duro-beam diving board la mesa/los arcos stand · ground pool or dive into an above ground pool...
TRANSCRIPT
DB-LM/DB-IM INSTALL 0619
ASSEMBLY & INSTALLATION INSTRUCTIONS
DURO-BEAM DIVING BOARD LA MESA /LOS ARCOS STAND
S.R.Smith, LLC Canby, Oregon | 800.824.4387 Tucson, Arizona | 800.737.5386
srsmith.com
Copyright ® 2019 S.R.Smith, LLC All rights reserved.
ATTENTION! THESE INSTRUCTIONS MUST REMAIN WITH PLATFORM OWNER
**PROFESSIONAL INSTALLATION RECOMMENDED**
WARNING:IMPORTANT INSTALLATION
INFORMATION
The installation of this product should be done only by a licensed and professional installer.
Installation should be done strictly in conformance with all local building codes, electrical
codes and other building and safety laws and regulations. Among other things, that your
installer should carefully analyze the need to bond the product to prevent an electrical
hazard. Failure to properly install this product could result in a dangerous condition, including but
not limited to electrical and or structural hazards. S.R.Smith. disclaims all liability arising from
the installation and the user assumes all risk associated with the installation.
For Technical Support or Assistance, Contact Customer Service at:
Canby, Oregon | 800.824.4387
Tucson, Arizona | 800.737.5386 srsmith.com
For warranty information:srsmith.com/warranty
To obtain complete copies of the ANSI/APSP/ICC-5 2011 Standard for Residential In-ground Pools or to obtain copies of the “Plan Your Dive, Steer Up” or “The Sensible Way to Enjoy Your In-ground Swimming Pool” contact:
The Association of Pool & Spa Professionals (APSP)2111 Eisenhower Ave.Alexandria, VA 22314
(703) 838-0083www.theapsp.org
WARNING
INSTALLATION MANUAL DURO-BEAM
1 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
TABLE OF CONTENTS:
Safety First ......................................................................................................................................................................................2
Intended Use Instructions......................................................................................................................................................3
Important Notices to the Installer ....................................................................................................................................4
Minimum Diving Water Envelope Information ........................................................................................................5
La Mesa Base Placement ........................................................................................................................................................6
Los Arcos Base Placement ...................................................................................................................................................7
Duro-Beam Board Dimensions & Fulcrum Settings ..............................................................................................8
La Mesa/Los Arcos Jig Information ..................................................................................................................................8
Installation Instructions ............................................................................................................................................................9
La Mesa Exploded View & Parts List ...........................................................................................................................10
Los Arcos Exploded View & Parts List ......................................................................................................................11
Paver Kit Information ............................................................................................................................................................12
BoardFall Water Feature Instructions ..........................................................................................................................13
Article 5 Extracted from ANSI/APSP/ICC-5 2011 .......................................................................................14-17
S.R.Smith Limited Warranty ..............................................................................................................................................18
INSTALLATION MANUAL DURO-BEAM
2 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
This S.R.Smith diving board and stand shall be installed only by a professional swimming pool contractor or with the direct supervision of a licensed professional, engineer or architect. Diving boards may be installed only on residential in-ground swimming pools properly designed for their use.
Diving boards that are improperly installed can be very dangerous to the user resulting in possible serious head and/or spinal column injury, including the paralysis or death of the user.
It is very important that this diving board and/or stand be installed only on a pool that is built in strict accordance with the American National Standard for Residential In-ground Swimming Pools (ANSI/APSP/ICC-5 2011) and in strict accordance with the included S.R.SMITH RESIDENTIAL POOL SPECIFICATIONS TABLE 2. Under no circumstances can this diving board and/or stand be installed on any above ground or on-ground swimming pool.
In addition to the above standard and referenced table, these installation instructions provided by S.R.Smith must be diligently followed.
It is also important that any and all warnings provided with the diving board be strictly adhered to and posted in a conspicuous location. If not provided or they are misplaced, please purchase warning signs from your pool contractor or professional pool supply store and post them in a location that the users of the diving board can clearly see.
