e-document management – phase 1

26
E-Document Management – Phase 1 Mike Ahern & Amanda Payton October 22, 2013 1a

Upload: javier

Post on 23-Feb-2016

44 views

Category:

Documents


0 download

DESCRIPTION

E-Document Management – Phase 1. Mike Ahern & Amanda Payton October 22, 2013. 1a. Objectives this morning. Bring folks up to speed on the overall project goals and current status Overview of the scan process – past and future Present additional steps needed under Phase 1 and why - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: E-Document Management – Phase 1

E-Document Management – Phase 1

Mike Ahern & Amanda PaytonOctober 22, 2013

1a

Page 2: E-Document Management – Phase 1

Objectives this morning

• Bring folks up to speed on the overall project goals and current status

• Overview of the scan process – past and future• Present additional steps needed under Phase 1

and why• Discuss/identify which documents are to be

scanned during phase 1• Present how to access “Places” and “OnBase”• Discuss what to do with the hard copy

documents once scanning is complete.

Page 3: E-Document Management – Phase 1

Project Overview

• This project is focused on scanning many current hard copy files to a searchable electronic format and developing a tool to make future documents searchable electronically.

• The Goal of this project is to reduce hard copy generation and storage of documents and records.

• The scope of phase zero was to make all 2007 to present noncompliance documents searchable via the web as a proof of concept for other documents

• The scope of phase 1 is to stand up the permanent edocument management system (OnBase), continue phase zero document type scanning, and initiate additional document types into the scanning process.

Page 4: E-Document Management – Phase 1

Current Status

• Progress and challenges since 2011o All offices have been scanning documents

• Director’s Journal/AGO Orders

• DO/LAA non compliance and return to compliance documents

o All but a handful of back-file documents were successfully scanned

o STARS2 process working, but some key information may be missing going forward

o Barcode process worked for the most parto Searchability improved over time

• Where we go from hereo Multi-phase plan to 2015o Begin phase 1 in November, Phase 2 in Spring 2014

• Phase 1 additional docs – facility permits, applications, etc culled from STARS2

• Open burning permissions and denials

• Asbestos/demolition notifications

ARAQMDCCHD

CDAQLCGHD

MTAPC

PCHDRAPCA

SWOAQA

TDES

0200400600800

1000120014001600

Phase Zero Total Scanned Documents

Total

Page 5: E-Document Management – Phase 1

The scan process – past and future

F5.EPA.OHIO.GOV

Page 6: E-Document Management – Phase 1

The scan process – past…..and…..

BARCODE>>>SCAN>>>INGEST FOLDER

Page 7: E-Document Management – Phase 1

The scan process –…..future

4 !!

Non-facility Phase 1 ingestion process

Citr

ix O

nBas

eCi

trix

WRA

PN(fo

r Dire

ctor

’s A

ction

s)F5

Ser

ver

Scan

ner

Scanned action(PDF file)

Local data store

F5 loginWebapps login to PLACES

Generate Place ID (Custom Defined

Area “CDA”)

CITRIX login

OnBase login

Ingestion process tied to Place IDLAA intake folder

CITRIX login

WRAPN login WRAPN Entry Save WRAPN entry

1a

Page 8: E-Document Management – Phase 1

Step 2 - creating the PLACE IDF5.EPA.OHIO.GOV

Non-facility Phase 1 ingestion process Ci

trix

OnB

ase

Citr

ix W

RAPN

(for D

irect

or’s

Actio

ns)

F5 S

erve

rSc

anne

r

Scanned action(PDF file)

Local data store

F5 loginWebapps login to PLACES

Generate Place ID (Custom Defined

Area “CDA”)

CITRIX login

OnBase login

Ingestion process tied to Place IDLAA intake folder

CITRIX login

WRAPN login WRAPN Entry Save WRAPN entry

1a

Page 9: E-Document Management – Phase 1

Step 2 - creating the CORE ID

F5.EPA.OHIO.GOV

Non-facility Phase 1 ingestion process

Citri

x OnB

ase

Citr

ix W

RAPN

(for D

irect

or’s

Actio

ns)

