dual concentric procedure

30
Schlumberger Private Dual Concentric Installation E. Jamieson Project Engineer Schlumberger

Upload: randy-blackburn

Post on 01-Oct-2015

22 views

Category:

Documents


0 download

DESCRIPTION

producion en campos petroleros

TRANSCRIPT

Main Presentation Title (42 pt Univers 57 Condensed)Schlumberger Private
© Schlumberger 2004
An asterisk is used throughout this presentation to denote a mark of Schlumberger. Other company, product, and service names may be trademarks, registered trademarks, or service marks of others.
Dual Concentric Installation
3. Set standing valve in lower completion nipple
Schlumberger Private
Click to begin
Schlumberger Private
1. Make up and RIH with completion tailpipe and Pod casing
2. Set plug in tailpipe nipple
Schlumberger Private
Schlumberger Private
Schlumberger Private
7. Make up Pod hanger to ESP and attach cable penetrator
Schlumberger Private
Schlumberger Private
3. Make up Pump Support Sub
Schlumberger Private
Schlumberger Private
6. Pressure test tubing
Schlumberger Private
Schlumberger Private
11. Pressure test outer tubing
Schlumberger Private
Schlumberger Private
1. Make up the stinger assembly and RIH with inner production tubing
2. Space Out and land assembly
Schlumberger Private
4. Pressure test inner tubing
Schlumberger Private
6. Continue to nipple down BOP, nipple up Xmas tree
Schlumberger Private