DIVING TIPS: Even the safest equipment must be used properly. S.R.Smith promotes safe diving by offering these tips on the proper use of your diving board: always dive into water that meets depth requirements, with arms extended; be aware of the bottom and the walls of the pool; avoid collisions with pool toys and floats; and instruct your pool users to always “steer up”. When you begin your dive you must get ready to steer up. As you enter the water, your arms must be extended over your head, hands flat aiming up. Hold your head and arch your back.
FOR RESIDENTIAL IN-GROUND SWIMMING POOL USE ONLY NO COMMERCIAL, PUBLIC OR SEMI-PUBLIC USE IS ALLOWED ONLY ONE PERSON ON THE DIVING BOARD AT ONE TIME
MAXIMUM WEIGHT = 250 LBS
PLAN YOUR DIVE
BACK ARCHED
ARMS EXTENDED
HEAD AND HANDS UP
HOLD DIVING FORM
STEER UP FOR A SAFE DIVE.
PLAN YOUR DIVE, STEER UP
SAFETY FIRST!WARNING
INSTALLATION MANUAL DURO-BEAM
3 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
“A pool is the safest place to swim and a diving board installed in compliance with manufacturers instructions and the ANSI/APSP/ICC-5 2011 Standard for In-ground Residential Pools is the safest place to dive from. To ensure that you and your family and guests are able to safely enjoy your diving board for many years, it is critical that you follow the following instructions.”
DO1. Know the shape and depth of the pool before you dive.
2. Make sure that all family members and guests are familiar with these instructions before they use your pool and diving board.
3. Make sure that the diving board has been installed in compliance with the Assembly and Installation Instructions and with the ANSI/APSP/ ICC-5 2011 Standard for In-ground Residential Pools. This includes the shape and depth of the pool as well as the height of the diving board.
4. Enter feet first the first time.
5. Plan your path to be sure you avoid any other swimmers, or objects in or under the water, such as floats, tires, toys etc.
6. Keep your head up, arms up and fully extended and steer up with your hands.
7. Practice carefully before you dive headfirst.
8. Become familiar with the diving board and its spring before diving headfirst
9. Dive straight ahead, not to the side of the board or pool.
10. Dive from the diving board only.
11. Make sure that children and non-swimmers are supervised at all times.
12. Always remember that when you dive you must steer up.
13. Inspect your diving board, base and stand on a regular basis (at least twice a year) and keep them in proper repair.
14. Contact your dealer, installer or S.R.Smith (800-737-5386) with any questions or concerns about the safe use of your diving board.
DON’T1. Don’t drink and dive.
2. Don’t install this or any diving board on an above ground pool or dive into an above ground pool from any surface.
3. Never install any S.R.Smith diving board on a variable fulcrum dive stand.
4. Don’t dive into a pool from anyplace not specifically designated for diving. Never dive into the shallow portion of any pool.
5. Don’t dive across the width of the pool or to the sides of the pool.
6. Don’t Run and dive.
7. Don’t engage in horseplay in or around the diving board or pool.
8. Don’t use your diving board as a trampoline.
9. Don’t do a back dive. Backyard pools are not built for that type of activity.
10. Don’t try fancy dives. Keep the dives simple.
11. Don’t dive into or through objects or toys such as inner tubes.
12. Don’t swim or dive alone.
13. Don’t use a diving board or stand or base that is rusted
or worn out or in poor repair.
INTENDED USE INSTRUCTIONSWARNING
INSTALLATION MANUAL DURO-BEAM
4 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
THE DURO-BEAM BOARD & LA MESA/LOS ARCOS STAND ARE A DIVING BOARD.
ONLY ONE PERSON AT A TIME ON THE DIVING BOARD, WITH A MAXIMUM WEIGHT LIMIT OF 250 LBS.
The specifications found on page 5 of this manual represent the minimum water envelope required by S.R.Smith and by the ANSI/APSP/ICC-5 2011 Standard for residential Inground Swimming Pools. Each of these dimensions must be met or exceeded. Installation of a diving board of any type on a pool that does not meet or exceed each of the minimum specifications as provided on page 5 including but not limited to the slope requirement, is in direct violation of this manufacturer’s instructions and the 2011 Standard, and can result in serious injury or death.
