Location Total 4025 m Pipeline Variant, Hydrostatic Tests and Cathodic ProtectionSystems Detailed Engineering and Construction SupervisionMinistry of Defense (2007 - 2008)
0716 Dalaman Airport Fuel Terminal Upgrade5000 cum Jet Fuel Storage Tank and Connections Detailed Engineering
Oil Storage and Distribution
-
Petrol Ofisi Inc. (2007)
0713 Derince Fuel Terminal Manifold RehabilitationWhite Product Pump and Manifold Station Renewal Detailed EngineeringPetrol Ofisi Inc. (2007)
0711 Istanbul Samandira Fuel Pipeline VariantFor 6 inch Pipeline (90 bar), 1011 m Variant Construction, 26 m Road Crossing with 10 inch Casing, Hydrostatic Test andCathodic Protection System Detailed EngineeringBayraktar Kardesler Construction Inc. (2007)
0710 Iskenderun Dortyol Fuel Pipeline VariantFor 8 inch Pipeline (90 bar), 1188 m Variant Construction, 36 m Road Crossing with 12 inch Casing, Hydrostatic Test andCathodic Protection System Detailed EngineeringAtakas Inc. (2007)
0709 Istanbul Samandira Fuel Pipeline VariantFor 6 inch Pipeline (90 bar), 427 m Variant Construction, Hydrostatic Test and Cathodic Protection System Detailed EngineeringIsmail Oncel (2007)
0707 Malatya Beylerderesi Fuel Pipeline VariantFor 6 inch Pipeline (90 bar), 5 m Road Crossing with 10 inch Casing, 202 m Variant Construction, Hydrostatic Tests and CathodicProtection System Detailed EngineeringState Highways 8th District Directorate (2007)
0706 Afyon Sandikli State Highway Fuel Pipeline VariantsFor 8 inch Pipeline (90 bar), at 4 Location 245 m Road Crossing with 12 inch Casing, at 2 Location 595 m Variant Construction,Hydrostatic Tests and Cathodic Protection System Detailed EngineeringSimsekler naat Ltd. (2007)
0704 Konya Main Airforce Base Fuel Pipeline5560 m, 6 inch Pipeline, Cathodic Protection System, Valve Pit and Fuel Transfer Pumps Detailed Engineering and ConstructionSupervision Ministry of Defense (2006 - 2007)
0701 Istanbul Europe Side Fuel Pipeline Displacement6 inch 80 m Pipeline (90 bar) Displacement, 22 m Crossing with 10 inch Casing and Cathodic Protection System DetailedEngineeringMVM Turizm ve Ticaret Ltd. (2007)
0622 South Antalya Tank Farm Restoration of Storage TanksRenewal of Insulations and Epoxy Painting of the 10000 cum and 5000 cum Storage Tanks Detailed Engineering andConstruction SupervisionMinistry of Defense (2006 - 2007)
0619 Mersin Fuel Pier F-76 Pipeline Connection1600 m, 8 inch F-76 Pipeline From Mersin Tank Farm to Fuel Pier, 10 cum Drainage Tank, 3 each Valve Pit and CathodicProtection System Detailed EngineeringMinistry of Defense (2006)
0616 Khurmala Oil Field Manifold Stations - IRAQKhurmala Oil Field South, Middle and North Areas Choke Valve and ESD Manifold Stations Piping, Structural andInstrumentation Detailed EngineeringKar - Avrasya Oil & Gas Services JV (2006)
0608 Antalya - Cukurhisar Pipeline Damages and Fuel Facilities Restoration8 inch, 530 m Pipeline (90 bar) Renewal, 105 m River Crossing, 40 m Gabion, 1500 m Pipe Insulation and 6200 sqm RoofRestoration at 12 Stations Detailed Engineering and Construction SupervisionMinistry of Defense (2006)
Oil Storage and Distribution
-
0607 West Turkey Fuel Facilities Restoration6 each 10 cum Drainage Tank, 8500 sqm Roof Restoration at 20 Station, 380 m Perimeter Fence, Concrete Pavement, HydrostaticTest and Cathodic Protection System Detailed Engineering and Construction SupervisionMinistry of Defense (2006 - 2008)
0606 Elazig - Mus Pipeline Damages and Fuel Facilities Restoration6 inch, 3,325 m Variant Construction (90 bar), 86 m River Crossing, Hydrostatic Test and Cathodic Protection System, 7,500 sqmPaved Areas and Internal Roads Restoration at 3 Stations Detailed Engineering and Construction Supervision ,Ministry of Defense (2006 - 2007)
0605 Malatya - Batman Pipeline Damages and Fuel Facilities Restoration4 and 6 inch, 790 m Pipeline (90 bar) Renewal, 70 m River Crossing, 120 m Gabion, 2300 m Pipe Insulation, 3600 m Wire Fence at5 Stations and 4300 sqm Roof Restoration at 11 Stations Detailed Engineering and Construction SupervisionMinistry of Defense (2006)
0514 Istanbul Haramidere Fuel TerminalTank Farm and Manifold Stations Renewal Detailed EngineeringPetrol Ofisi Inc. (2005)
0513 Khurmala Oil Field Development - IRAQ230 km Pipeline and Block Valve Stations Detailed EngineeringAvrasya Construction Inc. (2005 - 2006)
0507 Konya Main Airforce Base Aircraft Parking Apron Fuel Hydrant SystemJP-8 Fuel Hydrant Refueling System Detailed EngineeringMinistry of Defense (2005)
0506 Izmit Derince Mineral Oil FactoryTank Farm and Product Facilities Renewal Detailed EngineeringPetrol Ofisi Inc. (2005)
0505 Canakkale Kepez Fuel TerminalFuel Sea Terminal Detailed Engineering and Construction SupervisionPetrol Ofisi Inc. (2005)
0504 Istanbul Haramidere Fuel Terminal Bunker SystemPreperation of Process and Instrument Diagrams for the Bunker SystemPetrol Ofisi Inc. (2005)
0502 Baku - Tblisi - Ceyhan Crude Oil Pipeline IPT-2 Intermediate Pigging StationIPT-2 Intermediate Pigging Station Construction EngineeringFernas Ltd.Co. (2005)
0501 Istanbul Formula 1 Access Road Fuel Pipelines Variants6 inch 130 m Pipeline (90 bar) Displacement, 85 m TEM Motorway Crossing with 10 inch Casing, 16 inch 122 m BOTAS NaturalGas Pipeline Displacement, 96 m TEM Motorway Crossing with 20 inch Casing and Cathodic Protection System DetailedEngineeringKucukel Construction Ltd. (2005)
0420 Canakkale Kepez Fuel Terminal Bunker SystemPreperation of Process and Instrument Diagrams for the Bunker SystemPetrol Ofisi Inc. (2004)
0418 Izmit Mercedes Benz Factory Fuel Pipeline Variant6 inch 322 m Pipeline (90 bar) Variant Inside Factory Area, 178 m Paved Area Crossing with 10 inch Casing, Hydrostatic Test andCathodic Protection System Detailed Engineering and Construction SupervisionMercedes Benz Turk Inc. (2004 - 2005)
0417 Trabzon Fuel Terminal Restoration
Oil Storage and Distribution
-
Tank Farm and Manifold Stations Renewal Detailed EngineeringPetrol Ofisi Inc. (2004 - 2005)
0409 Mersin Fuel Pier RestorationRenewal of Fuel, Fire Water Pipelines, Pipe Racks and Cathodic Protection System of the Existing Fuel Pier Detailed Engineeringand Construction SupervisionMinistry of Defense (2004 - 2006)
0408 ErzurumTank Farm - Ilica Fuel Pipeline6 inch, 2.5 km Pipeline and Additional Facilities Detailed Engineering and Construction SupervisionMinistry of Defense (2004 - 2006)
