e k c e h g c id r n d l n io n a io t d io e is a n t a v

1
00 25 / 07 / 12 00 25 / 07 / 12 EL 1 : 25 @ A1 8 F ACADE S ECT I ON 7 & 8 0 0 . 5 1 1 . 5 2 m @ 1 : 25 0253 7 7 T h ea t r e S E F aca d e 1 : 25 8 F aca d e M a i n En t r a n ce L obby 1 : 25 I NTERI M ST AGE E W o r ki n Pr og r e ss DW G. NO. REVI SI ON SCALE DATE DRAW I NG PROJ ECT CHECKED F O R I NF O RM AT I ON NOTE 1 . 2 . 3 . 4 . F a x . 020 7381 4995 T e l . 020 7385 7126 L ondon , W 6 9 HN. P a l aceW h a rf , R a i nv ill eR o a d , Ke y 1265 LL P E S T UD I O L ATTER T AKE PREF ERENCE. DET AI L DRAW I NGS, T HE ASSEMBL Y DRAW I NGS & BET W EEN REF ERENCE OR W HERE DI SCREPANCI ES EXI ST RESOL UT I ON. ARCHI TECT S F OR ATTENT I ON OF T HE BE BROUGHT T O T HE DI MENSI ONS T HESE MUST ARE F OUND BET W EEN W HERE ANY DI SCREPANCI ES DI MENSI ON ST RI NGS. T O BE T AKEN F ROM DRAW I NG ALL DI MENSI ONS NOT SCALE F ROM T HE T HE CONT RACT OR MUST ST UDI O E LL P T HI S DRAW I NG I S COPYRI GHT ACADEM Y KENSI NGT ON AND AL DRI DGE = +12.430 +4.030 UPSTAND TOP OF = +13.110 +4.710 BALUSTRADE TOP OF = +5.200 FFL - 3.200 = +5.000 SSL - 3.400 = +7.725 SSL - 0.475 = +11.735 SSL +3.335 = +12.007 FFL +3.607 COLD BRIDGING (NBS G20/270) RC UPSTAND TO PREVENT TIMBER BATTEN TO TOP OF RC UPSTAND (NBS H72/251) FORM COPING FIXED TO TOP OF PPC ALUMINIUM PRESSING TO 10mm (NBS J31/342) CEMENT PARTICLE BOARD TO UP-STAND COLD BRIDGING (NBS J31/342) EPS INSULATION TO UPSTAND TO PREVENT PEDESTALS AS BALAST (NBS J31/131) AND PAVEMENT SLABS ON ²K U-VALUE 0.16W/m EPS INSULATION ON TOP TO ACHIEVE MIN. HOT APPLIED INVERTED ROOF COATING WITH RC UPSTAND TO SE DETAIL F4 COFFERED RC SLAB TO SE DETAIL BRICKWORK (NBS F10/110) (NBS F30/155) ACHIEVE MIN. U-VALUE 0.20W/m²K RIGID PHENOLIC INSULATION 90mm TO 12mm (NBS G10/151) CEMENT PARTICLE BOARD (NBS F30/245) SYSTEM WITH WALL TIES SURFACE FIXED CHANNEL FRAMING SYSTEM (NBS G10/151) DEFLECTION HEAD TO FACADE PLASTER BOARD LINING (NBS K10/166) SYSTEM 150mm (NBS G10/151) COLD ROLLED FACADE FRAMING 2725 2810 = +8.400 FFL +0.000 MIN. U-VALUE 0.16W/m²K (NBS P10/257) XPS INSULATION BELOW DPC TO ACHIEVE WHEEPHOLE (NBS F30/132) OVERLAPPING DPM TANKING DPC - CAVITY TRAY (NBS F30/345) (NBS F30/110) LEAN MIX CONCRETE FILL (NBS F10/355) BLOCK WORK BELOW DPC (NBS J40/ ) WATERPROOFING TO CAPPING BEAM VERTICAL DPM TANKING OVERLAPPING (NBS P20/201) PAINTED MDF BOARD AND TRIM ²K (NBS M10/291) U-VALUE 0.16W/m RIGID PIR INSULATION TO ACHIEVE MIN. (NBS J40/ ) LAPPING DRAINAGE COURSE & DPC DPM TO FACE OF