Drilling Operational Excellence Success Through a Team Approach
Oliver Massmann – Partner, General Director
www.duanemorris.com 2 www.duanemorris.com
• Drilling & Completion operations are very costly
• Huge amounts of pre-planning go into D&C campaigns
• Why is it then that Drilling Operational Excellence is often just an afterthought?
Introduction
www.duanemorris.com 3 www.duanemorris.com
The REACH Group
3
www.duanemorris.com 4 www.duanemorris.com
• Formed in 2000
• Over 100 Clients in 43 countries
• World Leaders in : – Performance Optimisation
– World Class Safety Culture
– Leadership Development
• Focused on Upstream O&G
• Strong Local Presence in Asia Pacific for 14 years.
The REACH Group
www.duanemorris.com 5 www.duanemorris.com
• Prominent Operator in SEA
• Tried Performance Optimisation Before With Limited Success
• Today I am happy to report that they are succeeding in improving Performance
• WHY???
• Because of their TEAM Approach.
Case Study
www.duanemorris.com 6 www.duanemorris.com
• 4 Well Campaign – Jack-Up Rig
• 35 – 40 Day Wells
• First Well = 5.11 Days Ahead of AFE
• Last Well = 13.03 Days Ahead of AFE
• $3.53MM in Offline Operations Savings (226hrs)
• $6.3MM Invisible Lost Time (ILT) Captured (429hrs)
• $9.8MM – Value of Lessons Learned
• $4.88MM Savings on last well on spread rate alone.
Real Results
www.duanemorris.com 7 www.duanemorris.com
Real Results
88.6% Improvement
www.duanemorris.com 8 www.duanemorris.com
Real Results
8
117% Improvement
www.duanemorris.com 9 www.duanemorris.com
Real Results
9
39.45% Improvement
www.duanemorris.com 10 www.duanemorris.com
Real Results
10
www.duanemorris.com 11 www.duanemorris.com
Real Results
11
47.2% Below Planned AFE
www.duanemorris.com 12 www.duanemorris.com
Real Results
12
44.8% Improvement
www.duanemorris.com 13 www.duanemorris.com
Real Results
13
www.duanemorris.com 14 www.duanemorris.com
Real Results
14
www.duanemorris.com 15 www.duanemorris.com
What do all these companies have in common to achieve great results?
A TEAM APPROACH
15
www.duanemorris.com 16 www.duanemorris.com
• Strong focus on Pre-Planning
• Well Delivery Process (WDP) or Well Delivery Assurance (WDA)
• Statement of Requirements (SoR)
• Basis of Design (BoD)
• Peer Reviews
• All great tools yielding huge $ savings
• BUT – big prize also exists in operations
Drilling & Completion Operations Typical Approach
16
www.duanemorris.com 17 www.duanemorris.com 17
The Circles of Success
All three aligned = ideal performance culture People
Technology Process
www.duanemorris.com 18 www.duanemorris.com
WORK THE PROCESS
BECAUSE THE PROCESS WORKS!
18
The Process
www.duanemorris.com 19 www.duanemorris.com
The process in this case comes under many names:
– Performance Optimisation
– Continuous Improvement
– Technical Limit (TL)
– Drilling the Limit (DTL)
– Operational Excellence (OE)
– Drilling Improvement Process (DIP)
– Six Sigma.
The Process
19
www.duanemorris.com 20 www.duanemorris.com
The Process
20
www.duanemorris.com 21 www.duanemorris.com
• Operators need to focus on Operational Performance Improvement ($$$)
• Must have a Structured Methodology to implement this
• Critical to have the right TEAM and the right APPROACH in order to succeed
• A successful team approach is heavily dependent on strong LEADERSHIP.
The Key Message
21
www.duanemorris.com 22 www.duanemorris.com
• Planning & Enrolment (Project kick-off)
– Engage the entire team
– Determine project Goals & Objectives
– Select Key Success Factors (KSF)
– Outline Key Performance Indicators (KPI) that feed into the KSFs
– Design a robust Implementation Plan (Roadmap)
– Led from the top, and done as a team.
Performance Improvement 1
22
www.duanemorris.com 23 www.duanemorris.com
• Leadership Workshop
– Best opportunity to involve all the key stakeholders (operator, contractor, service companies etc.) before implementation
– Agree on defined Goals & Objectives
– Review and confirm all KSFs and KPIs
– Validate Implementation Plan
– This is where the Leaders need to start “waking the talk” and leading by example.
23
Performance Improvement 2
www.duanemorris.com 24 www.duanemorris.com
• Drill / Complete / Test the Well on Paper (DWOP / CWOP / TWOP) – This is NOT a Pre-Spud Meeting
– Need to involve all key stakeholders
– Needs to be held early enough before spud
– Break down well / operations into hole sections / phases
– Build a culture of challenge
– Identify offline operations, opportunities, main risks
– Determine target times
– Develop Action List
– Develop Action Plan to be implemented at the rig site to drive optimal performance.
Performance Improvement 3
24
www.duanemorris.com 25 www.duanemorris.com
• Implementation – Heart of the PO process
– PLAN “Plan the battle, don’t battle the plan”
– DO “Give people the right information at the right
time in order for them to make the right decisions”
– MEASURE “What gets measured gets done”
– LEARN “Insanity: doing the same thing over and over
again and expecting a different result”
• Team approach and strong leadership critical here as well.
Performance Improvement 4
25
www.duanemorris.com 26 www.duanemorris.com
• Sustainability
– Start with the end in mind
– Create a sustainability plan
– Train key people to take over the Performance Roles
– Periodic Health Checks.
26
Performance Improvement 5
www.duanemorris.com 27 www.duanemorris.com
• Junior Drilling Engineer Syndrome
• Office based initiative
• Lack of qualified personnel
• No Implementation Plan
• Lack of greater involvement
• No visibility
• Not celebrating success
• Poor Teamwork & Weak Leadership
27
Potential Traps
www.duanemorris.com 28 www.duanemorris.com
• Quality planning
• Operational Best Practices
• Effective Knowledge Management
• Consistent top quartile performance
• Visibility of Results
• Celebrating Success
• Leaders Walking the Talk
• Engaged, Involved, Happy Team
What Does Success Look Like?
28
www.duanemorris.com 29 www.duanemorris.com
What Does Success Look Like?
29
www.duanemorris.com 30 www.duanemorris.com
Even More Important in a Time of Crisis in our industry
30
$ bbl
www.duanemorris.com 31 www.duanemorris.com
Thank you !