Page 1: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

CDPHCalifornia Department of Public Health

Dual Plumbed Systemsand

Cross Connection Control

Nov 9, 2010

Page 2: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Dual Plumbed SystemsPresented by Randy Barnard Drinking Water ProgramCalifornia Department of Public Health

Page 3: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

CDPH, Drinking Water ProgramBesides regulating public drinking water systems,CDPH:

Established Water Recycling Criteria (Title 22) which outline treatment and reuse requirements

Established Cross-Connection Control Regulations (Title 17) to protect public water supplies

On-going involvement with cross-connection control issues

Reviews new and emerging treatment technologies Collects fees from project applicants

Page 6: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Uses of Recycled WaterAccording to Title 22, Section 60307

Disinfected tertiary recycled water: Flushing toilets and urinals Commercial laundriesDecorative fountains Priming drain traps Industrial process water

Page 7: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Dual Plumbed SystemsAccording to Title 22, Section 60301.250

Means a system with separate piping for recycled water and potable water within a facility.And the recycle water serves Plumbing outlets (not fire) within a building

or Outdoor landscape irrigation at residences.

Page 8: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Not Allowed Dual PlumbedToilet and urinal flushing in mental facilities. (Section 13554(a))

Inside facilities that produce/process food. (Section 60313(c))

Internal individually-owned residential units (except for fire). (Section 60313(b))*

*Conflicts with new 2007 statue 13553

Page 9: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Recycled Water and CondosAccording to CA Water Code, Section 13553

(New statue not reflected in regs yet!)

RW may be used in condos if Title 22 Engineering report Backflow protection of drinking water Appropriate modifications Cross connection testing Maintain records Condo declaration stating RW use

Page 10: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

New CA Plumbing CodeCode Chapter 16 - Part II

California Dual Plumbing Code established statewide standards for installing both potable and recycled water plumbing systems in commercial, retail, and office buildings, theaters, auditoriums, condominiums, schools, hotels, apartments, barracks, dormitories, jails, prisons, and reformatories.

The new code will be effective January 2011.

Page 11: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Title 22 Engineering ReportSection 60323 (general) Qualified, CA PE engineer with wastewater

experience. Design description. Indicate means for

compliance with regs. Contingency plan assuring

only treated RW to use areas.

Page 12: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Title 22 Engineering ReportSection 60314 (Dual plumbed specific) Details of:Number, location, and type of facilities in use

area.Ave number of persons served daily.Boundaries including maps.List of operation personnel at each facility.RW use at each use area.

Page 13: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Title 22 Engineering ReportSection 60314 (Dual plumbed specific) Plans and Specs including:Proposed piping system.Pipe locations for RW and PW.Type and location of fixtures accessible to

public.Back flow prevention methods.

Description of cross connection prevention methods.

Page 14: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Other Key Points of Dual PlumbedPW back up supply only allowed via an air-gap separation.Report back flow incidents to CDPH <24 hours.

Page 15: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Other Key Points of Dual PlumbedBack flow devices inspected/maintained.Cross Connection inspections (visual) Before system S/U Annually

Cross Connection tests (physical) Every 4 years

Page 16: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Cross Connection ControlInternal Dual Plumbed

Presented by Brian Bernados Drinking Water ProgramCalifornia Department of Public Health

Page 17: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

•Title 17: Backflow Protection

Reasons for Backflow Protection Water user’s onsite activities pose a

health risk to the water supply if access is provided.

Many involve Increase threat of cross-connections (dual plumbed, graywater, recycled water systems)

Page 18: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Backflow Prevention

Usually Nothing HappensIts Big News When it Does HappenMultiple Things Go WrongNeed Water and ContaminantsSomething is plumbed wrongHumans Aren’t Paying AttentionIt Happens

Page 19: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Poorly Plumbed Fixtures

The public had been drinking recycled water for several years from a drinking fountain before this was discovered.

This was found through a pressure shutdown testing procedure.

Page 20: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Title 17 RegulationsPWS must install backflow protection assemblies approved by the CDPH. (a list of approved assemblies is available)Annual testing is required of Backflow Assemblies; defective assemblies must be replaced or repaired with approved parts/assemblies

Page 21: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

What Happens Beyond the meter?

