Page 1: DUTCO MCCONNELL DOWELL FABRICATION LLC

DUTCO MCCONNELL DOWELL FABRICATION LLC

www.mcconnelldowell.com | www.macdowfabrication.comMechanical | Electrical | Fabrication | Pipelines | Tunnelling | Civil | Marine

Page 2: DUTCO MCCONNELL DOWELL FABRICATION LLC

TABLE OF CONTENTS

1. WHO WE ARE2 WHAT OUR CLIENTS CAN EXPECT FROM US2. WHAT OUR CLIENTS CAN EXPECT FROM US3. HOW DO WE ACHIEVE OUR CLIENTS’ EXPECTATIONS4. ORGANISATION STRUCTURE5 STRATEGIC FOCUS5. STRATEGIC FOCUS6. HEALTH, SAFETY & ENVIRONMENT7. QUALITY7. QUALITY8. AWARDS / APPRECIATION9. RECENT WORK 10 CURRENT WORK10. CURRENT WORK11. CASE STUDIES12. FABRICATION FACILITIES

Page 3: DUTCO MCCONNELL DOWELL FABRICATION LLC

WE ARE A WE ARE A MAJOR ENGINEERING, MAJOR ENGINEERING, FABRICATION & CONSTRUCTION GROUPCONSTRUCTION GROUP

Page 4: DUTCO MCCONNELL DOWELL FABRICATION LLC

OwnershipOwnership1. WHO WE ARE – DUTCO MCCONNELL DOWELL

OwnershipOwnership

DUTCO GROUP

DUTCO McCONNELL DOWELL (ME) LLC (DMDME)

DUTCO McCONNELL DOWELL FABRICATION LLC (DMDF)

Page 5: DUTCO MCCONNELL DOWELL FABRICATION LLC

1. WHO WE ARE – DUTCO MCCONNELL DOWELL

Been active in the Middle East for 35 years with experience in pipeline,

mechanical and electrical civil fabrication tunnel and undergroundmechanical and electrical, civil, fabrication, tunnel and underground

Local specialist with international expertise in delivering technologically

challenging projectschallenging projects

Long standing record in delivering good quality projects on time over a

id f t i i Oil d G P t h i l I d t i lwide range of competencies in Oil and Gas, Petrochemical, Industrial,

Power, Water and Infrastructure sectors

Safety is the core value of our Company – we are proud of our industry

leading Safety Statistics.

Page 6: DUTCO MCCONNELL DOWELL FABRICATION LLC

1. WHO WE ARE – MCCONNELL DOWELL CORPORATION

Major contractor delivering a broad infrastructure service across multiple market sectorssectors

Specialist and industry-leading marine, pipeline and tunnelling construction capability

Revenues of $2 5 billion and Work in Hand of $3 5 billionRevenues of $2.5 billion and Work in Hand of $3.5 billion

Currently ranked 6 in the Top 40 Australian contractors

Delivering stand alone or multi-disciplinary self perform capability for individual contracts in excess of $1billion

Strong safety culture resulting in industry-leading results

Internationally certified for safety, quality and environmental practices

Track record for time and cost-efficient design

E i d i ll t t d li d l i l di i j t Experienced in all contract delivery models, including concession projects

Page 7: DUTCO MCCONNELL DOWELL FABRICATION LLC

WHERE McCONNELL DOWELL OPERATES

Page 8: DUTCO MCCONNELL DOWELL FABRICATION LLC

1. WHO WE ARE – DUTCO GROUP

Established in 1947Established in 1947

Diverse, multi-faceted organisation with operations in widely

diff i fi ld f h i il i i t t t f th tdiffering fields, from heavy civil engineering, to state of-the-art

communication systems, to 5-star world class hospitality

Wholly owned by UAE nationals

Employs over 20,000 people.Employs over 20,000 people.

Certified to ISO (Quality, Health, Safety and Environment)

Committed to environmental protection and ensure that projects

adhere to the very best environmental practices.

