AFRICAN DEVELOPMENT FUND
MULTINATIONAL-WAEMU-ECOWAS-ECCAS
AIR TRANSPORT SECTORS OF WEST AND CENTRAL AFRICA
(PASTA –CO)
OITC/GECL DEPARTMENTS
June 2015
Translated document
P
ub
lic
Dis
clo
sure
Au
tho
rize
d
P
ub
lic
Dis
clo
sure
Au
thori
zed
TABLE OF CONTENTS
Project Information Sheet .......................................................................................................... iii
Project Summary ........................................................................................................................ v
Results-Based Logical Framework .......................................................................................... vii
Project Implementation Schedule ............................................................................................... x
I – Strategic Thrusts and Rationale ............................................................................................ 1
1.1. Project Linkages with Country Strategy and Objectives ............................................. 1
1.2. Rationale for the Bank’s Involvement ......................................................................... 3
1.3. Aid Coordination ......................................................................................................... 4
II – Project Description .............................................................................................................. 4
2.1. Project Objectives and Components ............................................................................ 4
2.2. Technical Solutions Adopted and Alternatives Explored ............................................ 5
2.3. Project Type ................................................................................................................. 6
2.4. Project Cost and Financing Arrangement .................................................................... 6
2.5. Project Target Area and Beneficiaries ......................................................................... 7
2.6. Participatory Approach in Project Identification, Design and Implementation .......... 7
2.7 Bank Group Experience and Lessons Reflected in Project Design ............................... 8
2.8. Key Performance Indicators .......................................................................................... 8
III – Project Feasibility ............................................................................................................... 9
3.1. Economic Benefit ........................................................................................................ 9
3.2. Environmental and Social Impact ................................................................................ 9
IV – Implementation ................................................................................................................ 10
4.1. Implementation Arrangement .................................................................................... 10
4.2. Monitoring and Evaluation ........................................................................................ 12
4.3. Governance ................................................................................................................ 13
4.4 Sustainability ............................................................................................................. 13
4.5. Risk Management ...................................................................................................... 13
4.6. Knowledge Building .................................................................................................. 14
V – Legal Framework .............................................................................................................. 14
5.1. Legal Instrument ....................................................................................................... 14
5.2. Conditions Associated with the Bank’s Involvement ............................................... 14
5.3. Compliance with Bank Policies ................................................................................ 15
VI – RECOMMENDATION ................................................................................................... 15
LIST OF ANNEXES
Annex I. Operation’s Eligibility for RPG
Annex II. Detailed Description of Key Activities
Annex IIIa. ECOWAS Comparative Socio-economic Indicators
Annex IIIb. WAEMU Comparative Socio-economic Indicators
Annex IIIc. ECCAS Comparative Socio-economic Indicators
Annex IVa. Table of ADB Portfolio in Central Africa at 31/12/2014
Annex IVb. Table of ADB Portfolio in West Africa at 31/12/2014
Annex V Main Related Projects Financed by the Bank and the Country’s other Development
Partners
Annex VI. Map of Project Area
i
CURRENCY EQUIVALENTS
December 2014
UA 1 = USD 1.464
UA 1 = EUR 1.174
UA 1 = CFAF 769.923
Fiscal Year From 1 January to 31 December
Weights and Measures
1metric ton = 2204 pounds
1 kilogramme (kg) = 2.200
1 metre (m) = 3. 28 feet
1 millimetre (mm) = 0.03937 inch
1 kilometre (Km) = 0.62 mile
1 hectare (ha) = 2.471 acres
Km² = square kilometre
m3 = cubic metre
m² = square metre
ml = linear metre
mm3 = Million cubic metres
m3/h = cubic metre per hour
l/s = litre per second
l/dy/pers. = litre per day per person
ii
ACRONYMS AND ABBREVIATIONS
ACI Airport Council International
ACSAC Community Civil Aviation Safety and Security Oversight Agency
ADB African Development Bank
ADF African Development Fund
AFCAC African Civil Aviation Commission
AFD French Development Agency
AFRAA African Airlines Association
AGA Airport and Ground Assistance
ANAC National Civil Aviation Agency
APEX Airport Excellence
ASECNA Agency for Aerial Navigation Safety in Africa and Madagascar
ASSA-AC Air Safety Oversight Agency in Central Africa
AVSEC Aviation Security (ICAO)
BAG Banjul Accord Group
BAGASOO Banjul Accord Group Aviation Safety Oversight Organization
BWAS Bank of West African States
CAPSA Cooperative Arrangement for the Prevention of Spread of Communicable Disease Through Air Travel
CCDY Yamoussoukro Decision Monitoring and Coordination Committee
CEMAC Central African Economic and Monetary Community
COPIL Steering Committee
COSCAP Cooperative Development of Operational Safety and Continuing Airworthiness Programme
DAC Directorate of Civil Aviation
DGAC General Directorate of Civil Aviation
EASA European Aviation Safety Agency
ECCAIRS European Coordination Centre for Accident and Incident Reporting Systems
ECCAS Economic Community of Central African States
ECOWAS Economic Community of West African States
FAA Federal Aviation Administration
IATA International Air Transport Association
ICAO International Civil Aviation Organization
JTC Joint Technical Committee
LEI Lack of Effective Implementation
LCO Licensing and Certification Obligations
MIDT Ministry of Infrastructure, Accessibility and Transport
NEPAD New Partnership for Africa’s Development
OPS Operations
PACIE Trade and Economic Integration Support Programme
PARCI Institutional Capacity-Building Support Project
PASTA-CO Air Transport Sector Support Project in West and Central Africa
PEL Personnel Licences
PIDA Programme for the Development of Infrastructure in Africa
REC Regional Economic Community
RIS Bank Regional Integration Strategy 2014 – 2023 (being finalized)
RSOOs Regional Aerial Safety Oversight Agencies
SAR Search And Rescue
SARPS Standards and Recommended Practices
SOFIA Training management software
UA Unit of Account
USOAP Universal Safety Oversight Audit Program
WAEMU West African Economic and Monetary Union
WCA West and Central Africa
WFP World Food Programme
iii
PROJECT BRIEF
DONEE: General Secretariat of the Economic Community of Central
African States (ECCAS)
Commission of the West African Economic and Monetary
Union (WAEMU)
Commission of the Economic Community of West African
States (ECOWAS) on behalf of the Banjul Accord Group
States
EXECUTING AGENCIES: The ECCAS General Secretariat through its Department of
Physical, Economic and Monetary Integration for the project
components in the ECCAS area; BP 2112 Libreville –
GABON – Tel.: (241) 44 47 31 – Fax: (241) 44 47 32
The ECOWAS Commission through its Directorate of
Transport for programme monitoring on behalf of the Banjul
Accord Group; P.O.B 401, Abuja, Nigeria, Tel : (234)
93147647, Fax: (234) 9 314 3005 / 3147644
The WAEMU Commission through its Department of
Community Territorial Development, Infrastructure,
Transport and Telecommunications for project monitoring
on behalf of WAEMU and Mauritania, 01 P.O. Box 543,
Ouagadougou, Burkina Faso, Tel: (226)50318873 à 76, Fax:
(226)50318872
Financing Plan
Source Amount (UA
Million)
Instrument
ADF
8.000
Grant
ECCAS 1.799 Counterpart
contribution
ECOWAS 0.711 Counterpart
contribution
WAEMU 0.486 Counterpart
contribution
TOTAL COST 10.996
iv
Key ADF Financing Information
Loan/Grant Currency
Unit of Account
Interest Type* NA
Interest Rate Margin* NA
Commitment Fee* NA
Other Costs* NA
Maturity NA
Grace Period NA
FRR, NPV (Baseline scenario) NA
ERR (Baseline scenario) NA
*If applicable
Time Frame – Key Milestones (expected)
Concept Note Approval
October 2014
Project Approval June 2015
Effectiveness September 2015
Last Disbursement 2019
Completion 2019
Last Reimbursement NA
v
PROJECT SUMMARY
Project Overview
The Project to Support the Air Transport Sector in West and Central Africa (PASTA-CO) is in
line with the Bank’s Ten-Year Strategy and corresponds to the thrusts of NEPAD’s PIDA,
especially the establishment of secured and efficient air spaces and airports for which the Bank
plays the role of catalyst of regional integration in Africa. It is also consistent with the Regional
Integration Strategy Paper (RISP) for Central Africa, whose Pillar II aims to build the
institutional and human capacities of RECs. Similarly, it is consistent with the West Africa
Regional Integration Strategy Paper whose Pillar II targets institutional capacity building and
support for regional initiatives and mechanisms that foster integration into the global economy.
Lastly, the project is aligned to the Bank Group’s Long-Term Strategy and consistent with its
sectoral focus on infrastructure with particular emphasis on regional integration. The project
outcomes will contribute to the objective of action plans for the development of air transport in
the three Regional Economic Communities to improve air transport safety and the liberalization
of cross-border air transport services in these regions to support trade, tourism and investment.
The project’s general objective is to contribute to improving civil aviation safety and to offer
safe and efficient air navigation services in a unified airspace in order to support trade and
regional socio-economic integration within the West and Central Africa region. It will improve
air transport safety, security and effectiveness mostly by: (i) building the oversight capacity of
Regional Air Safety Agencies; (ii) building the capacity of key air transport stakeholders in
both regions; and (iii) supporting mechanisms for coordinating regional air transport policies.
Financing Arrangement:
The project cost of UA 10.996 million is financed by ADF for UA 8.00 million, through the
Regional Public Goods Window. The overall contribution of the three RECs stands is UA 2.996
million including respectively UA 1.799 million for ECCAS, UA 0.711 million for ECOWAS
and UA 0.486 million for WAEMU. The project’s implementation will span four years, from
2015 to 2019.
Needs Assessment
The continental dimensions of the ECCAS and ECOWAS areas, compounded by land transport
problems, make air transport the most popular mode of commercial exchange and movement
of people in Central and West Africa. Unfortunately, users are far from satisfied with the air
services offered today. The main characteristics of the sector in these sub-regions are: (i) the
poor level of air safety and security in the region; (ii) the insufficient air links in and between
Member States of ECOWAS and ECCAS; (iii) weak capacities of Government departments in
charge of civil aviation; (iv) a high rate of air accidents, which is four times the global average
although Africa represents only 4.1% of global air traffic; (v) lack of airport infrastructure and
air navigation equipment and services.
Despite commendable efforts made, much still remains to be done to ensure better connectivity,
economies of scale and sustainable development of air transport in these regions, to enable it to
effectively play its role in supporting economic production and regional integration.
vi
Target Beneficiaries
The project’s main direct beneficiaries are: (i) the ECCAS General Secretariat; (ii) ECOWAS
Commission; (iii) WAEMU Commission, but also the various Regional Coordination units of
NEPAD, the national focal points of ECCAS and ECOWAS, civil aviation authorities and
Ministries responsible for transport, trade and regional integration in ECCAS and ECOWAS
member countries.
Improving air transport operating conditions (better safety and security, regular flights, increase
in flights between capitals, lower tariffs and also recognition of passengers’ rights) will lead to
an increase in human and commercial exchanges due to the accessibility of Member States and
better regional integration.
The indirect beneficiaries of the project are residents of these zones, particularly women and
youth who will operate in a more favourable environment and benefit from basic infrastructure.
In fact, airlines will be able to take advantage of opportunities for growing intra-community
exchanges.
Bank’s Comparative Advantage and Value Added
Since 1970, the Bank has been lending vital support to the air sector, especially by financing
49 operations including the construction/rehabilitation of airports, installation of navigation
equipment, training, procurement of aircrafts and project preparation studies in the sector. This
project will consolidate these achievements, especially by building air safety/security capacities
in the beneficiary regions.
Knowledge Building
This will mainly involve disseminating good practices in air transport programme management
in the 3 REC member countries and in the production of quality and internationally-complaint
statistics and data in the sector. Dissemination of these practices in Member States’ Government
departments will be via documents produced, procedures manuals and training sessions to be
organized under the project. Knowledge garnered and lessons learned will be disseminated
within the Bank and in beneficiary countries.
vii
Results-Based Logical Framework
Project Countries and Name: Countries of Central and West Africa – PSTA-OC Project
Global Project Objective: Build the capacity of regional aerial safety and of the Civil Aviation authorities of West and Central Africa; (ii) ensure application of international standards at the main WCA airports; (iii)
strengthen the aid coordination mechanisms in order to improve security, safety and efficiency of air transport in the region
Results Chain Performance Indicators
Means of Verification Risks/Mitigation Measures
Indicator (including CSI) Current Target
Imp
act
Contribute to improving civil aviation safety and to offer safe
and efficient air navigation
services in a unified airspace in order to support trade and regional
socio-economic integration within
the West and Central Africa region.
