AFRICAN DEVELOPMENT FUND MULTINATIONAL-WAEMU-ECOWAS-ECCAS AIR TRANSPORT SECTORS OF WEST AND CENTRAL AFRICA (PASTA CO) OITC/GECL DEPARTMENTS June 2015 Translated document Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 16-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

AFRICAN DEVELOPMENT FUND

MULTINATIONAL-WAEMU-ECOWAS-ECCAS

AIR TRANSPORT SECTORS OF WEST AND CENTRAL AFRICA

(PASTA –CO)

OITC/GECL DEPARTMENTS

June 2015

Translated document

P

ub

lic

Dis

clo

sure

Au

tho

rize

d

P

ub

lic

Dis

clo

sure

Au

thori

zed

Page 2: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

TABLE OF CONTENTS

Project Information Sheet .......................................................................................................... iii

Project Summary ........................................................................................................................ v

Results-Based Logical Framework .......................................................................................... vii

Project Implementation Schedule ............................................................................................... x

I – Strategic Thrusts and Rationale ............................................................................................ 1

1.1. Project Linkages with Country Strategy and Objectives ............................................. 1

1.2. Rationale for the Bank’s Involvement ......................................................................... 3

1.3. Aid Coordination ......................................................................................................... 4

II – Project Description .............................................................................................................. 4

2.1. Project Objectives and Components ............................................................................ 4

2.2. Technical Solutions Adopted and Alternatives Explored ............................................ 5

2.3. Project Type ................................................................................................................. 6

2.4. Project Cost and Financing Arrangement .................................................................... 6

2.5. Project Target Area and Beneficiaries ......................................................................... 7

2.6. Participatory Approach in Project Identification, Design and Implementation .......... 7

2.7 Bank Group Experience and Lessons Reflected in Project Design ............................... 8

2.8. Key Performance Indicators .......................................................................................... 8

III – Project Feasibility ............................................................................................................... 9

3.1. Economic Benefit ........................................................................................................ 9

3.2. Environmental and Social Impact ................................................................................ 9

IV – Implementation ................................................................................................................ 10

4.1. Implementation Arrangement .................................................................................... 10

4.2. Monitoring and Evaluation ........................................................................................ 12

4.3. Governance ................................................................................................................ 13

4.4 Sustainability ............................................................................................................. 13

4.5. Risk Management ...................................................................................................... 13

4.6. Knowledge Building .................................................................................................. 14

V – Legal Framework .............................................................................................................. 14

5.1. Legal Instrument ....................................................................................................... 14

5.2. Conditions Associated with the Bank’s Involvement ............................................... 14

5.3. Compliance with Bank Policies ................................................................................ 15

VI – RECOMMENDATION ................................................................................................... 15

Page 3: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

LIST OF ANNEXES

Annex I. Operation’s Eligibility for RPG

Annex II. Detailed Description of Key Activities

Annex IIIa. ECOWAS Comparative Socio-economic Indicators

Annex IIIb. WAEMU Comparative Socio-economic Indicators

Annex IIIc. ECCAS Comparative Socio-economic Indicators

Annex IVa. Table of ADB Portfolio in Central Africa at 31/12/2014

Annex IVb. Table of ADB Portfolio in West Africa at 31/12/2014

Annex V Main Related Projects Financed by the Bank and the Country’s other Development

Partners

Annex VI. Map of Project Area

Page 4: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

i

CURRENCY EQUIVALENTS

December 2014

UA 1 = USD 1.464

UA 1 = EUR 1.174

UA 1 = CFAF 769.923

Fiscal Year From 1 January to 31 December

Weights and Measures

1metric ton = 2204 pounds

1 kilogramme (kg) = 2.200

1 metre (m) = 3. 28 feet

1 millimetre (mm) = 0.03937 inch

1 kilometre (Km) = 0.62 mile

1 hectare (ha) = 2.471 acres

Km² = square kilometre

m3 = cubic metre

m² = square metre

ml = linear metre

mm3 = Million cubic metres

m3/h = cubic metre per hour

l/s = litre per second

l/dy/pers. = litre per day per person

Page 5: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

ii

ACRONYMS AND ABBREVIATIONS

ACI Airport Council International

ACSAC Community Civil Aviation Safety and Security Oversight Agency

ADB African Development Bank

ADF African Development Fund

AFCAC African Civil Aviation Commission

AFD French Development Agency

AFRAA African Airlines Association

AGA Airport and Ground Assistance

ANAC National Civil Aviation Agency

APEX Airport Excellence

ASECNA Agency for Aerial Navigation Safety in Africa and Madagascar

ASSA-AC Air Safety Oversight Agency in Central Africa

AVSEC Aviation Security (ICAO)

BAG Banjul Accord Group

BAGASOO Banjul Accord Group Aviation Safety Oversight Organization

BWAS Bank of West African States

CAPSA Cooperative Arrangement for the Prevention of Spread of Communicable Disease Through Air Travel

CCDY Yamoussoukro Decision Monitoring and Coordination Committee

CEMAC Central African Economic and Monetary Community

COPIL Steering Committee

COSCAP Cooperative Development of Operational Safety and Continuing Airworthiness Programme

DAC Directorate of Civil Aviation

DGAC General Directorate of Civil Aviation

EASA European Aviation Safety Agency

ECCAIRS European Coordination Centre for Accident and Incident Reporting Systems

ECCAS Economic Community of Central African States

ECOWAS Economic Community of West African States

FAA Federal Aviation Administration

IATA International Air Transport Association

ICAO International Civil Aviation Organization

JTC Joint Technical Committee

LEI Lack of Effective Implementation

LCO Licensing and Certification Obligations

MIDT Ministry of Infrastructure, Accessibility and Transport

NEPAD New Partnership for Africa’s Development

OPS Operations

PACIE Trade and Economic Integration Support Programme

PARCI Institutional Capacity-Building Support Project

PASTA-CO Air Transport Sector Support Project in West and Central Africa

PEL Personnel Licences

PIDA Programme for the Development of Infrastructure in Africa

REC Regional Economic Community

RIS Bank Regional Integration Strategy 2014 – 2023 (being finalized)

RSOOs Regional Aerial Safety Oversight Agencies

SAR Search And Rescue

SARPS Standards and Recommended Practices

SOFIA Training management software

UA Unit of Account

USOAP Universal Safety Oversight Audit Program

WAEMU West African Economic and Monetary Union

WCA West and Central Africa

WFP World Food Programme

Page 6: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

iii

PROJECT BRIEF

DONEE: General Secretariat of the Economic Community of Central

African States (ECCAS)

Commission of the West African Economic and Monetary

Union (WAEMU)

Commission of the Economic Community of West African

States (ECOWAS) on behalf of the Banjul Accord Group

States

EXECUTING AGENCIES: The ECCAS General Secretariat through its Department of

Physical, Economic and Monetary Integration for the project

components in the ECCAS area; BP 2112 Libreville –

GABON – Tel.: (241) 44 47 31 – Fax: (241) 44 47 32

The ECOWAS Commission through its Directorate of

Transport for programme monitoring on behalf of the Banjul

Accord Group; P.O.B 401, Abuja, Nigeria, Tel : (234)

93147647, Fax: (234) 9 314 3005 / 3147644

The WAEMU Commission through its Department of

Community Territorial Development, Infrastructure,

Transport and Telecommunications for project monitoring

on behalf of WAEMU and Mauritania, 01 P.O. Box 543,

Ouagadougou, Burkina Faso, Tel: (226)50318873 à 76, Fax:

(226)50318872

Financing Plan

Source Amount (UA

Million)

Instrument

ADF

8.000

Grant

ECCAS 1.799 Counterpart

contribution

ECOWAS 0.711 Counterpart

contribution

WAEMU 0.486 Counterpart

contribution

TOTAL COST 10.996

Page 7: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

iv

Key ADF Financing Information

Loan/Grant Currency

Unit of Account

Interest Type* NA

Interest Rate Margin* NA

Commitment Fee* NA

Other Costs* NA

Maturity NA

Grace Period NA

FRR, NPV (Baseline scenario) NA

ERR (Baseline scenario) NA

*If applicable

Time Frame – Key Milestones (expected)

Concept Note Approval

October 2014

Project Approval June 2015

Effectiveness September 2015

Last Disbursement 2019

Completion 2019

Last Reimbursement NA

Page 8: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

v

PROJECT SUMMARY

Project Overview

The Project to Support the Air Transport Sector in West and Central Africa (PASTA-CO) is in

line with the Bank’s Ten-Year Strategy and corresponds to the thrusts of NEPAD’s PIDA,

especially the establishment of secured and efficient air spaces and airports for which the Bank

plays the role of catalyst of regional integration in Africa. It is also consistent with the Regional

Integration Strategy Paper (RISP) for Central Africa, whose Pillar II aims to build the

institutional and human capacities of RECs. Similarly, it is consistent with the West Africa

Regional Integration Strategy Paper whose Pillar II targets institutional capacity building and

support for regional initiatives and mechanisms that foster integration into the global economy.

Lastly, the project is aligned to the Bank Group’s Long-Term Strategy and consistent with its

sectoral focus on infrastructure with particular emphasis on regional integration. The project

outcomes will contribute to the objective of action plans for the development of air transport in

the three Regional Economic Communities to improve air transport safety and the liberalization

of cross-border air transport services in these regions to support trade, tourism and investment.

The project’s general objective is to contribute to improving civil aviation safety and to offer

safe and efficient air navigation services in a unified airspace in order to support trade and

regional socio-economic integration within the West and Central Africa region. It will improve

air transport safety, security and effectiveness mostly by: (i) building the oversight capacity of

Regional Air Safety Agencies; (ii) building the capacity of key air transport stakeholders in

both regions; and (iii) supporting mechanisms for coordinating regional air transport policies.

Financing Arrangement:

The project cost of UA 10.996 million is financed by ADF for UA 8.00 million, through the

Regional Public Goods Window. The overall contribution of the three RECs stands is UA 2.996

million including respectively UA 1.799 million for ECCAS, UA 0.711 million for ECOWAS

and UA 0.486 million for WAEMU. The project’s implementation will span four years, from

2015 to 2019.

Needs Assessment

The continental dimensions of the ECCAS and ECOWAS areas, compounded by land transport

problems, make air transport the most popular mode of commercial exchange and movement

of people in Central and West Africa. Unfortunately, users are far from satisfied with the air

services offered today. The main characteristics of the sector in these sub-regions are: (i) the

poor level of air safety and security in the region; (ii) the insufficient air links in and between

Member States of ECOWAS and ECCAS; (iii) weak capacities of Government departments in

charge of civil aviation; (iv) a high rate of air accidents, which is four times the global average

although Africa represents only 4.1% of global air traffic; (v) lack of airport infrastructure and

air navigation equipment and services.

Despite commendable efforts made, much still remains to be done to ensure better connectivity,

economies of scale and sustainable development of air transport in these regions, to enable it to

effectively play its role in supporting economic production and regional integration.

Page 9: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

vi

Target Beneficiaries

The project’s main direct beneficiaries are: (i) the ECCAS General Secretariat; (ii) ECOWAS

Commission; (iii) WAEMU Commission, but also the various Regional Coordination units of

NEPAD, the national focal points of ECCAS and ECOWAS, civil aviation authorities and

Ministries responsible for transport, trade and regional integration in ECCAS and ECOWAS

member countries.

Improving air transport operating conditions (better safety and security, regular flights, increase

in flights between capitals, lower tariffs and also recognition of passengers’ rights) will lead to

an increase in human and commercial exchanges due to the accessibility of Member States and

better regional integration.

The indirect beneficiaries of the project are residents of these zones, particularly women and

youth who will operate in a more favourable environment and benefit from basic infrastructure.

In fact, airlines will be able to take advantage of opportunities for growing intra-community

exchanges.

Bank’s Comparative Advantage and Value Added

Since 1970, the Bank has been lending vital support to the air sector, especially by financing

49 operations including the construction/rehabilitation of airports, installation of navigation

equipment, training, procurement of aircrafts and project preparation studies in the sector. This

project will consolidate these achievements, especially by building air safety/security capacities

in the beneficiary regions.

Knowledge Building

This will mainly involve disseminating good practices in air transport programme management

in the 3 REC member countries and in the production of quality and internationally-complaint

statistics and data in the sector. Dissemination of these practices in Member States’ Government

departments will be via documents produced, procedures manuals and training sessions to be

organized under the project. Knowledge garnered and lessons learned will be disseminated

within the Bank and in beneficiary countries.

Page 10: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

vii

Results-Based Logical Framework

Project Countries and Name: Countries of Central and West Africa – PSTA-OC Project

Global Project Objective: Build the capacity of regional aerial safety and of the Civil Aviation authorities of West and Central Africa; (ii) ensure application of international standards at the main WCA airports; (iii)

strengthen the aid coordination mechanisms in order to improve security, safety and efficiency of air transport in the region

Results Chain Performance Indicators

Means of Verification Risks/Mitigation Measures

Indicator (including CSI) Current Target

Imp

act

Contribute to improving civil aviation safety and to offer safe

and efficient air navigation

services in a unified airspace in order to support trade and regional

socio-economic integration within

the West and Central Africa region.