Page 9: DUTCO MCCONNELL DOWELL FABRICATION LLC

2. WHAT OUR CLIENTS CAN EXPECT FROM US

DEPENDABLEClients must be able to depend on us to get their projects built safely, on time and to the p g p j y,required quality

MINDFUL OF OUR CLIENTS’ NEEDSWe must ensure we know what our Clients’ need and want

DIVERSEWe are diverse in geographies throughout the region and core competencies

MOTIVATED TO ACHIEVEWe are motivated to achieve our targets

EXCEPTIONALWe are exceptional in everything we do

Page 10: DUTCO MCCONNELL DOWELL FABRICATION LLC

3. HOW DO WE ACHIEVE OUR CLIENTS’ EXPECTATIONS `````````````````````````````````````````````````````````````````````````````````````````````````````````````````````CLIENTS’ EXPECTATIONSPRODUCTIVITY

AACCOUNTABILITY

SAFETYSAFETY

SOLUTIONS

INTEGRITY

ON TIME DELIVERY

NEW OPPORTUNITIES

Page 11: DUTCO MCCONNELL DOWELL FABRICATION LLC

4. MIDDLE EAST REGIONAL ORGANIZATION STRUCTURE

Page 12: DUTCO MCCONNELL DOWELL FABRICATION LLC

4. DUTCO MCCONNELL DOWELL FABRICATION ORGANISATION CHART

General Manager FabricationRussell Briggs

Workshop ManagerHSE AdvisorFabrication Business AdministratorWimal KoraleMohd Zoheb

Operations

Barnabas Judy

Support ServicesEstimating Manager – Fabrication Workshop

Ch d h dhChandrahas Jadhav

Supervisor & Emergency Response CoordinatorMurali Gopalan

Quality EngineerShreenath Vijaykumar

Engineer & PlannerGlenn Lorenzo

Estimator(TBA)

Logistics  & Procurement Coordinator

Vazeer Khan

Document ControllerVipeesh Vipinan

Fabrication ForemenJohn  Antony Joy Kutty

Masood Hassan Vo Hien Manh

QC InspectorVarughese Mani

DraughtsmanSumesh Govindan

DraughtsmanFlint Dominic

QC InspectorShaiju Varkey

Head Office Support

Vipeesh Vipinan

Time KeeperManasa Kumar

Welding ForemanGopalan Prakasan

Blasting & Painting

Flint DominicShaiju Varkey ‐Management‐Commercial‐Financial‐QHSE‐HR & IT

Material ControllerNevil Kumara

QA/QC Assistant

DraughtsmanSubin Jose

Blasting & Painting Sadhan Biswas

Machine ShopDavid  Masih

Prakash Sharma

QA/QC AssistantSoma 

Gunawardana

Store ManNoor Mohd

Page 13: DUTCO MCCONNELL DOWELL FABRICATION LLC

5. STRATEGIC FOCUS

Delivery SystemsDelivery SystemsGeographic LocationsGeographic Locations

Design & ConstructHard Dollar

AllianceStrategic Investments

Cost Reimbursable

Design & ConstructHard Dollar

AllianceStrategic Investments

Cost Reimbursable

DubaiAbu Dhabi

QatarKingdom of Saudi Arabia

DubaiAbu Dhabi

QatarKingdom of Saudi Arabia

Cost ReimbursableCost Reimbursable

Markets

Oil & GasIndustrial Process

Markets

Oil & GasIndustrial Process

Competencies

Mechanical & ElectricalPipeline

Competencies

Mechanical & ElectricalPipeline

EnergyTransport

WaterInfrastructure

Mining & Metals

EnergyTransport

WaterInfrastructure

Mining & Metals

pCivil & Marine

FabricationTunnel & Underground

pCivil & Marine

FabricationTunnel & Underground

Mining & MetalsMining & Metals

Page 14: DUTCO MCCONNELL DOWELL FABRICATION LLC

6. HEALTH, SAFETY & ENVIRONMENT

SAFETY VISION

INITIATIVESINITIATIVES

Page 15: DUTCO MCCONNELL DOWELL FABRICATION LLC

SAFETY PERFORMANCE (ME REGION)

6. HEALTH, SAFETY & ENVIRONMENT

Our Safety record is a testament to the commitment of our people, and our commitment to continual improvement, never resting on our laurels.