0406 Konya Main Airforce Base FOB Facilities Jet Fuel Storage TanksRestoration of 3 each 1000 cum Storage Tank and Epoxy Coating, Level Measurement Systems, 2 each Oil/Fuel SeperatorSystem and 1,750 m Wire Fence Detailed Engineering and Construction SupervisionMinistry of Defense (2004 - 2006)
0316 Baku - Tblisi - Ceyhan (BTC) Crude Oil Pipeline Sivas - Ceyhan Section (Lot-C)330 km, 34 and 42 inch Crude Oil Pipeline Construction EngineeringPunj Lloyd - Limak (PLL) Joint Venture (2003 - 2005)
0315 Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Horasan - Sivas Section (Lot-B)465 km, 42 inch Crude Oil Pipeline Construction EngineeringStreicher - Timmerman - Gunsayil - Alarko (STA) Joint Venture (2004 - 2005)
0302 2001 Fuel Pipelines Washout DamagesFor 4,6,8 and 10 inch Pipelines (90 bar), 654 m River Crossing, 3700 m Variant Construction, 160 m Railway and Road Crossing,113 m Gabion Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and ConstructionSupervisionMinistry of Defense (2003 - 2005)
0301 Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Pump StationsConstruction Engineering for 4 Main 1 Intermediate Pump StationCBI John Brown Limited (2003 - 2004)
0202 Tersakan River Fuel Pipeline Variant and Various POL Facilities RestorationFor 6 inch Pipeline (90 bar) 80 m Variant Construction, at 6 Tank Farm Concrete Pavement and Internal Road ConstructionDetailed Engineering and Construction SupervisionMinistry of Defense (2002 - 2004)
0106 Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Crossings SurveyRiver, Highway and Railway Crossings Survey on the 1,070 km Crude Oil Pipeline RouteBotas Inc. BTC Directorate (2001)
0101 Golcuk Naval Base Fuel Pier150 m Fuel Pier and Land Facilities Detailed Engineering and Construction SupervisionMinistry of Defense (2001 - 2007)
0007 Konya Main Airforce Base FOB Facilities Jet Fuel Loading SystemRefueling Truck Loading/Unloading Facilities Detailed Engineering and Construction SupervisionMinistry of Defense (2000 - 2002)
0004 Restoration of Fuel Facilities at East TurkeyRestoration of Fuel Facilities at Eastern Anatolia Detailed Engineering and Construction Supervision Ministry of Defense (2000 - 2002)
0003 Restoration of Fuel Facilities at West TurkeyRestoration of Fuel Facilities at Western Anatolia Detailed Engineering and Construction SupervisionMinistry of Defense (2000 - 2002)
Oil Storage and Distribution
-
0002 1999 East and West Anatolia Fuel Pipeline VariantsFor 4,6 and 8 inch Pipelines (90 bar), 2990 m Variant Construction, 397 m River Crossing, Hydrostatic Tests and CathodicProtection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (2000 - 2002)
9917 Renewal of Pumps on Iskenderun - Malatya PipelineRenewal of Pump Groups at 5 Pump Stations Detailed Engineering and Construction Supervision Ministry of Defense (1999 - 2001)
9908 Restoration of Fuel Storage Tanks at Izmir Uzunada Naval BaseRestoration of 2 each 8,350 cum Fuel Storage Tank Detailed Engineering and Construction SupervisionMinistry of Defense (1999 - 2000)
9907 Adana, Osmaniye and Erzurum Fuel Pipeline VariantsFor 6,8 and 10 inch Pipelines (90 bar), 870 m Variant Construction, Hydrostatic Tests and Cathodic Protection Systems DetailedEngineering and Construction SupervisionMinistry of Defense (1999 - 2000)
9901 Osmaniye Pump Station RestorationRenewal of Pump Groups at Osmaniye Pump Station Detailed Engineering and Construction Supervision Ministry of Defense (1999 - 2001)
9816 1998 Fuel Facilities RestorationFor 4,6 and 8 inch Pipelines (90 bar), 2610 m Variant Construction, Hydrostatic Tests, Cathodic Protection Systems and VariousRestoration Works at 13 Tank Farm and Pump Station Detailed Engineering and Construction SupervisionMinistry of Defense (1998 - 2001)
9815 Denizli Cardak Rail Car Towing System and Osmaniye Manifold Station RestorationRail Car Towing System at Denizli Cardak Rail Unloading Point, 6 inch 70 m Pipeline, Cathodic Protection System and OsmaniyeLow Pressure Manifold Station Detailed Engineering and Construction SupervisionMinistry of Defense (1998 - 2000)
9814 Istanbul Alibeykoy and Izmit Tank Farms RestorationStorm Water Drainage System at Alibeykoy Tank Farm, 1716 m Internal Road at Izmit Tank Farm Detailed Engineering andConstruction SupervisionMinistry of Defense (1992 - 1993)
9810 Izmit - Eskisehir Pipeline Pump Stations RestorationRenewal of Pump Groups at 3 Pump Stations Detailed Engineering and Construction SupervisionMinistry of Defense (1998 - 2001)
9808 1997 East Turkey Fuel Facilities RestorationRestoration of Pump Stations at North Iskenderun, Elazig, Adana, Mersin Tank Farms and Gezin Pump Station DetailedEngineering and Construction SupervisionMinistry of Defense (1998 - 2000)
9805 Bursa, Karacabey and Sogut Fuel Pipeline VariantsFor 4 and 6 inch Pipelines (90 bar), 245 m Road Crossing, 1610 m Variant Construction, Hydrostatic Tests and CathodicProtection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (1998 - 2000)
9801 Esenyurt, Sazlidere, Yenicekoy and Erzin Pipeline VariantsFor 4,6 and 8 inch Pipelines (90 bar), 120 m Road Crossing, 970 m Variant Construction, Hydrostatic Tests and CathodicProtection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (1998 - 1999)
9721 Kemah, Sivas, Diyarbakr and Batman Pipeline VariantsFor 4 and 8 inch Pipelines (90 bar), 100 m Road Crossing, 1875 m Variant Construction, 225 m Concrete Encasement,Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (1997 - 1999)
Oil Storage and Distribution
-
9712 1996 Various Fuel Facilities RestorationFor 4,6 and 8 inch Pipelines (90 bar), 2000 m Variant Construction, Hydrostatic Tests, Cathodic Protection Systems and VariousRestoration Works at 11 Tank Farm Detailed Engineering and Construction SupervisionMinistry of Defense (1997 - 1999)
9709 Istanbul Alibeykoy and Bursa Mudanya Fuel Pipeline VariantsFor 4 and 6 inch Pipelines (90 bar), 225 m Variant Construction, Hydrostatic Tests and Cathodic Protection Systems DetailedEngineering and Construction SupervisionMinistry of Defense (1997 - 1999)
9708 Sivas Divrigi Mursal Fuel Pipeline VariantFor 6 inch Fuel Pipeline (90 bar), 2319 m Variant Construction, Hydrostatic Test and Cathodic Protection System DetailedEngineering and Construction SupervisionMinistry of Defense (1997 - 1998)