Volume of commercial exchanges in WCA

In 2014: 19% In 2025: 23% IATA Statistics

Statistics published by Ministry of Transport and

Civil Aviation

REC Monitoring Reports UN Comtrade

Ou

tco

me

Outcome 1: Airport safety levels

in West and Central Africa improved

Rate of non-compliance in WCA with ICAO safety standards

2014 : 66%

2020 : 45%

ICAO and FAA Audit

Reports Report of meetings of

CCSDY and Ministries

ICAO Statistics

Risks:

(i) Weak capacity of the RECs to perform their project

coordination role

(ii) Sustainability of actions and mechanisms that will be put

in place

(iii) Political tensions linked to elections in the countries

Mitigation Measures

(i) Revive steering committees

and monitoring

arrangements and delegate

works supervision to ICAO

and establishment of JTC

Outcome 2 : Airport infrastructure aligned to ICAO safety standards

Number of airports certified compliant with ICAO safety and security standards

2014: 3

2020 : 20

ICAO Audit Reports

Rate of compliance of airport infrastructure 2014: 30% 2020 : 50% ICAO Audit Reports

Rate of compliance with safety standards 2014: 45% 2020 : 75% ICAO Audit Reports

Outcome 3 : Increase in air traffic Rate of increase of air traffic in the region 2014: 8% 2020: 13% ASECNA Statistics

IATA Statistics

Page 11: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

viii

Ou

tpu

ts

Outcome 1 : Capacity-building

and support for air safety oversight agencies implemented

Institutional support put in place

Technical management tools put in place

Offices and equipment available

Regional and national inspectors (PEL, OPS,

AIR and AGA) trained

Inspector manuals available

Number of operator certifications conducted

In 2014 :

1 operational agency

(BAGASSO)

Although existing, ACSA and

ASSAC are not operational

In 2020

- Institutional structure in place

(Organizational chart, head office)

- Technical tools in place and

operational

- Inspectors recruited and on duty

- Number of inspector manuals

prepared and delivered

- At least 10 operators’

certifications conducted

Progress reports of

oversight and safety agencies

Control mission reports

Project supervision reports Project completion reports

ASSA-AC and ACSA

Board meeting reports Project progress reports

(ii) Airport revenue generated

by agency operations can

ensure the sustainability of

investments

(iii) Mediations for political

consensus

Output 1: Capacity building and

support for air safety oversight

agencies operational

Institutional support in place

Technical and management tools in place

Space and equipment available

Regional and national inspectors (PEL, OPS, AIR

and AGA) trained

Inspectors’ manuals available

Number of operator certifications

In 2014

1Agency operational (BAGASSO)

ACSA and ASSAC existing but

not operational

In 2020:

- Institutional support in

place (HQ organization

chart) - Technical tools in place and

operational

- Inspectors recruited and on

the job

- Number of inspectors’

manuals prepared and applied

- At least 10 operator

certifications carried out

Progress reports of security

supervision agencies

Control mission reports Programme supervision

reports

Programme completion

reports

Records of ASSA-AC and

ACSA Board of Directors’ meetings

Progress reports

Output 2 : Studies and

institutional support for the monitoring and coordination of

air transport programmes

strengthened

1. Regional AVSEC experts pool set up;

2. Training of State inspectors in safety and air transport units;

3. Support for the creation of a regional

accidents/incidents investigations bureau; 4. Improvement of the organization of Search

and Rescue (SAR) mechanisms in WCA;

5. Feasibility study to set up an air leasing company in West and Central Africa;

6. Conduct of diagnostic study of the gender

situation in air transport in WCA;

In 2014 :

1. Non-existent 2. Non-existent

3. Absence of investigations

bureau ; 4. SAR arrangement not

operational

5. Absence of study on leasing

6. Absence of statistical data

on gender

In 2020:

1. 1 pool of 40 experts put in place ;

2. At least 10 training sessions

organized 3. 1 regional investigations

bureau put in place.

4. 1 SAR programme put in place.

5. One study report validated

6. One diagnostic study of gender-based data

validated;

Progress reports of safety oversight agencies

Control mission reports

Project supervision reports Project completion reports

Report of ICAO and EASA

Page 12: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

ix

Output 3: Support for airports

security, safety and certification. 1. APEX safety and security review 2. Compliance-related investment plan

3. Safety and security audits in the WCA

region 4. Establishment of effective local

runway safety teams in each

international airport in West and Central Africa

In 2014 : 1. No review

2. No plan

3. 1 annual audit in the region 4. No local safety team

In 2020 : 1. Review report validated

2. Plan prepared and validated

3. At least 1 safety audit and 1 security audit performed per

airport per year

4. 30 effective local runway safety teams set up in the

West and Central Africa

region

Output 4: Project management

and coordination

Implementation reports

Joint technical committee

Financial and accounts audit

Reports produced Number of joint technical committee meetings

held

Number of audit reports produced

2014 :

0 report produced 0 joint technical committee held

0 audit report produced

In 2020 :

At least 5 audit reports produced, At least 6 joint technical

committee meetings organized,

16 implementation reports produced.

Components Resources

Key

acti

vit

ies

1. Capacity-building and support for Regional Aerial Safety Agencies (RSOO)

2. Studies and institutional support for monitoring and coordination of air transport programmes

3. Support for certification and compliance of ECCAS and ECOWAS Member States’ international airports

4. Project management and coordination.

COMPONENTS Total

1. Capacity-building and support for regional agencies 4.614

2.

Studies and institutional support to the

air transport sector for the monitoring of

air transport programmes

1.621

3 Support for airports security, safety and

certification 2.032

4 Project management and coordination 2.200

Base Cost 10.466

Physical contingencies 0.314

Price escalation 0.216

Total Cost (Net of taxes and customs

duties) 10.996

Page 13: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

x

PROVISIONAL PROJECT IMPLEMENTATION SCHEDULE

Years

Activities / Months J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

Prior to commencement

Board presentation

Loan effectiveness

Project launch mission

Equipement and supplies

Bid invitation IT and office equipment

Supply of goods and commencement

Studies and institutional support

Preparation and approval of ToR, SL and BI

Start of bidding process

Bids submission

Review of bids and signature of contracts

Commencement of studies

Approval of study reports

Consultants

Preparation of BD and drawing up of SL

Publication of bid invitations, analysis and award

Consultancy services

Preparation of institutional support

Establishment of technical tools for management

of agencies

Conduct of APEX reviews by ICAO

Establishment of local safety teams

Tech, assist EASA

Training and miscellaneous

Selection of participants

Conduct of training in security and safety

Monitoring

Mid-term review

Monitoring and evaluation

JTC meeting

Audit

Annual audit of accounts

Final audit of accounts

20182015 2016 2017 2019

Page 14: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

1

REPORT AND RECOMMENDATION OF THE MANAGEMENT TO THE BOARD OF

DIRECTORS CONCERNING THE PROPOSED AWARD OF A GRANT OF UA 8.00

MILLION CORRESPONDING TO UA 3.042 MILLION TO THE ECOWAS COMMISSION,

UA 2.957 MILLION TO WAEMU COMMISSION AND UA 2.000 MILLION TO THE ECCAS

GENERAL SECRETARIAT, TO FINANCE THE PROJECT TO SUPPORT THE AIR

TRANSPORT SECTORS IN WEST AND CENTRAL AFRICA (PASTA-CO)

This proposal, submitted for the Board’s approval, concerns the award of an ADF Grant of UA 8.00

million, under the terms set out in this report, consisting of UA 3.042 million to the ECOWAS

Commission, UA 2.957 million to the WAEMU Commission and UA 2.000 million to the ECCAS

General Secretariat, to contribute to the financing of the Project to Support the Air Transport Sector in

West and Central Africa (PASTA-CO). This institutional support, to be implemented from 2015-2019,

seeks to strengthen institutional capacity to oversee civil aviation safety and security and contribute to

the development and safety of air transport in West and Central Africa by putting in place common

institutional and regulatory frameworks in countries of the two sub-regions.

I. STRATEGIC THRUST AND RATIONALE

1.1. Project Linkages with the Country’s Strategy and Objectives

The global objective of the project is to contribute to improving civil aviation safety and to offer safe

and efficient air navigation services in a unified airspace in order to support trade and regional socio-

economic integration within the West and Central Africa region.

It will help to improve air transport safety, security and effectiveness, mostly by: (i) building the

capacity of regional aerial safety oversight agencies; (ii) ensuring compliance with international

standards of the main airports in WCA (iii) building the capacity of key air transport stakeholders in

both regions; and (iv) providing support to air transport policy coordination mechanisms in both

regions.

In fact, the air transport sector continues to face major safety and security challenges evidenced by: (i)

the weak level of air safety and security in the region; (ii) insufficient air links within and between

Member States of ECOWAS and ECCAS; (iii) the weak capacity of Government departments in

charge of Civil Aviation; (iv) a high rate of air accidents, which is four times the global average

whereas Africa represents only 4.1% of global air traffic; (v) the dearth of airport infrastructure and

aerial navigation equipment and services. In order to address these challenges, Regional Economic

Communities designed action plans for safe and effective air transport in their regions. The PASTA-

CO Project is consistent with the ECOWAS 2020 Vision and ECCAS 2025 Agenda. Specifically, this

project is anchored on the air transport development action plans prepared by RECs and validated by

ICAO, especially:

- At ECCAS, the project is anchored on the “2010-2015 Action Plan for Improving Air

Transport in Central Africa”. This plan, which was adopted by ECCAS Heads of State

and Government by Decision No. 20/CEEAC/CCEG/XIV/09 of 24 October 2009,

sought to make air transport safe, regular and affordable in Central Africa.

- At ECOWAS, the project derives from the Air Transport Action Plan which was

adopted by Member States in 2003, amended successively in 2009, 2011 and 2013, and

Page 15: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

2

which aimed to develop a well-structured regional air transport system with safe,

reliable, effective and affordable air services for all of Africa and well integrated in the

global network, in accordance with the ECOWAS 2020 Vision.

- At WAEMU, the project hinges on the Member States’ “Common Air Transport

Programme” (PCTA) adopted by Decision No. 008/2002/CM/UEMOA of the Statutory

Council of Ministers on 27 June 2002 with two main sector objectives: (i) Develop a

reliable, orderly and effective air transport system within WAEMU area that complies

with ICAO standards; and (ii) Foster the effectiveness of the Civil Aviation

administration and the competitiveness of air transport enterprises and (iii) Render air

transport accessible and affordable to the population of the Union.

The PASTA-CO Project’s design is consistent with the Bank’s Ten-Year Strategy and corresponds to

the thrusts of NEPAD’s PIDA, especially the establishment of secured and efficient air spaces and

airports. The Bank’s intervention via this project is in line with the Regional Integration Strategy Paper

(RISP) for Central African whose Pillar II aims to strengthen the institutional and human capacities of

RECs. It is also consistent with the Regional Integration Strategy Paper for West Africa whose Pillar

II targets institutional capacity-building and support for regional initiatives and mechanisms to

integrate the global economy. The project is aligned to the Bank Group’s Long-Term Strategy and

consistent with its sectoral focus on infrastructure with particular emphasis on regional integration.

The project outcomes will contribute to the objective of action plans for the development of air

transport in the three Regional Economic Communities to improve air transport safety and the

liberalization of cross-border air transport services in these regions to support trade, tourism and

investment

Key Development Issues

Several conferences of African Ministers in charge of air transport have been organized jointly by the

African Union and the Economic Commission for Africa (ECA) to lend fresh impetus to the air

transport sub-sector. These past few years, some improvements have been noted in the operation of

airlines. Many countries have complied with ICAO requirements by setting up autonomous civil

aviation authorities, and there has been a trend towards concession of airport management. Some

invested in improving air navigation services. Nevertheless, safety and security remain major

challenges to be addressed. Thus, ICAO reviews conducted in the WCA region in the form of USOAP

audits highlighted these countries’ deficiencies in the field of air safety and security.

Regarding airport infrastructure, only 4 out of the 69 airports covered by ICAO in the region are

certified as compliant with ICAO safety standards.

According to ACI’s 2014 classification of the 50 most frequented airports of Africa, 14 were from the

West and Central Africa region.

It was noticed in most major airports that: (i) runways and aircraft parking areas are not maintained,

resulting in a rundown pavement system; (ii) technical buildings are non-standard, with degraded

control towers (control block) that no longer offer the required 360° panoramic visibility; (iii) control

positions are unsuitable due to narrow lookouts and obsolete consoles; (iv) navigation equipment is no

longer compliant and is insufficient or non-existent for all platforms, making air navigation uncertain

across the entire air space.

It follows therefore that few airports have obtained the FAA Category 1 certification (Abidjan, Accra,

Lagos and Banjul, etc.) and some have lost it. Others need to meet regulatory standards for Annex 14

Page 16: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

3

(Aerodrome) compliance and subsequent certification. According to ICAO, only 40% of African

airports are compliant with safety standards, compared to 60% on a global average. To remedy this

situation, ICAO plans to certify all airports by 2019 and raise the percentage of compliant airports to

the global average by 2020.

With regard to air safety, although 2012 was the safest year in aviation history, the accident rate in the

Africa Region was higher comparatively, rising from 3.27 in 2011 to 3.71 in 2012 which remains the

highest rate globally.