Installation of this Duro-Spring Jump Board & Duro-Spring Steel Stand is limited to Residential Inground Pools only.
CHECK YOUR LOCAL ELECTRICAL CODE FOR BONDING REQUIREMENTS.
A 6’ diving board can only be installed on a 6’ dive stand; an 8’ diving board can only be installed on a 8’ stand.
USE ANTI-SEIZE ON ALL HARDWARE.
The Duro-Spring Jump Board and the Duro-Spring Steel Stand are a complete system and must be installed that way.
Comply with local government regulations for Residential Inground Swimming Pools if they exceed the ANSI/APSP/ICC-5 2011 Standard for Residential Inground Swimming Pools.
Read carefully pages 11–14 of this installation manual which contain portions of the ANSI/APSP/ICC-5 2011 Standard for Residential Inground Swimming Pools, ensure that you understand Figure 3 and Table 1 provided in the ANSI/APSP/ICC-5 2011 Standard.
NOTE: The installation of Duro-Spring Jump Board & Duro-Spring Steel Stand is not complete until you, the installer, have measured the pool as well as the diving board’s height above water and the Jump Board’s overhang to ensure they meet the S.R.Smith’s Residential Pool Minimum Specifications and the ANSI/APSP/ICC-5 2011 Standard for Residential Inground Swimming Pools. In addition, the installation of this diving board is not complete until you the installer have delivered to your customer and reviewed with your customer the “Owners Manual” as well as the “Plan Your Dive Steer-Up” brochure.
IMPORTANT NOTICES TO THE INSTALLER
INSTALLATION MANUAL DURO-BEAM
5 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
MINIMUM DIVING WATER ENVELOPE:NOTE: DRAWINGS ARE NOT TO SCALE.
A B C D A B C D WA AB BC CD* DE WE
0
I 6’-0” 7’-6” 5’-0” 2’-9” 10’-0” 12’-0” 10’-0” 8’-0” 1’-6” 7’-0” 7’-6” VARIES 6’-0” 28’-9”
II 6’-0” 7’-6” 5’-0” 2’-9” 12’-0” 15’-0” 12’-0” 8’-0” 1’-6” 7’-0” 7’-6” VARIES 6’-0” 28’-9”
III 6’-10” 8’-0” 5’-0” 2’-9” 12’-0” 15’-0” 12’-0” 8’-0” 2’-0” 7’-6” 9’-0” VARIES 6’-0” 31’-3”
IV 7’-8” 8’-6” 5’-0” 2’-9” 15’-0” 18’-0” 15’-0” 9’-0” 2’-6” 8’-0” 10’-6” VARIES 6’-0” 33’-9”
V 8’-6” 9’-0” 5’-0” 2’-9” 15’-0” 18’-0” 15’-0” 9’-0” 3’-0” 9’-0” 12’-0” VARIES 6’-0” 36’-9”
POOL TYPE
MINIMUM DEPTHS AT POINT
MINIMUM WIDTHS AT POINT
MINIMUM LENGTHS BETWEEN POINTS
TABLE 1 - MINIMUM WATER ENVELOPE (ANSI/APSP/ICC-5 2011)
DIVING BOARD LENGTH HOW** F G H J K L M N
0
I 6’ DB / 6’ JB 20” 2’-9” 5’-0” 4’-0” 7’-2.5” 7’-6” 6’-0” 3’-9” 2’-1.5” 12’
II 8’ DB / 6’ JB 20” 2’-9” 3’-10” 4’-2” 7’-2.5” 7’-6” 6’-8” 3’-9” 2’-1.5” 12’
III 10’ DB / 8’ JB 26” 2’-9” 4’-4.75” 4’-4.5” 7’-5.5” 8’-0” 6’-7” 3’-11.5” 1’-7.5” 13’
IV 10’ DB / 8’ JB 30” 2’-9” 5’-10.5” 3’-10” 7’-8” 8’-6” 8’-3” 5’-7” 2’-7” 13’