9707 1996 West Anatolia Turkey Fuel Pipeline VariantsFor 4,6 and 8 inch Pipelines (90 bar), 890 m Variant Construction, 75 m Gabion Construction, Hydrostatic Tests and CathodicProtection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (1997 - 1998)
9702 1996 East Turkey Fuel Pipeline VariantsFor 6 and 8 inch Pipelines (90 bar), 340 m River Crossing, 555 m Variant Construction, Hydrostatic Tests and CathodicProtection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (1997 - 1999)
9701 Iskenderun Sariseki Fuel Pipeline VariantsFor 3 each 8 inch and 1 each 24 inch Pipeline (90 bar), 5940 m Variant Construction, 40 m Road Crossing with Casing,Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (1997 - 1998)
9601 1995 East Turkey Fuel Pipeline VariantsFor 4,6 and 8 inch Pipelines (90 bar), 220 m River Crossing, 390 m Variant Construction, Hydrostatic Tests and CathodicProtection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (1996)
9508 Kirikkale Fuel Storage FacilitiesEnvironmental Impact Assessment for 2 each 2000 cum, 4 each 1000 cum Fuel Storage Tank, Pump Station and 4 km PipelineTurkuaz Oil Products Inc. (1995)
9504 1994 East Turkey Fuel Pipeline VariantsFor 4,6 and 8 inch Pipelines (90 bar), 155 m River Crossing, 1300 m Variant Construction, 20 m Gabion Construction, HydrostaticTests and Cathodic Protection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (1995 - 1996)
9503 1995 Fuel Facilities RestorationVarious Restoration Works at Eskisehir and Erzurum Pump Stations Detailed Engineering and Construction SupervisionMinistry of Defense (1995 - 1996)
9502 Iskenderun - Elazig Fuel Pipelines Route Study316 km 8 inch Iskenderun-Malatya and 127 km 6 inch Malatya-Elazig Fuel Pipelines Route Study Detailed EngineeringMinistry of Defense (1995 - 1996)
9304 1992 East Turkey Fuel Pipeline VariantsFor 4,6,8 and 10 inch Pipelines (90 bar), 1085 m River Crossing, 3420 m Variant Construction, 395 m Gabion Construction, 210 mRetaining Wall Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and ConstructionSupervisionMinistry of Defense (1993 - 1995)
9207 Elazig - Batman Pipeline Pump Stations RestorationRenewal of Pump Groups at Elazig - Batman Pipeline Pump Stations Detailed Engineering
Oil Storage and Distribution
-
Ministry of Defense (1992)
9206 Merzifon Main Airforce Base Jet Fuel Storage FacilitiesJet Fuel Storage Facilities Basic EngineeringMinistry of Defense (1992)
9203 1991 East and West Turkey Fuel Pipeline VariantsFor 4,6 and 8 inch Pipelines (90 bar), 550 m River Crossing, 4555 m Variant Construction, 270 m Gabion Construction,Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction SupervisionMinistry of Defense (1992 - 1994)
9101 Afyon Airfield Main Operation FacilitiesJet Fuel Storage Facilities Detailed Engineering and Construction SupervisionMinistry of Defense (1991 - 1994)
9007 Batman, Bismil, Diyarbakir Pump Stations Renewal of Pump GroupsRenewal of 8 each Main Line Pump Group at 3 Pump Station Basic EngineeringMinistry of Defense (1992)
9003 1990 Fuel Facilities RestorationRestoration of 7 each 1,250 cum Fuel Storage Tandk at 7 Tank Farm, Concrete Pavement Construction at 4 Pump StationDetailed Engineering and Construction SupervisionMinistry of Defense (1990 - 1992)
8905 Iskenderun Fuel Operations CenterFuel Operations Center Basic EngineeringMinistry of Defense (1989 - 1990)
8902 Akhisar Airfield F-16 FacilitiesJet Fuel Storage and Dispensing Facility Basic EngineeringMinistry of Defense (1989)
8704 Slice 38 Various Fuel FacilitiesPump Stations, Manifold and Valve Pits Detailed Engineering and Construction SupervisionMinistry of Defense (1987 - 1989)
8606 Ipras - Haramidere Fuel Pipeline128 km, 16 inch, Fuel Pipeline Construction Supervision and Ipras Pump Station Detailed Engineering and ConstructionSupervisionMinistry of Transportation DLH General Directorate (1986 - 1988)
8605 Corlu Airfield Jet Fuel Storage FacilitiesJet Fuel Storage and Hydrant Refueling System Detailed Engineering and Construction SupervisionMinistry of Defense (1986 - 1989)
8502 Dalaman Airfield Jet Fuel Storage FacilitiesJet Fuel Storage Facilities Detailed Engineering and Construction SupervisionMinistry of Defense (1984 - 1987)
8102 Restoration of Jet Fuel Facilies at Bandrma Main Airforce BaseRestoration of Jet Fuel Storage Tanks and Manifold System Detailed Engineering and Construction SupervisionMinistry of Defense (1981 - 1985)
8003 Iskenderun Fuel Facilities RestorationRestoration of Fuel Tanks Detailed Engineering and Construction SupervisionMinistry of Defense (1980 - 1984)
8002 Konya Main Airforce Base Jet Fuel Storage FacilitiesJet Fuel Storage Tanks, Manifold, Piping and Truck Loading Station Detailed Engineering and Construction Supervision
Oil Storage and Distribution
-
Ministry of Defense (1980 - 1984)
7602 Istanbul Ataturk Airport Jet Fuel Hydrant FacilitiesJet Fuel Hydrant System and Facilities Detailed EngineeringMinistry of Transportation DLH General Directorate (1976 - 1977)
1202 TaqTaq Oil Field TT16,17,18 Crude Oil Flow Lines ? IRAQ7 km Crude Oil Flow Lines Detailed EngineeringHavatek Inc. (2011)
1101 TaqTaq Oil Field TT12,13,14,15 Crude Oil Flow Lines - IRAQ11.5 km Crude Oil Flow Lines Detailed EngineeringHavatek Inc. (2011)
Oil Storage and Distribution
-
Services Provided By ESERConceptual EngineringBasic Engineering
0911 - Nasiriya Oil Field Development - IRAQ
Client: Weatherford MENA
Start - Finish: 2009
Alone or Joint-Venture: Alone
Detailed Description
2 Billion Barrels Reserv Capacity Oil Field Development Front End Engineering Design (FEED)
1 Central Proccessing Facility (CPF)3 Oil and Gas Gathering Center (GC)232 km, 36 inch Heavy Crude Oil Export Pipeline36 km, 20 inch Light Crude Oil Export Pipeline23 km, 10 inch LPG Export Pipeline5 km, 24 inch Natural Gas Export Pipeline12 km, 24 inch Well Field Trunk Pipelines13 km, 20 inch Well Field Trunk Pipelines7 km, 18 inch Well Field Trunk Pipelines40 km, 8 inch Well Field Flow Pipelines66 km, 6 inch Well Field Flow Pipelines35 km, 16 inch HDPE Raw Water Pipeline3 River Crossing (Euphrates River)19 Motorway and State Highway Crossing3 Railway Crossing22 Channel and Ditch Crossing27 Pipeline Crossing
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysGeotechnical StudiesDetailed EngineeringCost EstimationsTender DocumentationConstruction SpecificationsAs-Built DocumentationGeophysical Studies
0908 - Marmara Ereglisi Fuel Terminal
Client: Marmara Depoculuk Hizmetleri Inc.