SAFETY PERFORMANCE (ME REGION)

SAFETY STATISTICSSAFETY STATISTICS

2009 2010 2011 20122013

( up to June)( up to June)

Man Hours 7,089,187 5,865,354 1,427,215 2,315,853 1,431,835

Lost Time Incidents 2 0 0 0 0

Lost Time Incident Frequency Rate (LTIFR) 0.28 0.00 0.00 0.00 0.00

NMIFR/NMI/Manhours x 1 000 000 21.63 36.05 35.7 59.59 42.601,000,000

Recordable Injury Frequency Rate (Fatal + LTI + RWC + MTI) 2.96 0.85 3.50 2.16 0.70

Medical Treatment Injury 2 40 0 34 3 50 0 86 0 00j yFrequency Rate (MTI) 2.40 0.34 3.50 0.86 0.00

All Injury Frequency Rate (Fatal + LTI + RWC + MTI + FAI) 8.32 5.11 9.81 9.07 9.78

Note: Recently achieved 10M Note: Recently achieved 10M manhoursmanhours without LTIwithout LTI

Recently achieved 3 years without LTI.Recently achieved 3 years without LTI.

Page 16: DUTCO MCCONNELL DOWELL FABRICATION LLC

6. HEALTH, SAFETY & ENVIRONMENT

SAFETY CULTURE:

See Something Say Something

No matter how minorProactive Behavior

I R ti blIncrease Reporting- Near miss Reporting- Safety Observations

Responsible ReportingContinuous Learning  

Education 

Reduction in Accidents Reduction in Frequency & 

LTI’s / Medical Treatment Case & First Aid Treatment

q ySeriousness /

Accidents / Injuries

Page 17: DUTCO MCCONNELL DOWELL FABRICATION LLC

7. QUALITY

Page 18: DUTCO MCCONNELL DOWELL FABRICATION LLC

8. AWARDS / APPRECIATION

QATALUM (Qatar Aluminium) EMAL (Emirates Aluminium) DUBAL (Dubai Aluminium)

Page 19: DUTCO MCCONNELL DOWELL FABRICATION LLC

9. CURRENT WORK

Project DescriptionWeight (in Tons)

Total Weight (in Tons)

Client Start Date Completion

Outotech IlmeniteProject

Fabrication works for National Titanium DioxideCompany (NTDC) Saudi Arabia

Outotech GmbH 1/2013 9/2013ProjectDubai

Company (NTDC), Saudi Arabia

820

- Supply of Bins & Hoppers 547

- Supply of Tanks & Classified Bins 148

- Support Legs & Platform for Conveyors- Lot 1 & 2 94Support Legs & Platform for Conveyors Lot 1 & 2 94

- Air Ventilation Support Beam 5

- Screen Chutes with wear plates 26

Bariq Mining Structrual steel fabrication for filter house 76

136

Bariq Mining Limited

10/2012 8/2013

Fabrication of trash screen 50

Fabrication of Chutes 10

EMAL Bath Crucible Duct Work

EMAL Bath Crucible Duct Work for Crushing Area 5 5 KEMPE 5/2013 7/2013

Page 20: DUTCO MCCONNELL DOWELL FABRICATION LLC

10. RECENT WORK

Project DescriptionWeight (in Tons)

Total Weight (in Tons)

Client Start Date Completion

Pipeline Marker Post Fabrication of Pipeline Marker Post - 200 nos 10 10 EMARAT 3/2013 5/2013

EMAL Bath Crucible Duct Work

EMAL Bath Crucible Duct Work for Infeed Area 5 5 KEMPE 4/2013 6/2013

Bariq Mining Shop Fabricated Tanks 104

427

Bariq Mining Company Limited

1/2012 1/2013

Platework supply contract 224

Grizzly supports 61 427Grizzly supports 61

Truck Feeder and Electric Equipment 32

Hydraulic Truck Loading System 6

Page 21: DUTCO MCCONNELL DOWELL FABRICATION LLC

11 CASE STUDIES11. CASE STUDIES

Page 22: DUTCO MCCONNELL DOWELL FABRICATION LLC

FABRICATIONProject Case Studies

FABRICATION

Page 23: DUTCO MCCONNELL DOWELL FABRICATION LLC

Client: Outotech GmbH

OUTOTECH ILMENITE PROJECT, DUBAI

ScopeOur Challenge was to offer a competitive price for a fabricated steel work package totalling 800 tons , to the worlds 2nd largest Ilmenite smelter plant which will be producing upwards of 500,000 Tons of Titanium Dioxide per annum.Dioxide per annum.