Volume of commercial exchanges in WCA
In 2014: 19% In 2025: 23% IATA Statistics
Statistics published by Ministry of Transport and
Civil Aviation
REC Monitoring Reports UN Comtrade
Ou
tco
me
Outcome 1: Airport safety levels
in West and Central Africa improved
Rate of non-compliance in WCA with ICAO safety standards
2014 : 66%
2020 : 45%
ICAO and FAA Audit
Reports Report of meetings of
CCSDY and Ministries
ICAO Statistics
Risks:
(i) Weak capacity of the RECs to perform their project
coordination role
(ii) Sustainability of actions and mechanisms that will be put
in place
(iii) Political tensions linked to elections in the countries
Mitigation Measures
(i) Revive steering committees
and monitoring
arrangements and delegate
works supervision to ICAO
and establishment of JTC
Outcome 2 : Airport infrastructure aligned to ICAO safety standards
Number of airports certified compliant with ICAO safety and security standards
2014: 3
2020 : 20
ICAO Audit Reports
Rate of compliance of airport infrastructure 2014: 30% 2020 : 50% ICAO Audit Reports
Rate of compliance with safety standards 2014: 45% 2020 : 75% ICAO Audit Reports
Outcome 3 : Increase in air traffic Rate of increase of air traffic in the region 2014: 8% 2020: 13% ASECNA Statistics
IATA Statistics
viii
Ou
tpu
ts
Outcome 1 : Capacity-building
and support for air safety oversight agencies implemented
Institutional support put in place
Technical management tools put in place
Offices and equipment available
Regional and national inspectors (PEL, OPS,
AIR and AGA) trained
Inspector manuals available
Number of operator certifications conducted
In 2014 :
1 operational agency
(BAGASSO)
Although existing, ACSA and
ASSAC are not operational
In 2020
- Institutional structure in place
(Organizational chart, head office)
- Technical tools in place and
operational
- Inspectors recruited and on duty
- Number of inspector manuals
prepared and delivered
- At least 10 operators’
certifications conducted
Progress reports of
oversight and safety agencies
Control mission reports
Project supervision reports Project completion reports
ASSA-AC and ACSA
Board meeting reports Project progress reports
(ii) Airport revenue generated
by agency operations can
ensure the sustainability of
investments
(iii) Mediations for political
consensus
Output 1: Capacity building and
support for air safety oversight
agencies operational
Institutional support in place
Technical and management tools in place
Space and equipment available
Regional and national inspectors (PEL, OPS, AIR
and AGA) trained
Inspectors’ manuals available
Number of operator certifications
In 2014
1Agency operational (BAGASSO)
ACSA and ASSAC existing but
not operational
In 2020:
- Institutional support in
place (HQ organization
chart) - Technical tools in place and
operational
- Inspectors recruited and on
the job
- Number of inspectors’
manuals prepared and applied
- At least 10 operator
certifications carried out
Progress reports of security
supervision agencies
Control mission reports Programme supervision
reports
Programme completion
reports
Records of ASSA-AC and
ACSA Board of Directors’ meetings
Progress reports
Output 2 : Studies and
institutional support for the monitoring and coordination of
air transport programmes
strengthened
1. Regional AVSEC experts pool set up;
2. Training of State inspectors in safety and air transport units;
3. Support for the creation of a regional
accidents/incidents investigations bureau; 4. Improvement of the organization of Search
and Rescue (SAR) mechanisms in WCA;
5. Feasibility study to set up an air leasing company in West and Central Africa;
6. Conduct of diagnostic study of the gender
situation in air transport in WCA;
In 2014 :
1. Non-existent 2. Non-existent
3. Absence of investigations
bureau ; 4. SAR arrangement not
operational
5. Absence of study on leasing
6. Absence of statistical data
on gender
In 2020:
1. 1 pool of 40 experts put in place ;
2. At least 10 training sessions
organized 3. 1 regional investigations
bureau put in place.
4. 1 SAR programme put in place.
5. One study report validated
6. One diagnostic study of gender-based data
validated;
Progress reports of safety oversight agencies
Control mission reports
Project supervision reports Project completion reports
Report of ICAO and EASA
ix
Output 3: Support for airports
security, safety and certification. 1. APEX safety and security review 2. Compliance-related investment plan
3. Safety and security audits in the WCA
region 4. Establishment of effective local
runway safety teams in each
international airport in West and Central Africa
In 2014 : 1. No review
2. No plan
3. 1 annual audit in the region 4. No local safety team
In 2020 : 1. Review report validated
2. Plan prepared and validated
3. At least 1 safety audit and 1 security audit performed per
airport per year
4. 30 effective local runway safety teams set up in the
West and Central Africa
region
Output 4: Project management
and coordination
Implementation reports
Joint technical committee
Financial and accounts audit
Reports produced Number of joint technical committee meetings
held
Number of audit reports produced
2014 :
0 report produced 0 joint technical committee held
0 audit report produced
In 2020 :
At least 5 audit reports produced, At least 6 joint technical
committee meetings organized,
16 implementation reports produced.
Components Resources
Key
acti
vit
ies
1. Capacity-building and support for Regional Aerial Safety Agencies (RSOO)
2. Studies and institutional support for monitoring and coordination of air transport programmes
3. Support for certification and compliance of ECCAS and ECOWAS Member States’ international airports
4. Project management and coordination.
COMPONENTS Total
1. Capacity-building and support for regional agencies 4.614
2.
Studies and institutional support to the
air transport sector for the monitoring of
air transport programmes
1.621
3 Support for airports security, safety and
certification 2.032
4 Project management and coordination 2.200
Base Cost 10.466
Physical contingencies 0.314
Price escalation 0.216
Total Cost (Net of taxes and customs
duties) 10.996
x
PROVISIONAL PROJECT IMPLEMENTATION SCHEDULE
Years
Activities / Months J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Prior to commencement
Board presentation
Loan effectiveness
Project launch mission
Equipement and supplies
Bid invitation IT and office equipment
Supply of goods and commencement
Studies and institutional support
Preparation and approval of ToR, SL and BI
Start of bidding process
Bids submission
Review of bids and signature of contracts
Commencement of studies
Approval of study reports
Consultants
Preparation of BD and drawing up of SL
Publication of bid invitations, analysis and award
Consultancy services
Preparation of institutional support
Establishment of technical tools for management
of agencies
Conduct of APEX reviews by ICAO
Establishment of local safety teams
Tech, assist EASA
Training and miscellaneous
Selection of participants
Conduct of training in security and safety
Monitoring
Mid-term review
Monitoring and evaluation
JTC meeting
Audit
Annual audit of accounts
Final audit of accounts
20182015 2016 2017 2019
1
REPORT AND RECOMMENDATION OF THE MANAGEMENT TO THE BOARD OF
DIRECTORS CONCERNING THE PROPOSED AWARD OF A GRANT OF UA 8.00
MILLION CORRESPONDING TO UA 3.042 MILLION TO THE ECOWAS COMMISSION,
UA 2.957 MILLION TO WAEMU COMMISSION AND UA 2.000 MILLION TO THE ECCAS
GENERAL SECRETARIAT, TO FINANCE THE PROJECT TO SUPPORT THE AIR
TRANSPORT SECTORS IN WEST AND CENTRAL AFRICA (PASTA-CO)
This proposal, submitted for the Board’s approval, concerns the award of an ADF Grant of UA 8.00
million, under the terms set out in this report, consisting of UA 3.042 million to the ECOWAS
Commission, UA 2.957 million to the WAEMU Commission and UA 2.000 million to the ECCAS
General Secretariat, to contribute to the financing of the Project to Support the Air Transport Sector in
West and Central Africa (PASTA-CO). This institutional support, to be implemented from 2015-2019,
seeks to strengthen institutional capacity to oversee civil aviation safety and security and contribute to
the development and safety of air transport in West and Central Africa by putting in place common
institutional and regulatory frameworks in countries of the two sub-regions.
I. STRATEGIC THRUST AND RATIONALE
1.1. Project Linkages with the Country’s Strategy and Objectives
The global objective of the project is to contribute to improving civil aviation safety and to offer safe
and efficient air navigation services in a unified airspace in order to support trade and regional socio-
economic integration within the West and Central Africa region.
It will help to improve air transport safety, security and effectiveness, mostly by: (i) building the
capacity of regional aerial safety oversight agencies; (ii) ensuring compliance with international
standards of the main airports in WCA (iii) building the capacity of key air transport stakeholders in
both regions; and (iv) providing support to air transport policy coordination mechanisms in both
regions.
In fact, the air transport sector continues to face major safety and security challenges evidenced by: (i)
the weak level of air safety and security in the region; (ii) insufficient air links within and between
Member States of ECOWAS and ECCAS; (iii) the weak capacity of Government departments in
charge of Civil Aviation; (iv) a high rate of air accidents, which is four times the global average
whereas Africa represents only 4.1% of global air traffic; (v) the dearth of airport infrastructure and
aerial navigation equipment and services. In order to address these challenges, Regional Economic
Communities designed action plans for safe and effective air transport in their regions. The PASTA-
CO Project is consistent with the ECOWAS 2020 Vision and ECCAS 2025 Agenda. Specifically, this
project is anchored on the air transport development action plans prepared by RECs and validated by
ICAO, especially:
- At ECCAS, the project is anchored on the “2010-2015 Action Plan for Improving Air
Transport in Central Africa”. This plan, which was adopted by ECCAS Heads of State
and Government by Decision No. 20/CEEAC/CCEG/XIV/09 of 24 October 2009,
sought to make air transport safe, regular and affordable in Central Africa.
- At ECOWAS, the project derives from the Air Transport Action Plan which was
adopted by Member States in 2003, amended successively in 2009, 2011 and 2013, and
2
which aimed to develop a well-structured regional air transport system with safe,
reliable, effective and affordable air services for all of Africa and well integrated in the
global network, in accordance with the ECOWAS 2020 Vision.
- At WAEMU, the project hinges on the Member States’ “Common Air Transport
Programme” (PCTA) adopted by Decision No. 008/2002/CM/UEMOA of the Statutory
Council of Ministers on 27 June 2002 with two main sector objectives: (i) Develop a
reliable, orderly and effective air transport system within WAEMU area that complies
with ICAO standards; and (ii) Foster the effectiveness of the Civil Aviation
administration and the competitiveness of air transport enterprises and (iii) Render air
transport accessible and affordable to the population of the Union.
The PASTA-CO Project’s design is consistent with the Bank’s Ten-Year Strategy and corresponds to
the thrusts of NEPAD’s PIDA, especially the establishment of secured and efficient air spaces and
airports. The Bank’s intervention via this project is in line with the Regional Integration Strategy Paper
(RISP) for Central African whose Pillar II aims to strengthen the institutional and human capacities of
RECs. It is also consistent with the Regional Integration Strategy Paper for West Africa whose Pillar
II targets institutional capacity-building and support for regional initiatives and mechanisms to
integrate the global economy. The project is aligned to the Bank Group’s Long-Term Strategy and
consistent with its sectoral focus on infrastructure with particular emphasis on regional integration.
The project outcomes will contribute to the objective of action plans for the development of air
transport in the three Regional Economic Communities to improve air transport safety and the
liberalization of cross-border air transport services in these regions to support trade, tourism and
investment
Key Development Issues
Several conferences of African Ministers in charge of air transport have been organized jointly by the
African Union and the Economic Commission for Africa (ECA) to lend fresh impetus to the air
transport sub-sector. These past few years, some improvements have been noted in the operation of
airlines. Many countries have complied with ICAO requirements by setting up autonomous civil
aviation authorities, and there has been a trend towards concession of airport management. Some
invested in improving air navigation services. Nevertheless, safety and security remain major
challenges to be addressed. Thus, ICAO reviews conducted in the WCA region in the form of USOAP
audits highlighted these countries’ deficiencies in the field of air safety and security.
Regarding airport infrastructure, only 4 out of the 69 airports covered by ICAO in the region are
certified as compliant with ICAO safety standards.
According to ACI’s 2014 classification of the 50 most frequented airports of Africa, 14 were from the
West and Central Africa region.
It was noticed in most major airports that: (i) runways and aircraft parking areas are not maintained,
resulting in a rundown pavement system; (ii) technical buildings are non-standard, with degraded
control towers (control block) that no longer offer the required 360° panoramic visibility; (iii) control
positions are unsuitable due to narrow lookouts and obsolete consoles; (iv) navigation equipment is no
longer compliant and is insufficient or non-existent for all platforms, making air navigation uncertain
across the entire air space.
It follows therefore that few airports have obtained the FAA Category 1 certification (Abidjan, Accra,
Lagos and Banjul, etc.) and some have lost it. Others need to meet regulatory standards for Annex 14
3
(Aerodrome) compliance and subsequent certification. According to ICAO, only 40% of African
airports are compliant with safety standards, compared to 60% on a global average. To remedy this
situation, ICAO plans to certify all airports by 2019 and raise the percentage of compliant airports to
the global average by 2020.
With regard to air safety, although 2012 was the safest year in aviation history, the accident rate in the
Africa Region was higher comparatively, rising from 3.27 in 2011 to 3.71 in 2012 which remains the
highest rate globally.
The accident ratio for all types of aircraft more than doubled in the region (6.17 in 2011 to 12.44
accidents per million flights in 2012), with 13 accidents in 2012 against 8 in 2011. It is noteworthy
that air companies listed in the IOSA register had no accidents (39 companies registered to date
including 22 members of AFRAA).
