DUST DEPOSITION SAMPLING REPORT – QUARTER 2, 2019
GORTADROMA LANDFILL (REF. W0017-04), GORTADROMA, BALLYHAHILL,
CO. LIMERICK.
Prepared for: Limerick City and County Council,
Dooradoyle Road, Dooradoyle, Co. Limerick.
3234 - Gortadroma May 3rd, 2019
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 2: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/2.jpg)
3234 / May 3rd, 2019
ISSUE/REVISION INDEX
Revision Pages Revised
Remarks # Prep. Rev. Date
PA TO’B 03/05/2019 Issue Draft for Internal Review
PB JR 03/05/2019 All Issue Draft for Client’s Review
PC JR 03/05/2019 Issue Final Document
Prepared by; Trisha O’ Brien, M.Sc
Reviewed by; John Rea, B.Sc., MIEnv.Sc.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 3: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/3.jpg)
3234 / May 3rd, 2019
TABLE OF CONTENTS
Page
1. INTRODUCTION 1
1.1. Dust Deposition 1
1.1.1. Sampling Issues 1
1.2. Dust Deposition Regulatory Criteria 1
1.3. Dust Deposition Methodology 1
2. DUST DEPOSITION SCOPE OF WORK 3
3. DUST DEPOSITION RESULTS 4
4. DUST DEPOSITION CONCLUSIONS 4
DRAWINGS
Fig.2-A03– Environmental Monitoring Points
APPENDICES
I Dust Deposition Laboratory Results
II Dust Deposition Concentration Calculation Sheets
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 4: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/4.jpg)
1 3234 / May 3rd, 2019
1. INTRODUCTION
JRE Environment (JRE) was retained by Limerick City and County Council to complete a dust deposition
sampling programme at the Gortadroma Landfill site in Gortadroma, Ballyhahill, Co. Limerick. The site is
a closed landfill site with an operational bring centre. Monitoring and sampling was completed at on-
site sample locations to assess dust deposition concentrations from the site operations. Monitoring
locations are provided on Drawing Fig.2-A03, attached.
The site is licenced by the Environmental Protection Agency (EPA) under Waste Licence Ref. W0017-04
(Waste Licence). The dust deposition was completed in compliance with Schedule C.3 of the site Waste
Licence. This report deals with the findings of the dust deposition sampling event for Quarter 2, 2019
completed at six (6) pre-determined sampling locations (i.e., D1, D3, D4, D5, D6 and D7) outlined in
Schedule C.3 of the site Waste Licence. Sampling was completed between March and April 2019.
1.1. Dust Deposition
Dust includes particulate matter (PM) with a particulate diameter typically between 1 and 75 microns
(i.e., µm). Dust deposition typically occurs in close proximity to the source and the main impacts from
suspend particulates may be experienced within 500 m of the source as the airborne dust falls out of
suspension. Larger PM deposits closer to the source and the rates of deposition and the size of PM
decreases with distance from the source. Typically, the dust collected by dust deposition sampling is for
larger PM (i.e., between 35 – 75 µm).
1.1.1. Sampling Issues
There were no sampling issues recorded during Quarter 2, 2019.
1.2. Dust Deposition Regulatory Criteria
There are no National or European Union (EU) guidelines or limits for dust deposition concentrations. In
the absence of regulatory criteria, the recognised guidelines used for comparing dust deposition
concentrations is provided by the TA Luft Technical Instructions on Air Quality Control, July 2001 (i.e.,
350 mg/m2/day). These limits are included in Schedule B.1 of the site Waste Licence.
1.3. Dust Deposition Methodology
Dust monitoring was completed at pre-determined locations to assess dust deposition concentrations
arising from day to day operations at the site. Monitoring locations are provided in Table A and
Drawing Fig.2-A03.
Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect
bulk dust deposition. The method employed is based on the German Standard Method VDI 2119 and
collects total particulate matter. The gauge consists of a gauge bottle supported on a stand of
approximately 1.5 metres high. The apparatus consisted of a collection vessel with an open mouth
diameter of 93 mm with a collection sample bottle of 2.0 litres volume. When the sample period had
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 5: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/5.jpg)
2 3234 / May 3rd, 2019
elapsed the sample vessels were checked for the presence of any unusual deposits such as leaves or
insects and these were removed before analysis of the samples took place. The samples collected were
then transferred to an accredited laboratory along with appropriate chain-of-custody documentation
for gravimetric (weight) analysis to determine the concentration of deposited material in each
collection vessel.
