Top Drive Rig Up Incident - 9 August 2005Jingemia 6 - North Perth Basin
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
2/13
Top Drive Rig Up Incident - 9 August 2005
Jingemia 6 - North Perth Basin
Well Jingemia 6
Rig Ensign Rig 16
Activity Install Varco TDS11S Top Drive on ODE Rig 16
Mast Ideco Full View - 136ft clear height
Crew Normal rig crew plus 4 Indonesian Varco rig-upcrew
Weather Cool / cold and windy with rain squalls
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
3/13
Top Drive Rig Up Incident - 9 August 2005Jingemia 6 - North Perth Basin
Sequence of Events 08:30 hr s Work Permit issued Top drive picked up to f loor Guide beam picked up Experienced diff icult ies with t op drive clearance when
at t empt ing to connect t he hanger link
Approx. 18:10 hrs decide to change out short hanger linkfor long version Varco operator (IP) st anding on top cross brace below
crown Varco operator with radio on monkey board wit h line of
sight t o operator near crown and Supervisor on floor Varco Supervisor with radio and one operator next t o
Ensign crewman operating winch
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
4/13
Top Drive Rig Up Incident - 9 August 2005
Jingemia 6 - North Perth Basin
Guide BeamHanger Link
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
5/13
Top Drive Rig Up Incident - 9 August 2005
Jingemia 6 - North Perth Basin
Hanger
GuideBeam
Sheave
IP Standing onThis Beam
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
6/13
Top Drive Rig Up Incident - 9 August 2005
Jingemia 6 - North Perth Basin Sequence of Events
Removed short link and lowered to f loor wi t h main winch
Picked up long link and raised to near monkey board withmain winch
St opped winch and manoeuvred link past t op drive &monkey board fingers
Varco operator on monkey board called to operator atcrown for clearance to recommence hoist ing
On receipt of clearance he called the Varco Supervisor onthe floor who passed the inst ruct ion to the winchoperator
Load raised approx. 1/2m before a scream heard from the
IP at t he crown at approx. 18:30 hrs
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
7/13
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
8/13
Top Drive Rig Up Incident - 9 August 2005
Jingemia 6 - North Perth Basin Sequence of Events
IP incurred a de-gloving inj ury with subst ant ial damageto forearm tendons
Subsequent ly had four f ingers of left hand amputat ed atf irst knuckle f rom palm plus surgery t o forearm to address
tendon damage Total 89 days lost t ime
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
9/13
Top Drive Rig Up Incident - 9 August 2005
Jingemia 6 - North Perth Basin
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
10/13
Top Drive Rig Up Incident - 9 August 2005
Jingemia 6 - North Perth Basin Investigation
Permit to Work issued at 08:30 hrs, incident occurred at
approx. 18:30 hrs Varco crew on shif t from 06:00 hrs. Permit cont inued through crew change, Permit Authority
change out , dusk JHA prior to issue of PTW consisted of 6 lines and was not
reviewed at any t ime between issue and the incident JHA did not address issue of potential language difficulty
though this was informally discussed
Change out of link was not subj ect t o a JHA Discussions had t aken place but were not documented IP had been in t he mast for approx. 3 hrs
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
11/13
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
12/13
Top Drive Rig Up Incident - 9 August 2005
Jingemia 6 - North Perth Basin Corrective Actions
Operations suspended for 36 hrs and trauma counselling
provided for ODE & Varco crews Held meet ing wi th all sit e personnel prior t o
recommencing operat ions Re-it erat ed and re-enforced the need for detailed JHAs;
the JHA for subsequent installation of the hanger linkalone was 18 l ines
Re-it erat ed and re-enforced requir ement for JHAs to bereviewed when condit ions change
Re-it erat ed and re-enforced requirements for WorkPermit s t o t erminate on crew change or permit Authorit ychange
-
7/31/2019 Drillsafe Forum Sep06 Origin Top Drive Rigup Jingemia6 Sheave
13/13
Top Drive Rig Up Incident - 9 August 2005
Jingemia 6 - North Perth Basin Corrective Actions
Review procedures t o include specif ic climat ic condit ionswhere appropriat e in work orders
Investigate use of enclosed safety becket type sheaves forall applicat ions
Invest igat e use of cont rolled descent device t o facilit at eretr ieval of inj ured personnel from mast
Include fat igue management in fut ure Ice Breakers
Develop t raining program for Wellsit e Permit t o Workusers