In May 2012, IATA, ICAO and other organizations adopted a Strategic Action Plan for Improving
Safety in Africa which aimed to address safety weaknesses and strengthen safety oversight capacity in
the region by 2015. The plan, adopted in July 2012 by the African Union Ministerial Conference on
Safety and Security in Africa as an integral part of the Abuja Declaration, was approved at the African
Union General Assembly in January 2013.
1.2. Rationale for the Bank’s Involvement
The 25 WCA countries have a population of about 463 million, corresponding to nearly 35% of the
total population of Africa. These 25 States account for roughly 45% of the continent’s Gross Domestic
Product (GDP). WCA has a total area of 11.74 million km² and average population density of 39
people/km². The economic mainstay of WCA countries is agriculture, which employs close to 65% of
the labour force. The combined agricultural, mining, fishery potentials and human resources of WCA
countries should help in their significant development.
However, this prospect is blighted by air transport issues observed to varying degrees in these countries
including: high rates, insufficient inter-State links, dilapidated airport infrastructure, inadequate
assistance in air navigation, proliferation of airlines operating poorly maintained aircrafts and scarcity
of financial resources.
In order to help address these inadequacies, the Bank financed the Air Safety Oversight Capacity-
Building Programme in West and Central Africa (COSCAP) which made it possible to: (i) harmonize
the 3 RECs’ technical regulations with the training of regional inspectors to carry out inspections and
audits based on ICAO Standards and Recommended Practices; (ii) harmonize economic regulations
related to air transport in West and Central Africa; (iii) put in place regional air safety oversight
agencies in ECOWAS (Banjul Accord Group States), CEMAC and WAEMU; (iv) establish air
transport units within RECs; (v) support the implementation monitoring of some aspects of the
Yamoussoukro Decision related to air transport liberalization in each of the three RECs.
This project is a logical follow-up to COSCAP one of whose main goals was the setting up of regional
civil aviation safety oversight agencies in Central and West Africa so as to ensure that Member States
comply with ICAO standards, consolidate these achievements and thereby contribute to improving air
transport safety, security and efficiency. The aim will be to: (i) build the oversight capacity of Regional
Air Safety Agencies set up; (ii) contribute to airport safety and security improvement by support; (iii)
4
build the capacity of key air transport stakeholders in the regions concerned; and (iv) provide support
to the air transport policy coordination mechanisms in the regions.
1.3. Aid Coordination
ECOWAS and WAEMU Commissions and the ECCAS Secretariat General currently receive support
from major donors, namely the Bank, the European Union, the French Development Agency and the
World Bank. This support is focussed mainly on areas such as governance, trade facilitation, regional
integration, peace and security, natural resources management and environment and the bulk of this
support targets capacity building.
The lack of an integrated multi-donor assistance framework remains one of the main weaknesses of
the current donor support for these communities. In the air transport sub-sector, aid coordination is
done through annual meetings of Joint Technical Committees (JTC) of projects, the Yamoussoukro
Decision Coordination and Monitoring Committee (CCSDY) and annual meeting of the Council of
Civil Aviation Ministers tasked with monitoring the implementation of this Decision. The last two
Bank operations aimed at building the capacities of the sector actors are the ECCAS (PARCI)
Institutional Capacity Building Project and COSCAP-WAEMU-CEMAC-ECOWAS. This
coordination effort will be stepped up during joint supervision missions of this project designed to
complement the Bank’s and other partners’ operations. The project being trans-regional in character
can guarantee that the Regional Economic Communities will work closely together.
Table 1.1
Donor Coordination
Sector or sub-sector* Importance
GDP Exports Manpower
Air Transport 6.47 % 11.87 % 14.1 %
REC
(USD Million)
Donors (2005-
2014) Amount (USD Million [%]
12.34 ADF 7.803 13.99%
AFD 3.221 5.78%
European Union 13.161 23.60%
WB 31.578 56.63%
TOTAL 55.764 100.00%
Level of aid coordination
Existence of thematic working groups No
Existence of a global sector programme No
ADB’s role in aid coordination None
Sources : ECCAS, CEMAC, WAEMU and ECOWAS economic reports
II. PROJECT DESCRIPTION
2.1. Project Objectives and Components
2.1.1 The project’s sector objective is to contribute to improving civil aviation safety and to offer
safe and efficient air navigation services in a unified airspace in order to support trade and regional
socio-economic integration within the West and Central Africa regions.
5
2.1.2 Specifically, the project aims to: (i) build the safety and security oversight capacity of
Regional Air Safety Agencies and Civil Aviation Authorities; (ii) ensure that main WCA airports
comply with international standards; and (iii) strengthen coordination mechanisms so as to improve
air transport safety, security and effectiveness in the region.
2.1.3. Project Components: The project has four components namely: (i) Capacity-building and
support for Regional Air Safety Agencies; (ii) Studies and institutional support for air transport
programme monitoring and coordination; (iii) Support for airport security and certification; and (iv)
Project management and coordination.
Table 2.1
Detail of Components: N° Components Description Cost (in
UAM)
A
Capacity-building and
support for Regional Air
Safety Oversight
Agencies
This component aims to strengthen the capacities of regional agencies tasked with safety/security oversight and ensure
their operationalization in the project regions:
1. Institutional support;
2. Establishment of technical management tools;
3. Equipment and training.
4.614
B
Studies and institutional
support for air transport
programme monitoring
and coordination
This component aims to equip institutions with skills needed to monitor activities to be coordinated and supervised by
them. This involves:
1. supporting the establishment a Regional AVSCE Experts’ Pool;
2. training of civil aviation administrations and air transport units in air safety and security;
3. support for the creation of a regional investigations and incidents office in WCA;
4. improvement of the Search and Rescue arrangement in WCA;
5. feasibility study for the putting in place of a regional aviation medical centre;
6. feasibility study for the creation of an aircraft leasing company in WCA;
7. diagnostic study on gender in the air transport sector in WCA;
8. preparation of the WCA gender policy action plan in the air transport sector
9. training on gender issues in regional transport projects
10. support for the establishment of a database on air transport in WCA
1.621
C
Support for airport
security, safety and
certification
This component will enable the region to align its main airports to international standards, thereby making them more
attractive while improving the overall safety level with a view to certification. It comprises the following activities :
1. APEX Review (ICAO-ACI) for certification, gender mainstreaming in the definition of standards for the principal
airports of the two regions;
2. preparation of an airport investment plan to align airport infrastructure to international standards;
3. Establishment of local safety teams
3. support for Member States’ audit and inspection programme
2.032
D
Project management and
coordination
1. Equipping and operation of project management units;
2. Putting in place and operation of a joint technical committee;
3. Feedback workshops and seminars;
4. Financial and accounts audit.
2.200
2.1.4. The details of some key activities are given in Annex II.
2.2. Technical Solutions Adopted and Alternatives Explored
2.2.1 Although the causes of the human and financial resource constraints of ECCAS, ECOWAS
and WAEMU in the air transport sector are linked to inadequate management mechanisms, they are
also of a structural nature. Institutional reforms are necessary to address these difficulties. In parallel,
these institutions are in dire need of capacity reinforcement to advance the integration agenda in such
priority areas as air transport development and harmonization of sector policies including those linked
to transport facilitation. Thus, the approach adopted by the project consists in supporting the
implementation of action plans for air transport development in these regions and in providing
technical assistance via organizations such as ICAO and EASA capable of strengthening the existing
capacities of these institutions to enable them carry through the work programmes for key sectors
(infrastructure, transport, commerce, statistics, programming).
6
Table 2.2
Alternatives Considered and Reasons for Rejection Alternative Solutions Brief Description Causes of Rejection
Option of a separate project per
REC
Each REC manages components assigned
to it through a separate grant
This would not allow for an exchange of experience and
data on the sector and project implementation; Also
sector constraints are identical for the various regions
2.3. Project Type
2.3.1 PASTA-CO is an institutional support project which, by virtue of its regional dimension and
its objectives, contributes to the promotion of a Regional Public Good. Indeed, it fulfils the conditions
set out in the new Strategy and Policy approved by the Bank in 2014 and the eligibility criteria for
Regional Public Goods (cf. Annex I). The choice of institutional support as the form of intervention
stemmed from the nature of planned activities (technical assistance, studies and training) to be
implemented in several institutions. Through this institutional support, the Bank also intends to
strengthen synergy with the support of other TFPs working to build capacity in agencies tasked with
steering institutional reforms and the support of regional integration mechanisms targeted by this
project.
2.4. Project Cost and Financing Arrangement
The project cost estimates, net of taxes and customs duties, is UA 15.188 million (equivalent to CFAF
11.694 billion at the December 2014 exchange rate of UA 1 = CFAF 769.923). These cost estimates
were based on the unit costs of similar projects in the same area and sector. The summaries of cost estimates by project component and expenditure category are given respectively
in Tables 2.3 and 2.4 below:
Table 2.3
Summary of Cost Estimates by Project Component COMPONENTS UA Million CFAF Billion
For. Exch. L.C. Total For. Exch. L.C. Total
A Capacity building and support for air safety agencies
2.973 1.641 4.614 2.289 1.263 3.6
B
Studies and institutional support for
RECs for the monitoring and coordination of air transport projects
0.846 0.775 1.621 0.651 0.597 1.248
C Support for airport safety, security and
certification
1.625 0.406 2.032 1.251 0.313 1.564
D Project management and coordination 0.409 1.790 2.200 0.315 1.378 1.694
Base Cost 5.853 4.613 10.466 4.507 3.552 8.058
Physical contingencies 0.176 0.138 0.314 0.135 0.107 0.242
Price escalation 0.121 0.095 0.216 0.093 0.073 0.166
Total Cost (Net of taxes and customs duties) 6.150 4.846 10.996 4.735 3.731 8.466
Table 2.4
Summary of Cost Estimates by Expenditure Category (in UA and CFAF Thousand) EXPENDITURE CATEGORIES UA Million CFAF Billion
F. E. LC Total F. E. LC Total
1. Goods 0.077 0.019 0.096 0.059 0.015 0.074
2. Services 4.426 4.256 8.682 3.408 3.277 6.685
2. Operating cost 1.350 0.338 1.688 1.040 0.260 1.300
Base Cost 5.853 4.613 10.466 4.507 3.552 8.058
Physical contingencies 0.176 0.138 0.314 0.135 0.107 0.242
Price escalation 0.121 0.095 0.216 0.093 0.073 0.166
Total Cost (Net of
taxes and customs
duties)
6.150 4.846 10.996 4.735 3.731 8.466
7
2.4.1 Financing Arrangement: The project will be financed to the tune of UA 8.000 million by
the ADF, representing 72.75% of the project cost. The three RECs will contribute to the tune of UA
2.996 million including respectively UA 1.799 million for ECCAS (16.36%), UA 0.711 million for
ECOWAS (6.47%) and UA 0.486 million for WAEMU (4.42%).
2.4 The project costs by source of financing and expenditure schedule are presented in the
following tables.
Table 2.5: Source of financing (in USD and UA Thousand) Source of Financing UA Million CFAF Billion Percentage
For. Exch. L.C. Total For. Exch. L.C. Total
ADF 5.084 2.916 8.000 3.914 2.245 6.159 72.75%
ECCAS 0.861 0.938 1.799 0.663 0.722 1.385 16.36%
ECOWAS 0.205 0.506 0.711 0.158 0.390 0.548 6.47%
WAEMU - 0.486 0.486 - 0.374 0.374 4.42%
TOTAL 6.150 4.846 10.996 4.735 3.731 8.466 100.00%
Table 2.6: Expenditure schedule by source of financing (in UA Million) SOURCE 2015 2016 2017 2018 2019 Total
ADF 1.000 2.200 2.000 2.000 0.800 8.000
ECCAS 0.225 0.495 0.450 0.450 0.180 1.799
ECOWAS 0.089 0.196 0.178 0.178 0.071 0.711
WAEMU 0.061 0.134 0.121 0.121 0.049 0.486
% Base Cost 12.50% 27.50% 25.00% 25% 10% 100%
2.5. Project Target Area and Beneficiaries
2.5.1 The Project Area (PA) covers the 25 member countries of ECOWAS and ECCAS and a
surface area of 11,740,600 km² (nearly 35% of the total area of Africa). The target population is about
463 million people. The project’s main direct beneficiaries are: (i) the ECCAS General Secretariat;
(ii) the ECOWAS Commission; (iii) the WAEMU Commission as well as NEPAD Regional
Coordination Offices, national focal points of ECCAS and ECOWAS, civil aviation administrations
and the Ministries responsible for Transport, Trade and Regional Integration in ECCAS and ECOWAS
Member States.
2.5.2. The project’s indirect beneficiaries are the population of these countries, women, youth and
the aviation sector that will benefit from a more favourable regulatory environment and basic
infrastructure. Indeed, airlines will benefit from growth opportunities for inter-community exchanges.