The accident ratio for all types of aircraft more than doubled in the region (6.17 in 2011 to 12.44

accidents per million flights in 2012), with 13 accidents in 2012 against 8 in 2011. It is noteworthy

that air companies listed in the IOSA register had no accidents (39 companies registered to date

including 22 members of AFRAA).

In May 2012, IATA, ICAO and other organizations adopted a Strategic Action Plan for Improving

Safety in Africa which aimed to address safety weaknesses and strengthen safety oversight capacity in

the region by 2015. The plan, adopted in July 2012 by the African Union Ministerial Conference on

Safety and Security in Africa as an integral part of the Abuja Declaration, was approved at the African

Union General Assembly in January 2013.

1.2. Rationale for the Bank’s Involvement

The 25 WCA countries have a population of about 463 million, corresponding to nearly 35% of the

total population of Africa. These 25 States account for roughly 45% of the continent’s Gross Domestic

Product (GDP). WCA has a total area of 11.74 million km² and average population density of 39

people/km². The economic mainstay of WCA countries is agriculture, which employs close to 65% of

the labour force. The combined agricultural, mining, fishery potentials and human resources of WCA

countries should help in their significant development.

However, this prospect is blighted by air transport issues observed to varying degrees in these countries

including: high rates, insufficient inter-State links, dilapidated airport infrastructure, inadequate

assistance in air navigation, proliferation of airlines operating poorly maintained aircrafts and scarcity

of financial resources.

In order to help address these inadequacies, the Bank financed the Air Safety Oversight Capacity-

Building Programme in West and Central Africa (COSCAP) which made it possible to: (i) harmonize

the 3 RECs’ technical regulations with the training of regional inspectors to carry out inspections and

audits based on ICAO Standards and Recommended Practices; (ii) harmonize economic regulations

related to air transport in West and Central Africa; (iii) put in place regional air safety oversight

agencies in ECOWAS (Banjul Accord Group States), CEMAC and WAEMU; (iv) establish air

transport units within RECs; (v) support the implementation monitoring of some aspects of the

Yamoussoukro Decision related to air transport liberalization in each of the three RECs.

This project is a logical follow-up to COSCAP one of whose main goals was the setting up of regional

civil aviation safety oversight agencies in Central and West Africa so as to ensure that Member States

comply with ICAO standards, consolidate these achievements and thereby contribute to improving air

transport safety, security and efficiency. The aim will be to: (i) build the oversight capacity of Regional

Air Safety Agencies set up; (ii) contribute to airport safety and security improvement by support; (iii)

Page 17: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

4

build the capacity of key air transport stakeholders in the regions concerned; and (iv) provide support

to the air transport policy coordination mechanisms in the regions.

1.3. Aid Coordination

ECOWAS and WAEMU Commissions and the ECCAS Secretariat General currently receive support

from major donors, namely the Bank, the European Union, the French Development Agency and the

World Bank. This support is focussed mainly on areas such as governance, trade facilitation, regional

integration, peace and security, natural resources management and environment and the bulk of this

support targets capacity building.

The lack of an integrated multi-donor assistance framework remains one of the main weaknesses of

the current donor support for these communities. In the air transport sub-sector, aid coordination is

done through annual meetings of Joint Technical Committees (JTC) of projects, the Yamoussoukro

Decision Coordination and Monitoring Committee (CCSDY) and annual meeting of the Council of

Civil Aviation Ministers tasked with monitoring the implementation of this Decision. The last two

Bank operations aimed at building the capacities of the sector actors are the ECCAS (PARCI)

Institutional Capacity Building Project and COSCAP-WAEMU-CEMAC-ECOWAS. This

coordination effort will be stepped up during joint supervision missions of this project designed to

complement the Bank’s and other partners’ operations. The project being trans-regional in character

can guarantee that the Regional Economic Communities will work closely together.

Table 1.1

Donor Coordination

Sector or sub-sector* Importance

GDP Exports Manpower

Air Transport 6.47 % 11.87 % 14.1 %

REC

(USD Million)

Donors (2005-

2014) Amount (USD Million [%]

12.34 ADF 7.803 13.99%

AFD 3.221 5.78%

European Union 13.161 23.60%

WB 31.578 56.63%

TOTAL 55.764 100.00%

Level of aid coordination

Existence of thematic working groups No

Existence of a global sector programme No

ADB’s role in aid coordination None

Sources : ECCAS, CEMAC, WAEMU and ECOWAS economic reports

II. PROJECT DESCRIPTION

2.1. Project Objectives and Components

2.1.1 The project’s sector objective is to contribute to improving civil aviation safety and to offer

safe and efficient air navigation services in a unified airspace in order to support trade and regional

socio-economic integration within the West and Central Africa regions.

Page 18: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

5

2.1.2 Specifically, the project aims to: (i) build the safety and security oversight capacity of

Regional Air Safety Agencies and Civil Aviation Authorities; (ii) ensure that main WCA airports

comply with international standards; and (iii) strengthen coordination mechanisms so as to improve

air transport safety, security and effectiveness in the region.

2.1.3. Project Components: The project has four components namely: (i) Capacity-building and

support for Regional Air Safety Agencies; (ii) Studies and institutional support for air transport

programme monitoring and coordination; (iii) Support for airport security and certification; and (iv)

Project management and coordination.

Table 2.1

Detail of Components: N° Components Description Cost (in

UAM)

A

Capacity-building and

support for Regional Air

Safety Oversight

Agencies

This component aims to strengthen the capacities of regional agencies tasked with safety/security oversight and ensure

their operationalization in the project regions:

1. Institutional support;

2. Establishment of technical management tools;

3. Equipment and training.

4.614

B

Studies and institutional

support for air transport

programme monitoring

and coordination

This component aims to equip institutions with skills needed to monitor activities to be coordinated and supervised by

them. This involves:

1. supporting the establishment a Regional AVSCE Experts’ Pool;

2. training of civil aviation administrations and air transport units in air safety and security;

3. support for the creation of a regional investigations and incidents office in WCA;

4. improvement of the Search and Rescue arrangement in WCA;

5. feasibility study for the putting in place of a regional aviation medical centre;

6. feasibility study for the creation of an aircraft leasing company in WCA;

7. diagnostic study on gender in the air transport sector in WCA;

8. preparation of the WCA gender policy action plan in the air transport sector

9. training on gender issues in regional transport projects

10. support for the establishment of a database on air transport in WCA

1.621

C

Support for airport

security, safety and

certification

This component will enable the region to align its main airports to international standards, thereby making them more

attractive while improving the overall safety level with a view to certification. It comprises the following activities :

1. APEX Review (ICAO-ACI) for certification, gender mainstreaming in the definition of standards for the principal

airports of the two regions;

2. preparation of an airport investment plan to align airport infrastructure to international standards;

3. Establishment of local safety teams

3. support for Member States’ audit and inspection programme

2.032

D

Project management and

coordination

1. Equipping and operation of project management units;

2. Putting in place and operation of a joint technical committee;

3. Feedback workshops and seminars;

4. Financial and accounts audit.

2.200

2.1.4. The details of some key activities are given in Annex II.

2.2. Technical Solutions Adopted and Alternatives Explored

2.2.1 Although the causes of the human and financial resource constraints of ECCAS, ECOWAS

and WAEMU in the air transport sector are linked to inadequate management mechanisms, they are

also of a structural nature. Institutional reforms are necessary to address these difficulties. In parallel,

these institutions are in dire need of capacity reinforcement to advance the integration agenda in such

priority areas as air transport development and harmonization of sector policies including those linked

to transport facilitation. Thus, the approach adopted by the project consists in supporting the

implementation of action plans for air transport development in these regions and in providing

technical assistance via organizations such as ICAO and EASA capable of strengthening the existing

capacities of these institutions to enable them carry through the work programmes for key sectors

(infrastructure, transport, commerce, statistics, programming).

Page 19: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

6

Table 2.2

Alternatives Considered and Reasons for Rejection Alternative Solutions Brief Description Causes of Rejection

Option of a separate project per

REC

Each REC manages components assigned

to it through a separate grant

This would not allow for an exchange of experience and

data on the sector and project implementation; Also

sector constraints are identical for the various regions

2.3. Project Type

2.3.1 PASTA-CO is an institutional support project which, by virtue of its regional dimension and

its objectives, contributes to the promotion of a Regional Public Good. Indeed, it fulfils the conditions

set out in the new Strategy and Policy approved by the Bank in 2014 and the eligibility criteria for

Regional Public Goods (cf. Annex I). The choice of institutional support as the form of intervention

stemmed from the nature of planned activities (technical assistance, studies and training) to be

implemented in several institutions. Through this institutional support, the Bank also intends to

strengthen synergy with the support of other TFPs working to build capacity in agencies tasked with

steering institutional reforms and the support of regional integration mechanisms targeted by this

project.

2.4. Project Cost and Financing Arrangement

The project cost estimates, net of taxes and customs duties, is UA 15.188 million (equivalent to CFAF

11.694 billion at the December 2014 exchange rate of UA 1 = CFAF 769.923). These cost estimates

were based on the unit costs of similar projects in the same area and sector. The summaries of cost estimates by project component and expenditure category are given respectively

in Tables 2.3 and 2.4 below:

Table 2.3

Summary of Cost Estimates by Project Component COMPONENTS UA Million CFAF Billion

For. Exch. L.C. Total For. Exch. L.C. Total

A Capacity building and support for air safety agencies

2.973 1.641 4.614 2.289 1.263 3.6

B

Studies and institutional support for

RECs for the monitoring and coordination of air transport projects

0.846 0.775 1.621 0.651 0.597 1.248

C Support for airport safety, security and

certification

1.625 0.406 2.032 1.251 0.313 1.564

D Project management and coordination 0.409 1.790 2.200 0.315 1.378 1.694

Base Cost 5.853 4.613 10.466 4.507 3.552 8.058

Physical contingencies 0.176 0.138 0.314 0.135 0.107 0.242

Price escalation 0.121 0.095 0.216 0.093 0.073 0.166

Total Cost (Net of taxes and customs duties) 6.150 4.846 10.996 4.735 3.731 8.466

Table 2.4

Summary of Cost Estimates by Expenditure Category (in UA and CFAF Thousand) EXPENDITURE CATEGORIES UA Million CFAF Billion

F. E. LC Total F. E. LC Total

1. Goods 0.077 0.019 0.096 0.059 0.015 0.074

2. Services 4.426 4.256 8.682 3.408 3.277 6.685

2. Operating cost 1.350 0.338 1.688 1.040 0.260 1.300

Base Cost 5.853 4.613 10.466 4.507 3.552 8.058

Physical contingencies 0.176 0.138 0.314 0.135 0.107 0.242

Price escalation 0.121 0.095 0.216 0.093 0.073 0.166

Total Cost (Net of

taxes and customs

duties)

6.150 4.846 10.996 4.735 3.731 8.466

Page 20: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

7

2.4.1 Financing Arrangement: The project will be financed to the tune of UA 8.000 million by

the ADF, representing 72.75% of the project cost. The three RECs will contribute to the tune of UA

2.996 million including respectively UA 1.799 million for ECCAS (16.36%), UA 0.711 million for

ECOWAS (6.47%) and UA 0.486 million for WAEMU (4.42%).

2.4 The project costs by source of financing and expenditure schedule are presented in the

following tables.

Table 2.5: Source of financing (in USD and UA Thousand) Source of Financing UA Million CFAF Billion Percentage

For. Exch. L.C. Total For. Exch. L.C. Total

ADF 5.084 2.916 8.000 3.914 2.245 6.159 72.75%

ECCAS 0.861 0.938 1.799 0.663 0.722 1.385 16.36%

ECOWAS 0.205 0.506 0.711 0.158 0.390 0.548 6.47%

WAEMU - 0.486 0.486 - 0.374 0.374 4.42%

TOTAL 6.150 4.846 10.996 4.735 3.731 8.466 100.00%

Table 2.6: Expenditure schedule by source of financing (in UA Million) SOURCE 2015 2016 2017 2018 2019 Total

ADF 1.000 2.200 2.000 2.000 0.800 8.000

ECCAS 0.225 0.495 0.450 0.450 0.180 1.799

ECOWAS 0.089 0.196 0.178 0.178 0.071 0.711

WAEMU 0.061 0.134 0.121 0.121 0.049 0.486

% Base Cost 12.50% 27.50% 25.00% 25% 10% 100%

2.5. Project Target Area and Beneficiaries

2.5.1 The Project Area (PA) covers the 25 member countries of ECOWAS and ECCAS and a

surface area of 11,740,600 km² (nearly 35% of the total area of Africa). The target population is about

463 million people. The project’s main direct beneficiaries are: (i) the ECCAS General Secretariat;

(ii) the ECOWAS Commission; (iii) the WAEMU Commission as well as NEPAD Regional

Coordination Offices, national focal points of ECCAS and ECOWAS, civil aviation administrations

and the Ministries responsible for Transport, Trade and Regional Integration in ECCAS and ECOWAS

Member States.

2.5.2. The project’s indirect beneficiaries are the population of these countries, women, youth and

the aviation sector that will benefit from a more favourable regulatory environment and basic

infrastructure. Indeed, airlines will benefit from growth opportunities for inter-community exchanges.