Table A: Dust Deposition Monitoring Locations
Location
Ref.
Sample ID Location Coordinates Start Date End Date Exposure
Time
D1 D19-D1-02 Western Boundary of Site 52.540148,
-9.152193 27/03/2019 24/04/2019 28 Days
D3 D19-D3-02 At Entrance of Site, East
of SW4
52.535604,
-9.149777 27/03/2019 24/04/2019 28 Days
D4 D19-D4-02
Northern Boundary of
Site, adjacent to S8
(Surface Water Location)
52.541373,
-9.147953 27/03/2019 24/04/2019 28 Days
D5 D19-D5-02 Adjacent to S9 (Surface
Water Location)
52.540631,
-9.143982 27/03/2019 24/04/2019 28 Days
D6 D19-D6-02
East of Site, adjacent to
S10 (Surface Water
location)
52.539915,
-9.140941 27/03/2019 24/04/2019 28 Days
D7 D19-D7-02 East of leachate lagoon 52.537987,
-9.144069 27/03/2019 24/04/2019 28 Days
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 6: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/6.jpg)
3 3234 / May 3rd, 2019
2. DUST DEPOSITION SCOPE OF WORK
The scope of work was to determine dust deposition concentrations at pre-determined sampling
locations included in the Site Licence. The scope of work included the following:
Complete dust deposition monitoring at six (6) locations within the Gortadroma site including those
outlined in Table C.3.1 of the site Waste Licence. Sample frequency was completed with reference to
Table C.3.1. of the site Waste Licence (i.e., Quarterly Monitoring events).
Complete dust deposition sampling with reference to the German Standard Method VDI 2119 (i.e.,
using Bergerhoff dust deposition sampler) consisting of gauge dust collection vessels of with a
diameter of 93 mm supported on a stand of approximately 1.5 metres high.
Collect dust deposition samples over a 28-day period and submit samples to an accredited laboratory
for gravimetric analysis.
Report dust deposition results to Limerick City and County Council.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 7: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/7.jpg)
4 3234 / May 3rd, 2019
3. DUST DEPOSITION RESULTS
The results of the dust deposition sampling programme completed in Quarter 2, 2019 are presented in
Table B and the analytical reports for the collected samples are provided in Appendix I.
The dust deposition concentrations were calculated from the dust content of the collection vessel (in
milligrams), the area of the mouth of the collection vessel and the number of days the collection vessel
is exposed for sampling. The final concentration is calculated to the general reference (mg/m2/day)
using the following formula:
Xd= Wm
A x D
Where:
Xd = Dust Deposition Concentration (mg/m2/day)
Wm = Dust weight (mg)
A = Area of the mouth surface of the collection vessel (m2)
D = No. Days Exposure
The concentration calculation sheets for the collected samples are provided in Appendix II.
Table B: Dust Deposition Monitoring Results
Sample ID Result
(mg/m2/day)
Waste Licence Limit
(mg/m2/day)
D19-D1-02 96.6 350
D19-D3-02 40.4 350
D19-D4-02 35.7 350
D19-D5-02 211.1 350
D19-D6-02 196.4 350
D19-D7-02 197.5 350
4. DUST DEPOSITION CONCLUSIONS
The results of the dust deposition monitoring programme completed at the Gortadroma site indicated
that the dust deposition concentrations were less than the 350 mg/m2/day limit at all monitoring
locations during the second quarter sampling event in 2019.