BLOCK WORK OVER- DPC TO TOP OF BLOCK (NBS F30/330) PLASTER 13mm PAINTED (NBS M20/210) BLOCK WALL 140mm (NBS F10/355) LAYER (NBS M10/130) REINFORCED SCREED ON SEPARATING DRAIN CAVITY MIN. 100mm WOOD LAMINATE FLOORING (NBS K21/116) PAINTED MDF AS SKIRTING (NBS P20/200) FOR SCREED MOVEMENT (NBS M10/291) STRIP OF FOAM INSULATION TO ALLOW (NBS P10/256) 30mm TO PREVENT COLD BRIDGING ZERO ODP RIGID XPS INSULATION PILES TO SE DETAIL RC CAPPING BEAM ON TOP OF TO SE DETAIL PILES UNDER COLUMN BEYOND RC CAPPING BEAM ON TOP OF CAVITY TIE (NBS F30/220) PILE TO SE DETAIL BENTONITE DPM (NBS J40/286) RC WALL TO SE DETAIL PILES APPROX. 1m BEAM TAKEN DOWN FROM TOP OF DPM TO FACE & TOP OF CAPPING (NBS J40/291) STUDDED CAVITY DRAIN MEMBRANE RC SLAB TO SE DETAIL BENTONITE DPM (NBS J40/286) PROTECTION TO SE DETAIL CELLCORE FOR GROUND MOVEMENT BLINDING TO SE DETAIL TOP RAIL AND GLASS INFILL PANELS (NBS L30/555) BRACKETS AND POSTS, NYLON POWDER COATED BALUSTRADE COMPRISING PPC STEEL FIXING RC COLUMN BEYOND TO SE DETAIL RC SLAB TO SE DETAIL TO SE DETAIL CONCRETE STRIP FOUNDATION CONCRETE BLINDING TO SE DETAIL (NBS J40/141) POLYETHYLENE GAS REDARDANT DPM (NBS P10/256) BRIDGING BELOW RC SLAB, 2m IN TO PREVENT COLD ZERO ODP RIGID XPS INSULATION 30mm SAND BLINDING 50mm TO SE DETAIL (NBS P10/256) COLD BRIDGING TO BACK OF FOUNDATION TO PREVENT ZERO ODP RIGID XPS INSULATION 30mm = +8.200 SSL - 0.200 - 0.020 = +8.380 TOP OF SCREED (NBS M10/130) REINFORCED SCREED ON SEPARATING LAYER ²K (NBS M10/291) U-VALUE 0.16W/m RIGID PIR INSULATION TO ACHIEVE MIN. RECONSTITUDED STONE TILES (NBS M40/116) (NBS L20/492) AUTOMATIC BE-PARTING SLIDING DOOR ENGINEER’S DETAIL BOLTED INTO RC SLAB TO STRUCTURAL WALLING AND STRUCTURAL GLASS LOBBY PAINTED RHS FRAME TO SUPPORT CURTAIN PPC ALUMINIUM FLASHING (NBS H11/111) (NBS P10/235) GAP FILLED WITH MINERAL WOOL WALLING (NBS H11/111) NEOPRENE SEAL GLAZED INTO CURTAIN BONDED TO TOP OF RHS (NBS H11/111) EPDM GLAZED INTO CURTAIN WALLING AND U-VALUE 1.8W/m²K (NBS H11/111) SYSTEM, DOUBLE GLAZED, TO ACHIEVE MIN. SLEEVED PPC ALUMINIUM CURTAIN WALLING BACK TO RC COLUMNS TO SE DETAIL EXTERNAL BRACING OFF CURTAIN WALLING WALKWAY TO SE DETAIL (NBS L10/671) GALVANIZED STEEL BRACKET TO SUPPORT UPSTAND (NBS L10/671) TO SUPPORT GRATING EDGE AND FORM CONTINUOUS GALVANIZED STEEL ANGLE RC SLAB TO SE DETAIL SPANDREL PANEL (NBS H11/111) INSULATED MILL FINISHED ALUMINIUM ²K (NBS P10/215) MIN. U-VALUE 1.8W/m GAP FILLED WITH MINERAL WOOL TO ACHIEVE PLASTER BOARD LINING (NBS K10/166) WALLING HEAD