Start - Finish: 2009 - 2010
Alone or Joint-Venture: Alone
Detailed Description
TANK FARM FACILITIES :
3 each 45,600 cum API 650 Fuel Storage Tank2 each 22,300 cum API 650 Fuel Storage Tank3 each 7,250 cum API 650 Fuel Storage Tank6 each 3,640 cum API 650 Fuel Storage Tank3 each 3,555 cum API 650 Fuel Storage TankRenewal of Existing Administration Building (600 sqm)Renewal of Existing Auxiliary Building (1285 sqm)Pig Station and Sea Collector (1160 sqm)Product Manifold and Third Collector (869 sqm)Truck Fuel Loading Canopy (13 Truck, 810 sqm)Fire Water Manifold (103 sqm)Driver Waiting and Operation Building (258 sqm)Main Entry Security Building (57 sqm)Visitor Car Park (35 vehicle)Truck Parks (37 truck, 14 truck)Tank Dike Walls and Perimeter WallEthanol, Waste and Injection Skid SystemsTank Farm Station Piping and Valves 31 each Transfer Pump HDPE and Steel Fire Water Pipelines and Fire HydrantsSteel Pipe Racks and SupportsTank Farm Geotechnical Studies (Total 367 m Soil Boring)Storm Water, Oily Water and Waste Water Drainage SystemsFire Foam and Cooling Water SystemSweeping of PIGs with Nitrogen Gas SystemHVAC and Plumbing SystemsLighting, Power, Fire Alarm and Grounding SystemsElectrical LV Switchgear and Distribution SystemsInstrumentation and Control SystemsField Lighting, Grounding and Lightning Protection Systems
SEA TERMINAL FACILITIES :
2 each Boarding Dolphine (12 m x 8 m)Steel Pipe Rack and Catway Between Land and Unloading Dolphine (250 m)Catways Between Boarding Dolphines and Mooring Dolphines (2 each, 60 m)Pig Station and Loading Arms on the Unloading DolphineSea Terminal Trnsformer Building (25 sqm)Sea Terminal Area Bathymetric Studies
PIPELINE BETWEEN TANK FARM and SEA TERMINAL :
1,970 m, 20 inch, 1,500 cum/h Underground Fuel Pipeline1 each State Highway Crossing by Horizontal Drilling3 each Secondary Road Crossing by Horizontal DrillingDetermination of Existing Underground Pipeline Routes by Pipe DetectorsPipeline Cathodic Protection System
Oil Storage and Distribution
-
Services Provided By ESERDetailed EngineeringConstruction Shop DrawingsConstruction SpecificationsProcurement Documentation
0818 - Erbil Integrated Project Khurmala - IRAQ
Client: Kar Construction and Engineering
Start - Finish: 2008 - 2009
Alone or Joint-Venture: Alone
Detailed Description
Central Processing Station - Refinery Crude Oil Pipeline, 39500 m, 20 inchNorth Station - Central Processing Station Trunk Line, 10500 m, 6 inchMiddle Station - Central Processing Station Trunk Line, 3600 m, 6 inchAlignment Sheets and Typical DetailsConstruction ProceduresQuality Assurance Control ProceduresDocument Control ManagementWork Method StatementsHydraulic and Surge CalculationsMiddle Station Civil, Structural, Piping Plans and IsometricsNorth Station Civil, Structural, Piping Plans and IsometricsCentral Processing Station Civil, Structural, Piping Plans and IsometricsRefinery Area Piping Plans and IsometricsSeperator, Pig, Crude Tank and Pump Areas Civil and Structural PlansLP and HP Flares, Fresh Water Tank Foundations and Structural PlansMaterial Take-Off for Stations, Seperator and Pig LauncherNorth and Middle Stations Electrical, Power and Grounding PlansConstruction Engineering Support Services on Site
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringConstruction Shop DrawingsStart-up InspectionsCommissioningAs-Built Documentation
0817 - TaqTaq Oil Field Crude Oil Trunk and Flow Lines - IRAQ
Client: Zozik - Gorkem Joint Venture
Start - Finish: 2008 - 2009
Alone or Joint-Venture: Alone
Detailed Description
8800 m, 16 inch Trunk Line6300 m, 6 inch Flow LinesAlignment Sheets and Typical DetailsRoad and River CrossingsCathodic Protection SystemWelding, NDT, Hydrotest, etc. ProceduresQuality Control and DCC ManagementAs-Built Drawings
Oil Storage and Distribution
-
Services Provided By ESERDetailed EngineeringCost EstimationsTender DocumentationConstruction SpecificationsProcurement Documentation
0716 - Dalaman Airport Fuel Terminal Upgrade
Client: Petrol Ofisi Inc.
Start - Finish: 2007 - 2007
Alone or Joint-Venture: Alone
Detailed Description
5,000 cum JET-A1 Storage Tank500 cum Fire Water Storage TankLV Switchgear and Distribution Systems Field Lighting and Grounding SystemsInstrumentation and Control SystemsStorage Tanks Level Measurement SystemsPipelines and Valves (1 inch - 12 inch, 2300 m)6 each Transfer Pump (40 cum/h, 70 cum/h) Foam Tanks Foam and Cooling Water LinesHDPE and Steel Fire Water Lines and HydrantsSteel Piperacks and SupportsStormwater Drainage SystemOily Water Drainage SystemConcrete Pavements, Pipe Channels and Dikes
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringCost EstimationsTender DocumentationConstruction SpecificationsProcurement Documentation
0713 - Derince Fuel Terminal Manifold Rehabilitation
Client: Petrol Ofisi Inc.
