dunne.p_c12370316_part k and m audit a1

3
B B A A 1 1 2 2 3 3 6400 6400 3000 23 m² FIRE LOBBY 1790 1790 411 1360 1360 400 800 800 1340 50 m² STAIR CORE A 300 2750 300 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 30 31 10 m² Service Duct 1100 1400 300 300 F.F.L: -4.700 F.F.L: -1.725 01 02 03 03 04 05 05 06 A A B B F.F.L: -2.900 300 1100 1400 01-Basement Floor -4700 03 70 70 60 45 300 160 27.57° 25 25 04 06 07 Detail 1A 400 Hazard warning strip 15mm of Bedding 60 45 15mm of Bedding 15 02-Ground Floor 0 2 160 300 60 390 10 50 82 380 25 25 04 07 08 09 Posible connection detail. To engineers specifcations Hazard warning strip 400 15mm of Bedding 15 01-Basement Floor -4700 02-Ground Floor 0 1 2 3 4700 1723 301 2676 930 1090 80 770 79 1723 800 830 120 4300 300 6400 6400 400 01 02 02 03 04 05 06 06 07 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Scale Checked by Drawn by Date Project number Notes As indicated 29/04/2015 15:04:23 Ground Floor Project 4 Project No. 4 Part K/M Stairs 12-02-15 Patrick Dunne Checker 135 01-External Wall. The external wall is roughly 325mm thick precast concrete panal. 100mm of concrete , Breather membrain , 125mm of kingspan ridgid insulation , Vaipour Barrior , 100mm of concrete. With a polished concrete finish. 02-Internal stair core. The internal concrete stair core walls are 300mm thick with a polished concrete finish. 03-Floor finishes for roof landing. The floor finish for the roof stair core is a 6m non slip rubber. With a R ratting of 0.05 . 05-Sub landings. The stairs are made of reinforced precast concrete with a 8mm carpet finish and 1790mm in width. With a R ratting of 1.5. Complying with part K/M of the technical guidance doctument. North 07-Internal partition wall. The internal stud partition wall is made up of alluminium C channels 80mm , with Gypsum plaster board 12.5mm either side with a skim coat wet plaster finish. Suported with high tention cables 10mm in diameter which are suspened from the roof.The tention cables are incased in a steel sheeting. 06-Handrails. The handrails ard made up stainless steel verticals 50mm with glazing and a stell handrail. The steel vertical balustrades are secured with 2 no. 10mm diameter bolts and 2 no. 82 x 42 x 10mm steel fixings. Which are conected back to a steel plate that is fixed to the precast concrete stairs with 3no. 10mm diameter bolts and a steel plate. Complying with part K/M of the technical guidance doctument. To engineers specifications 04-Stairs. The stairs are made of reinforced precast concrete with a 8mm carpet finish and 1790mm in width. Rise of 160mm and a going of 300mm. With 40mm nosing on the first and last step and a carburudum strip on every other step. Also a hazard warning strip at the top and bottom of every flight of stairs. With a R ratting of 1.5. Complying with part K/M/B of the technical guidance doctument. Key Plan 1 : 50 01-Basement Floor 1 : 5 Section BB Deatil 1 1 : 5 Section BB Detail 2 1 : 50 Section BB ground Detail 4 Detail 1 Detail 2 Detail 3 Deatil 1A scale 1:2 They 25mm thick soild concrete finish and they nosings are secured with the same fixing. To engineers specifications.

Upload: patrick-dunne

Post on 11-Feb-2017

171 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Dunne.P_C12370316_Part K and M Audit A1

BB

AA

1

1

2

2

3

36400 6400

3000

23 m²FIRE LOBBY

1790

1790

411

1360

1360

400

800

800

1340

50 m²STAIR CORE A

300

2750

300

12345678910111213141516171819

21 22 23 24 25 26 27 28 29 30 31

10 m²Service Duct

1100

1400

300

300

F.F.L: -4.700

F.F.L: -1.725

01

02

03

03

040505

06

A

A

BB

F.F.L: -2.900300

1100

1400

01-Basement Floor-4700

03

70

70

60

45

300

160

27.5

25

25

04

06

07

Detail 1A

400

Hazard warningstrip15mm of Bedding

60

45

15mm of Bedding

15

02-Ground Floor0

2

160

300

60

390

10

5082

380

25

25

04

07

0809

Posible connection detail. To engineers specifcations

Hazard warning strip

400

15mm of Bedding

15

01-Basement Floor-4700

02-Ground Floor0

1 2 3

4700

1723

301

2676

930

1090

8077

079

1723 800

830

120

4300

300

6400 6400

400

01

02 02

0304

05

06

06 07

12

34

56

78

9

1011

1213

14

1516

1718

19

32

3334

3536

3738

3940

4142

4344

4546

Scale

Checked by

Drawn by

Date

Project number

Notes

As indicated

29/0

4/20

15 1

5:04

:23

Ground Floor

Project 4

Project No. 4

Part K/M Stairs

12-02-15

Patrick Dunne

Checker

135

01-External Wall.The external wall is roughly 325mm thick precastconcrete panal.100mm of concrete , Breather membrain , 125mm ofkingspan ridgid insulation , Vaipour Barrior , 100mm ofconcrete. With a polished concrete finish.