RESTRAINT (NBS P20/201) PAINTED MDF BOARD LINING TO COVER CURTAIN FRAMING SYSTEM (NBS G10/152) DOWNSTAND FORMED BY METAL FACADE TO ACHIEVE MIN. 0.16W/m²K (NBS P10/218) MINERAL WOOL INSULATION TO SOFFIT MINERAL WOOL BETW. STUDS (NBS P10/215) BREATHER MEMEBRANE (NBS H92/785) RAINSCREEN PANELS (NBS H92/120) VERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND (NBS L20/491) AUTOMATIC BE-PARTING SLIDING DOOR (NBS P10/256) BRIDGING TO FACE OF RC SLAB TO PREVENT COLD ZERO ODP RIGID XPS INSULATION 30mm (NBS J40/ ) DPM TANKING TAKEN OVER TOP OF THRESHOLD CONCRETE PILE CAP & PILE BEYOND TO SE DETAIL FORM THRESHOLD STEEL ANGLES ON TIMBER PACKER TO STEEL ANGLE (NBS P20/170) ALUMINIUM THRESHOLD COVER FIXED INTO (NBS M10/130) REINFORCED SCREED ON SEPARATING LAYER ²K (NBS M10/291) U-VALUE 0.16W/m RIGID PIR INSULATION TO ACHIEVE MIN. ENTRANCE MATTING (NBS N10/300) RC COLUMN TO SE DETAIL TO SE DETAIL PPC RHS BRACKET TO SUPPORT POSTS STRUCTURE TO SE DETAIL RC COLUMNS TO SUPPORT LOUVRE PPC RHS BEAM SPANNING BETWEEN UPSTAND (NBS L10/671) TO SUPPORT GRATING EDGE AND FORM CONTINUOUS GALVANIZED STEEL ANGLE FORM WALKWAY (NBS L10/671) GALVANIZED STEEL GRATING TO (NBS L10/671) PPC RHS POSTS TO SE DETAIL TO RHS POSTS (NBS L10/671) PPC ALUMINIUM LOUVRE PLATE FIXED SUSPENDED SOFFIT CLADDING (NBS H20/150) = +15.600 FFL +7.200 = +15.400 SSL +7.000 = +19.000 SSL +10.600 = +19.200 FFL +10.800 = +22.600 SSL +14.200 GLAZED IN (NBS H11/143) VENTILATION GRILL AT BOTTOM PPC ALUMINIUM PRESSING WITH (NBS P10/215) GAP FILLED WITH MINERAL WOOL MIN. U-VALUE 1.8W/m²K (NBS H11/111) SYSTEM, DOUBLE GLAZED, TO ACHIEVE PPC ALUMINIUM CURTAIN WALLING GLAZED IN (NBS H11/143) VENTILATION GRILL AT BOTTOM PPC ALUMINIUM PRESSING WITH BARRIER (NBS P10/432) PROPRIETARY FIRE AND ACOUSTIC (NBS P10/235) GAP FILLED WITH MINERAL WOOL INSULATED SPANDREL PANEL (NBS H92/121) PPC ALUMINIUM PRESSING FIXED TO (NBS P10/215) GAP FILLED WITH MINERAL WOOL GLAZED IN (NBS H11/143) VENTILATION GRILL AT BOTTOM PPC ALUMINIUM PRESSING WITH MIN. U-VALUE 1.8W/m²K (NBS H11/111) SYSTEM, DOUBLE GLAZED, TO ACHIEVE PPC ALUMINIUM CURTAIN WALLING GLAZED IN (NBS H11/143) VENTILATION GRILL AT BOTTOM PPC ALUMINIUM PRESSING WITH RC UPSTAND TO SE DETAIL (NBS P10/215) GAP FILLED WITH MINERAL WOOL AND GLAZED IN (NBS H11/111) COPING FIXED TO TOP OF RC UPSTAND PPC ALUMINIUM PRESSING TO FORM COLD BRIDGING (NBS J31/342) EPS INSULATION TO UPSTAND TO PREVENT INSULATED SPANDREL PANEL (NBS H92/121) PPC ALUMINIUM PRESSING FIXED TO (NBS P10/215) GAP FILLED WITH