Start - Finish: 2007 - 2007
Alone or Joint-Venture: Alone
Detailed Description
White Product Pump/Manifold Station Renewal(Steel Construction 1,500 sqm)
Control and Otomation Building (Concrete, 260 sqm )Truck Loading System Power Supply System (1600 kVA Transformer, 500 kVA Generator) LV Switchgear and Distribution Systems Field Lighting and Grounding SystemsInstrumentation and Control SystemsLoading, Blending and National Marker Systems OtomationWhite Product Pipelines and Valves (1 inch - 14 inch, 16,900 m)24 each White Product Pump (120 cum/h, 740 cum/h) Steel Piperacks and SupportsStormwater Drainage SystemOily Water Drainage SystemConcrete Pavements, Pipe Channels and Dikes
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringCost EstimationsTender DocumentationConstruction SpecificationsProcurement Documentation
0514 - Istanbul Haramidere Fuel Terminal
Client: Petrol Ofisi Inc.
Start - Finish: 2005
Alone or Joint-Venture: Alone
Detailed Description
White Product Pump Station and Sea Collector (Steel Construction, 2,025 sqm)Black Product Sea Collector (Steel Construction, 44 sqm)Fire Water Diesel Pump Building (Concrete, 45 sqm )Restoration of Black Product Manifold (Steel Construction, 268 sqm)Foam TanksLV Switchgear and Distribution System Storage Tanks Level Measurement SystemsField Lighting and Fire Alarm SystemsInstrumentation, Control and Otomation SystemsTank Field and Pump Buildings Grounding SystemsBlack and White Product Pipelines (17,000 m) and ValvesSteam and Condense PipelinesSteel Piperacks and SupportsHDPE and Steel Fire Water Lines and Hydrants (6,000 m)Foam and Cooling Water LinesStorm Water Drainage SystemOily Water Drainage SystemBlack and White Products Separator SystemsConcrete Pavements, Pipe Channels and Dikes
Oil Storage and Distribution
-
Services Provided By ESERDetailed EngineeringCost EstimationsConstruction Shop DrawingsConstruction SpecificationsProcurement Documentation
0513 - Khurmala Oil Field Development - IRAQ
Client: Avrasya Construction Inc.
Start - Finish: 2005 - 2006
Alone or Joint-Venture: Alone
Detailed Description
Underground Crude Oil Pipelines14 inch 1.2 km, 16 inch 17. 5 km, 20 inch 55 kmUnderground Gas Pipelines20 inch 68.6 km, 24 inch 32 kmAboveground Crude Oil Pipelines Between Individual Wells and Stations (6 inch 55 km)Below Ground Water Pipelines 4,6,8 inch2 each Crude Oil Pipeline Block Valve Station2 each Gas Pipeline Block Valve Station2 each Temporary Water Pigging StationFinalization of Alignment SheetsDesign of Crude Oil and Gas Pipeline Block Valve StationsLayout, Plan, Section, Isometrics, Civil DetailsHazardous Area ClassificationAccess RoadsDesign of Temporary Water Line Pigging Stations (Layout, Plan, Isometrics)Typical Special Crossing Design
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringCost EstimationsTender DocumentationConstruction Specifications
0507 - Konya Main Airforce Base Aircraft Parking Apron Fuel Hydrant
System
Client: Ministry of Defense
Start - Finish: 2005
Alone or Joint-Venture: Alone
Detailed Description
Restoration of Existing Filter / Water Seperator Station3 each Prefabric Hydrant Refueling Pit550 m, PN 16 DN 150 PE Steel Pipe550 m, PN 16 DN 200 PE Stainless Steel PipePipelines Hydrostatic TestsPipelines Cathodic Protection SystemProvision of PN 16 DN 100 Pantograph on the Aircraft Apron
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringCost EstimationsConstruction SpecificationsProcurement DocumentationAs-Built Documentation
0506 - Izmit Derince Mineral Oil Factory
Client: Petrol Ofisi Inc.
Start - Finish: 2005
Alone or Joint-Venture: Alone
Detailed Description
Preparation of As-Built Drawings of the Existing Facilites
Detailed topographical survey of the complete areaArchitectural plans and sections of all the buildings (14,000 sqm)Electrical lighting measurements and plans of all the buildingsVentilating plans of the product factoriesVOC (Volatile Organic Compound) and air flow measurementsHVAC plans of the mineral oil laboratoryFlow diagrams and layout plans of all the pipelinesField lighting, power, fire alarm and level indicator systemsStorm water, oily water and infrastructure system plans
Design of New Facilities
HVAC installation of the mineral oil factoryLighting and power installations of all the buildings (14,000 sqm)Field lighting, fire alarm and LV Distribution systemsTank fields grounding and level indicating systemsInstrumentation, control and otomation systemsStorm water, oily water drainage systems and seperatorConcrete pavements, pipe channels and dikesSteel pipe racks and supportsHDPE and steel fire water pipelines and hydrantsThermal fluid/Hot oil pipelinesProduct pipelines in all the tank fields (23,000 m)Manifolds and product pipelines in the product factories Storage tank and pig connections of the sea loading linesSteam and condense pipelinesHot water pipelinesCompressed air pipelinesCold water pipelinesManifold stations in the mineral oil tank field
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringCost EstimationsConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioningProcurement DocumentationAs-Built Documentation
0505 - Canakkale Kepez Fuel Terminal
Client: Petrol Ofisi Inc.
Start - Finish: 2005
Alone or Joint-Venture: Alone
Detailed Description
Facilities for Bunker Selling to Ships (350 tons/hr) :
Pump Station (140 sqm, Steel Construction)Total 7 each Black and White Product Pumps6 each Aboveground Storage Tank (Total 8,500 tons)Heating CenterOffice BuildingBlending System on the PierLoading and Unloading Terminals on the Pier (3 each)LV Switchgear Building and LV Distribution System500 kVA Stand-by Diesel GeneratorStorage Tanks Level Measurement SystemsField and Perimeter Lighting SystemsInstrumentation and Control SystemsTank Farm and Pump Station Grounding SystemsBlack and White Product Carbon Steel Pipelines (12,000 m) and ValvesSteam and Condense LinesSteel Pipe Racks and SupportsFire Water Lines and HydrantsFoam and Cooling Water LinesStorm Water Drainage SystemOily Water Drainage SystemFuel Separator SystemConcrete Paved Areas, Pipe Channels and Dikes
Oil Storage and Distribution
-
Services Provided By ESERConstruction Shop DrawingsConstruction SupervisionAs-Built DocumentationConstruction Engineering Support Services
0502 - Baku - Tblisi - Ceyhan Crude Oil Pipeline IPT-2 Intermediate
Pigging Station
Client: Fernas Ltd. Co.