F5 Se

rver

Scan

ner

Scanned action(PDF file)

Local data store

F5 loginWebapps login to PLACES

Generate Place ID (Custom Defined

Area “CDA”)

CITRIX login

OnBase login

Ingestion process tied to Place IDLAA intake folder

CITRIX login

WRAPN login WRAPN Entry Save WRAPN entry

1a

Page 10: E-Document Management – Phase 1
Page 11: E-Document Management – Phase 1
Page 12: E-Document Management – Phase 1
Page 13: E-Document Management – Phase 1
Page 14: E-Document Management – Phase 1
Page 15: E-Document Management – Phase 1

F5.EPA.OHIO.GOV

Step 2 - creating the CORE ID

Page 16: E-Document Management – Phase 1

Step 2 - creating the CORE IDF5.EPA.OHIO.GOV

Page 17: E-Document Management – Phase 1

Step 2 - creating the CORE IDF5.EPA.OHIO.GOV

Non-facility Phase 1 ingestion process

Citr

ix O

nBas

eCi

trix

WRA

PN(fo

r Dire

ctor

’s Ac

tions

)F5

Ser

ver

Scan

ner

Scanned action(PDF file)

Local data store

F5 loginWebapps login to PLACES

Generate Place ID (Custom Defined

Area “CDA”)

CITRIX login

OnBase login

Ingestion process tied to Place IDLAA intake folder

CITRIX login

WRAPN login WRAPN Entry Save WRAPN entry

1a

Page 18: E-Document Management – Phase 1

Step 3 – Ingestion into OnBaseHTTPS://EPAFARM.EPA.OHIO.GOV

Non-facility Phase 1 ingestion process

Citrix

OnB

ase

Citrix

WRA

PN(fo

r Dire

ctor’s

Actio

ns)

F5 Se

rver

Scan

ner

Scanned action(PDF file)

Local data store

F5 loginWebapps login to PLACES

Generate Place ID (Custom Defined

Area “CDA”)

CITRIX login

OnBase login

Ingestion process tied to Place IDLAA intake folder

CITRIX login

WRAPN login WRAPN Entry Save WRAPN entry

1a

Page 19: E-Document Management – Phase 1

Step 3 – Ingestion into OnBaseHTTPS://EPAFARM.EPA.OHIO.GOV

4 !!

Page 20: E-Document Management – Phase 1

Step 3 – Ingestion into OnBaseHTTPS://EPAFARM.EPA.OHIO.GOV

4 !!

Page 21: E-Document Management – Phase 1

Step 3 – Ingestion into OnBaseHTTPS://EPAFARM.EPA.OHIO.GOV

4 !!

Ohio EPA Employee ID

Page 22: E-Document Management – Phase 1

Step 1a – Copy scanned file to locals folderHTTPS://EPAFARM.EPA.OHIO.GOV

Page 23: E-Document Management – Phase 1

Step 1a – Copy scanned file to locals folderHTTPS://EPAFARM.EPA.OHIO.GOV

Page 24: E-Document Management – Phase 1

Step 1a – Copy scanned file to locals folderHTTPS://EPAFARM.EPA.OHIO.GOV

Local scanned doc

Page 25: E-Document Management – Phase 1

Facility Non-Facility• NOVs• Open burning Permissions• Open burning Denials• Asbestos contractor letters

Phase 1 Documents

• NOVs• Permit applications• Permits (actually, all actions of the

Director)• Emissions reports

Information and links:Answer Place Topic ID 2363

Page 26: E-Document Management – Phase 1

Important items to keep in mind

• Initial set-up may involve additional steps (e.g., installing active-x control to access Places via the F5 server)

• A PLACE ID is required for each unique location associated with a scanned or uploaded document (STARS2 provides it with the document transfer into eDocs, manual scans will require a Custom Defined Area (CDA) to be created first.