MINERAL WOOL TO PREVENT COLD BRIDGING (NBS G20/270) TIMBER BOARD TO TOP OF RC UPSTAND SHINGLE AS BALAST (NBS J31/131) AND WASHED ROUNDED ²K U-VALUE 0.16W/m EPS INSULATION ON TOP TO ACHIEVE MIN. HOT APPLIED INVERTED ROOF COATING WITH 10mm (NBS J31/342) CEMENT PARTICLE BOARD TO UP-STAND RC SLAB TO SE DETAIL LIGHT FITTING (NBS K40/120) SUSPENDED ACOUSTIC PANEL WITH INTEGRATED (NBS L30/561) FREESTANDING GUARD RAILS (NBS N10/242) BLIND FIXED TO CURTAIN WALL TRANSOM (NBS H11/143) ENVIRONMENTAL ENGINEER’S SPEC. BESPOKE PPC METAL STRUCTURE TO VENTILATION BOX WITH ACOUSTIC LINING GLAZED IN THERMALLY INSULATED RC COLUMN TO SE DETAIL (NBS H11/143) ENVIRONMENTAL ENGINEER’S SPEC. BESPOKE PPC METAL STRUCTURE TO VENTILATION BOX WITH ACOUSTIC LINING GLAZED IN THERMALLY INSULATED PLASTER BOARD LINING (NBS K10/166) (NBS K10/167) TO SUPPORT VENTILATION BOX COLD ROLLED STEEL FRAMING VAPOUR BARRIER (NBS P10/315) PAINTED MDF AS SKIRTING (NBS P20/200) TILE AS FINISH (NBS K41/130) RAISED ACCESS FLOOR WITH CARPET RC SLAB TO SE DETAIL LIGHT FITTING (NBS K40/120) SUSPENDED ACOUSTIC PANEL WITH INTEGRATED (NBS N10/242) BLIND FIXED TO CURTAIN WALL TRANSOM (NBS H11/143) ENVIRONMENTAL ENGINEER’S SPEC. BESPOKE PPC METAL STRUCTURE TO VENTILATION BOX WITH ACOUSTIC LINING GLAZED IN THERMALLY INSULATED RC COLUMN TO SE DETAIL (NBS H11/143) ENVIRONMENTAL ENGINEER’S SPEC. BESPOKE PPC METAL STRUCTURE TO VENTILATION BOX WITH ACOUSTIC LINING GLAZED IN THERMALLY INSULATED PLASTER BOARD LINING (NBS K10/166) (NBS K10/167) TO SUPPORT VENTILATION BOX COLD ROLLED STEEL FRAMING VAPOUR BARRIER (NBS P10/315) PAINTED MDF AS SKIRTING (NBS P20/200) TILE AS FINISH (NBS K41/130) RAISED ACCESS FLOOR WITH CARPET RC SLAB TO SE DETAIL (NBS N10/242) BLIND FIXED TO CURTAIN WALL TRANSOM (NBS N10/242) BLIND FIXED TO CURTAIN WALL TRANSOM IT/BUSINESS STUDIES MATHS 1:73 FALL 2195 2200 DESIGN (NBS H13/) STRUCTURAL GLASS LOBBY TO SPECIALIST 565 585 815 1615 585 2485 75 2417 4308 = +8.400 FFL +/- 0.000 LOBBY ENTRANCE RECEPTION 600 2610 3515 2090 4035 2830 3170 (NBS H92/120) PPC ALUMINIUM RAINSCREEN PANEL (NBS G10/152) RAINSCREEN SUPPORT BRACKETS CEMENT FIBRE BOARD 12mm TO FIX 85 (NBS H92/776) TO ACHIEVE MIN. U-VALUE 0.20W/m²K PIR INSULATION TO ACHIEVE 140mm 585 1030 (NBS H92/121) TO INSULATED SPANDREL PANEL PPC ALUMINIUM PRESSING FIXED 35 815 585 585 445 585 550 35 815 550 35 585 445 585 550 35 100 = +23.300 +14.900 UPSTAND TOP OF 595 515 885 515 535 475 80 475 595 515 885 515 535 80 2015 1110 425 2700 3125 2015 1110 425 2700 3125 C14