Start - Finish: 2005 - 2005
Alone or Joint-Venture: Alone
Detailed Description
Construction Engineering for the Following Facilities
Transformer BuildingOperation and Utility BuildingAccommodation & Guard Building Foundations for Wax Handling Skids, Heating Container and PolesBypass Valve Shelters, Covers for ShaftsSteel Structures as Stairs, Platform and LaddersDiesel, Slope, Water Tanks and Oily Water SeparatorLines, Valves and PumpsStormwater, Sewage and Waste Water Systems34.5 kV Overhead Line, Power TransformerMV and LV Switchgear SystemsUPS and DC SystemsField Lighting, Grounding, Fire Alarm and Lightning Protection SystemsElectrical Trace HeatingElectrical Installations for BuildingsSCADA, Instrumentation and Telecommunication SystemsHVAC SystemsField EngineeringGeotechnical EngineeringAs-Built Documentation
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringCost EstimationsTender DocumentationConstruction SpecificationsProcurement Documentation
0417 - Trabzon Fuel Terminal Restoration
Client: Petrol Ofisi Inc.
Start - Finish: 2004 - 2005
Alone or Joint-Venture: Alone
Detailed Description
Trabzon Fuel Terminal Restoration
Facilities for 400 cum/h Black ProductBlack Product Pump and Manifold Station (180 sqm, Steel Construction)Facilities for 800 cum/h White ProductWhite Product Pump and Manifold Station (648 sqm, Steel Construction)Sea Collector Building for Loading/Unloading (185 sqm, Steel Construction)Fire Pump Building (108 sqm, Steel Construction)Sea Collector Switchgear Building (26 sqm, Steel Construction)Transformer/Generator Building (146 sqm, Concrete) 34.5/0.4 kV, 1,000 kVA Power Transformer and 500 kVA Stand-by Generator34.5 kV MV Power Supply and LV Distribution SystemsStorage Tanks Level Measurement SystemsField/Perimeter Lighting and CCTV SystemsControl and Operation SystemsTank Farm and Pump Buildings Grounding SystemsRenewal of all the Product Pipelines (17,000 m) and ValvesSteam and Condense LinesSteel Pipe Racks and SupportsPE and Steel Fire Water Lines and HydrantsFoam and Cooling Water LinesStorm Water Drainage SystemOily Water Drainage SystemSeparator Systems for White and Black ProductsConcrete Paved Areas, Pipe Channels and Dikes
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysBasic EngineeringDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioning
0408 - ErzurumTank Farm - Ilica Fuel Pipeline
Client: Ministry of Defense
Start - Finish: 2004 - 2006
Alone or Joint-Venture: Alone
Detailed Description
Erzurum Tank Farm - Ilica Rail Loading Station Pipeline
2,500 m, PN 100, DN 150 New Pipeline Construction2 each Highway Crossing (114 m)River Crossing (54 m)Hydrostatic TestsCathodic Protection with Transformer/Rectifier System
At 8 Different Pump Station and Tank Farm in East Anatolia
15 each Truck Unloading Pit4 each Unloading Pump Station11 each Truck Loading Point4 each Existing Manifold Station4 each Drainage Tank1 each Valve Pit1 each Standby Diesel-Generator Building (235 kVA, 0.4 kV)34.5 kV, 160 kVA Power SupplyHydrostatic TestsCathodic Protection System
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysConstruction Shop DrawingsConstruction Engineering Support Services
0316 - Baku - Tblisi - Ceyhan (BTC) Crude Oil Pipeline Sivas - Ceyhan
Section (Lot-C)
Client: Punj Lloyd - Limak (PLL) Joint Venture
Start - Finish: 2003 - 2005
Alone or Joint-Venture: Alone
Detailed Description
Baku - Tbilisi - Ceyhan Crude Oil PipelineSivas - Ceyhan Section (Lot C) 34, 42 inch, 330 km
River, Road and Railway CrossingsIrrigation Channels CrossingsCrossings at Steep Slopes and Side SlopesCrossings at Land SlidesConcrete Coating of PipesPiping and Hydrostatic TestsConstruction and Installation Works at Ball Valve StationsMechanical Completion Reports for Ball Valve StationsHydrostatic Tests at Ball Valve StationsEarth Works, Excavation and BackfillingConcrete Works, Foundations, Structural Steel and FencingPermanent Access RoadsElectrical and Instrumentation WorksRoute ChangesField Engineering and Pre-Construction SurveyCathodic Protection SystemsWork Method Statements and ProceduresAs-Built Documentation
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysConstruction Shop DrawingsAs-Built DocumentationConstruction Engineering Support Services
0315 - Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Horasan -
Sivas Section (Lot-B)
Client: Streicher - Timmerman - Gunsayil - Alarko (STA) Joint Venture
Start - Finish: 2004 - 2005
Alone or Joint-Venture: Alone
Detailed Description
Baku - Tbilisi - Ceyhan Crude Oil PipelineHorasan - Sivas Section (Lot B) 42 inch, 465 km
River, Road and Railway CrossingsIrrigation Channels CrossingsCrossings at Steep Slopes and Side SlopesCrossings at Land SlidesConcrete Coating of PipesPiping and Hydrostatic TestsConstruction and Installation Works at Ball Valve StationsMechanical Completion Reports for Ball Valve StationsHydrostatic Tests at Ball Valve StationsEarth Works, Excavation and BackfillingConcrete Works, Foundations, Structural Steel and FencingPermanent Access RoadsElectrical and Instrumentation WorksRoute ChangesField Engineering and Pre-Construction SurveyCathodic Protection SystemsWork Method Statements and ProceduresAs-Built Documentation
Oil Storage and Distribution
-
Services Provided By ESERConstruction Shop DrawingsProcurement DocumentationConstruction Engineering Support Services
0301 - Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Pump Stations
Client: CBI John Brown Limited
Start - Finish: 2003 - 2004
Alone or Joint-Venture: Alone
Detailed Description
PT1 - Posof Custody Metering and Pump Station ( h = 1,720 m )PT2 - Dumlu Pump Station ( h = 1,720 m )PT3 - Cayirli Pump Station ( h = 2,028 m )PT4 - Kangal Pump Station ( h = 1,595 m )
Security Building (315 sqm)Operation Building (840 sqm)Canteen (361 sqm)Guest House (333 sqm)Workshop (792 sqm)Pump House (1,680 sqm)Piping House (1,071 sqm)Scraper Station (375 sqm)Waste Collection (48 sqm)Utility Building (G.R.S) (176 sqm)Utility Building (Heating) (297 sqm)Utility Building (F.F) (119 sqm)Watchtowers ( 3 x 35 sqm)Car Sheds ( 48 x 12.5 sqm)Housing Compound ( 5 x 784 sqm)Relief Facilities Building (400 sqm)Helipad (50m x 50m)
IPT1 - Intermediate Pigging Station ( h = 1,315 m)
Piping House (966 sqm)Utility and Operation Building (767 sqm)Scraper Station (375 sqm)Fire Fighting Building (126 sqm)
Works Performed by ESER