No significant site work activities were taking place on site during the monitoring period and no major
sources of potential airborne dust were observed. The site was vegetated with limited exposed surface
areas with the exception of site roads. The potential for airborne dust impacts on off-site receptors is
considered to be minimal.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 8: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/8.jpg)
DRAWINGS
Fig.2-A03– Environmental Monitoring Points
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 9: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/9.jpg)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 10: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/10.jpg)
APPENDIX I
Dust Deposition Laboratory Results
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 11: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/11.jpg)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 12: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/12.jpg)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 13: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/13.jpg)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 14: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/14.jpg)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 15: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/15.jpg)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 16: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/16.jpg)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 17: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/17.jpg)
APPENDIX II
Dust Deposition Concentration Calculation Sheets
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 18: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/18.jpg)
DUST DEPOSITION CALCULATION
MARCH / APRIL 2019 - DUST DEPOSITION LOCATION D1
SITE DETAILS
Site: Gortadroma Landfill
Address Gortadroma, Ballyhahill, Co. Limerick
Client: Limerick County Council
Sampling Location ID: D19-D1-02
Sampling Location Description: Western Boundary of Site
Start Date: 27/03/2019
End Date: 24/04/2019
Monitoring Period (Days): 28
Collection Vessel Data
Sample Method Standard Method VDI 2119
Collection Vessel Height 1.5m
Collection Vessel Aperture Diameter 93mm
Collection Vessel Volume 2 Litres
Aperture Area (A) Calculation
Aperture Diameter - 93mm = 0.093 metres
Aperture Radius - 93mm / 2 = 0.0465 metres
Area = ∏r2 = ∏(0.0465)2 = 3.14(0.00216225) = 0.0068m2A = 0.0068
Weight (Wm) of Dust In Collection Vessel (in Milligrams from Lab Analysis)
Grammes Milligrammes
Gravimetric Analysis Result = 0.0184 18.4
Wm = 51.3 mg
FINAL DUST DEPOSITION CONCENTRATION CALCULATION
Wm Weight of Dust
Dust Deposition (Xd) = (A x D) Area x No. Days Exposure
Xd = 96.639 mg/m2/Day
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 19: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/19.jpg)
DUST DEPOSITION CALCULATION
MARCH / APRIL 2019 - DUST DEPOSITION LOCATION D3
SITE DETAILS
Site: Gortadroma Landfill
Address Gortadroma, Ballyhahill, Co. Limerick
Client: Limerick County Council
Sampling Location ID: D19-D3-02
Sampling Location Description: At Entrance of Site, East of SW4
Start Date: 27/03/2019
End Date: 24/04/2019
Monitoring Period (Days): 28
Collection Vessel Data
Sample Method Standard Method VDI 2119
Collection Vessel Height 1.5m
Collection Vessel Aperture Diameter 93mm
Collection Vessel Volume 2 Litres
Aperture Area (A) Calculation
Aperture Diameter - 93mm = 0.093 metres
Aperture Radius - 93mm / 2 = 0.0465 metres
Area = ∏r2 = ∏(0.0465)2 = 3.14(0.00216225) = 0.0068m2A = 0.0068
Weight (Wm) of Dust In Collection Vessel (in Milligrams from Lab Analysis)
Grammes Milligrammes
Gravimetric Analysis Result = 0.0077 7.7
Wm = 28 mg
FINAL DUST DEPOSITION CONCENTRATION CALCULATION
Wm Weight of Dust
Dust Deposition (Xd) = (A x D) Area x No. Days Exposure
Xd = 40.441 mg/m2/Day
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 20: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/20.jpg)
DUST DEPOSITION CALCULATION
MARCH / APRIL 2019 - DUST DEPOSITION LOCATION D4
SITE DETAILS
Site: Gortadroma Landfill
Address Gortadroma, Ballyhahill, Co. Limerick
Client: Limerick County Council
Sampling Location ID: D19-D4-02
Sampling Location Description: Northern Boundary of Site, adjacent to S8
Start Date: 27/03/2019