Upload: others

Post on 16-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

00

25/0

7/1

2

00

25/0

7/1

2

E

L

1:2

5@

A1

8

FA

CA

DE S

EC

TIO

N 7 & 8

00.5

11.5

2m @ 1:2

50253

7

7Theatre S

E F

acade

1:2

5

8Facade M

ain E

ntrance L

obby

1:2

5

INT

ERIM S

TA

GE E

Work in Pro

gress

DW

G.

NO.

RE

VISIO

N

SC

ALE

DA

TE

DR

AWIN

G

PR

OJE

CT

CH

EC

KE

D

FO

R I

NF

OR

MA

TIO

N

NO

TE

1.

2.

3.

4.

Fax. 020 7

381 4

995

Tel. 0

20 7

385 7

126

London,

W6 9

HN.

Palace W

harf, Rainville R

oad,

Key

1265

LLP

ESTU

DIO

LA

TT

ER T

AK

E P

RE

FE

RE

NC

E.

DE

TAIL D

RA

WIN

GS, T

HE

AS

SE

MB

LY D

RA

WIN

GS &

BE

TW

EE

N R

EF

ER

EN

CE O

RW

HE

RE DIS

CR

EP

AN

CIE

S E

XIS

T

RE

SO

LU

TIO

N.

AR

CHIT

EC

TS F

OR

AT

TE

NTIO

N O

F T

HE

BE B

RO

UG

HT T

O T

HE

DIM

EN

SIO

NS T

HE

SE M

US

TA

RE F

OU

ND B

ET

WE

EN

WH

ER

E A

NY DIS

CR

EP

AN

CIE

S

DIM

EN

SIO

N S

TRIN

GS.

TO B

E T

AK

EN F

RO

MD

RA

WIN

G A

LL DIM

EN

SIO

NS

NO

T S

CA

LE F

RO

M T

HE

TH

E C

ON

TR

AC

TO

R M

US

T S

TU

DIO E L

LP

THIS D

RA

WIN

G IS C

OP

YRIG

HT

AC

AD

EM

Y

KE

NSIN

GT

ON A

ND A

LD

RID

GE

= +12.430+4.030 UPSTANDTOP OF

= +13.110+4.710 BALUSTRADETOP OF

= +5.200FFL - 3.200

= +5.000SSL - 3.400

= +7.725SSL - 0.475

= +11.735SSL +3.335

= +12.007FFL +3.607

COLD BRIDGING (NBS G20/270)RC UPSTAND TO PREVENT TIMBER BATTEN TO TOP OF

RC UPSTAND (NBS H72/251)FORM COPING FIXED TO TOP OF PPC ALUMINIUM PRESSING TO 10mm (NBS J31/342)

CEMENT PARTICLE BOARD TO UP-STAND

COLD BRIDGING (NBS J31/342)EPS INSULATION TO UPSTAND TO PREVENT

PEDESTALS AS BALAST (NBS J31/131)AND PAVEMENT SLABS ON †K U-VALUE 0.16W/m

EPS INSULATION ON TOP TO ACHIEVE MIN. HOT APPLIED INVERTED ROOF COATING WITH

RC UPSTAND TO SE DETAIL

F4

COFFERED RC SLAB TO SE DETAIL

BRICKWORK (NBS F10/110)

(NBS F30/155)ACHIEVE MIN. U-VALUE 0.20W/m†K RIGID PHENOLIC INSULATION 90mm TO

12mm (NBS G10/151)CEMENT PARTICLE BOARD

(NBS F30/245)SYSTEM WITH WALL TIESSURFACE FIXED CHANNEL

FRAMING SYSTEM (NBS G10/151)DEFLECTION HEAD TO FACADE

PLASTER BOARD LINING (NBS K10/166)

SYSTEM 150mm (NBS G10/151)COLD ROLLED FACADE FRAMING

2725

2810

= +8.400FFL +0.000

MIN. U-VALUE 0.16W/m†K (NBS P10/257)XPS INSULATION BELOW DPC TO ACHIEVE

WHEEPHOLE (NBS F30/132)

OVERLAPPING DPM TANKINGDPC - CAVITY TRAY (NBS F30/345)

(NBS F30/110)LEAN MIX CONCRETE FILL

(NBS F10/355)BLOCK WORK BELOW DPC

(NBS J40/ )WATERPROOFING TO CAPPING BEAMVERTICAL DPM TANKING OVERLAPPING

(NBS P20/201) PAINTED MDF BOARD AND TRIM

†K (NBS M10/291)U-VALUE 0.16W/mRIGID PIR INSULATION TO ACHIEVE MIN.