Construction DrawingsSpecial Engineering Construction DetailsCivil Drawings - Site Grading, Pits, Foundations, Supports, Platforms, FencingArchitectural DetailsHVAC SystemElectrical Systems Including Cable Schedules and Wiring DiagramsFinal Material Take-OffFinal Data SheetsSpecifications, Method Statements and ProceduresEngineering Data BookFinal Layout DrawingsMaterial RequisitionsTechnical Bid Evaluation
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysBasic EngineeringGeophysical Studies
0106 - Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Crossings
Survey
Client: Botas Inc. BTC Directorate
Start - Finish: 2001
Alone or Joint-Venture: Alone
Detailed Description
On 1,070 km Baku-Tbilisi-Ceyhan Crude Oil Pipeline Route
18 each River Crossing Width Greater than 30 m.26 each River Crossing Width Between 5-30 m.84 each River Crossing Width Less than 5 m.2 each Main Highway Crossing 6 each Railway Crossing
The following tasks were performed during the execution of the works in order to find river watervelocity at different levels and risk of flood to the pipeline:
Necessary Permission LettersCoordination with State AuthoritiesDesk top Studies and Coordination with BotasSupply of Necessary EquipmentSite SurveyEvaluation of Site DataSubmission of River Crossing ReportReporting
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysGeotechnical StudiesBasic EngineeringDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioningGeophysical Studies
0101 - Golcuk Naval Base Fuel Pier
Client: Ministry of Defense
Start - Finish: 2001 - 2007
Alone or Joint-Venture: Alone
Detailed Description
Fuel Pier (150 m)75 m x 8 m + 75 m x 6 m reinforced concrete fueling pier126 each 800 mm diameter steel piles4 inch and 6 inch fuel pipesFire water, potable water and pressurized air systemsPier lighting, fire alarm and communication systemsPump station on the pier (120 cum/hour, 110 mss)
Transformer - Generator - Office Building (204 sqm)400 kVA Transformer and 400 kVA Stand-by Generator
4, 6, 8 inch Fuel Piping System (2,500 m)Fire water piping systemRestoration of pump stations, storage tanks, valve pits and pipe galleriesEx-Proof Lighting, Power, Fire Alarm and Cathodic Protection Systems
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysBasic EngineeringDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SupervisionStart-up InspectionsCommissioning
0007 - Konya Main Airforce Base FOB Facilities Jet Fuel Loading
System
Client: Ministry of Defense
Start - Finish: 2000 - 2002
Alone or Joint-Venture: Alone
Detailed Description
Konya Airbase FOB Facilities
2700 sqm Concrete Paved Truck Loading Area42 m DN 150, 22 m DN 100, 62 m DN 50 PE Insulated Steel Pipe42 m DN 150, 22 m DN 100 Stainless Steel PE Insulated PipeCathodic Protection System2 each Truck Loading Pit1 each Drainage Tank ModificationSurface Drainage and Oil Seperator Systems
Balikesir, Catalca Tank Farms and Fethiye, Hekimhan, Eric, Mutu and Tercan Pump Stations
50 kVA Standby Diesel - Generator Set Power and Control Panels
West and East Anatolia NATO Pipelines
Cathodic Protection of 74 km, 8 inch Iskenderun - Osmaniye Pipeline With Transformer/RectifierSystemCathodic Protection of 44 km, 8 inch Antalya - Dag Nahiyesi Pipeline With Transformer/RectifierSystem Cathodic Protection of 167 km, 6 inch Arifiye - Catalca Pipeline With Transformer/Rectifier System
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioning
0004 - Restoration of Fuel Facilities at East Turkey
Client: Ministry of Defense
Start - Finish: 2000 - 2002
Alone or Joint-Venture: Alone
Detailed Description
Osmaniye Tank Farm 1,250 m3 Tank Restoration and Epoxy CoatingMersin Tank Farm Perimeter FenceMutu Pump Station Concrete Paved AreasDiyarbakir Tank Farm Perimeter FenceDiyarbakir Tank Farm Truck Loading Point RestorationBatman Tank Farm Perimeter FenceBatman Tank Farm Generator Building RestorationMus Tank Farm Truck Loading Point RestorationAlibeykoy Tank Farm 3 each 10 cum Drainage TankErzurum Tank Farm Internal Connection RoadErzurum Tank Farm Scraper Buildings RestorationErzurum Tank Farm Railway Car Loading Pump Station RestorationErzurum Tank Farm Manifold Station Drainage SystemAkgedik Tank Farm Scraper Building RestorationTercan Tank Farm Concrete Paved AreaElazig Tank Farm Manifold Scraper Building RestorationHorasan Tank Farm Internal Connection RoadHorasan Tank Farm Truck Loading Drainage SystemErzincan Tank Farm Internal Connection RoadErzincan Tank Farm Manifold Station RestorationBalikesir Tank Farm Internal Connection RoadOsmaniye Tank Farm Internal Connection Road
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioning
0003 - Restoration of Fuel Facilities at West Turkey
Client: Ministry of Defense
Start - Finish: 2000 - 2002
Alone or Joint-Venture: Alone
Detailed Description
Cukurhisar Tank Farm 5,000 cum Tank Restoration and Epoxy CoatingBandirma Tank Farm Manifold Station Drainage SystemSaros Tank Farm Drainage System and Retaining WallAlibeykoy Tank Farm Perimeter FenceSandikli Pump Station HP Pump Station RestorationAltintas Pump Station HP Pump Station RestorationTercan Pump Station HP Pump Station RestorationOsmaneli Pump Station Internal Connection RoadOsmaneli Pump Station Scraper Station RestorationGoksu Tank Farm Scraper Station RestorationCorlu Tank Farm Scraper Station RestorationSincan Tank Farm Perimeter FenceCigli Tank Farm Perimeter FenceArifiye Tank Farm HP Pump Groups Restoration9 each Tank Farm New Diesel Generator Sets
Oil Storage and Distribution
-
Services Provided By ESERBasic EngineeringDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioningOperating and Maintenance Instructions
9917 - Renewal of Pumps on Iskenderun - Malatya Pipeline
Client: Ministry of Defense
Start - Finish: 1999 - 2001
Alone or Joint-Venture: Alone
Detailed Description
Renewal of Pump Groups at South Iskenderun, North Iskenderun, Narli, Golbasi and MalatyaPump Stations on 8 inch Iskenderun - Malatya Pipeline
14 each 200 cum /h, 360 mFS, High Pressure Pump3 each 120 cum /h, 522 mFS, High Pressure Pump17 each Gear Box17 each Gas Tight Steel Wall5 each Temperature Controlled Water Regulating Valve13 each DN150 PN100 Ball Valve14 each DN200 PN100 Ball ValveHP Pump Stations Main Electrical Power and Distribution SwitchgearsHP Pump Stations Electronic Control Systems6 each 8 inch Emergency Connection Valve Pit Construction1 each 6 inch Emergency Connection Valve Pit Construction
Oil Storage and Distribution
-
Services Provided By ESERDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioning
9908 - Restoration of Fuel Storage Tanks at Izmir Uzunada Naval
Base
Client: Ministry of Defense
Start - Finish: 1999 - 2000
Alone or Joint-Venture: Alone
Detailed Description