2.6. Participatory Approach in Project Identification, Design and Implementation
The participatory approach was respected at all stages of the project. The various stakeholders –
Directorates of Civil Aviation, airlines, officials of regional safety agencies as well as Government
departments responsible for steering the project – were consulted during the project preparation and
appraisal mission. Through their participation, pioneer agencies of the sector such as ICAO, EASA
and ASECNA lent assistance to the project design, especially for the choice of relevant activities in
line with the action plans for improving air transport in the regions concerned. This process will
continue during project implementation.
8
2.7. Bank Group Experience and Lessons Reflected in Project Design.
Since 1970, the Bank has lent significant support to the air sector, especially by financing 49 operations
including the construction/rehabilitation of airports, installation of navigation equipment, training,
procurement of aircraft and project preparation studies in the sector. This most recent operations
concern the rehabilitation of the Mohammed V airport in Rabat, Morocco, the Praia airport in Cape
Verde, the Air Transport Safety Project in DRC and lastly the COSCAP Project. In Central Africa, the
Bank financed the ECCAS Institutional Capacity-Building Support Project (PARCI) whose experts,
including the Administrative and Financial Officer, the Accountant and the Procurement Expert, will
be placed at this project’s disposal to ensure complementarity of Bank operations.
The design of this project was informed by lessons learned from Bank’s intervention as well as similar
ongoing experiences garnered during implementation of multinational projects.
Lessons learned: These relate to (i) Absence of procurement staff at the level of the RECs, accountant,
secretary, as well as project executing agency staff not trained in Bank rules and procedures; (ii) Weak
capacity of RECs to implement regional projects evidenced in the poor performance of the Bank’s
multinational portfolio; (iii) Absence of a coordination framework during projects involving several
RECs; (iv) Absence of implementation report drafted by ICAO which did not produce timely
supporting technical and financial reports on the use of funds received; (v) Failure to prepare audit
reports and final project implementation reports; and (vi) Noncommittal involvement of States.
Lessons reflected: The following actions were envisaged: (i) Strengthening of teams from the 3
economic communities with procurement and financial management experts coming from other Bank-
funded operations in these regions; (ii) Strengthening of coordination team through targeted support
in terms of short-term consultants and putting in place of technical assistance; (iii) Setting up of a joint
technical committee comprising experts from the three Regional Economic Communities; (iv)
Inclusion in works supervision agreements for some activities undertaken by ICAO and ESEA of a
clause requiring the production of implementation reports and the submission of same for the Bank’s
‘no objection’ before their signature; (v) Financial management modalities include the recruitment of
a single auditor for the three RECs for greater responsiveness regarding the production of reports; (vi)
Participation of country experts, via their civil aviation directorates, in the project design and
participation of these experts in the joint technical committee tasked with project coordination.
2.8. Key Performance Indicators
The key performance indicators and expected outcomes of the project are those stated in the logical
framework with deadlines. The Core Sector Indicators (CSI) on which emphasis will be placed are: (i)
volume of commercial exchanges in Central and West Africa; (ii) rate of non-compliance with ICAO
safety/security indicators in West and Central Africa; (iii) number of airports certified compliant with
ICAO safety and security standards; (v) number of safety and security audits and inspections; and (vi)
the number of local safety teams set up in airports.
For these to be achieved in a timely manner, implementation performance indicators were established
alongside these output indicators and aligned to the Bank’s institutional performance indicators. They
are mainly: (i) the effectiveness time frame; (ii) the deadline for fulfilment of conditions precedent to
first disbursement; (iii) procurement deadlines; (iv) the average implementation progress (IP)
indicator; (v) the disbursement rate versus expenditure schedule; and (vi) submission of quarterly
9
progress reports as well as audit reports. These indicators will be monitored during supervision
missions and the day-to-day management of the project.
III. PROJECT FEASIBILITY
3.1. Economic Benefit
Although this project is an institutional support and economic and financial analysis does not apply to
it, its economic rationale rests mainly on the expected effects of reinforced air transport safety and
security. These effects will have an impact on commercial exchanges and knowledge/manpower
mobility. Further, by financing regional safety oversight agencies, PASTA-CO will help West and
Central African States to meet their obligations under the Chicago Convention (and Annexes) and the
Yamoussoukro Decision. Each will benefit from a strengthening of its own safety and security
oversight capacities (thanks to training of its technical staff). Operationalizing the three regional
agencies will allow for self-funding of activities (especially certification), which will generate new
revenue and contribute to sustaining air safety oversight in the region. Certification or audit agencies
of other continents (FAA, EASA), as participants in their operationalization, will facilitate mutual
acceptance of audits and certificates issued and help avoid arbitrary delays. Lastly, the improvement
of civil aviation safety and security is closely related to the decrease in transport costs. The poor
safety/security-related performances of WCA countries make local companies less competitive
compared to major international companies.
3.2. Environmental, Social and Gender Impact
3.2.1 Environmental Impact: The project is expected to contribute to positive impacts on the
environment, especially through: (i) a decrease in CO2 emissions due to the compliance of airport
infrastructure (phasing out of very old, high-fuel-consuming and very noisy aircrafts still in operation);
(ii) the reduction of noise pollution and better protection of residents through respect of aviation
paths; and (iii) support in communicable disease control in airport areas. The project will enhance air
transport effectiveness and efficiency in West and Central Africa, thereby helping to support green
growth in those regions.
3.2.2 Social Impact: The improvement of aerial safety will facilitate the free movement of goods
and people. The expected positive effects are: (i) improvement of air transport safety conditions and
increase in air travel by the population; (ii) increase in agricultural revenues since perishable products
(fruits and vegetables, tropical flowers, meat and fish) will be exported by air freight and tourism
development (hotels, means of land transport, natural and cultural sites, handicrafts); and (iii) optimum
accessibility of Member States, and increase in South-South and North-South commercial exchanges.
3.2.3 Impact on Gender: The three Regional Economic Communities each have a gender policy.
Concerning institutional support, supported activities concern: (i) the drafting of the action plan of the
WCA gender policy in the transport sector; and (ii) training on gender issues in regional transport
projects. The project’s training component will reach out to 40% of women. To tackle the challenge
of the near-absence of gender-disaggregated data in the air transport sector, a diagnostic study of the
gender situation in air transport in West and Central Africa will be conducted.
3.2.4 Forced resettlement: The project will not lead to population displacement.
10
IV. IMPLEMENTATION
4.1. Implementation Arrangements
4.1.1. The project executing agencies are: (i) the ECCAS General Secretariat, through the
Department of Physical, Economic and Monetary Integration for components concerning the ECCAS
zone; (ii) the ECOWAS Commission, through the Directorate of Transport for components dealing
with Banjul Accord Group and Yamoussoukro Decision implementation support; and (iii) the
WAEMU Commission through the Directorate of Air Transport of the Department of Community
Territorial Development and Transport for project components concerning WAEMU and Mauritania.
4.1.2. During implementation of COSCAP, separate air transport units were created within the
ECOWAS and WAEMU Commissions. These will be the project management units. These units will
be reinforced by administrative and financial officers and procurement experts involved in other Bank
operations in these regions in a spirit of complementarity. As concerns the specific case of ECCAS, a
civil aviation engineer will be recruited in accordance with Bank procedures.
4.1.3. A Joint Technical Committee (JTC) will be set up bringing together designated experts from
the three Regional Economic Communities as well as representatives of beneficiary States through the
civil aviation departments. This JTC will be a regional framework of project coordination but also a
forum of exchange among the various Regional Economic Communities. The terms of reference of
this Committee feature in the technical annex of this report.
The involvement of RECs is based on the following principles:
NEPAD, which advocates the building of infrastructure as part of a regional development
vision;
The Yamoussoukro Decision on the liberalization of the air transport market in Africa
(1999) that binds AU Member States, the implementation of which at the level of each
region of Africa falls under RECs;
The need for Member States to pool their resources and work together to build on the
development of international air transport towards liberalization and globalization;
Recourse to RECs helps to make up for African States’ low income and to optimize the
gain expected from expenditure in the area of Air Transport through the pooling of
resources at community level.
4.1.4. As part of implementation of activities for the operationalization of regional air transport
safety oversight agencies, training of national inspectors in air safety, safety audits and APEX reviews
linked to airport certification, in addition to the agencies which will be directly involved, technical
assistance will be sought from ICAO as well as EASA which will be entrusted with the role of project
manager for these aspects. These interventions will be effected through technical assistance
agreements to be signed with the RECs. ICAO is indeed the specialized United Nations agency that
determines Standards and Recommended Practices (SARP) applicable worldwide by all Contracting
States and which covers all key aspects of international aviation. ICAO has extensive experience in
civil aviation development projects in Africa and the Indian Ocean. ICAO’s Directorate of Technical
Cooperation (TCB) has unique capacity to impartially administer complex organizational and
11
infrastructural development projects in the sector. The European Civil Aviation Agency (ESASA) is
currently implementing a similar project in Central Africa with European Union funding to which this
operation will be complementary.
4.1.5. Procurement Method
In light of the multi-regional character of this initiative which involves three Regional Economic
Communities (RECs) – ECCAS, ECOWAS and WAEMU – and to ensure overall coherence in project
implementation, especially for subsequent control and audits, all procurement will be in accordance
with the Bank’s Procurement Rules and Procedures.
Besides, the air transport agencies of the three RECs will be responsible for procurement activities,
relying on the organization in place in each of the RECs for that. These are: (i) the ECCAS Directorate
of Infrastructure; (ii) the ECOWAS Air Transport Unit; and (iii) WAEMU Directorate of Air
Transport. It is noteworthy that ASSAC and BAGASOO procurements will be handled via existing
mechanisms of ECCAS and ECOWAS respectively. ICAO and EASA will be retained based on
agreements, to carry out specific activities within their respective mandates and spheres of competence.
To allow for a seamless implementation of the project, RECs have committed to keep up the agreed
procurement capacity, ensuring especially the existence of a procurement specialist and a formal
organization that defines the roles and responsibilities of stakeholders in the procurement process.
Lastly, detailed arrangements, including mechanisms for Bank consideration (prior or ex-post) are set
out in the technical annex on procurements and agreed upon through the procurement plan.
4.1.6 Financial Management and Disbursements
Based on project implementation modalities, each of the three RECs (ECCAS, WAEMU and
ECOWAS) will be responsible for the financial management of project activities in its region. Project
activities will be implemented by staff in service placed under the authority of the Administrative and
Financial Officer, for the ECCAS Financial Pool; the Head of the External Funds Management Unit,
for the ECOWAS Finance Department; and the Head of the Settlements and Budget Implementation
Monitoring Division, for the WAEMU Commission Department of Administrative and Financial
Services.
Funds will be disbursed at the Bank by the special account method (mainly for operating costs) and
the direct payment method (for procurement of goods and services and other relatively high
expenses...).
The existing fiduciary arrangements in the three RECs have been deemed acceptable in light of the
Bank’s minimum requirements as defined in the Policy on “Financial Management of Projects
financed the African Development Bank”, adopted in February 2014.
The fiduciary risk evaluated for the project’s financial management is substantial for all RECs. When
the mitigation measures and action plan found in the annex are implemented, the financial management
arrangement designed for this project will furnish with reasonable assurance financial information that
is reliable and compliant with the relevant Bank minimum requirements.
4.1.7 Audit Arrangements
12
Audits will be performed annually by an independent external audit firm, which will be recruited on a
competitive basis pursuant to standard Bank terms of reference. The WAEMU Commission will recruit
the project’s external auditor for the other entities; thus, a single auditor will be recruited and within
six (6) months following project effectiveness, in close consultation with the other project executing
agencies and pursuant to Bank procedures. The terms of reference of the project external auditor will
be harmonized to factor in each executing agency’s specificities and approved during negotiations for
the recruitment of an independent firm with experience in auditing Bank-funded projects. Each entity
will design TOR applicable to its structure. Audits will comply with ISA/ISSAI standards. National
auditing standards that are mainly compliant with ISA or ISSAI standards will also be accepted. Audit
costs will be borne by the project. Financial statements audited by the independent firm will be
forwarded to the Bank within six (6) months following the closing of the relevant fiscal year by each
entity (see detail in technical annex B6).
4.2. Monitoring and Evaluation
4.2.1 The implementation of the project components will be monitored by air transport units. Joint
supervision missions (donors and RECs) and inter-donor coordination meetings will also allow for
reporting on the project’s performance in terms of physical and financial outputs.
4.2.2 Project monitoring by the Bank will be through sustained dialogue with the authorities,
especially through its Field Offices and during supervision missions. The project’s physical
implementation is expected to span a period of 48 months from June 2015 to June 2019. This
implementation schedule is deemed reasonable given the nature of reinforcement activities to be put
in place, the action plan and the time needed to set up related systems in the three Regional Economic
Communities. The tentative key milestones are presented in the following table:
Table 4
Project Monitoring and Supervision Time Frame Status Process Feedback
Q4 -2015 Project start-up Supervision mission Progress reports
Q1 – 2016 Consideration of the project –
procurement, resettlement
Supervision mission Progress reports / Aide-mémoire
Q3&Q4-2016, Implementation Supervision mission Progress reports / Aide-mémoire
Q1&Q2&Q3&Q4-2017-2018 Implementation Supervision mission and mid-
term review
Progress reports / Aide-mémoire
Q1 -2019
Q1 -2020
Guarantee period & first year of activities
Supervision mission Progress reports / Aide-mémoire Project completion report
13
4.3. Governance
4.3.1 The project’s governance risks are linked with procurement decisions, the use of project assets
and the selection of persons to be trained abroad or to benefit from capacity-building. These risks will
be mitigated through preparation of a detailed procurement plan, strict selection of participants and
enforcement of standard Bank rules and guidelines with the assistance of ICAO. More advanced
training will be offered to project staff members so that they are fully informed of requirements and
regulations. Compliance with these control arrangements will be reviewed during supervision
missions.