(NBS J40/ )LAPPING DRAINAGE COURSE & DPCDPM TO FACE OF BLOCK WORK OVER-

DPC TO TOP OF BLOCK (NBS F30/330)

PLASTER 13mm PAINTED (NBS M20/210)

BLOCK WALL 140mm (NBS F10/355)

LAYER (NBS M10/130)REINFORCED SCREED ON SEPARATING

DRAIN CAVITY MIN. 100mm

WOOD LAMINATE FLOORING (NBS K21/116)

PAINTED MDF AS SKIRTING (NBS P20/200)

FOR SCREED MOVEMENT (NBS M10/291)STRIP OF FOAM INSULATION TO ALLOW

(NBS P10/256)30mm TO PREVENT COLD BRIDGING ZERO ODP RIGID XPS INSULATION

PILES TO SE DETAILRC CAPPING BEAM ON TOP OF

TO SE DETAILPILES UNDER COLUMN BEYOND RC CAPPING BEAM ON TOP OF

CAVITY TIE (NBS F30/220)

PILE TO SE DETAIL

BENTONITE DPM (NBS J40/286)

RC WALL TO SE DETAIL

PILES APPROX. 1mBEAM TAKEN DOWN FROM TOP OF DPM TO FACE & TOP OF CAPPING

(NBS J40/291)STUDDED CAVITY DRAIN MEMBRANE

RC SLAB TO SE DETAIL

BENTONITE DPM (NBS J40/286)

PROTECTION TO SE DETAILCELLCORE FOR GROUND MOVEMENT

BLINDING TO SE DETAIL

TOP RAIL AND GLASS INFILL PANELS (NBS L30/555)BRACKETS AND POSTS, NYLON POWDER COATED BALUSTRADE COMPRISING PPC STEEL FIXING

RC COLUMN BEYOND TO SE DETAIL

RC SLAB TO SE DETAIL

TO SE DETAILCONCRETE STRIP FOUNDATION

CONCRETE BLINDING TO SE DETAIL

(NBS J40/141)POLYETHYLENE GAS REDARDANT DPM

(NBS P10/256)BRIDGINGBELOW RC SLAB, 2m IN TO PREVENT COLD ZERO ODP RIGID XPS INSULATION 30mm

SAND BLINDING 50mm TO SE DETAIL

(NBS P10/256)COLD BRIDGINGTO BACK OF FOUNDATION TO PREVENT ZERO ODP RIGID XPS INSULATION 30mm

= +8.200SSL - 0.200

- 0.020 = +8.380TOP OF SCREED

(NBS M10/130)REINFORCED SCREED ON SEPARATING LAYER

†K (NBS M10/291)U-VALUE 0.16W/mRIGID PIR INSULATION TO ACHIEVE MIN.

RECONSTITUDED STONE TILES (NBS M40/116)

(NBS L20/492)AUTOMATIC BE-PARTING SLIDING DOOR

ENGINEER’S DETAILBOLTED INTO RC SLAB TO STRUCTURAL WALLING AND STRUCTURAL GLASS LOBBY PAINTED RHS FRAME TO SUPPORT CURTAIN

PPC ALUMINIUM FLASHING (NBS H11/111)

(NBS P10/235)GAP FILLED WITH MINERAL WOOL

WALLING (NBS H11/111)NEOPRENE SEAL GLAZED INTO CURTAIN

BONDED TO TOP OF RHS (NBS H11/111)EPDM GLAZED INTO CURTAIN WALLING AND

U-VALUE 1.8W/m†K (NBS H11/111)SYSTEM, DOUBLE GLAZED, TO ACHIEVE MIN. SLEEVED PPC ALUMINIUM CURTAIN WALLING

BACK TO RC COLUMNS TO SE DETAILEXTERNAL BRACING OFF CURTAIN WALLING

WALKWAY TO SE DETAIL (NBS L10/671)GALVANIZED STEEL BRACKET TO SUPPORT

UPSTAND (NBS L10/671)TO SUPPORT GRATING EDGE AND FORM CONTINUOUS GALVANIZED STEEL ANGLE

RC SLAB TO SE DETAIL

SPANDREL PANEL (NBS H11/111)INSULATED MILL FINISHED ALUMINIUM

†K (NBS P10/215)MIN. U-VALUE 1.8W/mGAP FILLED WITH MINERAL WOOL TO ACHIEVE

PLASTER BOARD LINING (NBS K10/166)