2.6. Participatory Approach in Project Identification, Design and Implementation

The participatory approach was respected at all stages of the project. The various stakeholders –

Directorates of Civil Aviation, airlines, officials of regional safety agencies as well as Government

departments responsible for steering the project – were consulted during the project preparation and

appraisal mission. Through their participation, pioneer agencies of the sector such as ICAO, EASA

and ASECNA lent assistance to the project design, especially for the choice of relevant activities in

line with the action plans for improving air transport in the regions concerned. This process will

continue during project implementation.

Page 21: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

8

2.7. Bank Group Experience and Lessons Reflected in Project Design.

Since 1970, the Bank has lent significant support to the air sector, especially by financing 49 operations

including the construction/rehabilitation of airports, installation of navigation equipment, training,

procurement of aircraft and project preparation studies in the sector. This most recent operations

concern the rehabilitation of the Mohammed V airport in Rabat, Morocco, the Praia airport in Cape

Verde, the Air Transport Safety Project in DRC and lastly the COSCAP Project. In Central Africa, the

Bank financed the ECCAS Institutional Capacity-Building Support Project (PARCI) whose experts,

including the Administrative and Financial Officer, the Accountant and the Procurement Expert, will

be placed at this project’s disposal to ensure complementarity of Bank operations.

The design of this project was informed by lessons learned from Bank’s intervention as well as similar

ongoing experiences garnered during implementation of multinational projects.

Lessons learned: These relate to (i) Absence of procurement staff at the level of the RECs, accountant,

secretary, as well as project executing agency staff not trained in Bank rules and procedures; (ii) Weak

capacity of RECs to implement regional projects evidenced in the poor performance of the Bank’s

multinational portfolio; (iii) Absence of a coordination framework during projects involving several

RECs; (iv) Absence of implementation report drafted by ICAO which did not produce timely

supporting technical and financial reports on the use of funds received; (v) Failure to prepare audit

reports and final project implementation reports; and (vi) Noncommittal involvement of States.

Lessons reflected: The following actions were envisaged: (i) Strengthening of teams from the 3

economic communities with procurement and financial management experts coming from other Bank-

funded operations in these regions; (ii) Strengthening of coordination team through targeted support

in terms of short-term consultants and putting in place of technical assistance; (iii) Setting up of a joint

technical committee comprising experts from the three Regional Economic Communities; (iv)

Inclusion in works supervision agreements for some activities undertaken by ICAO and ESEA of a

clause requiring the production of implementation reports and the submission of same for the Bank’s

‘no objection’ before their signature; (v) Financial management modalities include the recruitment of

a single auditor for the three RECs for greater responsiveness regarding the production of reports; (vi)

Participation of country experts, via their civil aviation directorates, in the project design and

participation of these experts in the joint technical committee tasked with project coordination.

2.8. Key Performance Indicators

The key performance indicators and expected outcomes of the project are those stated in the logical

framework with deadlines. The Core Sector Indicators (CSI) on which emphasis will be placed are: (i)

volume of commercial exchanges in Central and West Africa; (ii) rate of non-compliance with ICAO

safety/security indicators in West and Central Africa; (iii) number of airports certified compliant with

ICAO safety and security standards; (v) number of safety and security audits and inspections; and (vi)

the number of local safety teams set up in airports.

For these to be achieved in a timely manner, implementation performance indicators were established

alongside these output indicators and aligned to the Bank’s institutional performance indicators. They

are mainly: (i) the effectiveness time frame; (ii) the deadline for fulfilment of conditions precedent to

first disbursement; (iii) procurement deadlines; (iv) the average implementation progress (IP)

indicator; (v) the disbursement rate versus expenditure schedule; and (vi) submission of quarterly

Page 22: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

9

progress reports as well as audit reports. These indicators will be monitored during supervision

missions and the day-to-day management of the project.

III. PROJECT FEASIBILITY

3.1. Economic Benefit

Although this project is an institutional support and economic and financial analysis does not apply to

it, its economic rationale rests mainly on the expected effects of reinforced air transport safety and

security. These effects will have an impact on commercial exchanges and knowledge/manpower

mobility. Further, by financing regional safety oversight agencies, PASTA-CO will help West and

Central African States to meet their obligations under the Chicago Convention (and Annexes) and the

Yamoussoukro Decision. Each will benefit from a strengthening of its own safety and security

oversight capacities (thanks to training of its technical staff). Operationalizing the three regional

agencies will allow for self-funding of activities (especially certification), which will generate new

revenue and contribute to sustaining air safety oversight in the region. Certification or audit agencies

of other continents (FAA, EASA), as participants in their operationalization, will facilitate mutual

acceptance of audits and certificates issued and help avoid arbitrary delays. Lastly, the improvement

of civil aviation safety and security is closely related to the decrease in transport costs. The poor

safety/security-related performances of WCA countries make local companies less competitive

compared to major international companies.

3.2. Environmental, Social and Gender Impact

3.2.1 Environmental Impact: The project is expected to contribute to positive impacts on the

environment, especially through: (i) a decrease in CO2 emissions due to the compliance of airport

infrastructure (phasing out of very old, high-fuel-consuming and very noisy aircrafts still in operation);

(ii) the reduction of noise pollution and better protection of residents through respect of aviation

paths; and (iii) support in communicable disease control in airport areas. The project will enhance air

transport effectiveness and efficiency in West and Central Africa, thereby helping to support green

growth in those regions.

3.2.2 Social Impact: The improvement of aerial safety will facilitate the free movement of goods

and people. The expected positive effects are: (i) improvement of air transport safety conditions and

increase in air travel by the population; (ii) increase in agricultural revenues since perishable products

(fruits and vegetables, tropical flowers, meat and fish) will be exported by air freight and tourism

development (hotels, means of land transport, natural and cultural sites, handicrafts); and (iii) optimum

accessibility of Member States, and increase in South-South and North-South commercial exchanges.

3.2.3 Impact on Gender: The three Regional Economic Communities each have a gender policy.

Concerning institutional support, supported activities concern: (i) the drafting of the action plan of the

WCA gender policy in the transport sector; and (ii) training on gender issues in regional transport

projects. The project’s training component will reach out to 40% of women. To tackle the challenge

of the near-absence of gender-disaggregated data in the air transport sector, a diagnostic study of the

gender situation in air transport in West and Central Africa will be conducted.

3.2.4 Forced resettlement: The project will not lead to population displacement.

Page 23: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

10

IV. IMPLEMENTATION

4.1. Implementation Arrangements

4.1.1. The project executing agencies are: (i) the ECCAS General Secretariat, through the

Department of Physical, Economic and Monetary Integration for components concerning the ECCAS

zone; (ii) the ECOWAS Commission, through the Directorate of Transport for components dealing

with Banjul Accord Group and Yamoussoukro Decision implementation support; and (iii) the

WAEMU Commission through the Directorate of Air Transport of the Department of Community

Territorial Development and Transport for project components concerning WAEMU and Mauritania.

4.1.2. During implementation of COSCAP, separate air transport units were created within the

ECOWAS and WAEMU Commissions. These will be the project management units. These units will

be reinforced by administrative and financial officers and procurement experts involved in other Bank

operations in these regions in a spirit of complementarity. As concerns the specific case of ECCAS, a

civil aviation engineer will be recruited in accordance with Bank procedures.

4.1.3. A Joint Technical Committee (JTC) will be set up bringing together designated experts from

the three Regional Economic Communities as well as representatives of beneficiary States through the

civil aviation departments. This JTC will be a regional framework of project coordination but also a

forum of exchange among the various Regional Economic Communities. The terms of reference of

this Committee feature in the technical annex of this report.

The involvement of RECs is based on the following principles:

NEPAD, which advocates the building of infrastructure as part of a regional development

vision;

The Yamoussoukro Decision on the liberalization of the air transport market in Africa

(1999) that binds AU Member States, the implementation of which at the level of each

region of Africa falls under RECs;

The need for Member States to pool their resources and work together to build on the

development of international air transport towards liberalization and globalization;

Recourse to RECs helps to make up for African States’ low income and to optimize the

gain expected from expenditure in the area of Air Transport through the pooling of

resources at community level.

4.1.4. As part of implementation of activities for the operationalization of regional air transport

safety oversight agencies, training of national inspectors in air safety, safety audits and APEX reviews

linked to airport certification, in addition to the agencies which will be directly involved, technical

assistance will be sought from ICAO as well as EASA which will be entrusted with the role of project

manager for these aspects. These interventions will be effected through technical assistance

agreements to be signed with the RECs. ICAO is indeed the specialized United Nations agency that

determines Standards and Recommended Practices (SARP) applicable worldwide by all Contracting

States and which covers all key aspects of international aviation. ICAO has extensive experience in

civil aviation development projects in Africa and the Indian Ocean. ICAO’s Directorate of Technical

Cooperation (TCB) has unique capacity to impartially administer complex organizational and

Page 24: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

11

infrastructural development projects in the sector. The European Civil Aviation Agency (ESASA) is

currently implementing a similar project in Central Africa with European Union funding to which this

operation will be complementary.

4.1.5. Procurement Method

In light of the multi-regional character of this initiative which involves three Regional Economic

Communities (RECs) – ECCAS, ECOWAS and WAEMU – and to ensure overall coherence in project

implementation, especially for subsequent control and audits, all procurement will be in accordance

with the Bank’s Procurement Rules and Procedures.

Besides, the air transport agencies of the three RECs will be responsible for procurement activities,

relying on the organization in place in each of the RECs for that. These are: (i) the ECCAS Directorate

of Infrastructure; (ii) the ECOWAS Air Transport Unit; and (iii) WAEMU Directorate of Air

Transport. It is noteworthy that ASSAC and BAGASOO procurements will be handled via existing

mechanisms of ECCAS and ECOWAS respectively. ICAO and EASA will be retained based on

agreements, to carry out specific activities within their respective mandates and spheres of competence.

To allow for a seamless implementation of the project, RECs have committed to keep up the agreed

procurement capacity, ensuring especially the existence of a procurement specialist and a formal

organization that defines the roles and responsibilities of stakeholders in the procurement process.

Lastly, detailed arrangements, including mechanisms for Bank consideration (prior or ex-post) are set

out in the technical annex on procurements and agreed upon through the procurement plan.

4.1.6 Financial Management and Disbursements

Based on project implementation modalities, each of the three RECs (ECCAS, WAEMU and

ECOWAS) will be responsible for the financial management of project activities in its region. Project

activities will be implemented by staff in service placed under the authority of the Administrative and

Financial Officer, for the ECCAS Financial Pool; the Head of the External Funds Management Unit,

for the ECOWAS Finance Department; and the Head of the Settlements and Budget Implementation

Monitoring Division, for the WAEMU Commission Department of Administrative and Financial

Services.

Funds will be disbursed at the Bank by the special account method (mainly for operating costs) and

the direct payment method (for procurement of goods and services and other relatively high

expenses...).

The existing fiduciary arrangements in the three RECs have been deemed acceptable in light of the

Bank’s minimum requirements as defined in the Policy on “Financial Management of Projects

financed the African Development Bank”, adopted in February 2014.

The fiduciary risk evaluated for the project’s financial management is substantial for all RECs. When

the mitigation measures and action plan found in the annex are implemented, the financial management

arrangement designed for this project will furnish with reasonable assurance financial information that

is reliable and compliant with the relevant Bank minimum requirements.

4.1.7 Audit Arrangements

Page 25: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

12

Audits will be performed annually by an independent external audit firm, which will be recruited on a

competitive basis pursuant to standard Bank terms of reference. The WAEMU Commission will recruit

the project’s external auditor for the other entities; thus, a single auditor will be recruited and within

six (6) months following project effectiveness, in close consultation with the other project executing

agencies and pursuant to Bank procedures. The terms of reference of the project external auditor will

be harmonized to factor in each executing agency’s specificities and approved during negotiations for

the recruitment of an independent firm with experience in auditing Bank-funded projects. Each entity

will design TOR applicable to its structure. Audits will comply with ISA/ISSAI standards. National

auditing standards that are mainly compliant with ISA or ISSAI standards will also be accepted. Audit

costs will be borne by the project. Financial statements audited by the independent firm will be

forwarded to the Bank within six (6) months following the closing of the relevant fiscal year by each

entity (see detail in technical annex B6).

4.2. Monitoring and Evaluation

4.2.1 The implementation of the project components will be monitored by air transport units. Joint

supervision missions (donors and RECs) and inter-donor coordination meetings will also allow for

reporting on the project’s performance in terms of physical and financial outputs.