Restoration of 2 each 8,350 cum Fuel Storage Tank (41,85 m diameter and 6 m height) atUzunada Naval Base
Construction of a new tank inside the existing tank by constructing 30 - 35 cm thick reinforcedconcrete at the bottom, 25 - 30 cm thick reinforced concrete at the side walls and 6 mm thick steelplates at the bottom and side walls
Epoxy coating of new tank steel plates and existing 60 each columnsWater insulation at the tank bottoms by removing tank top earth coverRestoration of existing tank manholes and construction of new 3 each manholeInstallation of new flame arrestersInstallation of measuring and sampling equipment and level indicator pipesImprovement of existing valvesInstallation of remote level indicatorsInstallation of grounding systemsRestoration of cathodic protection systemsHydrostatic test of 16 inch 600 m pipelineTar epoxy coating for the exterior side of the tank new steel platesConstruction of leveling concrete above water insulation
Oil Storage and Distribution
-
Services Provided By ESERBasic EngineeringDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioningOperating and Maintenance Instructions
9901 - Osmaniye Pump Station Restoration
Client: Ministry of Defense
Start - Finish: 1999 - 2001
Alone or Joint-Venture: Alone
Detailed Description
Renewal of Pump Groups at Osmaniye Pump Station on 8 inch Iskenderun - Malatya Pipeline
4 each 200 cum /h, 360 mFS, High Pressure Pump4 each Gear Box4 each Gas Tight Steel Wall1 each Temperature Controlled Water Regulating Valve4 each DN150 PN100 Ball Valve4 each DN200 PN100 Ball ValveHP Pump Stations Main Electrical Power and Distribution SwitchgearsHP Pump Stations Electronic Control Systems1 each 8 inch Emergency Connection Valve Pit Construction
Oil Storage and Distribution
-
Services Provided By ESERBasic EngineeringDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioningOperating and Maintenance Instructions
9810 - Izmit - Eskisehir Pipeline Pump Stations Restoration
Client: Ministry of Defense
Start - Finish: 1998 - 2001
Alone or Joint-Venture: Alone
Detailed Description
Renewal of Pump Groups at Izmit, Osmaneli and Sogut Pump Stations on 6 inch Izmit - EskisehirPipeline
6 each 120 cum/h, 522 mFS, High Pressure Pump3 each 100 cum /h, 350 mFS, High Pressure Pump3 each 237 kW Diesel Engine3 each 168 kW Diesel Engine9 each Gear Box9 each Gas Tight Steel Wall2 each Temperature Controlled Water Regulating Valve18 each DN150, PN100 Ball ValveHP Pump Stations Main Electrical Power and Distribution SwitchgearsHP Pump Stations Electronic Control Systems
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysGeotechnical StudiesBasic EngineeringCost EstimationsGeophysical Studies
9206 - Merzifon Main Airforce Base Jet Fuel Storage Facilities
Client: Ministry of Defense
Start - Finish: 1992
Alone or Joint-Venture: Alone
Detailed Description
Jet Fuel Storage Facilities
Jet Fuel Storage Tanks and Pump HousesManifold Filter Water Separator Station10 cum Drainage Tank2 each Truck Loading PitConnection Roads175 kVA Stand-By Diesel Generator Set6.3/0.4 kV, 200 kVA Transformer Substation, MV and LV Switchgear
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysGeotechnical StudiesBasic EngineeringDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioningGeophysical Studies
9101 - Afyon Airfield Main Operation Facilities
Client: Ministry of Defense
Start - Finish: 1991 - 1994
Alone or Joint-Venture: Alone
Detailed Description
Jet Fuel Storage Facilities
Jet Fuel Storage Tank and Pump HouseManifold Filter Water Separator Station10 cum Drainage Tank2 each Truck Loading Pit1,350 m, 6 inch Connection Pipeline100 kVA Stand-By Diesel Generator Set6.3/0.4 kV, 100 kVA Transformer Substation, MV and LV Switchgear
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionCommissioning
8606 - Ipras - Haramidere Fuel Pipeline
Client: Ministry of Transportation General Directorate of Railways, Harbours and Airports Construction
Start - Finish: 1986 - 1988
Alone or Joint-Venture: Alone
Detailed Description
Islamic Development Bank Financed Pipeline and Pump Station
16 inch Product Pipeline Construction Supervision
128 km, 16 inch, 100 kg/cm2, API 5L X52 Steel PipelineLaying of High Pressure Fuel PipesCathodic Protection620 m Concrete Encased River Crossing380 m River CrossingScraper Station Construction at 5 Locations
Ipras Pump Station Detailed Engineering and Construction Supervision
High Pressure Pump Station with 3 each 340 cum/h, 760 mLC Parallel Pump-Motor Group
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysGeotechnical StudiesBasic EngineeringDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioningGeophysical Studies
8605 - Corlu Airfield Jet Fuel Storage Facilities
Client: Ministry of Defense
Start - Finish: 1986 - 1989
Alone or Joint-Venture: Alone
Detailed Description
JP-4 Jet Fuel Storage and Hydrant Refueling System
Jet Fuel Storage Tanks and Pump HousesManifold Filter Water Separator Station10 cum Drainage TankTruck Loading and Unloading PitsCirculation Pit4 each Hydrant Refueling Pit on Aircraft Parking ApronAvgas Fuel Storage200 kVA Stand-By Diesel-Generator SetPipeline ConnectionCathodic Protection System15.8/0.4 kV Transformer Building, MV and LV Switchgear
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysGeotechnical StudiesBasic EngineeringDetailed EngineeringCost EstimationsTender DocumentationTender EvaluationConstruction SpecificationsConstruction SupervisionStart-up InspectionsCommissioningGeophysical Studies
8502 - Dalaman Airfield Jet Fuel Storage Facilities
Client: Ministry of Defense
Start - Finish: 1984 - 1987
Alone or Joint-Venture: Alone
Detailed Description
JP-4 Jet Fuel Storage Facilities
Jet Fuel Storage Tanks and Pump HousesManifold Filter Water Separator Station10 cum Drainage TankTruck Loading and Unloading Pits100 kVA Stand-By Diesel-Generator SetCathodic Protection System6.3/0.4 kV Transformer Substation, MV and LV Switchgear
Oil Storage and Distribution
-
Services Provided By ESERTopographical SurveysGeotechnical StudiesDetailed EngineeringCost EstimationsTender Documentation
7602 - Istanbul Ataturk Airport Jet Fuel Hydrant Facilities
Client: Ministry of Transportation DLH General Directorate
Start - Finish: 1976 - 1977
Alone or Joint-Venture: Alone
Detailed Description
Hydrant Refueling Pump GroupsManifold StationsFilter, Water Separator SystemsStainless Steel Jet Fuel PipelinesHydraulic Surge StoppersAutomatic Control SystemsFire Extinguishing SystemsPower Supply and Distribution SystemsCathodic Protection SystemsAdministration Building and Service BuildingsCommunication System
Oil Storage and Distribution