dugald river - oz minerals · dugald lode hw shear schist calcsilicates slate massive slate...

17

Upload: others

Post on 19-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for
Page 2: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

DUGALD RIVER

•Location:Queensland,Australia

•Orebodytype:Sediment-hostedzinc

leadsilvermineralisation

•Primarymetal:Zinc

•Proposedminingmethod:Mechanised

undergroundopenstoping

•Expectedminelife:16+years

•Resource(containedmetal):

5.8milliontonneszinc

1.0milliontonneslead

67.8millionouncessilver

Page 3: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

DUGALD RIVER

Page 4: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

Cloncurry airport

Cloncurry township

Yurbi Railloading facility

To Mount Isa

Dugald River deposit

LegendWaterPipelinefromLakeJulius

toErnestHenryMine

Possiblepowerlineextension

toDugald

Existingpowerlinefrom

MountIsatoErnestHenry

MountIsatoTownsvilleRailway

BourkeDevelopmentRoad

25 50

•Oneoftheworld’smostattractivezincdeposits.

•Large,highgraderesource:47.9milliontonnes

at12.1%zinc,2.1%leadand44gramsper

tonnesilver.

•Incloseproximitytoinfrastructureandservices.

•Pre-feasibilitystudycompletedDecember2006.

•Feasibilitystudyintothedevelopmentofa

200,000pazincmetalmineinitiatedinearly2007.

DUGALD RIVER

Kilometres

0

N

Page 5: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

LegendDugaldLode

HWShear

Schist

Calcsilicates

SlateMassive

SlateCalcareous

Limestone

metres

0 100 200

DUGALD RIVER

•Drillingisbeingcarriedoutforresource

definitionandmetallurgicaltestwork

•Amenabletoundergroundopenstoping,high

recoveryratesachievablewithconventional

crushing,grindingandflotation.

•Preliminarymarketingstudiesconfirmdemand.

Page 6: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

•Projectteamrecruited

•Explorationcampandassociated

infrastructureinplace.

DUGALD RIVER

Page 7: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

DUGALD RIVER

•Constructionlogisticsstudyhasconfirmed

feasibilityofoff-shoremodularconstruction.

•Significantcopperintersectionsandoutcrops

identifiedandpotentialisbeingassessed.

Page 8: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

•Twotypesoflead-zincdepositsought:

1.Century/MtIsa-style

2.Vein-style

•2761.987squarekilometres

ofexplorationtenements

CENTURY DISTRICT

139

°

139.

4 °

-18.4 °

-18.8 °

-19.2 °

138.

2 °

138.

6 °

CENTURYMINING LEASE

20 kmsAustralia GDA94

WANGUNDASmartrans JV

CONSTANCE RANGEICON Resources JV

EPM10544 LAWN HILL

EPM 14716

EPM 15283

EPM 14717

Page 9: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

CENTURY MINE 20PERCENTOFEMPLOYEESAREFROMLOCALINDIGENOUSGROUPS

Page 10: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

CENTURY REGIONAL CENTURYANDMTISA-STYLE

•CRCProjectcompletedoverthree

yearswiththefollowingoutcomes:

•Improvedunderstandingofthearchitecture

(seismicand3Dmodelling);

•Understanding,throughreversefluidand

stressfieldmodelling,ofhowmineralising

fluidscirculated;

•Apictureofthegeochemicalhaloofthedeposit;

•Targetsgeneratedfromacombination

oftheabove.

Page 11: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

•Stressandfluidflowmodellingundertaken

bytheCSIRO

CENTURY REGIONAL CENTURYANDMTISA-STYLE

Page 12: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

•Located2kilometerssouthwest

oftheCenturypit.

•Periodicallyworkedfrom1887to1980

producing2,653tonnesoflead

•Recentdrillinghasfocusedon:

- Definingaresource

Resourcefortheareaaroundtheoldworkings

expectedtobeannouncedQ22008

- Findingextensions

Extensionshavebeenfoundtothenortheast

alongstrike,upto200mfromtheoldworkings.

Thedepositisstillopeninthisdirectionand

atdepth.

CENTURY DISTRICT VEIN-STYLEPROSPECTS-SILVERKING

Page 13: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

CENTURY DISTRICT SILVERKING

Page 14: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

Silver King

Watsons Lode

Silver Star

Century Orebody Outline

Stars and Stripes

Silver Hills

Mended Hill

•Othervein-styleprospects

aretobetested2008

CENTURY DISTRICT VEIN-STYLEPROSPECTS

Page 15: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

•A$19m,three-yearexplorationprogram

commencedin2006withtheintentionof

increasingtheRoseberyMineresources.

•Impressiveinitialresultsexpandedthe

resourceby65%to11.7milliontonnes

•Furtherresourceupgradesareexpected

fromthenexttwoyearsofthisprogram.

ROSEBERY DISTRICT PROJECTHORIZONS

Page 16: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

ROSEBERY DISTRICT PROJECTHORIZONS

Page 17: DUGALD RIVER - OZ Minerals · Dugald Lode HW Shear Schist Calcsilicates Slate Massive Slate Calcareous Limestone metres 0 100 200 DUGALD RIVER • Drilling is being carried out for

ROSEBERY DISTRICT REGIONALEXPLORATION

•Focusonfindingnew,highgradelead-zinc

andcopperdepositsintheprospective

MtReadVolcanics

•AlliancewithBassMetalstoexplore

theHellyerMineLeases

•258.04squarekilometresoftenements