4.2.2 Project monitoring by the Bank will be through sustained dialogue with the authorities,

especially through its Field Offices and during supervision missions. The project’s physical

implementation is expected to span a period of 48 months from June 2015 to June 2019. This

implementation schedule is deemed reasonable given the nature of reinforcement activities to be put

in place, the action plan and the time needed to set up related systems in the three Regional Economic

Communities. The tentative key milestones are presented in the following table:

Table 4

Project Monitoring and Supervision Time Frame Status Process Feedback

Q4 -2015 Project start-up Supervision mission Progress reports

Q1 – 2016 Consideration of the project –

procurement, resettlement

Supervision mission Progress reports / Aide-mémoire

Q3&Q4-2016, Implementation Supervision mission Progress reports / Aide-mémoire

Q1&Q2&Q3&Q4-2017-2018 Implementation Supervision mission and mid-

term review

Progress reports / Aide-mémoire

Q1 -2019

Q1 -2020

Guarantee period & first year of activities

Supervision mission Progress reports / Aide-mémoire Project completion report

Page 26: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

13

4.3. Governance

4.3.1 The project’s governance risks are linked with procurement decisions, the use of project assets

and the selection of persons to be trained abroad or to benefit from capacity-building. These risks will

be mitigated through preparation of a detailed procurement plan, strict selection of participants and

enforcement of standard Bank rules and guidelines with the assistance of ICAO. More advanced

training will be offered to project staff members so that they are fully informed of requirements and

regulations. Compliance with these control arrangements will be reviewed during supervision

missions.

4.3.2 With regard to financial governance, project executing agencies will keep separate accounts

for the project using appropriate accounting software allowing for cost accounting and the production

of reports that indicate expenditure by component, by category and by source of financing. Project

accounts will be audited annually by an audit firm recruited for that purpose. Financial monitoring

reports (FMR) and annual audit reports will be forwarded to ADF within forty-five (45) and six (6)

days respectively, following the closing of the accounting period.

4.4 Sustainability

If implemented, the project will contribute to enhancing the institutional effectiveness of the

ECCAS General Secretariat, WAEMU Commission and ECOWAS Commission. This will be

reflected in net improvements in the design and monitoring of regional infrastructural development

projects – key aspects of the integration agenda, considering the expected impact on the movement of

people and goods – as well as in communication quality and cost. The project will also allow for better

reflecting in these programmes Member State Governments’ concerns about capacity-building for all

stakeholders in the monitoring-evaluation process and policy harmonization. Emphasis will be placed

on harmonizing the action of CEMAC and ECCAS, and WAEMU and ECOWAS in order to forge

greater cooperation and synergy among them and thus move towards the common goal of creating a

common market of Central and West Africa, as a prelude to the African Common Market – the AU’s

Minimum Integration Programme (MIP) target for 2020.

Lastly, project sustainability depends on the funding mechanisms of new agencies. Indeed, if these

new regional agencies have equity resources (from airport fees), they will be more sustainable. Using

the standard fees and charges, these agencies will help to ensure the improvement of airport services

and the sustainability of investments. In addition, the delegation of works supervision to ICAO and

EASA will contribute to the availability of proven skills (initial and continuing training), to guarantee

a high level of service that better takes users’ expectations into consideration. This technical assistance

will boost the likelihood of sustaining project outputs.

4.5 Risk Management

4.5.1 The following table summarizes residual risks (other than those related to governance and

sustainability) as well as mitigation measures.

Risk Level Mitigation Measures Weak capacity of the ECCAS, ECOWAS and WAEMU

Secretariats to assume their project coordination role

High

Putting in place of a steering committee and monitoring

arrangements, delegation of works supervision to ICAO, provision of technical assistance to ECCAS

Sustainability of actions and mechanisms to be put in place

High

Airport revenue generated by the operation of agencies will ensure

the sustainability of investments

Political tension in most of the countries concerned Moderate Mediation to reach political consensus in the countries concerned

Page 27: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

14

4.5.2 The above analysis reveals that project risks are relatively high. Nevertheless, the outputs

achieved by ECCAS, WAEMU and ECOWAS and the regional context argue in favour of Bank

support to the project, in light of the expected significant progress in terms of institutional effectiveness

and REC ownership of this operation and ongoing NEPAD projects and considering the Bank’s

commitment to see the mutation of these RECs through as part of its mandate and regional integration

strategy.

4.6. Knowledge Building

The project design has benefited from the assistance of ICAO, ASECNA and EASA. This will mainly

entail the dissemination of good practices in air transport programme management in Member States

of the three RECs and in the production of quality internationally-compliant statistics and data in the

sector. These practices will be disseminated in Government departments of member countries through

distribution of documents produced, procedure manuals as well as training sessions that will be

organized during the project. This knowledge and the lessons learned will be disseminated within the

Bank and in beneficiary countries.

V. LEGAL FRAMEWORK

5.1. Legal Instrument

5.1.1 The proposed financial instrument is an ADF Grant of UA 8.00 million, corresponding to UA

3.042 million to the ECOWAS Commission, UA 2.957 million to the WAEMU Commission and UA

2.000 million to the General Secretariat of ECCAS.

5.2. Conditions Associated with the Bank’s Involvement

A. Conditions precedent to effectiveness

The effectiveness of the Grant Agreement will be subject to its signature by the Donee and the Fund.

B. Conditions precedent to first disbursement

Apart from effectiveness of the Agreement, the first disbursement of Grant resources shall be subject

to fulfilment by Donee of the following conditions:

a. For WAEMU

Furnish to the Fund evidence of opening a special CFAF account in BWAS to receive Grant resources

allocated to WAEMU;

b. For ECOWAS

Furnish to the Fund evidence of the opening in a commercial bank acceptable to the Fund of a USD

(dollar) account to receive Grant resources allocated to ECOWAS and a NAIRA sub-account for

payment for specific activities undertaken in Nigeria;

Page 28: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

15

c. For ECCAS

Furnish to the Fund evidence of the opening in a commercial bank acceptable to the Fund, of a special

CFAF account to receive Grant resources allocated to ECCAS.

Other conditions. The Donee shall in addition:

a. For ECOWAS and ECCAS:

(i) Furnish to the Fund evidence of Donee’s commitment to other donors to participate in

financing the project;

b. For ECOWAS, ECCAS and WAEMU:

(ii) Furnish to the Fund, before 1 January every year and as from 2015, evidence of

mobilization of the counterpart contribution to financing, pursuant to the project

expenditure schedule ;

(iii) Forward to the Fund evidence of the inclusion in project staff of a procurement expert

and financial officer tasked with managing the fiduciary activities of the project.

Commitments. Donee commits to:

(i) Furnish to the Fund evidence of the designation of the seat of the Administrator of the

ACSAC-WAEMU Agency;

(ii) Furnish to the Fund evidence of the recruitment of experts of ASSAC-Central Africa;

(iii) Forward to the Fund agreements signed with ICAO and EASA;

(iv) Prepare and forward to the Fund quarterly progress reports of the project.

5.3. Compliance with Bank Policies

5.3.1 This project complies with the applicable Bank policies, especially those related to project

financial management, procurement, disbursement and eligibility of expenditure for Bank financing.

No exception is recommended.

VI. RECOMMENDATION

Management hereby recommends that the Board of Directors approve the proposal to award an ADF

Grant of UA 8.00 million, corresponding to UA 3.042 million to the ECOWAS Commission, UA

2.957 million to the WAEMU Commission and UA 2.000 million to the General Secretariat of ECCAS

, for the purpose and under the conditions set out in this Report.

Page 29: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

I

Annex I

Selection Indicators Remarks

A. Absence of rivalry:

One party can enjoy benefits without these

benefits being (much) less available for the

other parties

The project outcomes are: Outcome 1 : Improvement of the level of air transport safety in West and Central

Africa zone

Outcome 2 : Improvement of air transport services

Outcome 3 : Modernization of airport infrastructure and compliance with ICAO operational standards

None of these outcomes is so rare as to trigger rivalry and they will

benefit users but without impacting quality and quantity

B. Absence of exclusion :

It is hard or too costly to keep the others out

It is impossible to prevent non-participating

countries/communities from enjoying benefits generated by the

project. In fact, the improvement of air transport services in WCA

countries will also benefit other countries/communities they have

air links with

C. Public interest and ownership

-great public interest and a huge advantage

-there is proof of ownership by beneficiary

countries/regions

Huge benefits and strong ownership; the project will be

coordinated by the three RECs. Airport safety in each country

involved will be managed by a dedicated regional agency as well

as national safety/security oversight bodies and the market

regulation function

D. Regional dimension:

-Must involve at least two countries The project involving the 25 countries of WCA region requires the

involvement of all countries for its optimum implementation

-Can only be effectively implemented if each

country involved participates and supports its

production

E. Strategic alignment:

BPR must be in line with the Bank’s strategic

guidelines

The project is fully consistent with the Bank’s integration strategy

targeting better quality regional transport as a driver of integration.

The project was also selected by PIDA to develop the intra-African

transport market through implementation of the Yamoussoukro

Decision on air transport market liberalization and improvement

of air transport safety and security

F. Upstream and catalysing role:

The Bank support aims to correct the deterrent

effects that impede BPR or progress towards it,

due especially to the lack of coordination, the

fear of risk and the problem of fare-dodgers

The Bank’s support aims to remedy weaknesses observed in safety

and effectiveness currently impeding the development of the air

transport market

Rationale for the Operation’s Eligibility for Regional Public Goods

Page 30: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

II

G. Benefits flowing gradually from

cooperation:

The impact in terms of expected development

of cooperation among countries is clearly

higher than the net positive benefits each

country can obtain acting individually

The project’s benefits are higher (greater effectiveness) than those

that each country can obtain acting alone without cooperating with

other countries, particularly in terms of the harmonization and

implementation of safety and security regulations

H. Effects on development:

- Strengthening of governance

(adoption of health financial

practices; Harmonization of

governance practices;

abolition of trade barriers;

Creation of jobs)

- Knowledge building

(Optimization of data

collection; Dissemination of

best practices; brain drain)

- Environmental sustainability

and climate change

(Sustainable livelihoods;

capacity-building ; Adaptation

to climate change and

resistance to climate variations)

- Protection of human health

(study of homes; Limitation of

contagious diseases;

development of new treatments

or vaccines)

- Regional integration

(Promotion of trade;

Strengthening of safety;

Development of the private

sector)

The project will have a considerable impact on development, both

directly, by protecting human life (e.g. travellers), and by

strengthening sector governance. The participation of regional

communities and establishment of dedicated regional oversight

bodies will facilitate the collection of information on air transport

safety/security levels in the WCA space.

In addition, by ensuring safer and more affordable air transport, the

project will contribute to the promotion of intra-African trade and

greater safety. Market development will in turn attract private

investments in this sub-sector

Page 31: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

III

Annex II

Detailed Description of Key Activities

Component A: Capacity-building and support for Regional Aerial Safety Agencies

1. ASSAC – ECCAS and ACSAC-WAEMU

This support consists in the formulation of rules and related guides, the training of senior staff and

regional inspectors for agencies, the installation of technical management tools and the

establishment of a regional database on air safety. This will involve operationalizing the new

agencies through organizational support and staff training.

Specific activities planned

Technical activities are planned for the following aspects:

a) Institutional support to agencies

Institutional support concerns:

- Support for putting in place steering organs and tools;

- Equipment (high level IT equipment, software, office automation, furniture…);

It will also be necessary to ensure effective coordination between Member States and the agency

which should lead these States to delegate at least some of their operational regulatory, certification

and oversight activities.

b) Regulation

This will involve the assessment of instruments prepared at the level of the Regional Economic

Communities, especially the Community Aviation Rules covering ICAO Annexes 1, 6, 8 and 14.

Works will mainly concern aviation personnel licensing (PEL), technical aircraft operation (OPS),

air navigability (AIR) and airports and ground assistance (AGA) and will have a two-fold focus:

regulatory instruments and related inspector manuals. Without these two components, it will be

impossible for national and regional inspectors to successfully discharge their obligation of

overseeing aviation activity in the region. Should RACs be adopted before the project becomes

effective, the first phase of works will centre on inspector manuals.

c) Safety data

This will involve installing an IT tool for safety data monitoring, a tool that integrates the regional

dimension. The tool will be deployed as technical prerequisites are in place, in particular IT

equipment or internet connection.

The use of the SOFIA software at the country and regional levels will allow for the harmonization

of practices at regional level as well as the follow-up of the resolution of safety problems mainly

in the areas of PEL, OPS and AIR.

Page 32: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

IV

Alongside deploying SOFIA, assistance will be provided to implement ECCAIRS and establish

the database.

Training

During ICAO’s USOAP audits, it emerged that staff training was the weak link for many Member

States. Other critical elements (often the most affected also) include certification, oversight and the

follow-up of disparities in the areas of PEL, OPS, AIR and AGA. It is also noteworthy that these

are particular areas that agencies will cover.

Since human resources are crucial to the effective establishment of a regional safety agency,

training is a key element of this project.

The planned training concerns two staff categories:

- technical staff of agencies, and

- inspectors of civil aviation authorities in WCA States.

The project start-up phase will aim at specifying the type of training to be offered and the profile

of staff to be trained. Trainings offered in French will mainly be in the fields of PEL, OPS, AIR

and AGA, and will be supplemented by more targeted trainings in related fields. The objective will

be to upgrade the skills of regional and national inspectors to enable them to efficiently oversee air

transporters, maintenance agencies, training centres and airport operators.

2. BAGASSO (Regional Aerial Safety Oversight Agency of the Banjul Accord Group States):

Support for the implementation of the Agency’s Strategic Development Plan

Activity 1: Resolution of serious safety problems

The goal of this support is to enable the BAG States, namely, Guinea, Sierra Leone and Liberia

which are currently on the ICAO list of States having serious safety concerns (SSC), to build their

capacity in certification and oversight. This should ultimately enable these States to get off the list.