02-Internal stair core.The internal concrete stair core walls are 300mmthick with a polished concrete finish.03-Floor finishes for roof landing.The floor finish for the roof stair core is a 6m non sliprubber. With a R ratting of 0.05 .

05-Sub landings.The stairs are made of reinforced precast concrete with a8mm carpet finish and 1790mm in width.With a R ratting of 1.5.Complying with part K/M of the technical guidancedoctument.

North

07-Internal partition wall.The internal stud partition wall is made up of alluminiumC channels 80mm , with Gypsum plaster board 12.5mmeither side with a skim coat wet plaster finish. Suportedwith high tention cables 10mm in diameter which aresuspened from the roof.The tention cables are incasedin a steel sheeting.

06-Handrails.The handrails ard made up stainless steel verticals50mm with glazing and a stell handrail. The steel verticalbalustrades are secured with 2 no. 10mm diameter boltsand 2 no. 82 x 42 x 10mm steel fixings. Which areconected back to a steel plate that is fixed to the precastconcrete stairs with 3no. 10mm diameter bolts and asteel plate.Complying with part K/M of the technical guidancedoctument.To engineers specifications

04-Stairs.The stairs are made of reinforced precast concrete with a8mm carpet finish and 1790mm in width.Rise of 160mm and a going of 300mm.With 40mm nosing on the first and last step and acarburudum strip on every other step. Also a hazardwarning strip at the top and bottom of every flight of stairs.With a R ratting of 1.5.Complying with part K/M/B of the technical guidancedoctument.

Key Plan

1 : 5001-Basement Floor

1 : 5Section BB Deatil 1

1 : 5Section BB Detail 2

1 : 50Section BB ground

Detail 4

Detail 1

Detail 2Detail 3

Deatil 1A scale 1:2

They 25mm thick soildconcrete finish and theynosings are secured withthe same fixing. Toengineers specifications.

Page 2: Dunne.P_C12370316_Part K and M Audit A1

8070

0

930

325

60

60

172

80

930

6070

2078

0

768

120

42

50

55

2516

0

83

70

34

36

18

70 x 70 x 10mm stainlesssteel fixing plate with 3no. countersunk bolts facefixed to stairs.

01-Basement Floor-4700

02-Ground Floor0

B A

4700

3000

4300

400

1000

1723

17901790 450

01

0102

02

06

08

09

10

2627282930

31

11

84

179

12

BB

AA

1

1

2

2

3

36400 6400

3000

23 m²FIRE LOBBY

1790

1790

411

1360

1360

400

800

800

1340

50 m²STAIR CORE A

300

2750

300

12345678910111213141516171819

21 22 23 24 25 26 27 28 29 30 31

10 m²Service Duct

1100

1400

300

300

F.F.L: -4.700

F.F.L: -1.725

01

02

03

03

040505

06

A

A

BB

F.F.L: -2.900300

1100

1400

Scale

Checked by

Drawn by

Date

Project number

Notes

As indicated

29/0

4/20

15 1

5:04

:52

Ground Floor

Project 4

Project No. 4

Part K/M Stairs

12-02-15

Patrick Dunne

Checker

136

01-External Wall.The external wall is roughly 325mm thick precastconcrete panal.100mm of concrete , Breather membrain , 125mm ofkingspan ridgid insulation , Vaipour Barrior , 100mm ofconcrete. With a polished concrete finish.

02-Internal stair core.The internal concrete stair core walls are 300mmthick with a polished concrete finish.03-Floor finishes for roof landing.The floor finish for the roof stair core is a 6m non sliprubber. With a R ratting of 0.05 .

05-Sub landings.The stairs are made of reinforced precast concrete with a8mm carpet finish and 1790mm in width.With a R ratting of 1.5.Complying with part K/M of the technical guidancedoctument.

07-Internal partition wall.The internal stud partition wall is made up of alluminiumC channels 80mm , with Gypsum plaster board 12.5mmeither side with a skim coat wet plaster finish. Suportedwith high tention cables 10mm in diameter which aresuspened from the roof.The tention cables are incasedin a steel sheeting.

06-Handrails.The handrails ard made up stainless steel verticals50mm with glazing and a stell handrail. The steel verticalbalustrades are secured with 2 no. 10mm diameter boltsand 2 no. 82 x 42 x 10mm steel fixings. Which areconected back to a steel plate that is fixed to the precastconcrete stairs with 3no. 10mm diameter bolts and asteel plate.Complying with part K/M of the technical guidancedoctument.To engineers specifications

04-Stairs.The stairs are made of reinforced precast concrete with a8mm carpet finish and 1790mm in width.Rise of 160mm and a going of 300mm.With 40mm nosing on the first and last step and acarburudum strip on every other step. Also a hazardwarning strip at the top and bottom of every flight of stairs.With a R ratting of 1.5.Complying with part K/M/B of the technical guidancedoctument.