V 12’ DB / 8’ JB 40” 2’-9” 6’-2” 3’-11.5” 7’-9.5” 9’-0” 8’-2.5” 5’-9” 2’-7” 14’
POOL TYPE
MAX. DIVING BOARD LENGTHMAX. HEIGHT OVER WATER AT POINT A
CROSS SECTIONAL DIMENSIONS AT
POINT ACROSS SECTIONAL DIMENSIONS AT POINT B
TABLE 2 - S.R.SMITH RESIDENTIAL POOL MINIMUM SPECIFICATIONS
MIN. HEAD ROOM ABOVE
DIVING SURFACES
*Min. length between points CD may vary based upon water depth at point D and the slope between points C & DABBREVIATIONS: DB=Diving Board; JB=Jump Board; **HOW=Height Over Water
F
G
H
J K
NM
L
DIVING EQUIPMENT
TIP OF BOARD ABOVE POINT A
DIVING EQUIPMENT
DIVING EQUIPMENT PROHIBITED
DIVING EQUIPMENT PROHIBITED
INSTALLATION MANUAL DURO-BEAM
6 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
TABLE 3 – PLACEMENT CHART
ADDITIONALLY REFER TO: ANSI/APSP/ICC-5 2011 American National Standard for Residential Inground Swimming Pools and to page 5 for S.R.Smith Residential Inground Pool Minimum Specifications.
S.R.SMITH CANNOT GUARANTEE CUSTOMER’S CONCRETE OR THICKNESSNOTE: WHEN COPING IS USED, DO NOT SET FRONT JIG BOLTS CLOSER THAN 3” FROM THE BACK EDGE OF THE COPING.
FIG. A – LA MESA PLACEMENT SPECIFICATIONS:
NOTE: READ THESE INSTRUCTIONS IN THEIR ENTIRETY BEFORE ATTEMPTING THE INSTALLATION.
IMPORTANT:
THESE DIMENSIONS ARE ACCURATE ONLY FOR VERTICAL POOL WALLS, TYPICALLY GUNITE CONSTRUCTION, WITH LESS THAN A 3’ RADIUS TO THE POOL FLOOR.
DUE TO THE VARYING SIZES OF OTHER POOLS, TYPICALLY VINYL LINER CONSTRUCTION, PLEASE CONTACT CUSTOMER SERVICE FOR PROPER JIG PLACEMENT.
1-800-737-5386
LA MESAPART #
NOMINALBOARDLENGTH
ANSI/NSPI-5POOL TYPE
DISTANCE FROM WATER’S EDGE TO
FORWARD JIG BOLT
(S)
DISTANCE FROM END OF BOARD
TO FORWARD JIG BOLT
MAX HEIGHT OF BOARD
ABOVE WATER (HOW)
LAM6 6’ I 27.5” 45.5” 18” 20” LAM6 6’ II 27.5” 45.5” 18” 20” LAM6 6’ III 21.5” 45.5” 24” 26” LAM6 6’ IV 15.5” 45.5” 30” 30” LAM6 6’ V 9.5” 45.5” 36” 40” LAM8 8’ I LAM8 8’ II 41.25” 59.25” 18” 20” LAM8 8’ III 35.25” 59.25” 24” 26” LAM8 8’ IV 29.25” 59.25” 30” 30” LAM8 8’ V 23.25” 59.25” 36” 40” LAM10 10’ I LAM10 10’ II LAM10 10’ III 51.5” 75.5” 24” 26” LAM10 10’ IV 45.5” 75.5” 30” 30” LAM10 10’ V 39.5” 75.5” 36” 40”
MIN. OVERHANG
(WA)
Cannot Put 10’ diving board on a type I pool
Cannot Put 8’ diving board on a type I pool
Cannot Put 10’ diving board on a type II pool
BOARD LENGTH A 6’ 14” 8’ 22” 10’ 29.5”
INSTALLATION MANUAL DURO-BEAM
7 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
TABLE 4 – PLACEMENT CHART
ADDITIONALLY REFER TO: ANSI/APSP/ICC-5 2011 American National Standard for Residential Inground Swimming Pools and to page 5 for S.R.Smith Residential Inground Pool Minimum Specifications.