Specific actions:

- Drafting of an appraisal report on the current state of safety oversight capacities of

States;

- Putting in place of a certification process compliant with ICAO standards;

- Design of technical guidelines for conducting certification pursuant to ICAO

standards;

- Publication and dissemination of guidance materials for relevant sections ;

- Putting together of the inspector’s toolkit containing procedures, control lists and

CEA (Airworthiness Certificate) forms for national inspectors;

Page 33: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

V

- Training of national inspectors in the 5 phases of the certification process.

A. Activity 2:

The objective of this support is to strengthen the safety oversight capacity of BAG Member States

through delivery of effective ICT services, including aviation software packages, an aviation

tracking system and regional aviation register allowing for the real-time tracking of aviation

activities.

Specific actions:

1. Regional monitoring software

a. Aircraft safety assessment;

b. Putting in place of the register of air operators and approved maintenance agencies.

2. Dissemination of information

a. Establishment of a computerized training platform (CBT).

b. Opening of a technical library.

A. Component B: Studies and institutional support for air transport programme

monitoring and coordination. Adoption of technical safety rules and related procedures

This involves pursuing activities aimed at preparing and adopting civil aviation safety rules to

ensure that areas outlined in ICAO’s 19 Annexes are covered by community rules.

Activities to be undertaken mainly concern workshops to prepare, consider and validate rules to be

enforced within the community space.

B. Capacity-building for civil aviation administrations

This involves assisting Member States to implement new concepts and programmes designed by

ICAO. Identified actions include: (i) Training in community civil aviation safety regulations; (ii)

Support for the activities of USOAP ongoing surveillance method; (iii) Support to put in place

national safety programmes (NSP); (iv) establishment of regional expertise on dangerous goods;

(v) Assistance in the delivery of operators’ SMS; (vi) creation of a databank on safety.

Page 34: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

VI

C. Strengthening of capacities to investigate aviation accidents and incidents

This activity will comprise actions undertaken to build Member States’ capacities to investigate

accidents through seminars and workshops organized in cooperation with ICAO and renowned

investigation bureaus and to re-update the ACIP/ICAO study undertaken in 2010.

The following activities are envisaged: (i) Sensitization and training seminars on accident

investigation; (ii) Update of the 2010 ACIP/ICAO study on the creation of a regional accidents

investigation agency; and (iii) Study validation workshop.

The Search and Rescue (SAR) arrangement will also be reinforced and a regional SAR cooperation

and coordination mechanism put in place.

D. Support for implementation of the CAPSCA programme

Pursuant to Article 14 of the Chicago Convention on civil aviation, ICAO Member States

committed to take effective measures to prevent the spread of communicable diseases through air

travel including Ebola fever.

CAPSCA (Cooperative Arrangement for the Prevention of the Spread of Communicable Disease

through Air Travel) Programme is already in force in the 191 Member States of ICAO and gives

rise to meetings, training workshops and seminars.

Issues related to diseases spread through air travellers will be included in the ICAO Audits

agreement as from 2013. This project, formulated as the Ebola epidemic, continues, will support

RECs in accompanying their Member States through implementation of the following activities:

- Training of CAPSCA technical advisers;

- Sensitization seminars in Member States;

- Conduct of inspection and assistance missions in Member States;

Component C: Support for the certification and compliance of ECCAS and ECOWAS

Member States’ international airports

This involves the compliance of the main airports of ECOWAS and ECCAS Member States.

Twenty (20) airports of the region were identified in collaboration with the RECs and ICAO to

benefit from this assistance.

Four (4) major actions were identified:

- APEX safety and security review and conduct of a compliance study of the

region’s airport and aviation infrastructure with a view to defining a programme to

upgrade airport and aviation infrastructure/installations and aerial navigation

services:

consultancy service to conduct a diagnostic study, assess needs and prepare a

Page 35: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

VII

compliance programme/plan;

study feedback workshop and validation of the compliance programme;

prospecting for financing (organization of roundtables, preparation missions

targeting Technical and Financial Partners).

E. Member States’ Audit and Inspections Programme

The safety audit and inspection programme was listed among the priority actions of the Common

Air Transport Programme in West and Central Africa in order to address inadequacies observed

during ICAO safety audits and bring on board new measures adopted by ICAO to bolster aviation

safety. It aims at developing a common civil aviation safety policy in Member States, enabling

them to comply with international standards. Envisaged activities will hinge on:

- harmonizing the implementation of security measures. This will involve:

compliance control of the implementation of security measures;

technical assistance and support missions in Member States;

- strengthening the oversight capacities of Member States;

Page 36: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

VIII

Annex IIIa.

ECOWAS Comparative Socio-economic Indicators

Indicator Année CEDEAO AfriquePays en

Développement

Pays

DéveloppésCharts

Basic Indicators

Superficie ('000 Km²) 5 112,7 30 046,4 80 976,0 54 658,4

Population totale (millions) 2013 327,4 1 109,0 5 628,5 1 068,7

Population urbaine (% of Total) 2013 46,1 40,2 44,8 77,7

Densité de la population (au Km²) 2010 58,8 34,5 66,6 23,1

Revenu national brut (RNB) par Habitant ($ EU) 2012 1 170,7 1 691,5 2 780,3 39 688,1

Participation de la Population Active - Total (%) 2013 33,9 37,4 0,0 0,0

Participation de la Population Active - Femmes (%) 2013 43,1 42,5 39,8 43,3

Valeur de l'Indice sexospécifique de dévelop. humain 2007 0,5 0,5 .. 0,9

Indice de développement humain (rang sur 169 pays) 2012 .. .. .. ..

Population vivant en dessous de $ 1 par Jour (%) 1995 .. .. 25,0 ..

Indicateurs Démographiques

Taux d'accroissement de la population totale (%) 2013 2,7 2,5 1,4 0,7

Taux d'accroissement de la population urbaine (%) 2013 4,0 3,4 2,4 1,0

Population âgée de moins de 15 ans (%) 2013 43,9 40,9 29,2 17,7

Population âée de 65 ans et plus (%) 2013 2,8 3,5 6,0 15,3

Taux de dépendance (%) 2006 88,8 77,3 52,8 ..

Rapport de Masculinité (hommes pour 100 femmes) 2013 101,9 100,0 934,9 948,3

Population féminine de 15 à 49 ans (%) 2013 23,0 24,0 53,3 47,2

Espérance de vie à la naissance - ensemble (ans) 2013 54,7 59,2 65,7 79,8

Espérance de vie à la naissance - femmes (ans) 2013 55,7 60,3 68,9 82,7

Taux brut de natalité (pour 1000) 2013 40,1 35,3 21,5 12,0

Taux brut de mortalité (pour 1000) 2013 12,2 10,4 8,2 8,3

Taux de mortalité infantile (pour 1000) 2013 71,0 61,9 53,1 5,8

Taux de mortalité des moins de 5 ans (pour 1000) 2013 117,8 97,4 51,4 6,3

Indice synthétique de fécondité (par femme) 2013 5,6 4,6 2,7 1,8

Taux de mortalité maternelle (pour 100000) 2010 544,0 415,3 440,0 10,0

Femmes utilisant des méthodes contraceptives (%) 2013 17,0 34,9 61,0 75,0

Indicateurs de Santé et de Nutrition

Nombre de médecins (pour 100000 habitants) 2010 24,3 52,6 77,0 287,0

Nombre d'infirmières (pour 100000 habitants) 2008 112,2 .. 98,0 782,0

Naissances assistées par un personnel de santé qualifié (%) 2003 38,6 .. 39,0 99,3

Accès à l'eau salubre (% de la population) 2012 68,7 68,8 84,0 99,6

Accès aux services de santé (% de la population) 2000 61,8 65,2 80,0 100,0

Accès aux services sanitaires (% de la population) 2012 24,3 39,4 54,6 99,8

Pourcent. d'adultes de 15-49 ans vivant avec le VIH/SIDA 2012 2,3 3,9 161,9 14,1

Incidence de la tuberculose (pour 100000) 2012 120,7 223,6 .. ..

Enfants vaccinés contre la tuberculose (%) 2012 76,0 83,1 89,0 99,0

Enfants vaccinés contre la rougeole (%) 2012 58,2 74,6 76,0 92,6

Insuffisance pondérale des moins de 5 ans (%) 2008 24,7 .. 27,0 0,1

Apport journalier en calorie par habitant 2009 2 686,2 2 564,7 2 675,2 3 284,7

Dépenses publiques de santé (en % du PIB) 2011 .. 5,9 4,0 6,9

Indicateurs d'Education

Taux brut de scolarisation au (%) .. .. .. ..

Primaire - Total 2010 85,4 101,8 106,0 101,5

Primaire - Filles 2010 81,1 97,8 104,6 101,2

Secondaire - Total 2010 39,7 45,4 62,3 100,3

Secondaire - Filles 2010 36,6 41,9 60,7 100,0

Personnel enseignant féminin au primaire (% du total) 2010 41,9 43,7 .. ..

Alphabétisme des adultes - Total (%) 2006 .. .. 19,0 ..

Alphabétisme des adultes - Hommes (%) 2006 .. .. .. ..

Alphabétisme des adultes - Femmes (%) 2006 .. .. .. ..

Dépenses d'éducation en % du PIB 2008 .. 5,3 .. 5,4

Indicateurs d'Environnement

Terres arables en % de la superficie totale 2011 17,0 8,4 9,9 11,6

Taux annuel de déforestation (%) 2000 2,1 0,6 0,4 -0,2

Taux annuel de reboisement (%) .. .. .. ..

Emissions du CO2 par habitant (tonnes métriques) 2010 0,4 1,1 .. ..

dernière mise à jour: décembre 2014

CEDEAO

Indicateurs Socio-Economiques Comparatifs

Source : Base des données du Département des Statistiques de la BAD;

Banque Mondiale WDI; ONUSIDA; UNSD; OMS, UNICEF, WRI, PNUD, Rapports nationaux.

Notes: n.a. Non Applicable ; … : Données non disponibles.

0

500

1000

1500

2000

201

0

201

1

201

2

Revenu national brut (RNB) par Habitant ($ EU)

CEDEAO Afrique

2,3

2,35

2,4

2,45

2,5

2,55

2,6

2,65

2,7

2,75

2,8

201

0

201

1

201

2

201

3

Taux d'accroissement de la population totale (%)

CEDEAO Afrique

66,5

67

67,5

68

68,5

69

201

0

201

1

201

2

Accès à l'eau salubre (% de la population)

CEDEAO Afrique

0

20

40

60

80

100

120

200

0

200

1

200

2

200

3

200

4

200

5

200

6

200

7

200

8

200

9

201

0

Secondaire - Total

CEDEAO Afrique

Page 37: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

IX

Annex IIIb.

WAEMU Comparative Socio-economic Indicators

Indicator Année UEMOA AfriquePays en

Développement

Pays

DéveloppésCharts

Basic Indicators

Superficie ('000 Km²) 3 506,1 30 046,4 80 976,0 54 658,4

Population totale (millions) 2013 103,4 1 109,0 5 628,5 1 068,7

Population urbaine (% of Total) 2013 37,3 40,2 44,8 77,7

Densité de la population (au Km²) 2010 27,4 34,5 66,6 23,1

Revenu national brut (RNB) par Habitant ($ EU) 2012 772,7 1 691,5 2 780,3 39 688,1

Participation de la Population Active - Total (%) 2013 38,3 37,4 0,0 0,0

Participation de la Population Active - Femmes (%) 2013 41,7 42,5 39,8 43,3

Valeur de l'Indice sexospécifique de dévelop. humain 2007 0,4 0,5 .. 0,9

Indice de développement humain (rang sur 169 pays) 2012 .. .. .. ..

Population vivant en dessous de $ 1 par Jour (%) 1995 .. .. 25,0 ..

Indicateurs Démographiques

Taux d'accroissement de la population totale (%) 2013 2,9 2,5 1,4 0,7

Taux d'accroissement de la population urbaine (%) 2013 4,3 3,4 2,4 1,0

Population âgée de moins de 15 ans (%) 2013 44,9 40,9 29,2 17,7

Population âée de 65 ans et plus (%) 2013 2,8 3,5 6,0 15,3

Taux de dépendance (%) 2006 92,7 77,3 52,8 ..

Rapport de Masculinité (hommes pour 100 femmes) 2013 100,3 100,0 934,9 948,3

Population féminine de 15 à 49 ans (%) 2013 23,0 24,0 53,3 47,2

Espérance de vie à la naissance - ensemble (ans) 2013 56,6 59,2 65,7 79,8

Espérance de vie à la naissance - femmes (ans) 2013 58,8 60,3 68,9 82,7

Taux brut de natalité (pour 1000) 2013 41,2 35,3 21,5 12,0

Taux brut de mortalité (pour 1000) 2013 11,3 10,4 8,2 8,3

Taux de mortalité infantile (pour 1000) 2013 66,7 61,9 53,1 5,8

Taux de mortalité des moins de 5 ans (pour 1000) 2013 120,0 97,4 51,4 6,3

Indice synthétique de fécondité (par femme) 2013 5,7 4,6 2,7 1,8

Taux de mortalité maternelle (pour 100000) 2010 422,4 415,3 440,0 10,0

Femmes utilisant des méthodes contraceptives (%) 2013 16,9 34,9 61,0 75,0

Indicateurs de Santé et de Nutrition

Nombre de médecins (pour 100000 habitants) 2010 6,8 52,6 77,0 287,0

Nombre d'infirmières (pour 100000 habitants) 2008 44,6 .. 98,0 782,0

Naissances assistées par un personnel de santé qualifié (%) 2006 50,2 .. 39,0 99,3

Accès à l'eau salubre (% de la population) 2012 71,1 68,8 84,0 99,6

Accès aux services de santé (% de la population) 2000 43,4 65,2 80,0 100,0

Accès aux services sanitaires (% de la population) 2012 21,8 39,4 54,6 99,8

Pourcent. d'adultes de 15-49 ans vivant avec le VIH/SIDA 2012 1,5 3,9 161,9 14,1

Incidence de la tuberculose (pour 100000) 2012 104,1 223,6 .. ..