Location of Backflow Protection - Generally, located as close as practicable to user’s connection (typically at the meter).Protects public distribution systemLeaves the on-site system vulnerable to potential for cross-connections

Page 22: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Tertiary Recycled Water is Highly Treated, But Not Potable

Page 23: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Recycled Water Systems

CROSS-CONNECTION TESTS ARE IMPORTANT!!! Tracer, Pressure or Shut-down Test Visual Inspections Plan Check/As- builts On-site Supervisor Training Signs

Page 24: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

1620A.0 Inspection and Testing.(a) Initial cross-connection test before the initial operation

system; (b) an annual visual system inspection; (c) a cross-connection test every 4 years; (d) a cross-connection test when there is material reason to

believe that the potable water and/or recycled water system separation has been compromised;

A material reason to believe that the system has been compromised may be based on, but is not limited to, evidence gathered: (a) during a visual inspection, or (b) as a result of an inspection performed following complaints of water quality or flow conditions consistent with a compromised system

(e) a cross-connection test following remediation of a discovered cross-connection.

Page 25: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Annual Visual System Inspection.

A visual inspection shall be conducted annually by the Authority Having Jurisdiction or other authorities having jurisdiction.

(i) Recycled water & potable water meters are checked to verify that no modifications were made, and that no cross-connections are visible.

(ii) Check all pumps & equipment, room signs, and exposed piping.

(iii) Check all valves ensure that valve lock seals are still in place and intact. All valve control door signs shall be checked to verify that no signs have been removed.

(iv) If the visual inspection indicates that the recycled water plumbing has been modified, a Cross-Connection Test is required.

Page 26: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

“Cross-Connection Test” 1st halfPotable water is activated and pressurized. Recycled water is shut down and completely depressurized.Potable remains pressurized while the recycled water system is depressurized. Time period the recycled water system is to remain depressurized is case-by-case, taking into account the size and complexity of the potable and recycled water distribution systems, (typically at least one hour). All fixtures, potable & recycled, are checked for flow. Flow from any recycled outlet indicates a cross-connection. No flow from a potable outlet indicates it is connected to the recycled water system.

Page 27: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

“Cross-Connection Test” 2nd halfPotable water is completely depressurized. Recycled water is activated and pressurized. (For the initial test, a temporary connection to potable is required to test the recycled plumbing. At the conclusion, the temporary connection is disconnected.Recycled remains pressurized while the potable is depressurized. Time period is case-by-case, (typ. at least 1 hour). All fixtures, potable & recycled, are checked for flow. Flow from any potable outlet indicates a cross-connection. No flow from a recycled outlet indicates it is connected to the potable water system.

Page 28: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Cross-Connection Discovered(i) Shut down recycled water piping at the meter, and the

recycled water riser shall be drained. (ii) Shut down potable water to the building at the meter. (iii) The cross-connection shall be uncovered and disconnected. (iv) The building shall be retested. (v) Potable water system is chlorinated with 50 ppm 24 hours. (vi) The potable water system is flushed after 24 hours, and a

standard bacteriological test shall be performed. If test results are acceptable, the potable water system may be permitted to be recharged.

Notify water agency, CDPH, County DEH, RWQCB.

Page 29: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

Authority Having JurisdictionTest shall be conducted in the presence of the Authority Having Jurisdiction or other authorities having jurisdiction to determine whether a cross-connection occurred. Authority Having Jurisdiction = CDPHAlternate inspection and testing requirements may be allowed by the Authority Having Jurisdiction for residential, institutional or industrial buildings where shutting off the water is not practical. With CDPH approval -The recycled water purveyor or other designated appointee may substitute for the Authority Having Jurisdiction in the above mentioned inspection and tests. CDPH may delegate to the County DEH.

Page 30: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

County of San Diego

Recycled Water Plan Check and Inspection ManualSpecific details of the two methods can be found in this manual.Good reference

Page 31: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

DHS Oversight Options

Public Notification if cross connection occurs Require Preparation of Plans/ReportsPreferred Approaches Technical Assistance Guidance/Education Stress the Importance of Public Perception and

Education – What do customers want in the water they drink???

Page 32: Dual Plumbed Systems and Cross Connection Control (California Department of Public Health)

The EndQuestions?