S.R.SMITH CANNOT GUARANTEE CUSTOMER’S CONCRETE OR THICKNESSNOTE: WHEN COPING IS USED, DO NOT SET FRONT JIG BOLTS CLOSER THAN 3” FROM THE BACK EDGE OF THE COPING.
FIG. B – LOS ARCOS PLACEMENT SPECIFICATIONS:
NOTE: READ THESE INSTRUCTIONS IN THEIR ENTIRETY BEFORE ATTEMPTING THE INSTALLATION.
IMPORTANT:
THESE DIMENSIONS ARE ACCURATE ONLY FOR VERTICAL POOL WALLS, TYPICALLY GUNITE CONSTRUCTION, WITH LESS THAN A 3’ RADIUS TO THE POOL FLOOR.
DUE TO THE VARYING SIZES OF OTHER POOLS, TYPICALLY VINYL LINER CONSTRUCTION, PLEASE CONTACT CUSTOMER SERVICE FOR PROPER JIG PLACEMENT.
1-800-737-5386
LOS ARCOSPART #
NOMINALBOARDLENGTH
ANSI/NSPI-5POOL TYPE
DISTANCE FROM WATER’S EDGE TO
FORWARD JIG BOLT
(S)
DISTANCE FROM END OF BOARD
TO FORWARD JIG BOLT
MAX HEIGHT
OF BOARD ABOVE WATER (HOW)
LOS6 6’ I 27.5” 45.5” 18” 20”
LOS6 6’ II 27.5” 45.5” 18” 20”
LOS6 6’ III 21.5” 45.5” 24” 26”
LOS6 6’ IV 15.5” 45.5” 30” 30”
LOS6 6’ V 9.5” 45.5” 36” 40”
LOS8 8’ I
LOS8 8’ II 41.25” 59.25” 18” 20”
LOS8 8’ III 35.25” 59.25” 24” 26”
LOS8 8’ IV 29.25” 59.25” 30” 30”
LOS8 8’ V 23.25” 59.25” 36” 40”
MIN. OVERHANG
(WA)
Cannot Put 8’ diving board on a type I pool
BOARD LENGTH A 6’ 14” 8’ 22”
INSTALLATION MANUAL DURO-BEAM
8 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com8DB-LM/LA-IM Rev. 11/18 (BK-DB INSTALL)
FIG. C – DURO-BEAM JUMP BOARD
TABLE 5 – BOARD DIMENSIONS AND FULCRUM SETTINGS
TABLE 6 – JIG DIMENSIONS
FIG. D – LA MESA/LOS ARCOS JIG
* NOTE: 10’ jig available for La Mesa stand only.
Yellow Jig Caps (2) Red Jig Cap (1)
Model # Nominal Length A B C D F DIA.
DB6 6’ 70.25” 17.25” 12.00” 4.00” 30.00” 19/32” DB8 8’ 94.00” 17.25” 12.00” 4.00” 40.00” 19/32” DB10 10’ * 117.50” 17.25” 12.00” 4.00” 52.00” 19/32”
* NOTE: 10’ board not available for Los Arcos stand; 10’ board only applicable for the La Mesa stand in accordance with these installation instructions.
JIG TYPE A B BOLT 6’ La Mesa/Los Arcos 6.50” 14.00” 1/2” X 5” Carriage 8’ La Mesa/Los Arcos 6.50” 22.00” 1/2” X 5” Carriage 10’ La Mesa * 6.50” 29.50” 1/2” X 5” Carriage
INSTALLATION MANUAL DURO-BEAM
9 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
La Mesa/Los Arcos Stand and/or Duro-Beam Diving Board INSTALLATION INSTRUCTIONS
Be sure the concrete deck surrounding the anchor jig complies with the minimum dimensions as shown in Figure A on page 6 for the La Mesa stand, or Figure B on page 7 for the Los Arcos stand.
CHECK YOUR LOCAL ELECTRICAL CODE FOR BONDING REQUIREMENTS.
Read and understand the ANSI/APSP/ICC-5 2011 American National Standard for Residential Inground swimming Pools and Table 1 and Table 2 on page 5 before you install the La Mesa / Los Arcos Stand and/or Duro-Beam Diving Board.