4.3.2 With regard to financial governance, project executing agencies will keep separate accounts
for the project using appropriate accounting software allowing for cost accounting and the production
of reports that indicate expenditure by component, by category and by source of financing. Project
accounts will be audited annually by an audit firm recruited for that purpose. Financial monitoring
reports (FMR) and annual audit reports will be forwarded to ADF within forty-five (45) and six (6)
days respectively, following the closing of the accounting period.
4.4 Sustainability
If implemented, the project will contribute to enhancing the institutional effectiveness of the
ECCAS General Secretariat, WAEMU Commission and ECOWAS Commission. This will be
reflected in net improvements in the design and monitoring of regional infrastructural development
projects – key aspects of the integration agenda, considering the expected impact on the movement of
people and goods – as well as in communication quality and cost. The project will also allow for better
reflecting in these programmes Member State Governments’ concerns about capacity-building for all
stakeholders in the monitoring-evaluation process and policy harmonization. Emphasis will be placed
on harmonizing the action of CEMAC and ECCAS, and WAEMU and ECOWAS in order to forge
greater cooperation and synergy among them and thus move towards the common goal of creating a
common market of Central and West Africa, as a prelude to the African Common Market – the AU’s
Minimum Integration Programme (MIP) target for 2020.
Lastly, project sustainability depends on the funding mechanisms of new agencies. Indeed, if these
new regional agencies have equity resources (from airport fees), they will be more sustainable. Using
the standard fees and charges, these agencies will help to ensure the improvement of airport services
and the sustainability of investments. In addition, the delegation of works supervision to ICAO and
EASA will contribute to the availability of proven skills (initial and continuing training), to guarantee
a high level of service that better takes users’ expectations into consideration. This technical assistance
will boost the likelihood of sustaining project outputs.
4.5 Risk Management
4.5.1 The following table summarizes residual risks (other than those related to governance and
sustainability) as well as mitigation measures.
Risk Level Mitigation Measures Weak capacity of the ECCAS, ECOWAS and WAEMU
Secretariats to assume their project coordination role
High
Putting in place of a steering committee and monitoring
arrangements, delegation of works supervision to ICAO, provision of technical assistance to ECCAS
Sustainability of actions and mechanisms to be put in place
High
Airport revenue generated by the operation of agencies will ensure
the sustainability of investments
Political tension in most of the countries concerned Moderate Mediation to reach political consensus in the countries concerned
14
4.5.2 The above analysis reveals that project risks are relatively high. Nevertheless, the outputs
achieved by ECCAS, WAEMU and ECOWAS and the regional context argue in favour of Bank
support to the project, in light of the expected significant progress in terms of institutional effectiveness
and REC ownership of this operation and ongoing NEPAD projects and considering the Bank’s
commitment to see the mutation of these RECs through as part of its mandate and regional integration
strategy.
4.6. Knowledge Building
The project design has benefited from the assistance of ICAO, ASECNA and EASA. This will mainly
entail the dissemination of good practices in air transport programme management in Member States
of the three RECs and in the production of quality internationally-compliant statistics and data in the
sector. These practices will be disseminated in Government departments of member countries through
distribution of documents produced, procedure manuals as well as training sessions that will be
organized during the project. This knowledge and the lessons learned will be disseminated within the
Bank and in beneficiary countries.
V. LEGAL FRAMEWORK
5.1. Legal Instrument
5.1.1 The proposed financial instrument is an ADF Grant of UA 8.00 million, corresponding to UA
3.042 million to the ECOWAS Commission, UA 2.957 million to the WAEMU Commission and UA
2.000 million to the General Secretariat of ECCAS.
5.2. Conditions Associated with the Bank’s Involvement
A. Conditions precedent to effectiveness
The effectiveness of the Grant Agreement will be subject to its signature by the Donee and the Fund.
B. Conditions precedent to first disbursement
Apart from effectiveness of the Agreement, the first disbursement of Grant resources shall be subject
to fulfilment by Donee of the following conditions:
a. For WAEMU
Furnish to the Fund evidence of opening a special CFAF account in BWAS to receive Grant resources
allocated to WAEMU;
b. For ECOWAS
Furnish to the Fund evidence of the opening in a commercial bank acceptable to the Fund of a USD
(dollar) account to receive Grant resources allocated to ECOWAS and a NAIRA sub-account for
payment for specific activities undertaken in Nigeria;
15
c. For ECCAS
Furnish to the Fund evidence of the opening in a commercial bank acceptable to the Fund, of a special
CFAF account to receive Grant resources allocated to ECCAS.
Other conditions. The Donee shall in addition:
a. For ECOWAS and ECCAS:
(i) Furnish to the Fund evidence of Donee’s commitment to other donors to participate in
financing the project;
b. For ECOWAS, ECCAS and WAEMU:
(ii) Furnish to the Fund, before 1 January every year and as from 2015, evidence of
mobilization of the counterpart contribution to financing, pursuant to the project
expenditure schedule ;
(iii) Forward to the Fund evidence of the inclusion in project staff of a procurement expert
and financial officer tasked with managing the fiduciary activities of the project.
Commitments. Donee commits to:
(i) Furnish to the Fund evidence of the designation of the seat of the Administrator of the
ACSAC-WAEMU Agency;
(ii) Furnish to the Fund evidence of the recruitment of experts of ASSAC-Central Africa;
(iii) Forward to the Fund agreements signed with ICAO and EASA;
(iv) Prepare and forward to the Fund quarterly progress reports of the project.
5.3. Compliance with Bank Policies
5.3.1 This project complies with the applicable Bank policies, especially those related to project
financial management, procurement, disbursement and eligibility of expenditure for Bank financing.
No exception is recommended.
VI. RECOMMENDATION
Management hereby recommends that the Board of Directors approve the proposal to award an ADF
Grant of UA 8.00 million, corresponding to UA 3.042 million to the ECOWAS Commission, UA
2.957 million to the WAEMU Commission and UA 2.000 million to the General Secretariat of ECCAS
, for the purpose and under the conditions set out in this Report.
I
Annex I
Selection Indicators Remarks
A. Absence of rivalry:
One party can enjoy benefits without these
benefits being (much) less available for the
other parties
The project outcomes are: Outcome 1 : Improvement of the level of air transport safety in West and Central
Africa zone
Outcome 2 : Improvement of air transport services
Outcome 3 : Modernization of airport infrastructure and compliance with ICAO operational standards
None of these outcomes is so rare as to trigger rivalry and they will
benefit users but without impacting quality and quantity
B. Absence of exclusion :
It is hard or too costly to keep the others out
It is impossible to prevent non-participating
countries/communities from enjoying benefits generated by the
project. In fact, the improvement of air transport services in WCA
countries will also benefit other countries/communities they have
air links with
C. Public interest and ownership
-great public interest and a huge advantage
-there is proof of ownership by beneficiary
countries/regions
Huge benefits and strong ownership; the project will be
coordinated by the three RECs. Airport safety in each country
involved will be managed by a dedicated regional agency as well
as national safety/security oversight bodies and the market
regulation function
D. Regional dimension:
-Must involve at least two countries The project involving the 25 countries of WCA region requires the
involvement of all countries for its optimum implementation
-Can only be effectively implemented if each
country involved participates and supports its
production
E. Strategic alignment:
BPR must be in line with the Bank’s strategic
guidelines
The project is fully consistent with the Bank’s integration strategy
targeting better quality regional transport as a driver of integration.
The project was also selected by PIDA to develop the intra-African
transport market through implementation of the Yamoussoukro
Decision on air transport market liberalization and improvement
of air transport safety and security
F. Upstream and catalysing role:
The Bank support aims to correct the deterrent
effects that impede BPR or progress towards it,
due especially to the lack of coordination, the
fear of risk and the problem of fare-dodgers
The Bank’s support aims to remedy weaknesses observed in safety
and effectiveness currently impeding the development of the air
transport market
Rationale for the Operation’s Eligibility for Regional Public Goods
II
G. Benefits flowing gradually from
cooperation:
The impact in terms of expected development
of cooperation among countries is clearly
higher than the net positive benefits each
country can obtain acting individually
The project’s benefits are higher (greater effectiveness) than those
that each country can obtain acting alone without cooperating with
other countries, particularly in terms of the harmonization and
implementation of safety and security regulations
H. Effects on development:
- Strengthening of governance
(adoption of health financial
practices; Harmonization of
governance practices;
abolition of trade barriers;
Creation of jobs)
- Knowledge building
(Optimization of data
collection; Dissemination of
best practices; brain drain)
- Environmental sustainability
and climate change
(Sustainable livelihoods;
capacity-building ; Adaptation
to climate change and
resistance to climate variations)
- Protection of human health
(study of homes; Limitation of
contagious diseases;
development of new treatments
or vaccines)
- Regional integration
(Promotion of trade;
Strengthening of safety;
Development of the private
sector)
The project will have a considerable impact on development, both
directly, by protecting human life (e.g. travellers), and by
strengthening sector governance. The participation of regional
communities and establishment of dedicated regional oversight
bodies will facilitate the collection of information on air transport
safety/security levels in the WCA space.
In addition, by ensuring safer and more affordable air transport, the
project will contribute to the promotion of intra-African trade and
greater safety. Market development will in turn attract private
investments in this sub-sector
III
Annex II
Detailed Description of Key Activities
Component A: Capacity-building and support for Regional Aerial Safety Agencies
1. ASSAC – ECCAS and ACSAC-WAEMU
This support consists in the formulation of rules and related guides, the training of senior staff and
regional inspectors for agencies, the installation of technical management tools and the
establishment of a regional database on air safety. This will involve operationalizing the new
agencies through organizational support and staff training.
Specific activities planned
Technical activities are planned for the following aspects:
a) Institutional support to agencies
Institutional support concerns:
- Support for putting in place steering organs and tools;
- Equipment (high level IT equipment, software, office automation, furniture…);
It will also be necessary to ensure effective coordination between Member States and the agency
which should lead these States to delegate at least some of their operational regulatory, certification
and oversight activities.
b) Regulation
This will involve the assessment of instruments prepared at the level of the Regional Economic
Communities, especially the Community Aviation Rules covering ICAO Annexes 1, 6, 8 and 14.
Works will mainly concern aviation personnel licensing (PEL), technical aircraft operation (OPS),
air navigability (AIR) and airports and ground assistance (AGA) and will have a two-fold focus:
regulatory instruments and related inspector manuals. Without these two components, it will be
impossible for national and regional inspectors to successfully discharge their obligation of
overseeing aviation activity in the region. Should RACs be adopted before the project becomes
effective, the first phase of works will centre on inspector manuals.
c) Safety data
This will involve installing an IT tool for safety data monitoring, a tool that integrates the regional
dimension. The tool will be deployed as technical prerequisites are in place, in particular IT
equipment or internet connection.
The use of the SOFIA software at the country and regional levels will allow for the harmonization
of practices at regional level as well as the follow-up of the resolution of safety problems mainly
in the areas of PEL, OPS and AIR.
IV
Alongside deploying SOFIA, assistance will be provided to implement ECCAIRS and establish
the database.
Training
During ICAO’s USOAP audits, it emerged that staff training was the weak link for many Member
States. Other critical elements (often the most affected also) include certification, oversight and the
follow-up of disparities in the areas of PEL, OPS, AIR and AGA. It is also noteworthy that these
are particular areas that agencies will cover.
Since human resources are crucial to the effective establishment of a regional safety agency,
training is a key element of this project.
The planned training concerns two staff categories:
- technical staff of agencies, and
- inspectors of civil aviation authorities in WCA States.
The project start-up phase will aim at specifying the type of training to be offered and the profile
of staff to be trained. Trainings offered in French will mainly be in the fields of PEL, OPS, AIR
and AGA, and will be supplemented by more targeted trainings in related fields. The objective will
be to upgrade the skills of regional and national inspectors to enable them to efficiently oversee air
transporters, maintenance agencies, training centres and airport operators.
2. BAGASSO (Regional Aerial Safety Oversight Agency of the Banjul Accord Group States):
Support for the implementation of the Agency’s Strategic Development Plan
Activity 1: Resolution of serious safety problems
The goal of this support is to enable the BAG States, namely, Guinea, Sierra Leone and Liberia
which are currently on the ICAO list of States having serious safety concerns (SSC), to build their
capacity in certification and oversight. This should ultimately enable these States to get off the list.