WALLING HEAD RESTRAINT (NBS P20/201)PAINTED MDF BOARD LINING TO COVER CURTAIN

FRAMING SYSTEM (NBS G10/152)DOWNSTAND FORMED BY METAL FACADE

TO ACHIEVE MIN. 0.16W/m†K (NBS P10/218)MINERAL WOOL INSULATION TO SOFFIT

MINERAL WOOL BETW. STUDS (NBS P10/215)

BREATHER MEMEBRANE (NBS H92/785)

RAINSCREEN PANELS (NBS H92/120)VERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND

(NBS L20/491)AUTOMATIC BE-PARTING SLIDING DOOR

(NBS P10/256)BRIDGINGTO FACE OF RC SLAB TO PREVENT COLD ZERO ODP RIGID XPS INSULATION 30mm

(NBS J40/ )DPM TANKING TAKEN OVER TOP OF THRESHOLD

CONCRETE PILE CAP & PILE BEYOND TO SE DETAIL

FORM THRESHOLDSTEEL ANGLES ON TIMBER PACKER TO

STEEL ANGLE (NBS P20/170)ALUMINIUM THRESHOLD COVER FIXED INTO

(NBS M10/130)REINFORCED SCREED ON SEPARATING LAYER

†K (NBS M10/291)U-VALUE 0.16W/mRIGID PIR INSULATION TO ACHIEVE MIN.

ENTRANCE MATTING (NBS N10/300)

RC COLUMN TO SE DETAIL

TO SE DETAILPPC RHS BRACKET TO SUPPORT POSTS

STRUCTURE TO SE DETAILRC COLUMNS TO SUPPORT LOUVREPPC RHS BEAM SPANNING BETWEEN

UPSTAND (NBS L10/671)TO SUPPORT GRATING EDGE AND FORM CONTINUOUS GALVANIZED STEEL ANGLE

FORM WALKWAY (NBS L10/671)GALVANIZED STEEL GRATING TO

(NBS L10/671)PPC RHS POSTS TO SE DETAIL

TO RHS POSTS (NBS L10/671)PPC ALUMINIUM LOUVRE PLATE FIXED

SUSPENDED SOFFIT CLADDING (NBS H20/150)