We backed our offer with high levels of quality and a guaranteed delivery ,in a short time frame of just 20 weeks. Whilst maintaining extremely high levels of safety awareness.

To maintain these core factors our approach had to be innovative using advance fabrication methods ,welding technology and expertise in all fields such as fabrication assemble welding and painting.As the package included six day bins 7.4m x 7.4m x 2m in size and 50 Metric tons each in weight. which in them selves were large complex fabrications as wasthem selves were large complex fabrications as was the main frame which measured 40m x 7.5m x 0.8m and, weighed in at 63 Metric tons which has been fabricated in two halves ,with complete built up sections in 25mm and 30mm steel plate. Support structures ( legs ) Stair tower, penthouse steel fabrication, conveyor supports and various supply tanks / silos Service water tanks Using a total of 60tanks / silos. Service water tanks. Using a total of 60 types of materials in 10 deferent material grades, added to this most of the none standard sections were fabricated by our selves as they were unavailable from the steel suppliers.

Above all the delivery of such steel work on or before

Bin Assembly Drawing

ythe designated delivery date to the required specification safety is where our strength lies , in this case our delivery was to be overseas so keeping delivery dates so enabling shipping manifests to be completed prior to sailing has been all important.

Page 24: DUTCO MCCONNELL DOWELL FABRICATION LLC

OUTOTECH ILMENITE PROJECT , DUBAI

Page 25: DUTCO MCCONNELL DOWELL FABRICATION LLC

OUTOTECH ILMENITE PROJECT , DUBAI

Page 26: DUTCO MCCONNELL DOWELL FABRICATION LLC

OUTOTECH ILMENITE PROJECT , DUBAI

Page 27: DUTCO MCCONNELL DOWELL FABRICATION LLC

EMARAT PIPELINE MARKER POST, DUBAI

Client: EMARAT

ScopeFabrication of 200 no. of pipeline marker post.

Page 28: DUTCO MCCONNELL DOWELL FABRICATION LLC

EMAL BATH CRUCIBLE DUCT WORK FOR INFEED AREA

Client: KEMPE

ScopeBath Crucible Duct Work for Infeed Area

Page 29: DUTCO MCCONNELL DOWELL FABRICATION LLC

JURONG ISLAND , SINGAPORESummary of work: • Structural Steel Tons = 6,865

Pi T 7 400• Pipe Tons = 7,400 • Fab Dia Inch = 209,325 • Site Dia Inch = 117,117 • No. of PARs = 126No. of PARs 126 • No. of Towers = 17 • No. of STR = 16 • No. of SBR Racks = 48 • No. of Misc SBRS = 20

The 5 km of pipe racks provide the critical infrastructure thatthe critical infrastructure that connects the existing facilities to the new expansion

Page 30: DUTCO MCCONNELL DOWELL FABRICATION LLC

SHOP FABRICATED TANKS - JABAL SAYID GOLD & COPPER MINE, KSA

Client: Bariq Mining Limited

ScopeScopeClient’s EPCM contractor Client’s EPCM contractor was SNC Lavalin.was SNC Lavalin.The scope included The scope included designing tanks to APIdesigning tanks to APIdesigning tanks to API designing tanks to API 650, workshop detailing, 650, workshop detailing, material supply, material supply, fabrication, surface fabrication, surface treatment, rubber lining, treatment, rubber lining, h bl & t tih bl & t tishop assembly & testing shop assembly & testing

of the shop fabricated of the shop fabricated tanks.tanks.A total of 21 tanks & 4 A total of 21 tanks & 4 separators wereseparators wereseparators were separators were completed. All were completed. All were hydro tested as per the hydro tested as per the standards. Some were standards. Some were barged and rest were barged and rest were ggtransported via road to transported via road to Saudi.Saudi.