Specific actions:
- Drafting of an appraisal report on the current state of safety oversight capacities of
States;
- Putting in place of a certification process compliant with ICAO standards;
- Design of technical guidelines for conducting certification pursuant to ICAO
standards;
- Publication and dissemination of guidance materials for relevant sections ;
- Putting together of the inspector’s toolkit containing procedures, control lists and
CEA (Airworthiness Certificate) forms for national inspectors;
V
- Training of national inspectors in the 5 phases of the certification process.
A. Activity 2:
The objective of this support is to strengthen the safety oversight capacity of BAG Member States
through delivery of effective ICT services, including aviation software packages, an aviation
tracking system and regional aviation register allowing for the real-time tracking of aviation
activities.
Specific actions:
1. Regional monitoring software
a. Aircraft safety assessment;
b. Putting in place of the register of air operators and approved maintenance agencies.
2. Dissemination of information
a. Establishment of a computerized training platform (CBT).
b. Opening of a technical library.
A. Component B: Studies and institutional support for air transport programme
monitoring and coordination. Adoption of technical safety rules and related procedures
This involves pursuing activities aimed at preparing and adopting civil aviation safety rules to
ensure that areas outlined in ICAO’s 19 Annexes are covered by community rules.
Activities to be undertaken mainly concern workshops to prepare, consider and validate rules to be
enforced within the community space.
B. Capacity-building for civil aviation administrations
This involves assisting Member States to implement new concepts and programmes designed by
ICAO. Identified actions include: (i) Training in community civil aviation safety regulations; (ii)
Support for the activities of USOAP ongoing surveillance method; (iii) Support to put in place
national safety programmes (NSP); (iv) establishment of regional expertise on dangerous goods;
(v) Assistance in the delivery of operators’ SMS; (vi) creation of a databank on safety.
VI
C. Strengthening of capacities to investigate aviation accidents and incidents
This activity will comprise actions undertaken to build Member States’ capacities to investigate
accidents through seminars and workshops organized in cooperation with ICAO and renowned
investigation bureaus and to re-update the ACIP/ICAO study undertaken in 2010.
The following activities are envisaged: (i) Sensitization and training seminars on accident
investigation; (ii) Update of the 2010 ACIP/ICAO study on the creation of a regional accidents
investigation agency; and (iii) Study validation workshop.
The Search and Rescue (SAR) arrangement will also be reinforced and a regional SAR cooperation
and coordination mechanism put in place.
D. Support for implementation of the CAPSCA programme
Pursuant to Article 14 of the Chicago Convention on civil aviation, ICAO Member States
committed to take effective measures to prevent the spread of communicable diseases through air
travel including Ebola fever.
CAPSCA (Cooperative Arrangement for the Prevention of the Spread of Communicable Disease
through Air Travel) Programme is already in force in the 191 Member States of ICAO and gives
rise to meetings, training workshops and seminars.
Issues related to diseases spread through air travellers will be included in the ICAO Audits
agreement as from 2013. This project, formulated as the Ebola epidemic, continues, will support
RECs in accompanying their Member States through implementation of the following activities:
- Training of CAPSCA technical advisers;
- Sensitization seminars in Member States;
- Conduct of inspection and assistance missions in Member States;
Component C: Support for the certification and compliance of ECCAS and ECOWAS
Member States’ international airports
This involves the compliance of the main airports of ECOWAS and ECCAS Member States.
Twenty (20) airports of the region were identified in collaboration with the RECs and ICAO to
benefit from this assistance.
Four (4) major actions were identified:
- APEX safety and security review and conduct of a compliance study of the
region’s airport and aviation infrastructure with a view to defining a programme to
upgrade airport and aviation infrastructure/installations and aerial navigation
services:
consultancy service to conduct a diagnostic study, assess needs and prepare a
VII
compliance programme/plan;
study feedback workshop and validation of the compliance programme;
prospecting for financing (organization of roundtables, preparation missions
targeting Technical and Financial Partners).
E. Member States’ Audit and Inspections Programme
The safety audit and inspection programme was listed among the priority actions of the Common
Air Transport Programme in West and Central Africa in order to address inadequacies observed
during ICAO safety audits and bring on board new measures adopted by ICAO to bolster aviation
safety. It aims at developing a common civil aviation safety policy in Member States, enabling
them to comply with international standards. Envisaged activities will hinge on:
- harmonizing the implementation of security measures. This will involve:
compliance control of the implementation of security measures;
technical assistance and support missions in Member States;
- strengthening the oversight capacities of Member States;
VIII
Annex IIIa.
ECOWAS Comparative Socio-economic Indicators
Indicator Année CEDEAO AfriquePays en
Développement
Pays
DéveloppésCharts
Basic Indicators
Superficie ('000 Km²) 5 112,7 30 046,4 80 976,0 54 658,4
Population totale (millions) 2013 327,4 1 109,0 5 628,5 1 068,7
Population urbaine (% of Total) 2013 46,1 40,2 44,8 77,7
Densité de la population (au Km²) 2010 58,8 34,5 66,6 23,1
Revenu national brut (RNB) par Habitant ($ EU) 2012 1 170,7 1 691,5 2 780,3 39 688,1
Participation de la Population Active - Total (%) 2013 33,9 37,4 0,0 0,0
Participation de la Population Active - Femmes (%) 2013 43,1 42,5 39,8 43,3
Valeur de l'Indice sexospécifique de dévelop. humain 2007 0,5 0,5 .. 0,9
Indice de développement humain (rang sur 169 pays) 2012 .. .. .. ..
Population vivant en dessous de $ 1 par Jour (%) 1995 .. .. 25,0 ..
Indicateurs Démographiques
Taux d'accroissement de la population totale (%) 2013 2,7 2,5 1,4 0,7
Taux d'accroissement de la population urbaine (%) 2013 4,0 3,4 2,4 1,0
Population âgée de moins de 15 ans (%) 2013 43,9 40,9 29,2 17,7
Population âée de 65 ans et plus (%) 2013 2,8 3,5 6,0 15,3
Taux de dépendance (%) 2006 88,8 77,3 52,8 ..
Rapport de Masculinité (hommes pour 100 femmes) 2013 101,9 100,0 934,9 948,3
Population féminine de 15 à 49 ans (%) 2013 23,0 24,0 53,3 47,2
Espérance de vie à la naissance - ensemble (ans) 2013 54,7 59,2 65,7 79,8
Espérance de vie à la naissance - femmes (ans) 2013 55,7 60,3 68,9 82,7
Taux brut de natalité (pour 1000) 2013 40,1 35,3 21,5 12,0
Taux brut de mortalité (pour 1000) 2013 12,2 10,4 8,2 8,3
Taux de mortalité infantile (pour 1000) 2013 71,0 61,9 53,1 5,8
Taux de mortalité des moins de 5 ans (pour 1000) 2013 117,8 97,4 51,4 6,3
Indice synthétique de fécondité (par femme) 2013 5,6 4,6 2,7 1,8
Taux de mortalité maternelle (pour 100000) 2010 544,0 415,3 440,0 10,0
Femmes utilisant des méthodes contraceptives (%) 2013 17,0 34,9 61,0 75,0
Indicateurs de Santé et de Nutrition
Nombre de médecins (pour 100000 habitants) 2010 24,3 52,6 77,0 287,0
Nombre d'infirmières (pour 100000 habitants) 2008 112,2 .. 98,0 782,0
Naissances assistées par un personnel de santé qualifié (%) 2003 38,6 .. 39,0 99,3
Accès à l'eau salubre (% de la population) 2012 68,7 68,8 84,0 99,6
Accès aux services de santé (% de la population) 2000 61,8 65,2 80,0 100,0
Accès aux services sanitaires (% de la population) 2012 24,3 39,4 54,6 99,8
Pourcent. d'adultes de 15-49 ans vivant avec le VIH/SIDA 2012 2,3 3,9 161,9 14,1
Incidence de la tuberculose (pour 100000) 2012 120,7 223,6 .. ..
Enfants vaccinés contre la tuberculose (%) 2012 76,0 83,1 89,0 99,0
Enfants vaccinés contre la rougeole (%) 2012 58,2 74,6 76,0 92,6
Insuffisance pondérale des moins de 5 ans (%) 2008 24,7 .. 27,0 0,1
Apport journalier en calorie par habitant 2009 2 686,2 2 564,7 2 675,2 3 284,7
Dépenses publiques de santé (en % du PIB) 2011 .. 5,9 4,0 6,9
Indicateurs d'Education
Taux brut de scolarisation au (%) .. .. .. ..
Primaire - Total 2010 85,4 101,8 106,0 101,5
Primaire - Filles 2010 81,1 97,8 104,6 101,2
Secondaire - Total 2010 39,7 45,4 62,3 100,3
Secondaire - Filles 2010 36,6 41,9 60,7 100,0
Personnel enseignant féminin au primaire (% du total) 2010 41,9 43,7 .. ..
Alphabétisme des adultes - Total (%) 2006 .. .. 19,0 ..
Alphabétisme des adultes - Hommes (%) 2006 .. .. .. ..
Alphabétisme des adultes - Femmes (%) 2006 .. .. .. ..
Dépenses d'éducation en % du PIB 2008 .. 5,3 .. 5,4
Indicateurs d'Environnement
Terres arables en % de la superficie totale 2011 17,0 8,4 9,9 11,6
Taux annuel de déforestation (%) 2000 2,1 0,6 0,4 -0,2
Taux annuel de reboisement (%) .. .. .. ..
Emissions du CO2 par habitant (tonnes métriques) 2010 0,4 1,1 .. ..
dernière mise à jour: décembre 2014
CEDEAO
Indicateurs Socio-Economiques Comparatifs
Source : Base des données du Département des Statistiques de la BAD;
Banque Mondiale WDI; ONUSIDA; UNSD; OMS, UNICEF, WRI, PNUD, Rapports nationaux.
Notes: n.a. Non Applicable ; … : Données non disponibles.
0
500
1000
1500
2000
201
0
201
1
201
2
Revenu national brut (RNB) par Habitant ($ EU)
CEDEAO Afrique
2,3
2,35
2,4
2,45
2,5
2,55
2,6
2,65
2,7
2,75
2,8
201
0
201
1
201
2
201
3
Taux d'accroissement de la population totale (%)
CEDEAO Afrique
66,5
67
67,5
68
68,5
69
201
0
201
1
201
2
Accès à l'eau salubre (% de la population)
CEDEAO Afrique
0
20
40
60
80
100
120
200
0
200
1
200
2
200
3
200
4
200
5
200
6
200
7
200
8
200
9
201
0
Secondaire - Total
CEDEAO Afrique
IX
Annex IIIb.
WAEMU Comparative Socio-economic Indicators
Indicator Année UEMOA AfriquePays en
Développement
Pays
DéveloppésCharts
Basic Indicators
Superficie ('000 Km²) 3 506,1 30 046,4 80 976,0 54 658,4
Population totale (millions) 2013 103,4 1 109,0 5 628,5 1 068,7
Population urbaine (% of Total) 2013 37,3 40,2 44,8 77,7
Densité de la population (au Km²) 2010 27,4 34,5 66,6 23,1
Revenu national brut (RNB) par Habitant ($ EU) 2012 772,7 1 691,5 2 780,3 39 688,1
Participation de la Population Active - Total (%) 2013 38,3 37,4 0,0 0,0
Participation de la Population Active - Femmes (%) 2013 41,7 42,5 39,8 43,3
Valeur de l'Indice sexospécifique de dévelop. humain 2007 0,4 0,5 .. 0,9
Indice de développement humain (rang sur 169 pays) 2012 .. .. .. ..
Population vivant en dessous de $ 1 par Jour (%) 1995 .. .. 25,0 ..
Indicateurs Démographiques
Taux d'accroissement de la population totale (%) 2013 2,9 2,5 1,4 0,7
Taux d'accroissement de la population urbaine (%) 2013 4,3 3,4 2,4 1,0
Population âgée de moins de 15 ans (%) 2013 44,9 40,9 29,2 17,7
Population âée de 65 ans et plus (%) 2013 2,8 3,5 6,0 15,3
Taux de dépendance (%) 2006 92,7 77,3 52,8 ..
Rapport de Masculinité (hommes pour 100 femmes) 2013 100,3 100,0 934,9 948,3
Population féminine de 15 à 49 ans (%) 2013 23,0 24,0 53,3 47,2
Espérance de vie à la naissance - ensemble (ans) 2013 56,6 59,2 65,7 79,8
Espérance de vie à la naissance - femmes (ans) 2013 58,8 60,3 68,9 82,7
Taux brut de natalité (pour 1000) 2013 41,2 35,3 21,5 12,0
Taux brut de mortalité (pour 1000) 2013 11,3 10,4 8,2 8,3
Taux de mortalité infantile (pour 1000) 2013 66,7 61,9 53,1 5,8
Taux de mortalité des moins de 5 ans (pour 1000) 2013 120,0 97,4 51,4 6,3
Indice synthétique de fécondité (par femme) 2013 5,7 4,6 2,7 1,8
Taux de mortalité maternelle (pour 100000) 2010 422,4 415,3 440,0 10,0
Femmes utilisant des méthodes contraceptives (%) 2013 16,9 34,9 61,0 75,0
Indicateurs de Santé et de Nutrition
Nombre de médecins (pour 100000 habitants) 2010 6,8 52,6 77,0 287,0
Nombre d'infirmières (pour 100000 habitants) 2008 44,6 .. 98,0 782,0
Naissances assistées par un personnel de santé qualifié (%) 2006 50,2 .. 39,0 99,3
Accès à l'eau salubre (% de la population) 2012 71,1 68,8 84,0 99,6
Accès aux services de santé (% de la population) 2000 43,4 65,2 80,0 100,0
Accès aux services sanitaires (% de la population) 2012 21,8 39,4 54,6 99,8
Pourcent. d'adultes de 15-49 ans vivant avec le VIH/SIDA 2012 1,5 3,9 161,9 14,1
Incidence de la tuberculose (pour 100000) 2012 104,1 223,6 .. ..