End Date: 24/04/2019
Monitoring Period (Days): 28
Collection Vessel Data
Sample Method Standard Method VDI 2119
Collection Vessel Height 1.5m
Collection Vessel Aperture Diameter 93mm
Collection Vessel Volume 2 Litres
Aperture Area (A) Calculation
Aperture Diameter - 93mm = 0.093 metres
Aperture Radius - 93mm / 2 = 0.0465 metres
Area = ∏r2 = ∏(0.0465)2 = 3.14(0.00216225) = 0.0068m2A = 0.0068
Weight (Wm) of Dust In Collection Vessel (in Milligrams from Lab Analysis)
Grammes Milligrammes
Gravimetric Analysis Result = 0.0068 6.8
Wm = 9.6 mg
FINAL DUST DEPOSITION CONCENTRATION CALCULATION
Wm Weight of Dust
Dust Deposition (Xd) = (A x D) Area x No. Days Exposure
Xd = 35.714 mg/m2/Day
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 21: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/21.jpg)
DUST DEPOSITION CALCULATION
MARCH / APRIL 2019 - DUST DEPOSITION LOCATION D5
SITE DETAILS
Site: Gortadroma Landfill
Address Gortadroma, Ballyhahill, Co. Limerick
Client: Limerick County Council
Sampling Location ID: D19-D5-02
Sampling Location Description: Adjacent to S9
Start Date: 27/03/2019
End Date: 24/04/2019
Monitoring Period (Days): 28
Collection Vessel Data
Sample Method Standard Method VDI 2119
Collection Vessel Height 1.5m
Collection Vessel Aperture Diameter 93mm
Collection Vessel Volume 2 Litres
Aperture Area (A) Calculation
Aperture Diameter - 93mm = 0.093 metres
Aperture Radius - 93mm / 2 = 0.0465 metres
Area = ∏r2 = ∏(0.0465)2 = 3.14(0.00216225) = 0.0068m2A = 0.0068
Weight (Wm) of Dust In Collection Vessel (in Milligrams from Lab Analysis)
Grammes Milligrammes
Gravimetric Analysis Result = 0.0402 40.2
Wm = 38.7 mg
FINAL DUST DEPOSITION CONCENTRATION CALCULATION
Wm Weight of Dust
Dust Deposition (Xd) = (A x D) Area x No. Days Exposure
Xd = 211.134 mg/m2/Day
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 22: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/22.jpg)
DUST DEPOSITION CALCULATION
MARCH / APRIL 2019 - DUST DEPOSITION LOCATION D6
SITE DETAILS
Site: Gortadroma Landfill
Address Gortadroma, Ballyhahill, Co. Limerick
Client: Limerick County Council
Sampling Location ID: D19-D6-02
Sampling Location Description: East of Site, adjacent to S10
Start Date: 27/03/2019
End Date: 24/04/2019
Monitoring Period (Days): 28
Collection Vessel Data
Sample Method Standard Method VDI 2119
Collection Vessel Height 1.5m
Collection Vessel Aperture Diameter 93mm
Collection Vessel Volume 2 Litres
Aperture Area (A) Calculation
Aperture Diameter - 93mm = 0.093 metres
Aperture Radius - 93mm / 2 = 0.0465 metres
Area = ∏r2 = ∏(0.0465)2 = 3.14(0.00216225) = 0.0068m2A = 0.0068
Weight (Wm) of Dust In Collection Vessel (in Milligrams from Lab Analysis)
Grammes Milligrammes
Gravimetric Analysis Result = 0.0374 37.4
Wm = 54.9 mg
FINAL DUST DEPOSITION CONCENTRATION CALCULATION
Wm Weight of Dust
Dust Deposition (Xd) = (A x D) Area x No. Days Exposure
Xd = 196.429 mg/m2/Day
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16
![Page 23: DUST DEPOSITION SAMPLING REPORT QUARTER 2, 2019 … · 2019. 9. 7. · Dust was measured using Bergerhoff dust gauges, which were exposed over a 28-day period to collect bulk dust](https://reader036.vdocuments.us/reader036/viewer/2022081622/61393df0a4cdb41a985b9396/html5/thumbnails/23.jpg)
DUST DEPOSITION CALCULATION
MARCH / APRIL 2019 - DUST DEPOSITION LOCATION D7
SITE DETAILS
Site: Gortadroma Landfill
Address Gortadroma, Ballyhahill, Co. Limerick
Client: Limerick County Council
Sampling Location ID: D19-D7-02
Sampling Location Description: East of leachate lagoon
Start Date: 27/03/2019
End Date: 24/04/2019
Monitoring Period (Days): 28
Collection Vessel Data
Sample Method Standard Method VDI 2119
Collection Vessel Height 1.5m
Collection Vessel Aperture Diameter 93mm
Collection Vessel Volume 2 Litres
Aperture Area (A) Calculation
Aperture Diameter - 93mm = 0.093 metres
Aperture Radius - 93mm / 2 = 0.0465 metres
Area = ∏r2 = ∏(0.0465)2 = 3.14(0.00216225) = 0.0068m2A = 0.0068
Weight (Wm) of Dust In Collection Vessel (in Milligrams from Lab Analysis)
Grammes Milligrammes
Gravimetric Analysis Result = 0.0376 37.6
Wm = 43.6 mg
FINAL DUST DEPOSITION CONCENTRATION CALCULATION
Wm Weight of Dust
Dust Deposition (Xd) = (A x D) Area x No. Days Exposure
Xd = 197.479 mg/m2/Day
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 07-09-2019:04:16:16