Page 31: DUTCO MCCONNELL DOWELL FABRICATION LLC

SHOP FABRICATED TANKS - JABAL SAYID GOLD & COPPER MINE, KSA

Stainless Steel Tank Feed Pump Box

Rubber Lined Tanks

Page 32: DUTCO MCCONNELL DOWELL FABRICATION LLC

PLATEWORK SUPPLY CONTRACT - JABAL SAYID GOLD & COPPER MINE, KSA

Client: Bariq Mining Limited

ScopeClient’s EPCM contractor Client’s EPCM contractor was SNC Lavalin.was SNC Lavalin.The scope involves The scope involves workshop detailing, workshop detailing, material supplymaterial supplymaterial supply, material supply, fabrication, surface fabrication, surface treatment, rubber lining, treatment, rubber lining, cut and install bisalloy cut and install bisalloy lining, shop assembly & lining, shop assembly & t ti f th 67 l t kt ti f th 67 l t ktesting of the 67 platework testing of the 67 platework items (such as chutes, items (such as chutes, launders, kibbles, bin etc.) launders, kibbles, bin etc.) for the mine.for the mine.The bisalloy liners were a The bisalloy liners were a yybolted arrangement for bolted arrangement for ease of replacement. ease of replacement. As additional scope we As additional scope we also fabricated the skirts also fabricated the skirts assembly for the conveyorassembly for the conveyorassembly for the conveyor assembly for the conveyor systems to curtail the dust systems to curtail the dust contamination to the contamination to the environment.environment.

Page 33: DUTCO MCCONNELL DOWELL FABRICATION LLC

PLATEWORK SUPPLY CONTRACT - JABAL SAYID GOLD & COPPER MINE, KSA

Feed ChuteChute

ROM Discharge Chute Various Items

Page 34: DUTCO MCCONNELL DOWELL FABRICATION LLC

GRIZZLY PANEL INSTALLATION, SAUDI ARABIA

Client: Bariq Underground Mine

ScopeGrizzly Panel. Supply of cast Grizzly and Grizzly supporting structure – 2 units. Each cast Grizzly weighs appox.7.4 Tons each. and support structure appox. 30 Tons.

Page 35: DUTCO MCCONNELL DOWELL FABRICATION LLC

TRUCK FEEDER SYSTEM, SAUDI ARABIA

Client: BariqUnderground Mine

SScopeFabrication of Fabrication of Underground Truck Underground Truck Feeder, which Feeder, which incorporates ore pass incorporates ore pass transfer truck loading transfer truck loading chute, Platform, Impact chute, Platform, Impact Chute with Liner Plates, Chute with Liner Plates, Guards, etc. Truck Guards, etc. Truck Feeder Hydraulic Feeder Hydraulic Operating System, which Operating System, which includes the hydraulics includes the hydraulics and electrical and and electrical and instrumentation for the instrumentation for the Truck Feeder.Truck Feeder.

Page 36: DUTCO MCCONNELL DOWELL FABRICATION LLC

TRUCK LOADING – UNLOADING STATION, UAE

Client: FL Smidth Moller GmbH

SScopeThe project was to The project was to fabricate, install and fabricate, install and commission Alumina commission Alumina storage tanks with truck storage tanks with truck loading loading –– unloading unloading station in Jebel Ali port.station in Jebel Ali port.The scope included The scope included supply of material, shop supply of material, shop detailing, fabrication, detailing, fabrication, surface treatment, surface treatment, transportation and transportation and erection at site. erection at site.

Page 37: DUTCO MCCONNELL DOWELL FABRICATION LLC

12. FABRICATION FACILITIES IN ASIA

UAE Fabrication Yard Thailand Fabrication Yard

UAE Fabrication Yard Batam Fabrication Yard

UAE Fabrication YardBatam Fabrication Yard

Page 38: DUTCO MCCONNELL DOWELL FABRICATION LLC

Dutco McConnell Dowell Fabrication LLCDutco McConnell Dowell Fabrication LLC

Russell BriggsGeneral Manager FabricationGeneral Manager, Fabrication

Jebel Ali Industrial Area 2 – Dutco CompoundP O B 50733P.O. Box 50733Dubai, United Arab EmiratesP : +971 4 880 1083F : +971 4 880 1156

www.mcconnelldowell.com, www.macdowfabrication.comMechanical | Electrical | Fabrication | Pipelines | Tunnelling | Civil | Marine