Enfants vaccinés contre la tuberculose (%) 2012 95,6 83,1 89,0 99,0
Enfants vaccinés contre la rougeole (%) 2012 76,4 74,6 76,0 92,6
Insuffisance pondérale des moins de 5 ans (%) 2006 28,6 .. 27,0 0,1
Apport journalier en calorie par habitant 2009 2 635,1 2 564,7 2 675,2 3 284,7
Dépenses publiques de santé (en % du PIB) 2011 .. 5,9 4,0 6,9
Indicateurs d'Education
Taux brut de scolarisation au (%) .. .. .. ..
Primaire - Total 2012 91,3 101,8 106,0 101,5
Primaire - Filles 2012 86,9 97,8 104,6 101,2
Secondaire - Total 2011 34,9 45,4 62,3 100,3
Secondaire - Filles 2011 27,9 41,9 60,7 100,0
Personnel enseignant féminin au primaire (% du total) 2012 35,1 43,7 .. ..
Alphabétisme des adultes - Total (%) 2006 .. .. 19,0 ..
Alphabétisme des adultes - Hommes (%) 2006 .. .. .. ..
Alphabétisme des adultes - Femmes (%) 2006 .. .. .. ..
Dépenses d'éducation en % du PIB 2008 .. 5,3 .. 5,4
Indicateurs d'Environnement
Terres arables en % de la superficie totale 2011 11,4 8,4 9,9 11,6
Taux annuel de déforestation (%) 2000 2,1 0,6 0,4 -0,2
Taux annuel de reboisement (%) .. .. .. ..
Emissions du CO2 par habitant (tonnes métriques) 2010 0,2 1,1 .. ..
dernière mise à jour: décembre 2014
UEMOA
Indicateurs Socio-Economiques Comparatifs
Source : Base des données du Département des Statistiques de la BAD;
Banque Mondiale WDI; ONUSIDA; UNSD; OMS, UNICEF, WRI, PNUD, Rapports nationaux.
Notes: n.a. Non Applicable ; … : Données non disponibles.
0
500
1000
1500
2000
201
0
201
1
201
2
Revenu national brut (RNB) par Habitant ($ EU)
UEMOA Afrique
2,2
2,3
2,4
2,5
2,6
2,7
2,8
2,9
3
201
0
201
1
201
2
201
3
Taux d'accroissement de la population totale (%)
UEMOA Afrique
62
64
66
68
70
72
74
76
78
201
0
201
1
201
2
Accès à l'eau salubre (% de la population)
UEMOA Afrique
75
80
85
90
95
100
201
0
201
1
Secondaire - Total
UEMOA Afrique
X
Annex IIIc.
ECCAS Comparative Socio-economic Indicators
Indicator Année CEEAC AfriquePays en
Développement
Pays
DéveloppésCharts
Basic Indicators
Superficie ('000 Km²) 6 640,5 30 046,4 80 976,0 54 658,4
Population totale (millions) 2013 145,9 1 109,0 5 628,5 1 068,7
Population urbaine (% of Total) 2013 40,7 40,2 44,8 77,7
Densité de la population (au Km²) 2010 20,3 34,5 66,6 23,1
Revenu national brut (RNB) par Habitant ($ EU) 2012 1 323,1 1 691,5 2 780,3 39 688,1
Participation de la Population Active - Total (%) 2013 38,9 37,4 0,0 0,0
Participation de la Population Active - Femmes (%) 2013 48,2 42,5 39,8 43,3
Valeur de l'Indice sexospécifique de dévelop. humain 2007 0,4 0,5 .. 0,9
Indice de développement humain (rang sur 169 pays) 2012 .. .. .. ..
Population vivant en dessous de $ 1 par Jour (%) 1995 .. .. 25,0 ..
Indicateurs Démographiques
Taux d'accroissement de la population totale (%) 2013 2,8 2,5 1,4 0,7
Taux d'accroissement de la population urbaine (%) 2006 22,6 3,4 2,4 1,0
Population âgée de moins de 15 ans (%) 2013 .. 40,9 29,2 17,7
Population âée de 65 ans et plus (%) 2006 2,9 3,5 6,0 15,3
Taux de dépendance (%) 2006 95,5 77,3 52,8 ..
Rapport de Masculinité (hommes pour 100 femmes) 2013 .. 100,0 934,9 948,3
Population féminine de 15 à 49 ans (%) 2006 0,0 24,0 53,3 47,2
Espérance de vie à la naissance - ensemble (ans) 2013 51,9 59,2 65,7 79,8
Espérance de vie à la naissance - femmes (ans) 2013 53,4 60,3 68,9 82,7
Taux brut de natalité (pour 1000) 2013 41,9 35,3 21,5 12,0
Taux brut de mortalité (pour 1000) 2013 14,1 10,4 8,2 8,3
Taux de mortalité infantile (pour 1000) 2013 95,7 61,9 53,1 5,8
Taux de mortalité des moins de 5 ans (pour 1000) 2013 155,9 97,4 51,4 6,3
Indice synthétique de fécondité (par femme) 2013 5,7 4,6 2,7 1,8
Taux de mortalité maternelle (pour 100000) 2010 622,6 415,3 440,0 10,0
Femmes utilisant des méthodes contraceptives (%) 2013 22,2 34,9 61,0 75,0
Indicateurs de Santé et de Nutrition
Nombre de médecins (pour 100000 habitants) 2004 11,2 52,6 77,0 287,0
Nombre d'infirmières (pour 100000 habitants) 2004 83,4 .. 98,0 782,0
Naissances assistées par un personnel de santé qualifié (%) 2006 .. .. 39,0 99,3
Accès à l'eau salubre (% de la population) 2012 56,4 68,8 84,0 99,6
Accès aux services de santé (% de la population) 2000 56,2 65,2 80,0 100,0
Accès aux services sanitaires (% de la population) 2012 36,4 39,4 54,6 99,8
Pourcent. d'adultes de 15-49 ans vivant avec le VIH/SIDA 2012 2,1 3,9 161,9 14,1
Incidence de la tuberculose (pour 100000) 2012 285,5 223,6 .. ..
Enfants vaccinés contre la tuberculose (%) 2012 80,4 83,1 89,0 99,0
Enfants vaccinés contre la rougeole (%) 2012 78,1 74,6 76,0 92,6
Insuffisance pondérale des moins de 5 ans (%) 2005 .. .. 27,0 0,1
Apport journalier en calorie par habitant 1974 2 142,1 2 564,7 2 675,2 3 284,7
Dépenses publiques de santé (en % du PIB) 2011 .. 5,9 4,0 6,9
Indicateurs d'Education
Taux brut de scolarisation au (%) .. .. .. ..
Primaire - Total 2012 110,5 101,8 106,0 101,5
Primaire - Filles 2012 103,3 97,8 104,6 101,2
Secondaire - Total 2012 40,6 45,4 62,3 100,3
Secondaire - Filles 2012 32,1 41,9 60,7 100,0
Personnel enseignant féminin au primaire (% du total) 2012 34,7 43,7 .. ..
Alphabétisme des adultes - Total (%) 2006 .. .. 19,0 ..
Alphabétisme des adultes - Hommes (%) 2006 .. .. .. ..
Alphabétisme des adultes - Femmes (%) 2006 .. .. .. ..
Dépenses d'éducation en % du PIB 2008 .. 5,3 .. 5,4
Indicateurs d'Environnement
Terres arables en % de la superficie totale 2011 3,9 8,4 9,9 11,6
Taux annuel de déforestation (%) 2000 0,4 0,6 0,4 -0,2
Taux annuel de reboisement (%) .. .. .. ..
Emissions du CO2 par habitant (tonnes métriques) 2010 0,4 1,1 .. ..
dernière mise à jour: décembre 2014
CEEAC
Indicateurs Socio-Economiques Comparatifs
Source : Base des données du Département des Statistiques de la BAD;
Banque Mondiale WDI; ONUSIDA; UNSD; OMS, UNICEF, WRI, PNUD, Rapports nationaux.
Notes: n.a. Non Applicable ; … : Données non disponibles.
0
500
1000
1500
2000
201
0
201
1
201
2
Revenu national brut (RNB) par Habitant ($ EU)
CEEAC Afrique
2,2
2,3
2,4
2,5
2,6
2,7
2,8
2,9
201
0
201
1
201
2
201
3
Taux d'accroissement de la population totale (%)
CEEAC Afrique
0
10
20
30
40
50
60
70
80
201
0
201
1
201
2
Accès à l'eau salubre (% de la population)
CEEAC Afrique
95
96
97
98
99
100
101
102
103
104
201
0
201
1
201
2
Secondaire - Total
CEEAC Afrique
XI
Annex IV a
Table of Bank Operations in ECCAS Zone CENTRE REGION – LIST OF ACTIVE REGIONAL PROJECTS AT 31 DECEMBER 2014
Country Project Name Sector Fin. Srce Instr (Loan/Grant)
Approv. Date.
