E-ELT Status. G. Monnet Faculty Meeting May 19 th , 2006. E-ELT Design Process Status. “Toolbox” produced by 5 topical Working Groups Science, Instruments, AO, Site & Telescope Design accessible from ESO public web pages Core-ESE WG project definition report completed - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: E-ELT Status

1 European Southern Observatory

E-ELT Status

G. Monnet

Faculty Meeting May 19th, 2006

Page 2: E-ELT Status

2 European Southern Observatory

E-ELT Design Process Status

“Toolbox” produced by 5 topical Working Groups Science, Instruments, AO, Site & Telescope Design accessible from ESO public web pages

Core-ESE WG project definition report completed report presented to STC May 11th & ESRC May 19th

covers draft top-level requirements & telescope system design options

E-ELT Telescope Project Office installed by June 1st R. Gilmozzi P.I.; J. Spyromilio head P.O. Basic Reference Design to be presented to ESO

Community by P.O. & ESE November 29th – 30th

Page 3: E-ELT Status

3 European Southern Observatory

E-ELT WG: The Output

5 topical Community-ESO WGs Science, Instrument, AO, Site & Telescope Design 586 pages Toolbox produced & publicly available

Science

Design

Site

Instrument

A.O.

#09ELT-DS

WP

#11#02

#12

#04#05#06

#08#10

Page 4: E-ELT Status

4 European Southern Observatory

E-ELT WG: The Actors

Sarazin Mathy

s

Leibundgut

Yakstoiva

Franx

Arnaboldi

Udry

Zinnecker

Tolstoy

Rebolo

McCaughrean

HookHaehn

elt

Cimatti

Bergeron

Benz

Ardeberg

Shaver

Kissler-Patig

Kauefl

Fosbury

FreudlingComer

on

Rosati

Cunningham D’Odor

icoKerber

Casali

Kaufer

Kasper

Moorwood

Blommaert

Holland

Cuby

Brinchmann

BrandlIy

e

Pepe

Gredel

Appenzeller

Coudé du Foresto

Munoz-Tunon

Ortolani

Quirrenbach

Wilson Vern

in

Herbst

Gilmozzi

PatatSiebenm

orgen

Enard Noe

the

Tamai

Spyromilio

Dierickx

Dimmler

Koch

Schneermann

Swat Alvar

ez

Andersen

Castro

Goncharov

IyeKorhonen

Lemaitre

Salinari

Atad

Rousset

Glindemann

Vérinaud

Beuzit

Brandner

Dainty

Feldt

Ferrari

Love

Myers

Owner-Pedersen

Rabien

Ragazzoni

Riccardi

Rigaut

Stuik

Hubin

LeLouarn

Bonaccini

Page 5: E-ELT Status

5 European Southern Observatory

Main Toolbox components

31 Science cases including 7 “prominent” onesprioritized Telescope & Instrument requirements

a timed 12-Instrument suite covering science cases requirements on Telescope, AO & Siteassessment of technology, complexity, cost & risk

a roadmap for the ~5 AO systems required requirements on Telescope, Instruments & Site AO/LGS concepts & technological pathfinders

Site parameters evaluation & observing impact

Telescope Design families evaluation

Page 6: E-ELT Status

6 European Southern Observatory

E-ELT Top Level Science Requirements

a general-use multi-purpose facility(last-hour multi-telescope alternative opened)

an efficient improved-seeing “wide-field” facility(down to visual wavelengths)

an Instrument-friendly facility

Page 7: E-ELT Status

7 European Southern Observatory

Spherical Primary

(OWL-like)

NO

E-ELT Design Decision Tree

Aspheric segments

?

AO mirror in Tel.?

YES

Adaptive M2 ?

YES

Adaptive R-C or

Gregorian

YES

Seeing limited R-C or

Gregorian

NO

Adaptive 5-mirror Design

NO

YES

Option

Option

Page 8: E-ELT Status

8 European Southern Observatory

Two Alternative Designs (42-m)

M24.5m DM

M34.2m

Gregorian 5-Mirro

r

M26.0m

M42.5m DM

M52.7m T/T

M34.0mactive

λ 0.45 μm throughput (high efficiency aged coatings)

> 86% > 82%

Obstruction (area) 1.2% 9%

Image quality at 5’ 0”.2 diffraction-limited

Enclosure size ~ + 10m

Page 9: E-ELT Status

9 European Southern Observatory

E-ELT Top Level Science Requirements

(too?) large impact on telescope design