Enfants vaccinés contre la tuberculose (%) 2012 95,6 83,1 89,0 99,0

Enfants vaccinés contre la rougeole (%) 2012 76,4 74,6 76,0 92,6

Insuffisance pondérale des moins de 5 ans (%) 2006 28,6 .. 27,0 0,1

Apport journalier en calorie par habitant 2009 2 635,1 2 564,7 2 675,2 3 284,7

Dépenses publiques de santé (en % du PIB) 2011 .. 5,9 4,0 6,9

Indicateurs d'Education

Taux brut de scolarisation au (%) .. .. .. ..

Primaire - Total 2012 91,3 101,8 106,0 101,5

Primaire - Filles 2012 86,9 97,8 104,6 101,2

Secondaire - Total 2011 34,9 45,4 62,3 100,3

Secondaire - Filles 2011 27,9 41,9 60,7 100,0

Personnel enseignant féminin au primaire (% du total) 2012 35,1 43,7 .. ..

Alphabétisme des adultes - Total (%) 2006 .. .. 19,0 ..

Alphabétisme des adultes - Hommes (%) 2006 .. .. .. ..

Alphabétisme des adultes - Femmes (%) 2006 .. .. .. ..

Dépenses d'éducation en % du PIB 2008 .. 5,3 .. 5,4

Indicateurs d'Environnement

Terres arables en % de la superficie totale 2011 11,4 8,4 9,9 11,6

Taux annuel de déforestation (%) 2000 2,1 0,6 0,4 -0,2

Taux annuel de reboisement (%) .. .. .. ..

Emissions du CO2 par habitant (tonnes métriques) 2010 0,2 1,1 .. ..

dernière mise à jour: décembre 2014

UEMOA

Indicateurs Socio-Economiques Comparatifs

Source : Base des données du Département des Statistiques de la BAD;

Banque Mondiale WDI; ONUSIDA; UNSD; OMS, UNICEF, WRI, PNUD, Rapports nationaux.

Notes: n.a. Non Applicable ; … : Données non disponibles.

0

500

1000

1500

2000

201

0

201

1

201

2

Revenu national brut (RNB) par Habitant ($ EU)

UEMOA Afrique

2,2

2,3

2,4

2,5

2,6

2,7

2,8

2,9

3

201

0

201

1

201

2

201

3

Taux d'accroissement de la population totale (%)

UEMOA Afrique

62

64

66

68

70

72

74

76

78

201

0

201

1

201

2

Accès à l'eau salubre (% de la population)

UEMOA Afrique

75

80

85

90

95

100

201

0

201

1

Secondaire - Total

UEMOA Afrique

Page 38: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

X

Annex IIIc.

ECCAS Comparative Socio-economic Indicators

Indicator Année CEEAC AfriquePays en

Développement

Pays

DéveloppésCharts

Basic Indicators

Superficie ('000 Km²) 6 640,5 30 046,4 80 976,0 54 658,4

Population totale (millions) 2013 145,9 1 109,0 5 628,5 1 068,7

Population urbaine (% of Total) 2013 40,7 40,2 44,8 77,7

Densité de la population (au Km²) 2010 20,3 34,5 66,6 23,1

Revenu national brut (RNB) par Habitant ($ EU) 2012 1 323,1 1 691,5 2 780,3 39 688,1

Participation de la Population Active - Total (%) 2013 38,9 37,4 0,0 0,0

Participation de la Population Active - Femmes (%) 2013 48,2 42,5 39,8 43,3

Valeur de l'Indice sexospécifique de dévelop. humain 2007 0,4 0,5 .. 0,9

Indice de développement humain (rang sur 169 pays) 2012 .. .. .. ..

Population vivant en dessous de $ 1 par Jour (%) 1995 .. .. 25,0 ..

Indicateurs Démographiques

Taux d'accroissement de la population totale (%) 2013 2,8 2,5 1,4 0,7

Taux d'accroissement de la population urbaine (%) 2006 22,6 3,4 2,4 1,0

Population âgée de moins de 15 ans (%) 2013 .. 40,9 29,2 17,7

Population âée de 65 ans et plus (%) 2006 2,9 3,5 6,0 15,3

Taux de dépendance (%) 2006 95,5 77,3 52,8 ..

Rapport de Masculinité (hommes pour 100 femmes) 2013 .. 100,0 934,9 948,3

Population féminine de 15 à 49 ans (%) 2006 0,0 24,0 53,3 47,2

Espérance de vie à la naissance - ensemble (ans) 2013 51,9 59,2 65,7 79,8

Espérance de vie à la naissance - femmes (ans) 2013 53,4 60,3 68,9 82,7

Taux brut de natalité (pour 1000) 2013 41,9 35,3 21,5 12,0

Taux brut de mortalité (pour 1000) 2013 14,1 10,4 8,2 8,3

Taux de mortalité infantile (pour 1000) 2013 95,7 61,9 53,1 5,8

Taux de mortalité des moins de 5 ans (pour 1000) 2013 155,9 97,4 51,4 6,3

Indice synthétique de fécondité (par femme) 2013 5,7 4,6 2,7 1,8

Taux de mortalité maternelle (pour 100000) 2010 622,6 415,3 440,0 10,0

Femmes utilisant des méthodes contraceptives (%) 2013 22,2 34,9 61,0 75,0

Indicateurs de Santé et de Nutrition

Nombre de médecins (pour 100000 habitants) 2004 11,2 52,6 77,0 287,0

Nombre d'infirmières (pour 100000 habitants) 2004 83,4 .. 98,0 782,0

Naissances assistées par un personnel de santé qualifié (%) 2006 .. .. 39,0 99,3

Accès à l'eau salubre (% de la population) 2012 56,4 68,8 84,0 99,6

Accès aux services de santé (% de la population) 2000 56,2 65,2 80,0 100,0

Accès aux services sanitaires (% de la population) 2012 36,4 39,4 54,6 99,8

Pourcent. d'adultes de 15-49 ans vivant avec le VIH/SIDA 2012 2,1 3,9 161,9 14,1

Incidence de la tuberculose (pour 100000) 2012 285,5 223,6 .. ..

Enfants vaccinés contre la tuberculose (%) 2012 80,4 83,1 89,0 99,0

Enfants vaccinés contre la rougeole (%) 2012 78,1 74,6 76,0 92,6

Insuffisance pondérale des moins de 5 ans (%) 2005 .. .. 27,0 0,1

Apport journalier en calorie par habitant 1974 2 142,1 2 564,7 2 675,2 3 284,7

Dépenses publiques de santé (en % du PIB) 2011 .. 5,9 4,0 6,9

Indicateurs d'Education

Taux brut de scolarisation au (%) .. .. .. ..

Primaire - Total 2012 110,5 101,8 106,0 101,5

Primaire - Filles 2012 103,3 97,8 104,6 101,2

Secondaire - Total 2012 40,6 45,4 62,3 100,3

Secondaire - Filles 2012 32,1 41,9 60,7 100,0

Personnel enseignant féminin au primaire (% du total) 2012 34,7 43,7 .. ..

Alphabétisme des adultes - Total (%) 2006 .. .. 19,0 ..

Alphabétisme des adultes - Hommes (%) 2006 .. .. .. ..

Alphabétisme des adultes - Femmes (%) 2006 .. .. .. ..

Dépenses d'éducation en % du PIB 2008 .. 5,3 .. 5,4

Indicateurs d'Environnement

Terres arables en % de la superficie totale 2011 3,9 8,4 9,9 11,6

Taux annuel de déforestation (%) 2000 0,4 0,6 0,4 -0,2

Taux annuel de reboisement (%) .. .. .. ..

Emissions du CO2 par habitant (tonnes métriques) 2010 0,4 1,1 .. ..

dernière mise à jour: décembre 2014

CEEAC

Indicateurs Socio-Economiques Comparatifs

Source : Base des données du Département des Statistiques de la BAD;

Banque Mondiale WDI; ONUSIDA; UNSD; OMS, UNICEF, WRI, PNUD, Rapports nationaux.

Notes: n.a. Non Applicable ; … : Données non disponibles.

0

500

1000

1500

2000

201

0

201

1

201

2

Revenu national brut (RNB) par Habitant ($ EU)

CEEAC Afrique

2,2

2,3

2,4

2,5

2,6

2,7

2,8

2,9

201

0

201

1

201

2

201

3

Taux d'accroissement de la population totale (%)

CEEAC Afrique

0

10

20

30

40

50

60

70

80

201

0

201

1

201

2

Accès à l'eau salubre (% de la population)

CEEAC Afrique

95

96

97

98

99

100

101

102

103

104

201

0

201

1

201

2

Secondaire - Total

CEEAC Afrique

Page 39: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

XI

Annex IV a

Table of Bank Operations in ECCAS Zone CENTRE REGION – LIST OF ACTIVE REGIONAL PROJECTS AT 31 DECEMBER 2014

Country Project Name Sector Fin. Srce Instr (Loan/Grant)

Approv. Date.

Net Commt (MUA) Disburs Rate (%)*

Closing Date

A. PROJETS REGIONAUX-HORS CBFF

Multinational Cotton Sector Support Project -Chad Agriculture ADF Grant 29Nov06 5.00 58.7 30Sep15

Dem Rep Congo Lake Tanganyika Develop. Prog. (DRC) Agriculture ADF Loan 17Nov04 6.79 96.4 31Dec14

Multinational Lake Tanganyika Develop. Prog. (DRC) Agriculture ADF Grant 17Nov04 4.96 82.6 31Dec14

Multinational Congo Basin - Conservation of Ecosystems Environment ADF Grant 11Mar09 32.00 48.1 31Dec14

Cameroon Biodiversity Conservation Project (Cameroon) Environment ADF Loan 22Jul13 0.25 0.0 31Dec17

Multinational Biodiversity Conservation Project (Chad) Environment ADF Grant 22Jul13 0.25 0.0 31Dec17

Multinational Biodiversity Conservation Project (CAR) Environment ADF Grant 22Jul13 2.50 0.0 31Dec17

Multinational Lake Chad Basin Sustainable Development Environment ADF Grant 11Dec08 30.00 46.2 31Dec15

Multinational Kinshasa -Brazzaville Bridge Study Transport ADF Grant 3Dec08 5.00 51.8 31Dec15

Multinational CEMAC - Transport Facilitation Transport ADF Grant 5Jul07 14.00 12.8 30Nov14

Cameroon Cameroon/Congo: Ketta-Djoum Road Transport ADF Loan 25Sep09 59.27 58.1 31Dec15

Congo CG Cameroon/Congo: Ketta-Djoum Road Transport ADF Grant 25Sep09 61.90 48.5 31Dec15

Multinational Ouesso-Bangu-N'djamena Road and River Navigation Study Transport ADF Grant 1Dec10 8.00 12.8 31Dec14

Multinational Multinational Doussala-Dolisie Road Transport PRI Grant 28Mar11 0.33 61.0 31Jul14

Congo CG Ndende-Dolisie Road Project Transport ADF Loan 18Dec13 30.49 0.0 30Jun19

Multinational Transafrican Road Project (RTS)- Transport ADF Loan 11Dec13 20.90 0.0 31Dec19

Multinational Transafrican Road Project (RTS)- Transport ADF Grant 11Dec13 20.40 0.0 31Dec19

Multinational Ndende-Dolisie and Fac Road Project Transport ADB Loan 18Dec13 67.59 0.0 30Jun19

Multinational ECCAS Regional Water Policy Water Sup/Sanit

AWTF Grant 2Sep09 1.21 100.0 30Dec14

Multinational CAR-DRC Electricity Interconnection Ph.1 Power ADF Grant 19Sep12 29.73 0.0 31Dec17

Dem Rep Congo NELSAP Interconnection Project - DRC Power ADF Grant 27Nov08 27.62 6.0 31Dec14

Multinational Sect Development Support Project Power ADF Grant 20Nov13 39.40 0.0 31Dec19

Multinational Sect Development Support Project Power FAT Grant 20Nov13 5.00 0.0 31Dec19

Multinational CAR-DRC Electricity Interconnection Ph.1 Power ADF Grant 19Sep12 5.55 0.0 31Dec17

Chad Cameroon-Chad Interconnection Study Power ADF Grant 7Oct13 1.25 0.0 31Dec16

Cameroon Cameroon - Advans Cameroon (under the Africa SME Program)