= +15.600FFL +7.200

= +15.400SSL +7.000

= +19.000SSL +10.600

= +19.200FFL +10.800

= +22.600SSL +14.200

GLAZED IN (NBS H11/143)VENTILATION GRILL AT BOTTOMPPC ALUMINIUM PRESSING WITH

(NBS P10/215)GAP FILLED WITH MINERAL WOOL

MIN. U-VALUE 1.8W/m†K (NBS H11/111)SYSTEM, DOUBLE GLAZED, TO ACHIEVE PPC ALUMINIUM CURTAIN WALLING

GLAZED IN (NBS H11/143)VENTILATION GRILL AT BOTTOMPPC ALUMINIUM PRESSING WITH

BARRIER (NBS P10/432)PROPRIETARY FIRE AND ACOUSTIC

(NBS P10/235)GAP FILLED WITH MINERAL WOOL

INSULATED SPANDREL PANEL (NBS H92/121)PPC ALUMINIUM PRESSING FIXED TO

(NBS P10/215)GAP FILLED WITH MINERAL WOOL

GLAZED IN (NBS H11/143)VENTILATION GRILL AT BOTTOMPPC ALUMINIUM PRESSING WITH

MIN. U-VALUE 1.8W/m†K (NBS H11/111)SYSTEM, DOUBLE GLAZED, TO ACHIEVE PPC ALUMINIUM CURTAIN WALLING

GLAZED IN (NBS H11/143)VENTILATION GRILL AT BOTTOMPPC ALUMINIUM PRESSING WITH

RC UPSTAND TO SE DETAIL

(NBS P10/215)GAP FILLED WITH MINERAL WOOL

AND GLAZED IN (NBS H11/111)COPING FIXED TO TOP OF RC UPSTAND PPC ALUMINIUM PRESSING TO FORM

COLD BRIDGING (NBS J31/342)EPS INSULATION TO UPSTAND TO PREVENT

INSULATED SPANDREL PANEL (NBS H92/121)PPC ALUMINIUM PRESSING FIXED TO

(NBS P10/215)GAP FILLED WITH MINERAL WOOL

TO PREVENT COLD BRIDGING (NBS G20/270)TIMBER BOARD TO TOP OF RC UPSTAND

SHINGLE AS BALAST (NBS J31/131)AND WASHED ROUNDED †K U-VALUE 0.16W/m

EPS INSULATION ON TOP TO ACHIEVE MIN. HOT APPLIED INVERTED ROOF COATING WITH

10mm (NBS J31/342)CEMENT PARTICLE BOARD TO UP-STAND

RC SLAB TO SE DETAIL

LIGHT FITTING (NBS K40/120)SUSPENDED ACOUSTIC PANEL WITH INTEGRATED

(NBS L30/561)FREESTANDING GUARD RAILS

(NBS N10/242)BLIND FIXED TO CURTAIN WALL TRANSOM

(NBS H11/143)ENVIRONMENTAL ENGINEER’S SPEC.BESPOKE PPC METAL STRUCTURE TO VENTILATION BOX WITH ACOUSTIC LINING GLAZED IN THERMALLY INSULATED

RC COLUMN TO SE DETAIL

(NBS H11/143)ENVIRONMENTAL ENGINEER’S SPEC.BESPOKE PPC METAL STRUCTURE TO VENTILATION BOX WITH ACOUSTIC LINING GLAZED IN THERMALLY INSULATED

PLASTER BOARD LINING (NBS K10/166)

(NBS K10/167)TO SUPPORT VENTILATION BOXCOLD ROLLED STEEL FRAMING

VAPOUR BARRIER (NBS P10/315)

PAINTED MDF AS SKIRTING (NBS P20/200)

TILE AS FINISH (NBS K41/130)RAISED ACCESS FLOOR WITH CARPET

RC SLAB TO SE DETAIL

LIGHT FITTING (NBS K40/120)SUSPENDED ACOUSTIC PANEL WITH INTEGRATED

(NBS N10/242)BLIND FIXED TO CURTAIN WALL TRANSOM

(NBS H11/143)ENVIRONMENTAL ENGINEER’S SPEC.BESPOKE PPC METAL STRUCTURE TO VENTILATION BOX WITH ACOUSTIC LINING GLAZED IN THERMALLY INSULATED

RC COLUMN TO SE DETAIL

(NBS H11/143)ENVIRONMENTAL ENGINEER’S SPEC.BESPOKE PPC METAL STRUCTURE TO VENTILATION BOX WITH ACOUSTIC LINING GLAZED IN THERMALLY INSULATED

PLASTER BOARD LINING (NBS K10/166)

(NBS K10/167)TO SUPPORT VENTILATION BOXCOLD ROLLED STEEL FRAMING

VAPOUR BARRIER (NBS P10/315)

PAINTED MDF AS SKIRTING (NBS P20/200)

TILE AS FINISH (NBS K41/130)RAISED ACCESS FLOOR WITH CARPET

RC SLAB TO SE DETAIL

(NBS N10/242)BLIND FIXED TO CURTAIN WALL TRANSOM

(NBS N10/242)BLIND FIXED TO CURTAIN WALL TRANSOM

IT/BUSINESS STUDIES

MATHS

1:73 FALL

2195

2200

DESIGN (NBS H13/)STRUCTURAL GLASS LOBBY TO SPECIALIST

565

585

815

1615

585

2485

75

2417

4308

= +8.400FFL +/- 0.000

LOBBYENTRANCE RECEPTION

600

2610

3515

2090

4035

2830

3170

(NBS H92/120)PPC ALUMINIUM RAINSCREEN PANEL

(NBS G10/152)RAINSCREEN SUPPORT BRACKETS CEMENT FIBRE BOARD 12mm TO FIX

85

(NBS H92/776)TO ACHIEVE MIN. U-VALUE 0.20W/m†K PIR INSULATION TO ACHIEVE 140mm

585

1030

(NBS H92/121)TO INSULATED SPANDREL PANEL PPC ALUMINIUM PRESSING FIXED

35

815

585

585

445

585

550

35

815

550

35

585

445

585

550

35

100

= +23.300+14.900 UPSTANDTOP OF

595

515

885

515

535

475

80

475

595

515

885

515

535

80

2015

1110

425

2700

3125

2015

1110

425

2700

3125

C14