Key Plan

The floor finish for the Groundfloor stair core is a carpet 8mmfinish. With a R ratting of 0.05

1 : 5Section AA Detail 4

1 : 5Section BB detail 4

1 : 5Section AA detail 3

1 : 50Section AA

1 : 5Section BB detail 3 1 : 50

01-Basement Floor Copy 204

04

06

06

07

09

Vertical steel balustradeis secured with 2 no.10mm bolts.

04

0505

06 06

Detail 4

Detail 3

Detail 3

North

Page 3: Dunne.P_C12370316_Part K and M Audit A1

BB

AA

1

1

2

2

3

3

Plant Room

ProtectedStairs A

3000

Automatic open ing vent of1.5m2 is located on the roofabove the stairs

2750

F.F.L: +22.400

6400 6400

1360430081

014

3076

0

1685

1685

661

300

705

400

800

F.F.L: +20.622

300

03

03

05

A

A

BB

01

01

02

04

05

06

06

07

142143145146147148149150151152153

155 156 157 158 159 160 161 162 163 164 165154

F.F.L: +19.328F.F.L: +22.400

05-Third Floor17400

B A

06-Roof Level22250

Roof Parapet23700

Top of Roof25400

4850

3150

3000

1778

1090

3072

01

0202

03

04

050607

07161162163164

165

132131130129128127

05-Third Floor17400

1 2 3

06-Roof Level22250

Roof Parapet23700

Top of Roof25400

4850

3671

6400 6400

1778

1778

300

1100

300

301

2771

4450

1400

407

3710

9301104

01

02

02

03

04

05

05

06

0707

Automatic open ing vent of1.5m2 is located on the roofabove the stairs

151152

153

150149

148147

146145

144143

142141

140139

138

137136

135

The fixings for the C chanels andplasterboard is at 300mm spacings.

06-Roof Level22250

1778

301

93011

04

151

152

153

These are the 80mm stainlesssteel C chanels that make up themain structure of the partion wall.The gypum plasterboard is fixedto these C chanels. Which in turnthe C chanels are suported withhigh tention cables 10mm indiameter which are secured fromthe roof. To engineersspecifications.

0405 06

07

Wall is hiden so showoff C chanels.

A

C

C

Scale

Checked by

Drawn by

Date

Project number

Notes

As indicated

29/0

4/20

15 1

5:05

:33

Roof Level

Project 4

Project No. 4

Part K/M Stairs

12-02-15

Patrick Dunne

Checker

137

01-External Wall.The external wall is roughly 325mm thick precastconcrete panal.100mm of concrete , Breather membrain , 125mm ofkingspan ridgid insulation , Vaipour Barrior , 100mm ofconcrete. With a polished concrete finish.

02-Internal stair core.The internal concrete stair core walls are 300mmthick with a polished concrete finish.03-Floor finishes for roof landing.The floor finish for the roof stair core is a 6m non sliprubber. With a R ratting of 0.05 .

05-Sub landings.The stairs are made of reinforced precast concrete with a8mm carpet finish and 1790mm in width.With a R ratting of 1.5.Complying with part K/M of the technical guidancedoctument.

07-Internal partition wall.The internal stud partition wall is made up of alluminiumC channels 80mm , with Gypsum plaster board 12.5mmeither side with a skim coat wet plaster finish. Suportedwith high tention cables 10mm in diameter which aresuspened from the roof.The tention cables are incasedin a steel sheeting.

06-Handrails.The handrails ard made up stainless steel verticals50mm with glazing and a stell handrail. The steel verticalbalustrades are secured with 2 no. 10mm diameter boltsand 2 no. 82 x 42 x 10mm steel fixings. Which areconected back to a steel plate that is fixed to the precastconcrete stairs with 3no. 10mm diameter bolts and asteel plate.Complying with part K/M of the technical guidancedoctument.To engineers specifications

04-Stairs.The stairs are made of reinforced precast concrete with a8mm carpet finish and 1790mm in width.Rise of 160mm and a going of 300mm.With 40mm nosing on the first and last step and acarburudum strip on every other step. Also a hazardwarning strip at the top and bottom of every flight of stairs.With a R ratting of 1.5.Complying with part K/M/B of the technical guidancedoctument.

Key Plan

1 : 5006-Roof Level

North

1 : 50Section AA Roof Level

1 : 50Section BB roof

1 : 10Section AA Partition Wall Detail

1 : 10Section BB Cable Detail

1 : 20Section BB Roof Partition

These are the 80mm stainlesssteel C chanels that make upthe main structure of thepartion wall. The gypumplasterboard is fixed to these Cchanels. Which in turn the Cchanels are suported with hightention cables 10mm indiameter which are securedfrom the roof. To engineersspecifications.

Paartition WallDetail

Partition Wall Detail