Finance ADB LDC 17Dec14 0.87 0.0 31Dec19

Chad PRESIBALT Environment ADF Grant 17Dec14 5.35 0.0 31Dec19

RCA PRESIBALT Environment ADF Grant 17Dec14 2.02 0.0 31Dec19

Multinational Chad_.Strengthening Resilience -food and Nutritioni Agriculture ADF Grant 15Oct14 9.77 0.0 31Dec19

Cameroon Cmr-Chad Élect. Interc Project (CMR) Power ADF Loan 7Oct13 1.25 15.8 31Dec16

Multinational BDEAC- FAPA Grant Finance FAPA Grant 5Feb10 0.69 60.0 31Dec12

Multinational APOC (Phase III) Social ADF Grant 15Jul08 15.00 97.0 31Dec16

Multinational Capacity-Building Support Project Multi-Sector ADF Grant 19Dec12 7.00 10.7 30Dec16

Multinational Support for Inga - 3 Development Power NEPAD/IPPF Grant 23Aug13 1.37 0.0 31Dec16

Multinational Extension of Kinshasa-Ilebo Railway Transport NEPAD/IPPF Grant 15Jul12 0.73 42.6 30Jun15

Multinational North Kivu 220kv Transmission Line Power NEPAD/IPPF Grant 7Jun13 1.28 0.0 30Jun15

SUB-TOTAL : REGIONAL PROJECTS-Excluding CBFF 524.72

B. CBFF PROJECTS

Cameroon Rehabilitation and Management Project D Environment CBFF Grant 26Apr12 0.05 100.0 31Dec16

Dem Rep Congo Agroforestry Development Support Environment CBFF Grant 2Apr12 5.06 61.3 28Feb15

Eq Guinea Haute Ecosystems Sustainable Management Environment CBFF Grant 16Dec11 0.44 59.1 31Dec15

Multinational Achieving Conservation and Livelihood Environment CBFF Grant 13Nov09 1.03 64.9 31Dec14

Multinational Sankuru "Fair Trade" Carbon Initiative Environment CBFF Grant 7Apr10 1.12 90.1 1Mar15

Multinational Biodiversity International Environment CBFF Grant 9Jun10 1.29 62.9 31Dec14

Multinational Conservation International Foundation Environment CBFF Grant 9Jun10 1.14 12.8 31Jul15

Multinational "Ecomakala +" Environment CBFF Grant 12Jul11 2.10 33.3 31Dec15

Multinational REDD Agroforestry, South Kwamouth Environment CBFF Grant 12Jul11 2.10 54.8 31Mar15

Multinational Isangi REDD Integrated Pilot Project Environment CBFF Grant 19May11 1.94 62.1 30Sep15

Multinational Civil Society and Government Capacity Bu Environment CBFF Grant 13Jul11 2.70 20.3 30Jun16

Multinational Luki REDD Project Environment CBFF Grant 22Jul11 1.97 31.5 30Jun16

Multinational Mambasa REDD Project Environment CBFF Grant 27Apr11 2.50 64.0 30Sep15

Multinational Sustainable Afforestation and Reforestat Environment CBFF Grant 29Nov11 3.87 38.8 31Dec15

Multinational Support for Sustainable Resource Management Environment CBFF Grant 18May11 5.05 60.9 31Jul15

Multinational Support for Enlarged Training Programme E Environment CBFF Grant 19May11 6.43 100.0 31Dec14

Multinational Integrated Exploitation of the Jatro Plant Environment CBFF Grant 6Dec11 0.10 100.0 31Dec15

Multinational Development of Forestry Rejects and R Environment CBFF Grant 9Dec11 1.27 55.2 31Dec15

Multinational Improved Apiculture and Reforestation in Environment CBFF Grant 30Nov11 0.22 57.2 31Dec13

Multinational Vampeem – Development of African Medici Environment CBFF Grant 16Nov11 1.33 74.1 31Dec14

Multinational Multi-stakeholder Participation Support A Environment CBFF Grant 13Dec11 1.60 64.2 31Dec14

Multinational Strengthening of Farmers’ Contribution Environment CBFF Grant 13Apr12 2.84 20.2 31Dec15

Multinational Reforestation and Rehabilitation Project Environment CBFF Grant 6Dec11 0.19 71.9 31Dec15

Multinational Participatory Management and Restoration Environment CBFF Grant 6Dec11 0.13 39.7 31Dec15

Multinational MNV Basin Initiative Proposal Environment CBFF Grant 11Apr12 5.19 100.0 30Jun15

Dem Rep Congo Work closely with the populations to reduce deforestation and poverty in the Virunga-Hoyo region

Environment CBFF Grant 28Nov14 2.09 0.0 31Dec18

Multinational Stabilizing Carbon Emissions In The Sang Environment CBFF Grant 5Nov09 0.56 71.9 30Jun15

SUB-TOTAL CBFF PROJECTS 54.31

Grand Total 2,564.41 29.3%

Page 40: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

XII

Annex IVb

Table of Bank Operations in West Africa

Projet PaysDate

approbation

Date de

cloture

Montant (en

UC)Tx dec. Secteur

PROJET APPUI FILLIERE COTON - BENIN Benin 29/11/2006 30/09/2015 8 000 000 76,75 Agriculture

PROJET APPUI FILLIERE COTON - B- FASO Burkina Faso 29/11/2006 31/12/2014 10 000 000 92,51 Agriculture

PROJET APPUI FILLIERE COTON - MALI Mali 29/11/2006 30/09/2015 10 000 000 60,45 Agriculture

PROJET GESTION DURABLE BETAIL RUMI MALI Mali 25/01/2006 29/12/2014 5 320 000 73,66 Livestock

PROJET GESTION DURABLE BETAIL RUMI SENE Senegal 25/01/2006 30/06/2015 4 440 000 84,42 Livestock

TRANS-GAMBIA RIVER CROSSING PROJECT Gambia 16/12/2011 30/06/2017 63 550 000 14,90 Transport

TRANS-GAMBIA RIVER CROSSING PROJECT Senegal 16/12/2011 30/06/2017 3 180 000 0,00 Transport

BENIN/TOGO:PROJET DE REHABILITATION DE L Benin 05/10/2011 31/12/2016 38 870 000 35,66 Transport

BENIN/TOGO:PROJET DE REHABILITATION DE L Benin 05/10/2011 31/12/2016 34 270 000 30,45 Transport

BENIN/TOGO:PROJET DE REHABILITATION DE L Togo 05/10/2011 31/12/2016 4 810 000 0,95 Transport

TOGO - FACILITATION Togo 27/06/2012 31/12/2017 17 800 000 32,14 Transport

BURKINA-FASO FACILITATION CORRIDOR Burkina Faso 27/06/2012 31/12/2017 21 530 000 15,93 Transport

PROJET DE LA ROUTE TRANSAFRICAINE (RTS) Niger 11/12/2013 31/12/2019 58 980 000 0,00 Transport

GHANA - TOGO - BENIN POWER INTERCONNECT Ghana 04/04/2007 31/12/2014 14 870 000 78,05 Power

BENIN - TOGO - GHANA POWER INTERCONNECT Benin 04/04/2007 31/12/2015 17 390 000 19,38 Power

CLSG LIBERIA Liberia 06/11/2013 31/12/2018 8 102 000 0,00 Power

CLSG SIERRA LEONE Sierra Leone 06/11/2013 31/12/2018 14 500 000 0,00 Power

CLSG GUINEE Guinea 06/11/2013 31/12/2018 28 910 000 0,00 Power

CLSG-RURAL ELECTRIFICATION -LIBERIA Liberia 06/11/2013 31/12/2018 16 838 000 0,00 Power

ETUDE DE LA LIGNE GUINÉE -MALI (FOMI) Guinea 12/01/2011 30/04/2015 1 667 000 27,00 Electricity

ETUDE DE LA LIGNE GUINÉE -MALI (FOMI) Mali 12/01/2011 30/04/2015 833 000 37,33 Electricity

CRISIS RESPONSE : TA TO FIGHT EBOLA Guinea 01/10/2014 31/12/2015 1 500 000 47,01 Institutional Support

CRISIS RESPONSE : TA TO FIGHT EBOLA Sierra Leone 01/10/2014 31/12/2015 1 500 000 45,00 Institutional Support

CRISIS RESPONSE : TA TO FIGHT EBOLA Liberia 01/10/2014 31/12/2015 1 500 000 47,12 Institutional Support

EBOLA OP CI, GUINEA, LIBERIA, SL Liberia 01/10/2014 31/12/2016 35 000 000 0,00 Other Multi Sector

EBOLA OP CI, GUINEA, LIBERIA, SL Liberia 01/10/2014 31/12/2016 5 200 000 0,00 Multi Sector

EBOLA FIGHT BACK PROGRAMME GUINEA Guinea 01/10/2014 31/12/2016 12 400 000 66,67 Multi Sector

EBOLA FIGHT BACK PROGRAMME GUINEA Guinea 01/10/2014 31/12/2016 6 000 000 67,11 Multi Sector

EBOLA FIGHT BACK PROGRAMME GUINEA Guinea 01/10/2014 31/12/2016 2 600 000 66,67 Multi Sector

EBOLA FIGHT BACK PROGRAMME SIERRA LEONESierra Leone 01/10/2014 31/12/2015 19 800 000 50,00 Multi Sector

EBOLA FIGHT BACK PROGRAMME SIERRA LEONESierra Leone 01/10/2014 31/12/2015 5 600 000 50,24 Multi Sector

EBOLA FIGHT BACK PROGRAMME SIERRA LEONESierra Leone 01/10/2014 31/12/2015 4 800 000 50,00 Multi Sector

EBOLA FIGHT BACK PROGRAMME SIERRA LEONESierra Leone 01/10/2014 31/12/2015 2 800 000 50,00 Multi Sector

482 560 000 38,11%

Page 41: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

XIII

Annex IV

Main Related Projects Financed by the Bank and other Development Partners

Sectors/Projects Source of

Financing

Approval

Date

Signature

Date Effectiveness

Closing

Date

Approved

Amount

(CFAFM)

Peace, Security, Stability Sector

Peace-building mission in the Central African Republic

(MICOPAX) France 09/11/09 09/11/09 12/07/08 01/12/13 25,072

Peace Facility 4 (FP) EU, 10th EDF 17/12/10 01/05/11 31/12/13 3,501

Support for Peace and Security II (PAPSII) EU, 10th EDF 02/12/10 17/12/10 17/12/10 30/06/15 7,819

Infrastructure Sector (Transport & ICT) 13,682

Institutional and operational support for ECCAS to monitor the

implementation of PDCT-AC FPPI_NEPAD 27/09/10 06/10/10 06/10/10 30/11/13 494

Rail-bridge and extension of Kinshasa-Ilebo railway ADB 00/01/00 03/12/08 13/05/09 31/12/12 3,630

Study of Doussala-Dolisie Road and Transport Facilitation on the

Libreville-Brazzaville Corridor ADB/FPPI-NEPAD PRI

18/04/10 19/04/10 23/05/11 31/07/13 1,371

Study of Ouesso-Bangui -Ndjamena Road and River Navigation

on the Congo, Oubangui and Sangha ADB/ ADF 29/04/11 29/04/11 31/12/14 6,324

Ouesso-Sangmelima Road expenditure incurred for ECCAS coordination ADB /ADF 11/01/10 11/01/10 31/12/15 1,863

Energy & Water Sector

Project to Implement the Central African Regional Water Policy ADB/AWF &

IPPF-NEPAD 02/09/09 04/02/10 04/02/10 31/12/13 1,257

Environment Sector

Congo Basin Ecosystems Conservation Support Programme (PACEBCo) ADF/ADB 01/02/09 03/04/09 03/04/09 22,400

Conservation and Development of Fragile Ecosystems of Central

Africa (ECOFAC V) EU, 10th EDF 24/11/10 17/12/10 17/12/10 16/12/14 19,679

System to support the upsurge of timber processing in five Congo

Basin countries CFC 15/10/10 564

Agricultural Sector and Rural Development

Comprehensive African Agriculture Development Programme

(CAADP) WB_FS 27/10/10 22/11/10 01/10/10 31/12/13 2,000

Project to strengthen phytosanitary capacities of Member States of ECCAS and CEMAC FAO 01/06/11 08/06/11 01/07/11 01/01/13 223

Livestock for Livelihoods Project (L4LP) AU-BIRA 01/02/11 01/02/11 01/07/11 31/07/13 14

Project for the Participation of African Nations in Meetings of

Organizations responsible for fixing sanitary and phytosanitary standards

EU, AU-IBAR 115

Trade and Customs Sector

PACCIA II ITC

Support for the private sector CDE

Multi-sector

Capacity-building for Central African Parliamentarians (REPAC) ACBF 18/12/07 18/12/07 18/12/07 30/06/12 750

Page 42: e MULTINATIONAL-WAEMU-ECOWAS-ECCAS · outcomes will contribute to the objective of action plans for the development of air transport in the three Regional Economic Communities to

Annex V

Map of Project Area

This map has been provided by the staff of the African Development Bank exclusively for the use of readers of the report to

which it is attached. The names used and the borders shown do not imply on the part of the ADB Group and its members

any judgment concerning the legal status of a territory nor any approval or acceptance of these borders.