Net Commt (MUA) Disburs Rate (%)*
Closing Date
A. PROJETS REGIONAUX-HORS CBFF
Multinational Cotton Sector Support Project -Chad Agriculture ADF Grant 29Nov06 5.00 58.7 30Sep15
Dem Rep Congo Lake Tanganyika Develop. Prog. (DRC) Agriculture ADF Loan 17Nov04 6.79 96.4 31Dec14
Multinational Lake Tanganyika Develop. Prog. (DRC) Agriculture ADF Grant 17Nov04 4.96 82.6 31Dec14
Multinational Congo Basin - Conservation of Ecosystems Environment ADF Grant 11Mar09 32.00 48.1 31Dec14
Cameroon Biodiversity Conservation Project (Cameroon) Environment ADF Loan 22Jul13 0.25 0.0 31Dec17
Multinational Biodiversity Conservation Project (Chad) Environment ADF Grant 22Jul13 0.25 0.0 31Dec17
Multinational Biodiversity Conservation Project (CAR) Environment ADF Grant 22Jul13 2.50 0.0 31Dec17
Multinational Lake Chad Basin Sustainable Development Environment ADF Grant 11Dec08 30.00 46.2 31Dec15
Multinational Kinshasa -Brazzaville Bridge Study Transport ADF Grant 3Dec08 5.00 51.8 31Dec15
Multinational CEMAC - Transport Facilitation Transport ADF Grant 5Jul07 14.00 12.8 30Nov14
Cameroon Cameroon/Congo: Ketta-Djoum Road Transport ADF Loan 25Sep09 59.27 58.1 31Dec15
Congo CG Cameroon/Congo: Ketta-Djoum Road Transport ADF Grant 25Sep09 61.90 48.5 31Dec15
Multinational Ouesso-Bangu-N'djamena Road and River Navigation Study Transport ADF Grant 1Dec10 8.00 12.8 31Dec14
Multinational Multinational Doussala-Dolisie Road Transport PRI Grant 28Mar11 0.33 61.0 31Jul14
Congo CG Ndende-Dolisie Road Project Transport ADF Loan 18Dec13 30.49 0.0 30Jun19
Multinational Transafrican Road Project (RTS)- Transport ADF Loan 11Dec13 20.90 0.0 31Dec19
Multinational Transafrican Road Project (RTS)- Transport ADF Grant 11Dec13 20.40 0.0 31Dec19
Multinational Ndende-Dolisie and Fac Road Project Transport ADB Loan 18Dec13 67.59 0.0 30Jun19
Multinational ECCAS Regional Water Policy Water Sup/Sanit
AWTF Grant 2Sep09 1.21 100.0 30Dec14
Multinational CAR-DRC Electricity Interconnection Ph.1 Power ADF Grant 19Sep12 29.73 0.0 31Dec17
Dem Rep Congo NELSAP Interconnection Project - DRC Power ADF Grant 27Nov08 27.62 6.0 31Dec14
Multinational Sect Development Support Project Power ADF Grant 20Nov13 39.40 0.0 31Dec19
Multinational Sect Development Support Project Power FAT Grant 20Nov13 5.00 0.0 31Dec19
Multinational CAR-DRC Electricity Interconnection Ph.1 Power ADF Grant 19Sep12 5.55 0.0 31Dec17
Chad Cameroon-Chad Interconnection Study Power ADF Grant 7Oct13 1.25 0.0 31Dec16
Cameroon Cameroon - Advans Cameroon (under the Africa SME Program)
Finance ADB LDC 17Dec14 0.87 0.0 31Dec19
Chad PRESIBALT Environment ADF Grant 17Dec14 5.35 0.0 31Dec19
RCA PRESIBALT Environment ADF Grant 17Dec14 2.02 0.0 31Dec19
Multinational Chad_.Strengthening Resilience -food and Nutritioni Agriculture ADF Grant 15Oct14 9.77 0.0 31Dec19
Cameroon Cmr-Chad Élect. Interc Project (CMR) Power ADF Loan 7Oct13 1.25 15.8 31Dec16
Multinational BDEAC- FAPA Grant Finance FAPA Grant 5Feb10 0.69 60.0 31Dec12
Multinational APOC (Phase III) Social ADF Grant 15Jul08 15.00 97.0 31Dec16
Multinational Capacity-Building Support Project Multi-Sector ADF Grant 19Dec12 7.00 10.7 30Dec16
Multinational Support for Inga - 3 Development Power NEPAD/IPPF Grant 23Aug13 1.37 0.0 31Dec16
Multinational Extension of Kinshasa-Ilebo Railway Transport NEPAD/IPPF Grant 15Jul12 0.73 42.6 30Jun15
Multinational North Kivu 220kv Transmission Line Power NEPAD/IPPF Grant 7Jun13 1.28 0.0 30Jun15
SUB-TOTAL : REGIONAL PROJECTS-Excluding CBFF 524.72
B. CBFF PROJECTS
Cameroon Rehabilitation and Management Project D Environment CBFF Grant 26Apr12 0.05 100.0 31Dec16
Dem Rep Congo Agroforestry Development Support Environment CBFF Grant 2Apr12 5.06 61.3 28Feb15
Eq Guinea Haute Ecosystems Sustainable Management Environment CBFF Grant 16Dec11 0.44 59.1 31Dec15
Multinational Achieving Conservation and Livelihood Environment CBFF Grant 13Nov09 1.03 64.9 31Dec14
Multinational Sankuru "Fair Trade" Carbon Initiative Environment CBFF Grant 7Apr10 1.12 90.1 1Mar15
Multinational Biodiversity International Environment CBFF Grant 9Jun10 1.29 62.9 31Dec14
Multinational Conservation International Foundation Environment CBFF Grant 9Jun10 1.14 12.8 31Jul15
Multinational "Ecomakala +" Environment CBFF Grant 12Jul11 2.10 33.3 31Dec15
Multinational REDD Agroforestry, South Kwamouth Environment CBFF Grant 12Jul11 2.10 54.8 31Mar15
Multinational Isangi REDD Integrated Pilot Project Environment CBFF Grant 19May11 1.94 62.1 30Sep15
Multinational Civil Society and Government Capacity Bu Environment CBFF Grant 13Jul11 2.70 20.3 30Jun16
Multinational Luki REDD Project Environment CBFF Grant 22Jul11 1.97 31.5 30Jun16
Multinational Mambasa REDD Project Environment CBFF Grant 27Apr11 2.50 64.0 30Sep15
Multinational Sustainable Afforestation and Reforestat Environment CBFF Grant 29Nov11 3.87 38.8 31Dec15
Multinational Support for Sustainable Resource Management Environment CBFF Grant 18May11 5.05 60.9 31Jul15
Multinational Support for Enlarged Training Programme E Environment CBFF Grant 19May11 6.43 100.0 31Dec14
Multinational Integrated Exploitation of the Jatro Plant Environment CBFF Grant 6Dec11 0.10 100.0 31Dec15
Multinational Development of Forestry Rejects and R Environment CBFF Grant 9Dec11 1.27 55.2 31Dec15
Multinational Improved Apiculture and Reforestation in Environment CBFF Grant 30Nov11 0.22 57.2 31Dec13
Multinational Vampeem – Development of African Medici Environment CBFF Grant 16Nov11 1.33 74.1 31Dec14
Multinational Multi-stakeholder Participation Support A Environment CBFF Grant 13Dec11 1.60 64.2 31Dec14
Multinational Strengthening of Farmers’ Contribution Environment CBFF Grant 13Apr12 2.84 20.2 31Dec15
Multinational Reforestation and Rehabilitation Project Environment CBFF Grant 6Dec11 0.19 71.9 31Dec15
Multinational Participatory Management and Restoration Environment CBFF Grant 6Dec11 0.13 39.7 31Dec15
Multinational MNV Basin Initiative Proposal Environment CBFF Grant 11Apr12 5.19 100.0 30Jun15
Dem Rep Congo Work closely with the populations to reduce deforestation and poverty in the Virunga-Hoyo region
Environment CBFF Grant 28Nov14 2.09 0.0 31Dec18
Multinational Stabilizing Carbon Emissions In The Sang Environment CBFF Grant 5Nov09 0.56 71.9 30Jun15
SUB-TOTAL CBFF PROJECTS 54.31
Grand Total 2,564.41 29.3%
XII
Annex IVb
Table of Bank Operations in West Africa
Projet PaysDate
approbation
Date de
cloture
Montant (en
UC)Tx dec. Secteur
PROJET APPUI FILLIERE COTON - BENIN Benin 29/11/2006 30/09/2015 8 000 000 76,75 Agriculture
PROJET APPUI FILLIERE COTON - B- FASO Burkina Faso 29/11/2006 31/12/2014 10 000 000 92,51 Agriculture
PROJET APPUI FILLIERE COTON - MALI Mali 29/11/2006 30/09/2015 10 000 000 60,45 Agriculture
PROJET GESTION DURABLE BETAIL RUMI MALI Mali 25/01/2006 29/12/2014 5 320 000 73,66 Livestock
PROJET GESTION DURABLE BETAIL RUMI SENE Senegal 25/01/2006 30/06/2015 4 440 000 84,42 Livestock
TRANS-GAMBIA RIVER CROSSING PROJECT Gambia 16/12/2011 30/06/2017 63 550 000 14,90 Transport
TRANS-GAMBIA RIVER CROSSING PROJECT Senegal 16/12/2011 30/06/2017 3 180 000 0,00 Transport
BENIN/TOGO:PROJET DE REHABILITATION DE L Benin 05/10/2011 31/12/2016 38 870 000 35,66 Transport
BENIN/TOGO:PROJET DE REHABILITATION DE L Benin 05/10/2011 31/12/2016 34 270 000 30,45 Transport
BENIN/TOGO:PROJET DE REHABILITATION DE L Togo 05/10/2011 31/12/2016 4 810 000 0,95 Transport
TOGO - FACILITATION Togo 27/06/2012 31/12/2017 17 800 000 32,14 Transport
BURKINA-FASO FACILITATION CORRIDOR Burkina Faso 27/06/2012 31/12/2017 21 530 000 15,93 Transport
PROJET DE LA ROUTE TRANSAFRICAINE (RTS) Niger 11/12/2013 31/12/2019 58 980 000 0,00 Transport
GHANA - TOGO - BENIN POWER INTERCONNECT Ghana 04/04/2007 31/12/2014 14 870 000 78,05 Power
BENIN - TOGO - GHANA POWER INTERCONNECT Benin 04/04/2007 31/12/2015 17 390 000 19,38 Power
CLSG LIBERIA Liberia 06/11/2013 31/12/2018 8 102 000 0,00 Power
CLSG SIERRA LEONE Sierra Leone 06/11/2013 31/12/2018 14 500 000 0,00 Power
CLSG GUINEE Guinea 06/11/2013 31/12/2018 28 910 000 0,00 Power
CLSG-RURAL ELECTRIFICATION -LIBERIA Liberia 06/11/2013 31/12/2018 16 838 000 0,00 Power
ETUDE DE LA LIGNE GUINÉE -MALI (FOMI) Guinea 12/01/2011 30/04/2015 1 667 000 27,00 Electricity
ETUDE DE LA LIGNE GUINÉE -MALI (FOMI) Mali 12/01/2011 30/04/2015 833 000 37,33 Electricity
CRISIS RESPONSE : TA TO FIGHT EBOLA Guinea 01/10/2014 31/12/2015 1 500 000 47,01 Institutional Support
CRISIS RESPONSE : TA TO FIGHT EBOLA Sierra Leone 01/10/2014 31/12/2015 1 500 000 45,00 Institutional Support
CRISIS RESPONSE : TA TO FIGHT EBOLA Liberia 01/10/2014 31/12/2015 1 500 000 47,12 Institutional Support
EBOLA OP CI, GUINEA, LIBERIA, SL Liberia 01/10/2014 31/12/2016 35 000 000 0,00 Other Multi Sector
EBOLA OP CI, GUINEA, LIBERIA, SL Liberia 01/10/2014 31/12/2016 5 200 000 0,00 Multi Sector
EBOLA FIGHT BACK PROGRAMME GUINEA Guinea 01/10/2014 31/12/2016 12 400 000 66,67 Multi Sector
EBOLA FIGHT BACK PROGRAMME GUINEA Guinea 01/10/2014 31/12/2016 6 000 000 67,11 Multi Sector
EBOLA FIGHT BACK PROGRAMME GUINEA Guinea 01/10/2014 31/12/2016 2 600 000 66,67 Multi Sector
EBOLA FIGHT BACK PROGRAMME SIERRA LEONESierra Leone 01/10/2014 31/12/2015 19 800 000 50,00 Multi Sector
EBOLA FIGHT BACK PROGRAMME SIERRA LEONESierra Leone 01/10/2014 31/12/2015 5 600 000 50,24 Multi Sector
EBOLA FIGHT BACK PROGRAMME SIERRA LEONESierra Leone 01/10/2014 31/12/2015 4 800 000 50,00 Multi Sector
EBOLA FIGHT BACK PROGRAMME SIERRA LEONESierra Leone 01/10/2014 31/12/2015 2 800 000 50,00 Multi Sector
482 560 000 38,11%
XIII
Annex IV
Main Related Projects Financed by the Bank and other Development Partners
Sectors/Projects Source of
Financing
Approval
Date
Signature
Date Effectiveness
Closing
Date
Approved
Amount
(CFAFM)
Peace, Security, Stability Sector
Peace-building mission in the Central African Republic
(MICOPAX) France 09/11/09 09/11/09 12/07/08 01/12/13 25,072
Peace Facility 4 (FP) EU, 10th EDF 17/12/10 01/05/11 31/12/13 3,501
Support for Peace and Security II (PAPSII) EU, 10th EDF 02/12/10 17/12/10 17/12/10 30/06/15 7,819
Infrastructure Sector (Transport & ICT) 13,682
Institutional and operational support for ECCAS to monitor the
implementation of PDCT-AC FPPI_NEPAD 27/09/10 06/10/10 06/10/10 30/11/13 494
Rail-bridge and extension of Kinshasa-Ilebo railway ADB 00/01/00 03/12/08 13/05/09 31/12/12 3,630
Study of Doussala-Dolisie Road and Transport Facilitation on the
Libreville-Brazzaville Corridor ADB/FPPI-NEPAD PRI
18/04/10 19/04/10 23/05/11 31/07/13 1,371
Study of Ouesso-Bangui -Ndjamena Road and River Navigation
on the Congo, Oubangui and Sangha ADB/ ADF 29/04/11 29/04/11 31/12/14 6,324
Ouesso-Sangmelima Road expenditure incurred for ECCAS coordination ADB /ADF 11/01/10 11/01/10 31/12/15 1,863
Energy & Water Sector
Project to Implement the Central African Regional Water Policy ADB/AWF &
IPPF-NEPAD 02/09/09 04/02/10 04/02/10 31/12/13 1,257
Environment Sector
Congo Basin Ecosystems Conservation Support Programme (PACEBCo) ADF/ADB 01/02/09 03/04/09 03/04/09 22,400
Conservation and Development of Fragile Ecosystems of Central
Africa (ECOFAC V) EU, 10th EDF 24/11/10 17/12/10 17/12/10 16/12/14 19,679
System to support the upsurge of timber processing in five Congo
Basin countries CFC 15/10/10 564
Agricultural Sector and Rural Development
Comprehensive African Agriculture Development Programme
(CAADP) WB_FS 27/10/10 22/11/10 01/10/10 31/12/13 2,000
Project to strengthen phytosanitary capacities of Member States of ECCAS and CEMAC FAO 01/06/11 08/06/11 01/07/11 01/01/13 223
Livestock for Livelihoods Project (L4LP) AU-BIRA 01/02/11 01/02/11 01/07/11 31/07/13 14
Project for the Participation of African Nations in Meetings of
Organizations responsible for fixing sanitary and phytosanitary standards
EU, AU-IBAR 115
Trade and Customs Sector
PACCIA II ITC
Support for the private sector CDE
Multi-sector
Capacity-building for Central African Parliamentarians (REPAC) ACBF 18/12/07 18/12/07 18/12/07 30/06/12 750
Annex V
Map of Project Area
This map has been provided by the staff of the African Development Bank exclusively for the use of readers of the report to
which it is attached. The names used and the borders shown do not imply on the part of the ADB Group and its members
any judgment concerning the legal status of a territory nor any approval or acceptance of these borders.