NOTE: See page 13 for BoardFall water feature installation.
The La Mesa / Los Arcos Stand three-bolt jig should be set in accordance with Table 3 on page 6 (La Mesa stand) or Table 4 on page 7 (Los Arcos stand) with the “RED” capped bolt closest to the pool. The diving board must be placed on the deep end of the pool on centerline.
The tip of the diving board must be positioned directly over Pt. A as shown on the Figures 3 on page 5 and according to the ANSI/APSP/ICC-5 2011 Standard and S.R.Smith’s Residential Pool Minimum Specifications
Make sure the jig anchor bolts project out of the concrete deck 1-1/2” with ample concrete depth below the jig in accor-dance with Figure A on pages 6 (La Mesa stand) or Figure B on page 7 (Los Arcos stand). Do not install the La Mesa / Los Arcos Stand and/or Duro-Beam Diving Board if the deck does not meet the minimum requirements.
When finishing the deck surface, maintain a level deck where the jig bolts project out so the dive stand makes uniform contact with the deck surface. Allow the cement to fully cure before bolting the dive stand to the jig bolts.
Before bolting the dive stand to the jig bolts, chisel away any excess concrete that may have built up around the jig bolts then remove the protective red and yellow rubber bolt caps.
Place the stand over the three jig bolts and secure according to the Hardware Instructions on pages 10-11. Tighten the Stand Anchor Hex Nuts to 40-45 FT- LBS. Do not over tighten.
Once the La Mesa / Los Arcos Stand is properly secured to the three jig bolts, then secure the Diving Board to the Dive Stand according to the Hardware Instructions on page 10-11. Tighten the Board Mounting Hex Nuts to 20-25 FT- LBS. Do not over tighten.
The Diving Board must be installed according the below board leveling instructions:
The top surface of the diving board from the deck end to the tip end shall be level or have an upward slope of 5/8” per foot max-imum. Elevation difference shall not exceed 3-3/4” (6’ Board) or 5” (8’ Board) or 6-1/4” (10’ Board) from the deck end to the tip of the board. There shall be no downward slope towards the water. The slope shall be measured using a level as shown in the graphic to the left.
ONLY ONE PERSON ON THE JUMP BOARD AT A TIME, WITH A MAXIMUM WEIGHT OF 250 LBS.
INSTALLATION MANUAL DURO-BEAM
10 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com10DB-LM/LA-IM Rev. 11/18 (BK-DB INSTALL)
LA MESA BASE EXPLODED VIEW
HARDWARE TIGHTENING SCHEDULE:Secure Stand to Jig with Anchor Hex Nuts at 40-45 FT-LBSSecure Board to Stand with Mounting Hex Nuts at 20-25 FT-LBS
TABLE 1 – PARTS LIST
DRAWING REPRESENTS THE FOLLOWING PART NUMBERS:
LAM6 (shown) LAM8 LAM10
ITEM # COMPONENT DESCRIPTION D
B-M
LM-B
K
N/A
KITS – QTY. COUNTS
1 DB6WW 6’ Duro-Beam White w/White Top Tread & Hdw Kit 1
2 LAM6 6’ La Mesa Fiberglass Diving Base 1
3 LM-J6 6’ La Mesa/Los Arcos Mounting Jig 1
4 H-1/2 BLK WASH 1/2 x 2” Black Rubber Washer 2
5 H-1/2 RED WASH 1/2 x 2” Red Rubber Washer 2
6 H-SS 1/2 LOC WA 1/2 Lock Washer S.S. 2 3
7 H-SS 1/2 H NUT 1/2”- 13 Hex Finish Nut S.S. 2 3
8 H-SS 1/2 F WAS 1/2 USS Flat Washer S.S. 2 3
9 H-1-1/2 WHT CAP .750 x 1-1/2 White UV Nut Cap 2
10 H-SS 5 C BOLT 1/2-13 x 5 Carriage Bolt S.S. 2
11 H-WHT WAS/CAP I.F. White Washer/Cap 2
12 LM-FP La Mesa/Los Arcos Rubber Fulcrum Pad 1
NOTES: DB6WW diving board shown in exploded view for illustration purposes. Must be purchased separately. Other diving board options available.
