    Top Drive Rig Up Incident - 9 August 2005Jingemia 6 - North Perth Basin

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    2/13

    Top Drive Rig Up Incident - 9 August 2005

    Jingemia 6 - North Perth Basin

    Well Jingemia 6

    Rig Ensign Rig 16

    Activity Install Varco TDS11S Top Drive on ODE Rig 16

    Mast Ideco Full View - 136ft clear height

    Crew Normal rig crew plus 4 Indonesian Varco rig-upcrew

    Weather Cool / cold and windy with rain squalls

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    3/13

    Top Drive Rig Up Incident - 9 August 2005Jingemia 6 - North Perth Basin

    Sequence of Events 08:30 hr s Work Permit issued Top drive picked up to f loor Guide beam picked up Experienced diff icult ies with t op drive clearance when

    at t empt ing to connect t he hanger link

    Approx. 18:10 hrs decide to change out short hanger linkfor long version Varco operator (IP) st anding on top cross brace below

    crown Varco operator with radio on monkey board wit h line of

    sight t o operator near crown and Supervisor on floor Varco Supervisor with radio and one operator next t o

    Ensign crewman operating winch

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    4/13

    Top Drive Rig Up Incident - 9 August 2005

    Jingemia 6 - North Perth Basin

    Guide BeamHanger Link

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    5/13

    Top Drive Rig Up Incident - 9 August 2005

    Jingemia 6 - North Perth Basin

    Hanger

    GuideBeam

    Sheave

    IP Standing onThis Beam

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    6/13

    Top Drive Rig Up Incident - 9 August 2005

    Jingemia 6 - North Perth Basin Sequence of Events

    Removed short link and lowered to f loor wi t h main winch

    Picked up long link and raised to near monkey board withmain winch

    St opped winch and manoeuvred link past t op drive &monkey board fingers

    Varco operator on monkey board called to operator atcrown for clearance to recommence hoist ing

    On receipt of clearance he called the Varco Supervisor onthe floor who passed the inst ruct ion to the winchoperator

    Load raised approx. 1/2m before a scream heard from the

    IP at t he crown at approx. 18:30 hrs

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    7/13

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    8/13

    Top Drive Rig Up Incident - 9 August 2005

    Jingemia 6 - North Perth Basin Sequence of Events

    IP incurred a de-gloving inj ury with subst ant ial damageto forearm tendons

    Subsequent ly had four f ingers of left hand amputat ed atf irst knuckle f rom palm plus surgery t o forearm to address

    tendon damage Total 89 days lost t ime

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    9/13

    Top Drive Rig Up Incident - 9 August 2005

    Jingemia 6 - North Perth Basin

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    10/13

    Top Drive Rig Up Incident - 9 August 2005

    Jingemia 6 - North Perth Basin Investigation

    Permit to Work issued at 08:30 hrs, incident occurred at

    approx. 18:30 hrs Varco crew on shif t from 06:00 hrs. Permit cont inued through crew change, Permit Authority

    change out , dusk JHA prior to issue of PTW consisted of 6 lines and was not

    reviewed at any t ime between issue and the incident JHA did not address issue of potential language difficulty

    though this was informally discussed

    Change out of link was not subj ect t o a JHA Discussions had t aken place but were not documented IP had been in t he mast for approx. 3 hrs

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    11/13

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    12/13

    Top Drive Rig Up Incident - 9 August 2005

    Jingemia 6 - North Perth Basin Corrective Actions

    Operations suspended for 36 hrs and trauma counselling

    provided for ODE & Varco crews Held meet ing wi th all sit e personnel prior t o

    recommencing operat ions Re-it erat ed and re-enforced the need for detailed JHAs;

    the JHA for subsequent installation of the hanger linkalone was 18 l ines

    Re-it erat ed and re-enforced requir ement for JHAs to bereviewed when condit ions change

    Re-it erat ed and re-enforced requirements for WorkPermit s t o t erminate on crew change or permit Authorit ychange

  • 7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave

    13/13

    Top Drive Rig Up Incident - 9 August 2005

    Jingemia 6 - North Perth Basin Corrective Actions

    Review procedures t o include specif ic climat ic condit ionswhere appropriat e in work orders

    Investigate use of enclosed safety becket type sheaves forall applicat ions

    Invest igat e use of cont rolled descent device t o facilit at eretr ieval of inj ured personnel from mast

    Include fat igue management in fut ure Ice Breakers

    Develop t raining program for Wellsit e Permit t o Workusers