HARDWARE NOTE: Use a small dab of anti seize lubricant (included) on all bolt threads.
LA MESA BASE PLAN VIEW LA MESA BASE JIGS (6’, 8’ and 10’)
STUB-UP HOLE RELATIVE TO REAR JIG BOLTS
DB-TB-M: Board to Base Mounting Hardware
LM-BK: Base to Jig Mounting Hardware
INSTALLATION MANUAL DURO-BEAM
11 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
TABLE 8 – PARTS LIST
FIG. F – LOS ARCOS BASE EXPLODED VIEW
HARDWARE TIGHTENING SCHEDULE:
Secure Stand to Jig with Anchor Hex Nuts at 40-45 FT-LBS
Secure Board to Stand with Mounting Hex Nuts at 20-25 FT-LBS
HARDWARE NOTE: Use a small dab of anti seize lubricant (included) on all bolt threads.
DRAWING REPRESENTS THE FOLLOWING PART NUMBERS:
LOS6 (shown) LOS8
ITEM # COMPONENT DESCRIPTION D
B-T
B-M
LM-B
K
N/A
1 LOS6 6’ Los Arcos Fiberglass Diving Base 1
2 DB6WW 6’ Duro-Beam White w/White Top Tread & Hdw Kit 1
3 LM-J6 6’ La Mesa/Los Arcos Mounting Jig 1
4 H-1/2 BLK WASH 1/2 x 2” Black Rubber Washer 2
5 H-1/2 RED WASH 1/2 x 2” Red Rubber Washer 2
6 H-SS 1/2 LOC WA 1/2 Lock Washer S.S. 2 3
7 H-SS 1/2 H NUT 1/2”- 13 Hex Finish Nut S.S. 2 3
8 H-SS 1/2 F WASH 1/2 USS Flat Washer S.S. 2 3
9 H-1-1/2 WHT CAP .750 x 1-1/2 White UV Nut Cap 2
10 H-SS 5 C BOLT 1/2-13 x 5 Carriage Bolt S.S. 2
11 H-WHT WAS/CAP I.F. White Washer/Cap 2
12 LM-FP La Mesa/Los Arcos Rubber Fulcrum Pad 1
NOTES:DB6WW diving board shown in exploded view for illustration purposes. Must be purchased separately. Other diving board options available.
DB-TB-M: Board to Base Mounting Hardware
LM-BK: Base to Jig Mounting Hardware
KITS- QTY COUNTS
INSTALLATION MANUAL DURO-BEAM
12 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
Fig. 3
Pool Edge
48” (4’)
96”
(8’)
Fig. 1
Recommended Minimum Concrete Area for Diving Bases
– PLAN VIEW –
The minimum concrete depth shall be 6” for the diving base concrete pad.
When installing an S.R.Smith diving board and base set up using a paver kit, you must ensure that all standard require-ments for a diving board and base installation are met. The diving board and base set up must be compatible with the type of pool on the intended installation and all ANSI/APSP/ICC-5 2011 requirements must be met.
Figure 1 illustrates the standard minimum concrete pad recommended for all S.R.Smith diving board and base set ups, which is 4’ wide x 8’ long x 6” deep.
Figure 2 shows an example side view of a paver jig used in a paver installation. Pavers can be a maximum of 3” thick. Pavers must be mechanically attached to the concrete pad using a setting material (such as mortar or thinset for exam-ple) that is no thicker than 3/8”.
Refer to Figure 3 to determine how much of the jig needs to be exposed above the final deck surface. You will need to factor in the thickness of your paver (3” MAX.) and the thickness of your setting material (3/8” MAX.) for your individual installation.
S.R.Smith will not be responsible for damage to pavers caused by drilling or mechanically attaching to concrete pad. Refer to paver manufacturer’s specific installation instructions before beginning.
CONCRETE
Fig. 2
Example of a Paver Jig in Relationship to Concrete Pad – SIDE VIEW –
SOIL
CONCRETE
6” min.
Layer of setting material to secure pavers to concrete.
PAVERS3” max.
Drawing Not To Scale
HEIGHT ABOVE FINALDECK SURFACE See Figure 3 Below
DIVING BASE JIG
Minimum jig depth is either 3.5” or 4.5”. See Figure 3.
PAVER KIT INFO – SELECTED DIVING PRODUCTS
S.R.SMITH MIN. JIG PAVER JIG PAVER JIG HEIGHT ABOVE DIVING BASE DEPTH PART NUMBER BOLTS FINAL DECK SURFACE
LA MESA BASE / LOS ARCOS BASE 3.5” LM-J6 PAVER 1/2” X 8” Carriage SS 1.5” – WITH 8’ JIG 3.5” LM-J8 PAVER 1/2” X 8” Carriage SS 1.5” – WITH 10’ JIG 3.5” LM-J10 PAVER 1/2” X 8” Carriage SS 1.5” DURO-SPRING BASE 4.5” DS-J PAVER 5/8” X 10” Hex Head SS 1.5” TECHNI-SPRING STEEL / EDGE BASE 4.5” TS-EDGE-J PAVER 1/2” X 10” Hex Head SS 1.5” TECHNI-SPRING FIBERGLASS BASE 4.5” TSF-J PAVER 1/2” X 12” Hex Head SS 3.5” BAJA BASE 4.5” BA-J6 PAVER 1/2” X 10” Hex Head SS 1.5” – WITH 8’ JIG 4.5” BA-J8 PAVER 1/2” X 10” Hex Head SS 1.5” CITY BASE 3.5” CITY-J6 PAVER 1/2” X 8” Carriage SS 1.5” T7-N BASE (3 BOLT JIG) 4.5” T7-NJIG PAVER 1/2” X 10” Hex Head SS 2.0”
INSTALLATION MANUAL DURO-BEAM
13 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com13DB-LM/LA-IM Rev. 11/18 (BK-DB INSTALL)
NOTE: All 6, 8 and 10 foot La Mesa stands now have a 4” hole located in the bottom of the base for use when installing the Duro-Beam aquaBoard BOARD FALL water feature.
Use the enclosed cardboard template for locating the correct stub-up location during jig placement.
If installing a BOARD FALL waterfall feature, ensure that a 1/2” (minimum) water stub-up is located within the area designated by the enclosed cardboard template. Provide a minimum of 10 gallons per minute water flow for the BOARD FALL water feature. NOTE: Maximum water supply is 1-1/2” PVC.
To ensure all plumbing conduit will pass through the bottom of the base, it must pass through the 4” hole in the cardboard template.
INSTALLATION MANUAL DURO-BEAM
14 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
SUPPORT INFORMATION: ARTICLE 5 – POOL DIMENSIONS AND TOLERANCES Extracted from ANSI/APSP/ICC-5 2011, American National Standard for Residential Inground Swimming Pools
To obtain complete copies of the ANSI/APSP/ICC-5 2011
Standard for Residential Inground Pools contact:
The Association of Pool & Spa Professionals (APSP)
2111 Eisenhower Ave.Alexandria, VA 22314
(703) 838-0083
or visit: APSP.org
INSTALLATION MANUAL DURO-BEAM
15 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
SUPPORT INFORMATION: ARTICLE 5 – POOL DIMENSIONS AND TOLERANCES Extracted from ANSI/APSP/ICC-5 2011, American National Standard for Residential Inground Swimming Pools
INSTALLATION MANUAL DURO-BEAM
16 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
SUPPORT INFORMATION: ARTICLE 5 – POOL DIMENSIONS AND TOLERANCES Extracted from ANSI/APSP/ICC-5 2011, American National Standard for Residential Inground Swimming Pools
INSTALLATION MANUAL DURO-BEAM
17 Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com
SUPPORT INFORMATION: ARTICLE 5 – POOL DIMENSIONS AND TOLERANCES Extracted from ANSI/APSP/ICC-5 2011, American National Standard for Residential Inground Swimming Pools
Copyright ® 2019 S.R.Smith, LLC All rights reserved. | srsmith.com